CN105178289B - Precast dewatering pile tube and its application method in building foundation pit - Google Patents

Precast dewatering pile tube and its application method in building foundation pit Download PDF

Info

Publication number
CN105178289B
CN105178289B CN201510654291.0A CN201510654291A CN105178289B CN 105178289 B CN105178289 B CN 105178289B CN 201510654291 A CN201510654291 A CN 201510654291A CN 105178289 B CN105178289 B CN 105178289B
Authority
CN
China
Prior art keywords
pile tube
precast dewatering
precast
dewatering pile
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510654291.0A
Other languages
Chinese (zh)
Other versions
CN105178289A (en
Inventor
王志龙
李洪
周俊
宋孟琳
施麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI SECOND CONSTRUCTION Co Ltd
Original Assignee
JIANGXI SECOND CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI SECOND CONSTRUCTION Co Ltd filed Critical JIANGXI SECOND CONSTRUCTION Co Ltd
Priority to CN201510654291.0A priority Critical patent/CN105178289B/en
Publication of CN105178289A publication Critical patent/CN105178289A/en
Application granted granted Critical
Publication of CN105178289B publication Critical patent/CN105178289B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Invention is related to precast dewatering pile tube and its application method in a kind of building foundation pit, and the precast dewatering pile tube is hollow cylindrical shape, including tube wall and taper pile top, and the top of the tube wall has been spaced multiple permeable holes.Cartridge filter, and the upper end open of the cartridge filter, lower end closed are provided with inside the precast dewatering pile tube.The application method of precast dewatering pile tube comprises the following steps successively:(1) previously fabricated precast dewatering pile tube;(2) total quantity, the arrangement spacing of the precast dewatering pile tube are determined;(3) precast dewatering pile tube is installed, and water filling cleaning is carried out by root;(4) immersible pump and outlet pipe are put into the precast dewatering pile tube;(5) stop immersible pump drawing water, borehole cleaning, cement injection mortar, part of cement mortar by permeable hole to exosmosis and with soil solidifying outside the precast dewatering pile tube.Present invention reduces the tube well construction duration, while precast dewatering pile tube is changed into uplift pile, the anti-floating performance of precast dewatering pile tube is improved.

Description

Precast dewatering pile tube and its application method in building foundation pit
Technical field
The present invention relates to the realm of building construction, and in particular to be precast dewatering pile tube and its to be used in a kind of building foundation pit Method.
Background technology
In correlation technique, well-point dewatering method is a kind of method of artificial dewatering, because well-point dewatering method is applicable In the construction environment that level of ground water is higher or precipitation is more, digging base is unstable compared with deep, crater wall, the earthwork is now widely used in In engineering.Before excavation of foundation pit, precipitation pipe well and embedded well-point pipe are made in the drilling of foundation ditch surrounding, dewatering construction workload is big, and drop Well-point pipe is thrown aside after water is completed, and causes the waste of resource.
The content of the invention
In view of the above-mentioned problems, it is an object of the invention to provide precast dewatering pile tube and its application method in building foundation pit, solution Certainly dewatering construction workload is big, and well-point pipe is thrown aside after the completion of base pit dewatering, causes the technical problem of the wasting of resources.
In order to solve the above technical problems, the technical solution adopted by the present invention is divided into precast dewatering pile tube and institute in building foundation pit State the application method of precast dewatering pile tube.
The precast dewatering pile tube is a kind of engineering pile, is hollow cylindrical shape, including tube wall and taper pile top, the pipe The top of wall has been spaced multiple permeable holes.The cartridge filter of hollow cylindrical, and institute are provided with inside the precast dewatering pile tube The underground water stated outside the upper end open of cartridge filter, lower end closed, the precast dewatering pile tube enters precast dewatering by permeable hole In pile tube, enter after the filtering of cartridge filter in the cartridge filter, and the silt in underground water is intercepted in the tube wall Between surface and cartridge filter.
The precast dewatering pile tube carries out borehole cleaning, slip casting after construction is finished to it, treats that part of cement slurry passes through permeable hole Permeate and with soil solidifying outside the precast dewatering pile tube, the precast dewatering pile tube is changed into uplift pile, for foundation ditch provides enough Enough supports, improve the anti-floating performance of precast dewatering pile tube.
Preferably, the cross section of the permeable hole is horn-like, and cross section outer surface of the diameter along tube wall to interior Surface direction is gradually decreased.
Preferably, the external diameter of the permeable hole is 20mm, internal diameter is 8mm.
Preferably, the permeable hole is arranged in the area from the upper table of precast dewatering pile tube 40cm~60cm downwards In domain.
Preferably, the permeable hole uses prefabricated mould pore-forming.
Preferably, the inner surface of the taper pile top is provided with fixture, the cartridge filter is by connecting the fixture It is fixed in the precast dewatering pile tube.
Preferably, the lower end of the cartridge filter is the taper that size matches with the taper pile top, the cartridge filter Lower end be embedded in the taper pile top, so that cartridge filter is fixed in the precast dewatering pile tube.
The application method of precast dewatering pile tube, comprises the following steps successively in building foundation pit:(1) previously fabricated precast dewatering Pile tube, the diameter of the precast dewatering pile tube is determined according to the size of site operation environment and required draining pump;(2) base area is surveyed Report and Foundation Pit Support Design file, determine total quantity, the arrangement spacing of the precast dewatering pile tube;(3) precast dewatering is installed Pile tube, and water filling cleaning is carried out by root to the precast dewatering pile tube;(4) immersible pump is put into the precast dewatering pile tube and is gone out Water pipe, is first tested, and determines that the precast dewatering pile tube can formally proceed by draining operating after normal pumping, draining;(5) Construction finish after, stop immersible pump drawing water, carry out borehole cleaning processing, cement injection mortar, part of cement mortar by permeable hole to Exosmosis and with soil solidifying outside the precast dewatering pile tube.
Preferably, precast dewatering pile tube installation site is away from structural column and shear wall described in step (3).
Preferably, the upper surface of precast dewatering pile tube described in step (5) has poured bottom board concrete, the bottom board concrete closing The precast dewatering pile tube.
Beneficial effects of the present invention:The precast dewatering pile tube on engineering pile basis is inserted directly into foundation ditch by the present invention, is formed Well casing is installed while pipe well, the construction procedure for carrying out well casing installation again in foundation ditch internal drilling is save, shortens tube well construction work Phase.The mud of construction pipe well is a part for construction rubbish, and base is inserted directly into using the precast dewatering pile tube for belonging to engineering tubular pile Precipitation is carried out in hole can efficiently reduce the discharge of mud, reduce the influence to environment, realize civilized construction, green construction. In addition, construction finish after, to precast dewatering pile tube carry out borehole cleaning, slip casting, part of cement mortar by permeable hole to exosmosis simultaneously With soil solidifying outside the precast dewatering pile tube, precast dewatering pile tube is changed into uplift pile, enough supports are provided for foundation ditch, carried The high anti-floating performance of precast dewatering pile tube.
Brief description of the drawings
Invention is described further using accompanying drawing, but the embodiment in accompanying drawing does not constitute any limitation of the invention, For one of ordinary skill in the art, on the premise of not paying creative work, it can also be obtained according to the following drawings Its accompanying drawing.
Structural representation when Fig. 1 is draining of the present invention.
Structural representation when Fig. 2 is present invention shut-in well.
Reference:1st, precast dewatering pile tube, 2, permeable hole, 3, immersible pump, 4, outlet pipe, 5, underground water, 6, bottom board concrete, 7th, slip casing by pressure pipe, 8, cement mortar, 11, pervious bed, 12, impermeable stratum.
Embodiment
The invention will be further described with the following Examples.
Precast dewatering pile tube in building foundation pit, as shown in figure 1, the precast dewatering pile tube 1 is hollow cylindrical shape, including Tube wall and taper pile top.The top of the tube wall has been spaced multiple permeable holes 2.In the present embodiment, the permeable hole Cross section is horn-like, and outer surface to inner surface direction of the diameter along tube wall of cross section is gradually decreased, the permeable hole External diameter is 20mm, and internal diameter is 8mm, is easy to underground water 5 to be rapidly discharged into precast dewatering pile tube 1.
General soil horizon is divided into pervious bed 11 and impermeable stratum 12, and underground water 5 is focused primarily upon in pervious bed 11, squeezed into After the precast dewatering pile tube 1, the permeable hole 2 is entirely located in pervious bed 11, can make it that the efficiency of drawing water of permeable hole 2 is maximum Change, so as to farthest reduce the content of base mine water 5.In the present embodiment, the permeable hole 2 is arranged in from described pre- The upper table of precipitation pile tube 1 processed is downwards in 40cm~60cm region.Now, the permeable hole 2 is entirely located in pervious bed 11, And under foundation ditch 40cm~60cm depth influence of the underground water to foundation ditch it is maximum, drain the region moisture can permeable hole 2 compared with Influence of the underground water 5 to foundation ditch is substantially reduced in the case of few, realizes that efficiency is maximized.
The inside of precast dewatering pile tube 1 is provided with the cartridge filter of hollow cylindrical, and the upper end open of the cartridge filter, under End seal is closed, and the underground water 5 outside the precast dewatering pile tube 1 is entered in precast dewatering pile tube 1 by permeable hole 2, by cartridge filter Filtering after enter in the cartridge filter, and the silt in underground water 5 is intercepted between the inner surface and cartridge filter of the tube wall. In order to prevent cartridge filter from being floated in filtering, filter efficiency is influenceed, in the present embodiment, the inner surface of the taper pile top is provided with Fixture, when manufacturing the precast dewatering pile tube 1, the cartridge filter is fixed on described prefabricated beforehand through the connection fixture In precipitation pile tube 1.In another embodiment, the lower end of the cartridge filter is the cone that size matches with the taper pile top Shape, when manufacturing the precast dewatering pile tube 1, the lower end of the cartridge filter is embedded in the taper pile top, so that will filtering Cylinder is fixed in the precast dewatering pile tube 1.
The application method of precast dewatering pile tube, comprises the following steps successively in building foundation pit:
(1) previously fabricated precast dewatering pile tube 1, according to being determined the size of site operation environment and required immersible pump 3 The diameter of precast dewatering pile tube 1.Manufacture before precast dewatering pile tube 1, pile tube hole size is considered first, it is ensured that immersible pump 3 can It is convenient and swift to be put into and reclaim.Secondly, the permeable hole 2 of the precast dewatering pile tube 1 should be opened in the range of pervious bed 11, permeable Hole 2 is made horn-like of prefabricated mould, and outer surface to inner surface direction of the diameter along tube wall of cross section gradually decrease.Institute The external diameter for stating permeable hole 2 is 20mm, and internal diameter is 8mm, and permeable hole 2 arranges 4, the permeable hole 2 along the circle of precast dewatering pile tube 1 one It is arranged in from the upper table of the precast dewatering pile tube 1 downwards 40cm~60cm region.
(2) report and Foundation Pit Support Design file are surveyed in base area, determine total quantity, the arrangement of the precast dewatering pile tube 1 Spacing.
(3) precast dewatering pile tube 1 is installed, tried one's best when the precast dewatering pile tube 1 is installed away from structural column and shear wall.It is right The precast dewatering pile tube 1 carries out water filling cleaning by root, untill flowing out clear water, it is to avoid occur " dried-up well ".
(4) immersible pump 3 and outlet pipe 4 are put into the precast dewatering pile tube 1, the connection immersible pump 3 of outlet pipe 4 will be described Outside underground water discharge foundation ditch in precast dewatering pile tube 1.Tested first before running well, determine the precast dewatering pile tube 1 whether can normal pumping, draining, whether there is the phenomenons such as gas leakage, blocking appearance.The formal work of drawing water of input after test is normal.
(5) construction is shunt in a well after finishing by the bottom board concrete set in the upper surface of precast dewatering pile tube 1, according to bottom plate Concrete construction speed closes precast dewatering pile tube 1 one by one.Set before bottom board concrete, stop immersible pump 3 first and draw water.Due to precast dewatering The bottom deposit of pile tube 1 has substantial amounts of mud, thus it is quick after stopping pumping carry out borehole cleaning processing, cement injection mortar 8 is such as schemed Shown in 2, part of cement mortar 8 by permeable hole 2 to exosmosis and with the outer soil solidifying of the precast dewatering pile tube 1, will be prefabricated Precipitation pile tube 1 is closely connected with soil layer, is solved the problem of periphery pervious bed 11 loosens caused by Precipitation Process.Finally perform bottom plate Concrete, closing precast dewatering pile tube 1, is changed into uplift pile by precast dewatering pile tube 1 and uses, enough supports are provided for foundation ditch, improves The anti-floating performance of precast dewatering pile tube.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than to present invention guarantor The limitation of scope is protected, although being explained with reference to preferred embodiment to the present invention, one of ordinary skill in the art should Work as understanding, technical scheme can be modified or equivalent substitution, without departing from the reality of technical solution of the present invention Matter and scope.

Claims (10)

1. precast dewatering pile tube in a kind of building foundation pit, it is characterised in that the precast dewatering pile tube is a kind of engineering pile, in being Empty cylindrical shape, including tube wall and taper pile top, the top of the tube wall has been spaced multiple permeable holes;The precast dewatering The cartridge filter of hollow cylindrical, and the upper end open of the cartridge filter, lower end closed, the precast dewatering pipe are provided with inside pile tube Underground water outside stake is entered in precast dewatering pile tube by permeable hole, is entered after the filtering of cartridge filter in the cartridge filter, And the silt in underground water is intercepted between the inner surface and cartridge filter of the tube wall;The precast dewatering pile tube is finished in construction Afterwards, borehole cleaning, slip casting are carried out to it, treats that part of cement slurry is permeated and solid with the soil body outside the precast dewatering pile tube by permeable hole Knot, is used as uplift pile.
2. precast dewatering pile tube in building foundation pit according to claim 1, it is characterised in that the cross section of the permeable hole To be horn-like, and outer surface to inner surface direction of the diameter along tube wall of cross section is gradually decreased.
3. precast dewatering pile tube in building foundation pit according to claim 2, it is characterised in that the external diameter of the permeable hole is 20mm, internal diameter is 8mm.
4. according to precast dewatering pile tube in any described building foundation pit of claims 1 to 3, it is characterised in that the permeable hole It is arranged in from the upper table of the precast dewatering pile tube downwards 40cm~60cm region.
5. according to precast dewatering pile tube in any described building foundation pit of claims 1 to 3, it is characterised in that the permeable hole Using prefabricated mould pore-forming.
6. precast dewatering pile tube in building foundation pit according to claim 1, it is characterised in that the inner surface of the taper pile top Provided with fixture, the cartridge filter is fixed in the precast dewatering pile tube by connecting the fixture.
7. precast dewatering pile tube in building foundation pit according to claim 1, it is characterised in that the lower end of the cartridge filter is chi The very little taper matched with the taper pile top, the lower end of the cartridge filter is embedded in the taper pile top, so that will filtering Cylinder is fixed in the precast dewatering pile tube.
8. the application method of precast dewatering pile tube in a kind of building foundation pit according to claim 1, it is characterised in that successively Comprise the following steps:(1) previously fabricated precast dewatering pile tube, institute is determined according to the size of site operation environment and required immersible pump State the diameter of precast dewatering pile tube;(2) report and Foundation Pit Support Design file are surveyed in base area, determine the precast dewatering pile tube Total quantity, arrangement spacing;(3) precast dewatering pile tube is installed, and water filling cleaning is carried out by root to the precast dewatering pile tube;(4) Immersible pump and outlet pipe are put into the precast dewatering pile tube, is first tested, determines that the precast dewatering pile tube can normally be taken out It is formal after water, draining to proceed by draining operating;(5) after construction is finished, stop immersible pump and draw water, carry out borehole cleaning processing, perfusion Cement mortar, part of cement mortar by permeable hole to exosmosis and with soil solidifying outside the precast dewatering pile tube.
9. precast dewatering pile tube application method in building foundation pit according to claim 8, it is characterised in that in step (3) The precast dewatering pile tube installation site is away from structural column and shear wall.
10. precast dewatering pile tube application method in building foundation pit according to claim 8, it is characterised in that in step (5) The upper surface of the precast dewatering pile tube has poured bottom board concrete, and the bottom board concrete closes the precast dewatering pile tube.
CN201510654291.0A 2015-10-10 2015-10-10 Precast dewatering pile tube and its application method in building foundation pit Expired - Fee Related CN105178289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510654291.0A CN105178289B (en) 2015-10-10 2015-10-10 Precast dewatering pile tube and its application method in building foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510654291.0A CN105178289B (en) 2015-10-10 2015-10-10 Precast dewatering pile tube and its application method in building foundation pit

Publications (2)

Publication Number Publication Date
CN105178289A CN105178289A (en) 2015-12-23
CN105178289B true CN105178289B (en) 2017-10-31

Family

ID=54900679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510654291.0A Expired - Fee Related CN105178289B (en) 2015-10-10 2015-10-10 Precast dewatering pile tube and its application method in building foundation pit

Country Status (1)

Country Link
CN (1) CN105178289B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464120A (en) * 2015-12-29 2016-04-06 天津市海岸带工程有限公司 Foundation structure capable of pumping water by using centrifugal pump
CN106013095A (en) * 2016-06-14 2016-10-12 宫能和 Pile-forming method of netty tubular structure pile
CN110552361A (en) * 2018-06-04 2019-12-10 中冶天工集团有限公司 Pipe pile structure used as dewatering well
CN109137888A (en) * 2018-08-08 2019-01-04 中国二十冶集团有限公司 The dewatering construction method of prefabricated concrete pipe pile supporting construction
CN109610489B (en) * 2019-01-15 2020-07-31 中铁隧道局集团建设有限公司 Precipitation well for preventing sludge from blocking water suction pump
CN109723071B (en) * 2019-02-23 2021-02-09 杭州昂创科技有限公司 Construction method of double-layer steel drum drainage system built in basement floor post-cast strip
CN110172981B (en) * 2019-06-05 2020-05-05 招商局重庆交通科研设计院有限公司 Self-precipitation prestressed anti-slip pipe pile and construction method thereof
CN110984179B (en) * 2019-12-25 2021-07-09 兰州理工大学 Recyclable assembled drainage-collecting extruded-expanded-tire pile supporting structure and construction method
CN113338299B (en) * 2021-06-21 2023-02-28 中铁十二局集团有限公司 Pile well composite foundation pit supporting construction method
CN114134904B (en) * 2021-12-14 2022-11-01 中国五冶集团有限公司 Deep foundation pit supporting and dewatering integrated precast tubular pile construction method
CN114182719B (en) * 2021-12-25 2023-03-10 中机工程有限公司 Anti-floating pile for underground chamber foundation
CN115182369A (en) * 2022-07-29 2022-10-14 中交(南京)建设有限公司 Dewatering well structure and pile foundation construction method reconstructed by utilizing dewatering well

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1566539A (en) * 2003-06-12 2005-01-19 梁闽 Self-anchoring vacuum compaction method
CN102061691A (en) * 2009-11-12 2011-05-18 任再永 Construction method for treating foundation through filling by adopting draining pile tubes
CN102535490A (en) * 2012-03-06 2012-07-04 北京交通大学 Method for dewatering foundation pit by using bored cast-in-place pile
CN103669333A (en) * 2013-12-27 2014-03-26 中国地质大学(北京) Slide-resistant pile facilitating vacuum rainfall
CN103850260A (en) * 2014-03-24 2014-06-11 北京城建勘测设计研究院有限责任公司 Pile-well integration dewatering well
WO2015029054A1 (en) * 2013-08-27 2015-03-05 Naresh Kumar Slotted holes meshed plug steel pile
CN205012325U (en) * 2015-10-10 2016-02-03 江西建工第二建筑有限责任公司 Prefabricated precipitation tubular pile in building foundation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100880439B1 (en) * 2007-07-23 2009-01-29 대한주택공사 Apparatus and method for removing slime in a cast-in place pile construstion
CN102304924B (en) * 2011-06-28 2013-03-13 沈阳中建东设岩土工程有限公司 Non-resource-exploitation dewatering construction method and dewatering well

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1566539A (en) * 2003-06-12 2005-01-19 梁闽 Self-anchoring vacuum compaction method
CN102061691A (en) * 2009-11-12 2011-05-18 任再永 Construction method for treating foundation through filling by adopting draining pile tubes
CN102535490A (en) * 2012-03-06 2012-07-04 北京交通大学 Method for dewatering foundation pit by using bored cast-in-place pile
WO2015029054A1 (en) * 2013-08-27 2015-03-05 Naresh Kumar Slotted holes meshed plug steel pile
CN103669333A (en) * 2013-12-27 2014-03-26 中国地质大学(北京) Slide-resistant pile facilitating vacuum rainfall
CN103850260A (en) * 2014-03-24 2014-06-11 北京城建勘测设计研究院有限责任公司 Pile-well integration dewatering well
CN205012325U (en) * 2015-10-10 2016-02-03 江西建工第二建筑有限责任公司 Prefabricated precipitation tubular pile in building foundation

Also Published As

Publication number Publication date
CN105178289A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105178289B (en) Precast dewatering pile tube and its application method in building foundation pit
CN101736732B (en) Pressure and water reduction construction method of ultra-deep foundation pit confined water
CN105821830A (en) Permeation increase siphon drainage system for low-permeability soil slope
CN205152968U (en) Precipitation tubular well structure
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN110847200B (en) Dewatering and draining structure and dewatering and draining method for horizontal sand well of annular foundation pit
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN203569575U (en) Plastic blind ditch pipe sandless precipitation well
CN205591212U (en) Multi -functional precast tubular pile
CN104975610B (en) Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN103883291A (en) Hydrological well intra-tube gravel removing and shaft forming device and construction method
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well
CN208586605U (en) A kind of drainage type basement process stake
CN202787289U (en) Shut-in dewatering device for tube well
CN116024998A (en) Construction method for water-sealing blocking of deep foundation pit dewatering well
CN108166516A (en) Dewatering well utilization system based on sponge city and utilize method
CN211395715U (en) Dewatering and dewatering structure for horizontal sand well of annular foundation pit
CN211006723U (en) Drainage structures of precipitation well
CN106988330A (en) Soft soil foundation is layered dewatering construction structure and construction method
CN219732050U (en) Precipitation device of foundation pit local shallow layer self-priming pump
CN106894429B (en) Base pit engineering soft soil foundation is layered dewatering construction structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

Termination date: 20211010

CF01 Termination of patent right due to non-payment of annual fee