CN107268634A CN201710501976.0A CN201710501976A CN107268634A CN 107268634 A CN107268634 A CN 107268634A CN 201710501976 A CN201710501976 A CN 201710501976A CN 107268634 A CN107268634 A CN 107268634A
Authority
CN
China
Prior art keywords
waist rail
typified form
template
screw
boats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710501976.0A
Other languages
Chinese (zh)
Inventor
张明亮
江波
寻奥林
胡毅
黄兴
王大纲
姚露
伍雪闻
苏建菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN CONSTRUCTION ENGINEERING GROUP Corp
Hunan No6 Engineering Co Ltd
Original Assignee
HUNAN CONSTRUCTION ENGINEERING GROUP Corp
Hunan No6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN CONSTRUCTION ENGINEERING GROUP Corp, Hunan No6 Engineering Co Ltd filed Critical HUNAN CONSTRUCTION ENGINEERING GROUP Corp
Priority to CN201710501976.0A priority Critical patent/CN107268634A/en
Publication of CN107268634A publication Critical patent/CN107268634A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

Deep basal pit waist rail construction typified form system, including waist rail side template, wooden a tree, used in making timber for boats I, template ribs, screw-thread steel Two bors d's oeuveres back cord, U-shaped split bolt, buckle expansion bolt, bed die and support frame pipe, the bed die is placed on support frame pipe, waist rail side template, wooden a tree, used in making timber for boats I is assembled into a typified form unit with template ribs, it is connected with bed die, and pass through screw-thread steel Two bors d's oeuveres back cord, U-shaped split bolt, buckle expansion bolt and wooden a tree, used in making timber for boats II are fixed with foundation pit walls, the two ends of U-shaped split bolt and buckle expansion bolt, screw-thread steel Two bors d's oeuveres back cord is connected, waist rail side template carries out pre-drilled cavity according to the level interval and diameter of wire cord of anchor cable.Present invention composition component can utilize building site waste wood waste material, detachable assembling, resistance to overturning is good, it is safe and reliable, form cycling rate is high, environmental protection, saves the construction period, agree with requirement and the theory of the green construction of country's promotion, can be widely applied to the construction operation of heavy construction deep foundation ditch concrete waist rail.

Description

Deep basal pit waist rail construction typified form system
Technical field
The present invention relates to one kind construction typified form system, and in particular to a kind of deep basal pit waist rail construction stock mould plate body System.
Background technology
In the basement foundation ditch Construction stage of heavy construction, it will usually be related to support engineering, waist rail is supporting anchor One of indispensable pattern handling measure in rope, according to practical implementation, waist rail can use Two bors d's oeuveres shaped steel, it would however also be possible to employ Cast-in-situ steel reinforced concrete.Because waist rail is typically in underground environment, especially returned in the sidewall of basement cubic metre of earth of permanent supporting After filling out, if the antiseptic and rustproof quality of steel wale cannot be controlled, the steel construction maintenance for adding the later stage is not in place, can cause type Steel waist rail corrosion, and then cause prestressd anchor cable tensioning to be failed, cause the potential safety hazard of building structure;Further, since shaped steel waist Need the cooperation of the construction equipments such as crane during the installation of beam, and some base pit engineerings, construction equipment can not drive into, and lead to not peace Dress, or installation measure take of a relatively high, the influence overall duration, cause engineering cost to increase.In consideration of it, more base pit engineerings incline To in meeting structural performance requirements using concrete breast beam.
The technological requirement constructed according to pattern foundation pit supporting structure anchor cable and waist rail, typically treats that the earthwork is down excavated to anchor cable or waist rail mark The construction of waist rail is just proceeded by after high 1-1.5 meters.Conventional common practice is first to carry out smooth compacting to foundation ditch periphery, is set up Supporting frame, then carry out the template of waist rail construction and set up;Template is typically cut according to the sectional dimension of waist rail at the scene.By Surrounding enviroment are generally constructed the time difference than major structure of construction when Foundation Pit Construction, and many auxiliary facilities are uneven, if complete It is full low construction efficiency, waste of material to be caused relatively more, it is necessary to put into larger manpower and materials according to generally doing rule, and waist rail Construction quality can not obtain effective guarantee, cause construction cost to increase.
The content of the invention
The technical problems to be solved by the invention are constructed for existing engineering circles deep foundation pit of construction supporting concrete breast beam When template system exist take time and effort, waste of material is relatively more, construction cost height, cause waist rail concrete quality not had The defects such as effect guarantee are convenient there is provided a kind of selection, and install convenient, input labour is few with construction equipment, and construction cost is low, template Turnover rate is high, and resistance to overturning is good, safe and reliable, the deep basal pit waist rail construction typified form system of environmental protection.
The technical solution adopted for the present invention to solve the technical problems is:Deep basal pit waist rail construction typified form system, bag Include waist rail side template, wooden a tree, used in making timber for boats I, template ribs, screw-thread steel Two bors d's oeuveres back cord, U-shaped split bolt, buckle expansion bolt, bed die and Support frame pipe, support frame as described above pipe support is used as the vertical power transmission structure of whole typified form system on bottom of foundation ditch bed course Part, the bed die is placed on support frame pipe, and the waist rail side template, wooden a tree, used in making timber for boats I are assembled into a typified form with template ribs Unit, is connected with bed die, and passes through screw-thread steel Two bors d's oeuveres back cord, U-shaped split bolt, buckle expansion bolt and wooden a tree, used in making timber for boats II and foundation pit walls It is fixed, the two ends of the U-shaped split bolt are connected with buckle expansion bolt, screw-thread steel Two bors d's oeuveres back cord respectively, the waist rail Side template carries out pre-drilled cavity according to the level interval and diameter of wire cord of anchor cable.
Further, described waist rail side template, wooden a tree, used in making timber for boats I, template ribs can discard template, wooden a tree, used in making timber for boats using construction site Process, size can carry out regularization design according to the design size of deep basal pit waist rail;Waist rail side template, wooden a tree, used in making timber for boats I, template add Strong rib is assembled into a typified form unit by tapping screw or iron nail.Described typified form unit can be in factory or work Shift to an earlier date assembled completion in ground operation canopy, then job site is pulled to flat car or stroller and use position.
Further, described template ribs is installed on the two ends of typified form cell cube, can strengthen typified form list The resistance to overturning of first body, can also increase the service life of template.
Further, the screw-thread steel Two bors d's oeuveres back cord is laterally attached by two screw-thread steels by bar dowel, it is possible to use Construction site is discarded steel bar meter and formed, and size is designed according to the design size of deep basal pit waist rail;Screw-thread steel Two bors d's oeuveres back cord Bending angle, size is designed according to the sectional dimension of waist rail.
Further, described U-shaped split bolt to stretching screw rod with U-shaped reinforcement welding by forming;Can city to stretching screw rod Field is purchased, and U-shaped reinforcing bar can be processed using the waste steel bar or reinforcing bar defective material of job site;To stretch screw rod with it is U-shaped The diameter of reinforcing bar carries out determining after calculating value according to the design size of waist rail.
Further, the stake of described buckle expansion bolt one end implantation foundation ditch concrete support or foundation pit walls gunite concrete Interior, implantation depth is determined after being calculated according to the design size of waist rail;Buckle expansion bolt can market purchased, bolt Level interval between diameter and bolt should carry out determining after calculating value according to the design size of waist rail.
Further, described bed die can use common plank sheathing or bamboo slab rubber for building, can market purchased, can also Template is discarded using job site, bed die size need to be identical with the bottom section size of waist rail.
Further, described support frame pipe can be fastener type steel pipe scaffold or bowl fastening type steel pipe scaffold, scaffold Set up should according to the design size and construction loads of waist rail carry out Structure Calculation design, should meet concrete breast beam construction knot The related request such as structure security and resistance to overturning.
In the present invention, to ensure the resistance to overturning of support frame pipe, foundation ditch surrounding bottom should be compacted smooth, such as have ready conditions, Bed course cast hardening can be carried out;Such as consider the temporary drainage in foundation ditch, it might even be possible to also serve as temporary drain, reach multi-functional use On the way, it is cost-effective.
During due to excavation of foundation pit, the otherness of foundation pit walls formation characteristics is different, causes the flatness of foundation pit walls poor, and base It is usually the gunite concrete processing of piled anchor structure combination foundation pit walls during the design of its support of hole, it is therefore proposed that advanced before waist rail construction Row concrete ejection, makes foundation pit walls smooth straight, and the installation and gap plugging for being conducive to waist rail bed die are handled.
In the present invention, same base pit engineering, because the characteristic of rock stratum and the stress of supporting construction are different, waist rail section chi It is very little to have variety classes, therefore differentiation design need to be carried out to typified form, meet the requirement of site operation installation.
Before the concrete cast that waist rail is carried out using the present invention, reply bed die enters by foundation pit walls gap, side form anchor cable hole Row closure is handled, and prevents the spilling of concrete grout.
Detachable assembling of the invention, resistance to overturning is good, and safe and reliable, form cycling rate is high, environmental protection, saves construction Duration, agree with requirement and the theory of the green construction of country's promotion, can be widely applied to heavy construction deep foundation ditch concrete waist rail Construction.
Brief description of the drawings
Fig. 1 is the sectional drawing of the embodiment of the present invention;
Fig. 2 is the structural representation of the screw-thread steel Two bors d's oeuveres back cord of embodiment illustrated in fig. 1;
Fig. 3 is the right view of the screw-thread steel Two bors d's oeuveres back cord shown in Fig. 2;
Fig. 4 is the structural representation of the U-shaped split bolt of embodiment illustrated in fig. 1;
Fig. 5 is the structural representation of the typified form unit of embodiment illustrated in fig. 1;
Fig. 6 is the right view of typified form unit shown in Fig. 5.
Embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
Embodiment
Referring to the drawings, the present embodiment includes waist rail side template 1, wooden a tree, used in making timber for boats I 2, template ribs 3, screw-thread steel Two bors d's oeuveres back cord 4, U Type split bolt 5, buckle expansion bolt 6, bed die 7 and support frame pipe 8, support frame as described above pipe 8 are set up in bottom of foundation ditch bed course 10 On, as the vertical Force transmission partses of whole typified form system, the bed die 7 is placed on support frame pipe 8, the waist rail side form Plate 1, wooden a tree, used in making timber for boats 2 are assembled into a typified form unit with template ribs 3 by iron nail, are connected with bed die 7, and pass through screw-thread steel Two bors d's oeuveres back cord 4, U-shaped split bolt 5, buckle expansion bolt 6 and wooden a tree, used in making timber for boats II 12 are fixed with foundation pit walls 9(Wherein buckle expands Bolt is attached with foundation pit supporting pile or foundation pit walls gunite concrete), the two ends of the U-shaped split bolt 5 respectively with buckle Expansion bolt 6, screw-thread steel Two bors d's oeuveres back cord 4 are connected, and the waist rail side template 1 carries out pre- according to the level interval and diameter of wire cord of anchor cable 11 Perforate, convenient construction scene anchor cable 11 it is interspersed.
Described foundation pit walls 9, bottom of foundation ditch bed course 10, anchor cable 11 are not the composition components of the present embodiment, but this implementation The carrier of example or service object.
In the present embodiment, described waist rail side template 1 is respectively 350mm, 300mm by two pieces of width, and length is 1.8m, thick Spend the bamboo slab rubber composition for 18mm;A diameter of 200mm hole, position of opening are opened according to the level interval of anchor cable 11 and diameter of wire cord size Apart from the top edge 120mm of waist rail side template 1, horizontal direction is placed in the middle.
In the present embodiment, the described section of wooden a tree, used in making timber for boats I 2 is 70mm × 40mm, and length is 1.8m.
In the present embodiment, described template ribs 3 cuts into sector using the useless template in building site, and thickness is 18mm, Width is 80mm, and length is 350mm+300mm, and knuckle is 158 °.
In the present embodiment, described screw-thread steel Two bors d's oeuveres back cord 4 is by two φ 20 screw-thread steel 13 and four φ 10 short steel Muscle 14 is welded, and each component uses the waste steel bar or reinforcing bar defective material of job site, and the spacing between 2 screw-thread steels 13 is 30mm, meets the interspersed of U-shaped split bolt 5;The long 1m of screw-thread steel 13, centre in 158 ° of bending at the 450mm of end, then away from 75 ° from knuckle at the 50mm of two ends, it is easy to the installation of U-shaped split bolt 5 to fix.
In the present embodiment, described U-shaped split bolt 5 is by diameter 14mm to stretching the U-shaped of screw rod 15 and diameter 14mm Reinforcing bar 16 is welded, and the weld seam lap of splice is 150mm, using two-sided welding;To stretching the market purchasing of screw rod 15, U-shaped reinforcing bar 16 length are 750mm, are formed using the steel bar meter defective material bending of job site.
In the present embodiment, the described model M12 of buckle expansion bolt 6, length is 250mm, by market purchasing;Buckle is swollen The swollen level of bolt 6 arranges 2 rows to along waist rail top and bottom, and it is 745mm that spacing is arranged up and down, and level interval is 900mm.
In the present embodiment, described bed die 7 is discarded old template cutting by building site and formed, and thickness 18mm, width are 400mm, Length dimension is determined according to the size of discarded template.
In the present embodiment, described support frame pipe 8 is the double support for shuttering of steel tube fastener formula, and steel tube section is φ 48 × 3.0, The high 1.5m of frame, vertical rod vertical, horizontal spacing is 1.5m × 0.65m, is met《Fastener type steel pipe scaffold technical specification of security》's Related request.
In the present embodiment, because foundation ditch surrounding needs to also serve as temporary drain, therefore it is along foundation pit walls surrounding fluting bottom width 1m, groove depth 1m, side wall 1:1 slope, slope top is less than anchor cable position 0.5m, while 60mm thickness C15 pea gravel concreten bed courses are poured in bottom 10。
In the present embodiment, described wooden a tree, used in making timber for boats II 12 is arranged on the top of waist rail side template 1, is arranged according to spacing 900mm, length For 280mm, it is easy to the tensioning of U-shaped split bolt 5 to fasten.
The scheduling of incorporation engineering practice of construction and the continuity for being easy to waist rail to construct, this implementation is in building site machining shed 20 typified form units are made altogether, and scene is torn open according to the construction technology of waist rail circulation peace and used.
The present embodiment application parameters of engineering design be:Support pile spacing is 1.8m, and waist rail bottom width is 400mm, top Portion's width is 280mm, is highly 550mm, and lateral surface knuckle is 250mm apart from floor height, and the thickness of gunite concrete is 200mm, a diameter of 200mm of prestress anchorage cable;These parameters directly determine this implementation component composition and size design.
In the present embodiment, each component composition and size design calculate design, it is ensured that this implementation by construction technology software The component composition and size of example are safe and reliable and scientific and reasonable.
In the present embodiment, before the cast of waist rail concrete, bed die 7 should be checked along foundation pit walls latasuture gap and waist rail side form It is tight whether the anchor cable tapping hole of plate 1 blocks.
, should be according to before the cast of waist rail concrete in the present embodiment《Fastener type steel pipe scaffold technical specification of security》's Related request is checked support frame pipe 8.
In the present embodiment, before the cast of waist rail concrete, foundation pit walls construction of shotcrete is first carried out, makes foundation pit walls smooth It is straight, be conducive to installation and the encapsulation process of waist rail bed die.
In the present embodiment, when the turnover of typified form unit is utilized, template surface concrete should be cleared up, according to Construction requirement brush releasing agent, waist rail concrete surface is smooth when can make form removal.

Claims (8)

  1. The typified form system 1. deep basal pit waist rail is constructed, it is characterised in that:Including waist rail side template, wooden a tree, used in making timber for boats I, template ribs, Screw-thread steel Two bors d's oeuveres back cord, U-shaped split bolt, buckle expansion bolt, bed die and support frame pipe, support frame as described above pipe support are located at foundation ditch On bottom cushion, as the vertical Force transmission partses of whole typified form system, the bed die is placed on support frame pipe, the waist Side template, wooden a tree, used in making timber for boats I are assembled into a typified form unit with template ribs, are connected with bed die, and pass through screw-thread steel Two bors d's oeuveres Back cord, U-shaped split bolt, buckle expansion bolt and wooden a tree, used in making timber for boats II are fixed with foundation pit walls, the two ends point of the U-shaped split bolt It is not connected with buckle expansion bolt, screw-thread steel Two bors d's oeuveres back cord, the waist rail side template enters according to the level interval and diameter of wire cord of anchor cable Row pre-drilled cavity.
  2. The typified form system 2. deep basal pit waist rail according to claim 1 is constructed, it is characterised in that:Described waist rail side form Plate, wooden a tree, used in making timber for boats I, template ribs are discarded template, wooden a tree, used in making timber for boats using construction site and processed;Waist rail side template, wooden a tree, used in making timber for boats I, template add Strong rib is assembled into a typified form unit by tapping screw or iron nail.
  3. The typified form system 3. deep basal pit waist rail according to claim 1 or 2 is constructed, it is characterised in that:Described template Ribs is installed on the two ends of typified form unit.
  4. The typified form system 4. deep basal pit waist rail according to claim 1 or 2 is constructed, it is characterised in that:Described screw thread Steel Two bors d's oeuveres back cord is connected by two screw-thread steels by bar dowel transverse weld, discards reinforcing bar using construction site or reinforcing bar defective material adds Work is formed.
  5. The typified form system 5. deep basal pit waist rail according to claim 1 or 2 is constructed, it is characterised in that:Described is U-shaped right Bolt is drawn by being formed to stretching screw rod with U-shaped reinforcement welding;Purchased to stretching screw rod market, U-shaped reinforcing bar utilizes building site steel Muscle processes defective material.
  6. The typified form system 6. deep basal pit waist rail according to claim 1 or 2 is constructed, it is characterised in that:Described buckle In the implantation foundation ditch concrete support stake of expansion bolt one end or foundation pit walls gunite concrete;Adopted in buckle expansion bolt market Purchase.
  7. The typified form system 7. deep basal pit waist rail according to claim 1 or 2 is constructed, it is characterised in that:Described bed die Using common plank sheathing or bamboo slab rubber for building, bed die width is with waist rail bottom width.
  8. The typified form system 8. deep basal pit waist rail according to claim 1 or 2 is constructed, it is characterised in that:Described support Frame pipe is fastener type steel pipe scaffold or bowl fastening type steel pipe scaffold.
CN201710501976.0A 2017-06-27 2017-06-27 Deep basal pit waist rail construction typified form system Pending CN107268634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710501976.0A CN107268634A (en) 2017-06-27 2017-06-27 Deep basal pit waist rail construction typified form system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710501976.0A CN107268634A (en) 2017-06-27 2017-06-27 Deep basal pit waist rail construction typified form system

Publications (1)

Publication Number Publication Date
CN107268634A true CN107268634A (en) 2017-10-20

Family

ID=60069795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710501976.0A Pending CN107268634A (en) 2017-06-27 2017-06-27 Deep basal pit waist rail construction typified form system

Country Status (1)

Country Link
CN (1) CN107268634A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755700A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 A kind of the curved surface overlapping ring beam device and installation method of support underground enclosure wall
CN109162296A (en) * 2018-08-29 2019-01-08 中建局集团建设发展有限公司 Single side formwork system and the construction method poured using system progress exterior wall
CN111827708A (en) * 2020-06-19 2020-10-27 上海二十冶建设有限公司 Template construction method for repairing and transforming reinforced concrete buildings of historical industrial buildings
CN113482007A (en) * 2021-06-22 2021-10-08 青岛业高建设工程有限公司市北分公司 Waist beam supporting structure and construction method thereof
CN113756292A (en) * 2021-06-07 2021-12-07 中启胶建集团有限公司 Waist beam suspension steel bar and template quick-forming structure and construction method thereof
CN114673174A (en) * 2022-03-21 2022-06-28 中天建设集团有限公司 Formwork supporting device for anchor beam pouring construction and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10113818A1 (en) * 2001-03-21 2002-09-26 Richter Wolfgang Construction plate for lining a pit to secure the walls of a pipeline trench has recesses with removable bolt couplings for rotatably fixing braces about horizontal axes in pit lining
CN201460196U (en) * 2009-05-26 2010-05-12 湖北长安建筑股份有限公司 Concrete form board
CN101831978A (en) * 2010-03-16 2010-09-15 南通华荣建设集团有限公司 In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof
CN102926536A (en) * 2012-11-20 2013-02-13 白正茂 Template unilateral reinforcement combination tool and template unilateral reinforcement construction method
CN205444201U (en) * 2016-03-16 2016-08-10 中国建筑第八工程局有限公司 Reinforced concrete waist rail structure
CN106013172A (en) * 2016-07-01 2016-10-12 杭州江润科技有限公司 Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN207062956U (en) * 2017-06-27 2018-03-02 湖南省第六工程有限公司 A kind of deep basal pit waist rail construction typified form system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10113818A1 (en) * 2001-03-21 2002-09-26 Richter Wolfgang Construction plate for lining a pit to secure the walls of a pipeline trench has recesses with removable bolt couplings for rotatably fixing braces about horizontal axes in pit lining
CN201460196U (en) * 2009-05-26 2010-05-12 湖北长安建筑股份有限公司 Concrete form board
CN101831978A (en) * 2010-03-16 2010-09-15 南通华荣建设集团有限公司 In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof
CN102926536A (en) * 2012-11-20 2013-02-13 白正茂 Template unilateral reinforcement combination tool and template unilateral reinforcement construction method
CN205444201U (en) * 2016-03-16 2016-08-10 中国建筑第八工程局有限公司 Reinforced concrete waist rail structure
CN106013172A (en) * 2016-07-01 2016-10-12 杭州江润科技有限公司 Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN207062956U (en) * 2017-06-27 2018-03-02 湖南省第六工程有限公司 A kind of deep basal pit waist rail construction typified form system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘平等: "废旧木模板在施工中替代支撑的探讨", 《四川建筑》, no. 02, 28 April 2015 (2015-04-28) *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755700A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 A kind of the curved surface overlapping ring beam device and installation method of support underground enclosure wall
CN108755700B (en) * 2018-06-14 2021-02-09 上海二十冶建设有限公司 Installation method of curved surface superposed ring beam device for supporting underground enclosure wall
CN109162296A (en) * 2018-08-29 2019-01-08 中建局集团建设发展有限公司 Single side formwork system and the construction method poured using system progress exterior wall
CN109162296B (en) * 2018-08-29 2023-10-24 中建一局集团建设发展有限公司 Single-side formwork supporting system and construction method for pouring outer wall by utilizing same
CN111827708A (en) * 2020-06-19 2020-10-27 上海二十冶建设有限公司 Template construction method for repairing and transforming reinforced concrete buildings of historical industrial buildings
CN111827708B (en) * 2020-06-19 2022-03-04 上海二十冶建设有限公司 Template construction method for repairing and transforming reinforced concrete buildings of historical industrial buildings
CN113756292A (en) * 2021-06-07 2021-12-07 中启胶建集团有限公司 Waist beam suspension steel bar and template quick-forming structure and construction method thereof
CN113482007A (en) * 2021-06-22 2021-10-08 青岛业高建设工程有限公司市北分公司 Waist beam supporting structure and construction method thereof
CN113482007B (en) * 2021-06-22 2024-02-09 青岛业高建设工程有限公司市北分公司 Waist beam supporting structure and construction method thereof
CN114673174A (en) * 2022-03-21 2022-06-28 中天建设集团有限公司 Formwork supporting device for anchor beam pouring construction and construction method

Similar Documents

Publication Publication Date Title
CN107268634A (en) Deep basal pit waist rail construction typified form system
CN102031784B (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106958256B (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN106677787B (en) Vertical shaft repairing and reinforcement structure and repairing and reinforcement construction method
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN109797778A (en) One kind being suitable for the anhydrous layer of sand area upper pipe working well in desert and construction method
CN108060683A (en) A kind of middle weathering geology top-down construction method
CN105421468B (en) Basement supporting without concrete to support
CN106930271A (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground and its construction method without fertile groove
CN111910679B (en) Construction method of overlong and ultrahigh-weight retaining wall under complex terrain
CN110952456A (en) Pile type bridge construction process
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN201943086U (en) Underground building wall body
CN103321246A (en) Underground diaphragm wall based foundation pit construction method
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN108330902B (en) Construction method for cast-in-situ lower cross beam of high-pile wharf
CN108867690A (en) The reverse construction of peg board barricade of big foundation pit
CN209723033U (en) One kind being suitable for the anhydrous layer of sand area upper pipe working well in desert
CN110552371A (en) Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN108547625B (en) TBM cutterhead method for dismounting in a kind of tunnel
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN107100649B (en) Construction process for inclined shaft concrete pouring
CN111636875B (en) Construction method of vertical shaft locking ring for underground excavation construction of subway
CN207062956U (en) A kind of deep basal pit waist rail construction typified form system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020