CN109162296A - Single side formwork system and the construction method poured using system progress exterior wall - Google Patents

Single side formwork system and the construction method poured using system progress exterior wall Download PDF

Info

Publication number
CN109162296A
CN109162296A CN201810994533.4A CN201810994533A CN109162296A CN 109162296 A CN109162296 A CN 109162296A CN 201810994533 A CN201810994533 A CN 201810994533A CN 109162296 A CN109162296 A CN 109162296A
Authority
CN
China
Prior art keywords
formwork system
vertical
fastening part
stupefied
lateral surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810994533.4A
Other languages
Chinese (zh)
Other versions
CN109162296B (en
Inventor
覃亮
赵景科
杨重兴
姜天时
樊晶艳
郭黎
司正音
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201810994533.4A priority Critical patent/CN109162296B/en
Publication of CN109162296A publication Critical patent/CN109162296A/en
Application granted granted Critical
Publication of CN109162296B publication Critical patent/CN109162296B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The construction method that exterior wall pours is carried out the invention discloses single side formwork system and using the system, the formwork system is arranged in slope protection pile side, including the initial segment formwork system and the extended segment formwork system being arranged in above the initial segment formwork system, the initial segment formwork system is arranged on sole plate, including the first fastening part, the support section of the first fastening part lateral surface is arranged in and is embedded in sole plate earth anchor;Extended segment formwork system includes at least one second fastening part.It includes being embedded in the short side dowel in the initial segment formwork system in concrete layer and from being pierced by between two vertical back cords and outwardly extending long side dowel that vertical L-type, which draws dowel, the processing of long side dowel tail portion mantle fiber and tightens fixation by nut.Strong operability can also complete wall construction, universality with higher when only unilateral side has formwork condition well.Situations such as in implementation process without finding swollen mould, spillage, template displacement.

Description

Single side formwork system and the construction method poured using system progress exterior wall
Technical field
It is poured the present invention relates to technical field of building construction, especially single side formwork system and using system progress exterior wall Construction method.
Background technique
With flourishing for Building Trade in China, the construction land growing tension in city.Frequently encounter outer wall of basement Lead to not due to various reasons using generation the case where conventional two sides formwork.
This engineering is located in certain campus, and the collateral protection structure in engineering northwest is permanent retaining structure, with main structure Exterior wall and contignation undertake active earth pressure.Outer wall of basement thickness 800mm, foundation slab structure top mark height -9.8m.Basement Exterior wall is led wall dead size with the outer waterproof of support pile and is overlapped, and does not have and completes construction using traditional bilateral formwork system.And it applies Work environment is poor, does not have formwork condition, often brings construction delay, and construction cost is high, the big problem of security risk in work progress.
This engineering is specific, and there are the following problems: first, outer wall of basement thickness is big, and layer height is higher, and concrete was pouring The lateral pressure generated in journey is larger, therefore form bracing system must have enough intensity, rigidity and stability;
Second, exterior wall does not have any space away from distance is gone along with sb. to guard him, and waterproof layer does not allow to penetrate again on the outside of exterior wall, leads to reinforcement system Place one's entire reliance upon single side diagonal brace or to support, and uncertain factor is more;
Third, the pipelines such as municipal wastewater are outmoded on the outside of foundation pit, and the phenomenon that seeps water is than more serious, and exterior wall seepage resistance demand is higher, exterior wall water Flat construction joint is generally retained in the height away from bottom (building) plate face 300mm, and custom requirements exterior wall is preferably integrally poured with beam, board concrete It builds, if outer wall template system unstability will cause the collapsing of beam, plate template system, therefore pouring construction need to be segmented, every section of construction joint Position, which is stayed, sets steel plate for sealing water.
4th, retaining structure twice steel waist rail has protruded into exterior wall, and waterproofing work need to carry out the processing at steel waist rail, guarantees Waterproof has laminating condition.
Summary of the invention
The construction method that exterior wall pours is carried out the object of the present invention is to provide single side formwork system and using the system, to be solved Wall construction problem when certainly only unilateral side has a formwork condition reduces the construction cost of single side formwork, guarantee construction quality and Construction period.
To achieve the above object, the present invention adopts the following technical scheme:
One aspect of the present invention provides single side formwork system, which is arranged in 1 side of slope protection pile, including the initial segment branch Die body system and the extended segment formwork system being arranged in above the initial segment formwork system, the initial segment formwork system are arranged on basis On bottom plate 3, including the first fastening part, the support section of the first fastening part lateral surface is set and is embedded in sole plate 3 Interior earth anchor 4;It is concrete layer 2 between first fastening part medial surface and slope protection pile 1;
First fastening part includes form surfacing 5,5 lateral surface of form surfacing is set vertical times stupefied 6, fitting is arranged vertical The transverse direction master of secondary stupefied 6 lateral surface is stupefied 7, vertical back cord 10, U-shaped anchor bolt 8 and block 9, U-shaped 8 outward opening of anchor bolt are set It sets, in concrete layer 2, two shanks of bolt of U-shaped anchor bolt 8 are protruding and sequentially pass through for U-shaped 8 one end of anchor bolt Form surfacing 5, laterally master stupefied 7;
Block 9 is fixed on the tail portion of two shanks of bolt of U-shaped anchor bolt 8 by nut 13;
There are the gaps for being clamped two vertical back cords 10 of setting between block 9 and laterally master stupefied 7;
Extended segment formwork system includes at least one second fastening part, and second fastening part includes form surfacing 5, setting 5 lateral surface of form surfacing vertical times stupefied 6, fitting be arranged in vertical stupefied 6 lateral surface transverse direction master is stupefied 7, vertical back cord 10, U-shaped anchor bolt 8, block 9, vertical L-type draw dowel 11 and lateral lever 12, U-shaped 8 outward opening of anchor bolt setting, U-shaped anchor For 8 one end of fixing bolt in concrete layer 2, two shanks of bolt of U-shaped anchor bolt 8 sequentially pass through form surfacing 5, laterally master outward Stupefied 7;
Block 9 is fixed on the tail portion of two shanks of bolt of U-shaped anchor bolt 8 by nut 13;
There are the gaps for being clamped two vertical back cords 10 of setting between block 9 and laterally master stupefied 7;
It includes being embedded in short side dowel in the initial segment formwork system in concrete layer 2 and from two that vertical L-type, which draws dowel 11, It is pierced by between vertical back cord 10 and outwardly extending long side dowel, long side dowel tail portion mantle fiber is handled and tightened by nut 13 It is fixed;The angle of long side dowel Yu vertical back cord 10 is arranged in lateral lever 12.
Further, the earth anchor 4 is bent by the round steel of diameter 20mm;The interval of earth anchor 4 setting, adjacent earth anchor 4 Longitudinal pitch be 500mm-700mm, the horizontal spacing of adjacent earth anchor 4 is 800mm-1000mm.
Further, support section includes diagonal brace 14, connecting rod 15 and gag lever post 16, gag lever post 16 through setting earth anchor 4 it Between;
The lateral surface of first fastening part is set at the top of diagonal brace 14, and 14 bottom of diagonal brace is located on sole plate 3;
Pass through fastener fixing at the connecting node of diagonal brace 14 and gag lever post 16;
15 one end of connecting rod is located at the angle of sole plate 3 and the first fastening part lateral surface, and 15 other end of connecting rod rides upon On diagonal brace 14, the connecting node of connecting rod 15 and diagonal brace 14 passes through fastener fixing.
Further, the vertical back cord 10 is the I-steel of specification 16#.
Further, vertical time stupefied 6 flitch for 50*100mm;Laterally main stupefied 7 it is made of two steel pipes disposed in parallel;Steel Pipe diameter is 48mm.
Further, form surfacing 5 is the two-sided overlay film multi-layer board of 15mm thickness.
Further, vertical L-type draws dowel 11 to be bent by the round steel of diameter 25mm.
Further, the gap location between block 9 and lateral main stupefied 7 is also filled with stopper.
Further, the second fastening part further includes that return back to top upright bar 17 and being arranged in returns back to top the U support at 17 top of upright bar;It returns back to top vertical 17 bottom of bar is arranged on sole plate 3, and U holds in the palm opening upwards setting and the vertical back cord 10 of support.
Further, lateral lever 12 is 5# channel steel.
Further, in the first fastening part U-shaped anchor bolt 8 at least there are two;U-shaped anchor bolt in second fastening part 8 at least there are two.
Another aspect of the present invention, which is provided, carries out the construction method that exterior wall pours, construction party using above-mentioned single side formwork system Specific step is as follows for method:
Exterior wall height to be poured is segmented by step 1, and the height that pours of the first fastening part is less than in the initial segment formwork system Equal to 3500mm;The height that pours of single second fastening part is less than or equal to 3000mm in the formwork system of extended segment;
Step 2, according to the quantity of the second fastening part, in beginning section formwork system size after segmentation, extended segment formwork system The size of two fastening parts is stocked up;
Step 3, gag lever post 16 is arranged in pre-buried earth anchor 4 simultaneously in sole plate 3;The setting of the interval of earth anchor 4, adjacent earth anchor 4 are indulged It is 500mm-700mm to spacing, the horizontal spacing of adjacent earth anchor 4 is 800mm-1000mm;
Step 4 sets up the first fastening part of the initial segment formwork system in 1 side of slope protection pile;Form surfacing 5 is set, in template The lateral surface installation vertical secondary stupefied 6 of panel 5 installs laterally master stupefied 7 additional in vertical stupefied 6 lateral surface;U-shaped 8 He of anchor bolt is installed Vertical back cord 10;
After completing the first fastening part, diagonal brace 14 and connecting rod 15 is arranged in step 5;Respectively by the connection section of diagonal brace 14 and connecting rod 15 The connecting node fastener fixing of point, diagonal brace 14 and gag lever post 16;
Step 6 checks the initial segment formwork system, and after qualified, casting concrete pours height and is less than or equal to 3500mm;In coagulation Vertical L-type is drawn into the short side dowel embedment of dowel 11 wherein before native initial set;
Step 7, the concrete in be initiated section of formwork system reach intensity, and the first fastening part lateral surface is arranged in dismounting Support section, form surfacing 5, vertical time stupefied 6, laterally main stupefied 7, vertical back cord 10 and block 9;
Step 8 sets up the second fastening part of extended segment formwork system right above 1 side of slope protection pile, the initial segment formwork system Point;Form surfacing 5 is set, at lateral surface installation vertical time stupefied 6 of form surfacing 5, is installed additional in vertical stupefied 6 lateral surface laterally main Stupefied 7;U-shaped anchor bolt 8 and vertical back cord 10 are installed;The upright bar 17 that returns back to top is installed, in the upright bar 17 that returns back to top close to vertical back cord 10 When install additional U support;
Step 9 checks the second fastening part, after qualified, casting concrete.
Further, in step 2, the quantity of the second fastening part is greater than one in the formwork system of extended segment, the second fastening Partial construction method repeats step 7 and step 8, until being poured into exterior wall wall top.
The beneficial effects of the present invention are embodied in:
1, single side formwork system provided by the invention and the construction method that pours of exterior wall, the template body of use are carried out using the system Architecture is simple, low in cost, structurally reasonable, successfully explores the novel single side formwork body of a kind of common steel tube fastener and I-steel System provides a kind of new approaches for the application of single side formwork system.
2, single side formwork system provided by the invention and the construction method that pours of exterior wall, operability are carried out using the system By force, wall construction, universality with higher can also be completed well when only unilateral side has formwork condition.In implementation process In without finding swollen mould, spillage, template displacement situations such as.It is checked after demoulding, wall body vertical degree, flatness, compactness etc. are seen It is preferable to feel quality, reaches the requirement of concrete quality acceptance specification, economically, using most common engineering material, without additional Investment, has saved engineering cost, has achieved preferable economic benefit.
3, single side formwork system provided by the invention and the construction method that pours of exterior wall is carried out using the system, had preferable Generalization, soil become scarce resource today, can efficiently promote in old building remodeling, enlarging, refurbishment process The exploitation of the underground space and continuous improvement producing level.During integral construction, form surfacing, vertical time it is stupefied, laterally it is main it is stupefied, The auxiliary members such as upright bar and vertical back cord that return back to top can be used in turn repeatedly, save material.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification It is clear that understand through the implementation of the invention.The main object of the present invention and further advantage can be by specifications, power Specifically noted scheme is achieved and obtained in sharp claim.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is the structural schematic diagram of the initial segment formwork system.
Fig. 2 is the structural schematic diagram for pouring the second fastening part of first segment of extended segment formwork system.
Fig. 3 is the structural schematic diagram for pouring the second fastening part of second segment of extended segment formwork system.
Fig. 4 is the portion A enlarged drawing in Fig. 2.
Fig. 5 is 1-1 sectional view.
Fig. 6 is the side view of the portion A enlarged drawing in Fig. 2.
Fig. 7 is the plan view of U-shaped anchor bolt.
Appended drawing reference: 1- slope protection pile, 2- concrete layer, 3- sole plate, 4- earth anchor, 5- form surfacing, 6- are perpendicular To secondary stupefied, 7-, laterally main stupefied, 8-U type anchor bolt, 9- block, the vertical back cord of 10-, the vertical L-type of 11- draw dowel, 12- Lateral lever, 13- nut, 14- diagonal brace, 15- connecting rod, 16- gag lever post, 17- return back to top upright bar.
Specific embodiment
Carry out the technical solution that the present invention will be described in detail by the following examples, embodiment below is only exemplary, It is only capable of for explanation and illustration technical solution of the present invention, and the limitation to technical solution of the present invention cannot be construed to.
Using teaching building engineering as carrier, one aspect of the present invention provides single side formwork system, and formwork system setting exists 1 side of slope protection pile, it is described including the initial segment formwork system and the extended segment formwork system being arranged in above the initial segment formwork system The initial segment formwork system is arranged on sole plate 3, and including the first fastening part, the branch of the first fastening part lateral surface is arranged in Support part point and the earth anchor 4 being embedded in sole plate 3.Wherein, the earth anchor 4 can be bent by the round steel of diameter 20mm; The setting of the interval of earth anchor 4, the longitudinal pitch of adjacent earth anchor 4 are 500mm-700mm, and the horizontal spacing of adjacent earth anchor 4 is 800mm- 1000mm.It is concrete layer 2 between first fastening part medial surface and slope protection pile 1.
Specifically, gag lever post 16 is through setting as shown in Figure 1, support section includes diagonal brace 14, connecting rod 15 and gag lever post 16 Between earth anchor 4;The lateral surface of first fastening part is set at the top of diagonal brace 14, and 14 bottom of diagonal brace is located on sole plate 3;Tiltedly Pass through fastener fixing at support 14 and the connecting node of gag lever post 16;15 one end of connecting rod is located at sole plate 3 and the first fastening part The angle of lateral surface, 15 other end of connecting rod ride upon on diagonal brace 14, and the connecting node of connecting rod 15 and diagonal brace 14 passes through fastener It is fixed.
As shown in figure 5, the first fastening part include form surfacing 5,5 lateral surface of form surfacing that is laid in vertical times stupefied 6, The transverse direction master that vertical stupefied 6 lateral surface is arranged in fitting is stupefied 7, vertical back cord 10, U-shaped anchor bolt 8 and block 9, U-shaped anchoring spiral shell The setting of 8 outward opening of bolt, U-shaped 8 one end of anchor bolt is in the concrete layer 2, and two shanks of bolt of U-shaped anchor bolt 8 are to overhanging Out and sequentially pass through form surfacing 5, laterally main stupefied 7.
With further reference to shown in Fig. 7, block 9 is fixed on the tail portion of two shanks of bolt of U-shaped anchor bolt 8 by nut 13; There are the gaps for being clamped two vertical back cords 10 of setting between block 9 and laterally master stupefied 7.
As shown in Fig. 2, extended segment formwork system includes at least one second fastening part, second fastening part includes Form surfacing 5, vertical times stupefied the 6 of 5 lateral surface of form surfacing that is laid in, fitting be arranged in vertical stupefied 6 lateral surface transverse direction it is main Stupefied 7, vertical back cord 10, U-shaped anchor bolt 8, block 9, vertical L-type draw dowel 11, lateral lever 12, return back to top upright bar 17 and setting In the U support at 17 top of upright bar that returns back to top.U-shaped 8 outward opening of anchor bolt setting, U-shaped 8 one end of anchor bolt is embedded in concrete layer 2 Interior, two shanks of bolt of U-shaped anchor bolt 8 sequentially pass through form surfacing 5, laterally main stupefied 7 outward.Block 9 is fixed by nut 13 In the tail portion of two shanks of bolt of U-shaped anchor bolt 8;There are being used for, clamping setting two is vertical to be carried on the back between block 9 and laterally master stupefied 7 Stupefied 10 gap.The setting of 17 bottom of upright bar return back to top on sole plate 3, U holds in the palm opening upwards setting and the vertical back cord 10 of support. In order to stablize the vertical clamping of back cord 10, full stopper can also be filled in the gap between block 9 and laterally master stupefied 7.It is pouring During building concrete, wall bottom is to bear lateral pressure maximum, and bottom lateral pressure undertakes mainly by the U-shaped anchor bolt 8 of twice, root The pre-buried quality of the U-shaped anchor bolt 8 in portion is the successful deciding factor of single side formwork system.
As shown in figs. 4 and 6, the vertical L-type draws dowel 11 that can be bent by the round steel of diameter 25mm, including pre- The short side dowel that is embedded in the initial segment formwork system in concrete layer 2 and the outwardly directed long side dowel of vertical back cord 10 is passed through, Long side dowel tail portion mantle fiber handles and tightens fixation by nut 13;Lateral lever 12 is arranged in long side dowel and vertical back cord 10 angle, lateral lever 12 can be 5# channel steel.Vertical L-type draws 11 bending length of dowel, by establish model carry out by Power calculates, and determines that pre-buried vertical L-type draws the loading angle of dowel 11, scene processing must strict control bending angle and length.It is perpendicular It draws dowel 11 to be fixed on vertical back cord 10 by the lateral lever 12 that 5# channel steel is done to L-type, is born mainly by the drawknot node Therefore portion's lateral pressure need to guarantee that vertical L-type draws the long side dowel of dowel 11 to be pierced by the middle part of the vertical back cord 10 of double I-steel, and It is tightened using at least two nuts 13.
Wherein, 10 specification of vertical back cord is 16# I-steel.Vertical time stupefied 6 flitch for 50*100mm;Laterally master is stupefied 7 are made of two steel pipes disposed in parallel;Diameter of steel tube is 48mm.Form surfacing 5 is the two-sided overlay film multi-layer board of 15mm thickness.
Embodiment 1
The construction method that exterior wall pours is carried out using above-mentioned single side formwork system, the specific steps are as follows:
Step 1, the high 6500mm of exterior wall to be poured can be classified as two sections: the initial segment formwork system and extended segment branch die body The height that pours of system, the first fastening part is 3500mm;The height that pours of second fastening part is 3000mm.Extended segment branch die body Only need second fastening part that can be poured into wall top in system.
Step 2 is stocked up;
Step 3, the pre-buried earth anchor 4 in sole plate 3, while gag lever post 16 is set;The setting of the interval of earth anchor 4, adjacent earth anchor 4 Longitudinal pitch is 600mm, and the horizontal spacing of adjacent earth anchor 4 is 1000mm;
Step 4 sets up the first fastening part of the initial segment formwork system in 1 side of slope protection pile;Form surfacing 5 is set, in template The lateral surface installation vertical secondary stupefied 6 of panel 5 installs laterally master stupefied 7 additional in vertical stupefied 6 lateral surface;U-shaped 8 He of anchor bolt is installed Vertical back cord 10;
After completing the first fastening part, diagonal brace 14 and connecting rod 15 is arranged in step 5;Respectively by the connection section of diagonal brace 14 and connecting rod 15 The connecting node fastener fixing of point, diagonal brace 14 and gag lever post 16;
Step 6 checks the initial segment formwork system, and after qualified, casting concrete pours height and is less than 3500mm;At the beginning of concrete The short side dowel of dowel 11 is drawn to be embedded to wherein vertical L-type before solidifying, the supporting fixing point as extended segment formwork system;
Step 7, the concrete in be initiated section of formwork system reach intensity, and the first fastening part lateral surface is arranged in dismounting Support section, form surfacing 5, vertical time stupefied 6, laterally main stupefied 7, vertical back cord 10 and block 9;
Step 8 sets up the second fastening part of extended segment formwork system right above 1 side of slope protection pile, the initial segment formwork system Point;Form surfacing 5 is set, at lateral surface installation vertical time stupefied 6 of form surfacing 5, is installed additional in vertical stupefied 6 lateral surface laterally main Stupefied 7;U-shaped anchor bolt 8 and vertical back cord 10 are installed;The upright bar 17 that returns back to top is installed, in the upright bar 17 that returns back to top close to vertical back cord 10 When install additional U support;
Step 9, the second fastening part in checking step eight, after qualified, casting concrete.After concrete reaches intensity Demoulding.
Embodiment 2, single side formwork system and the construction method poured using system progress exterior wall are different with embodiment 1 Place is that the high 8700mm of exterior wall to be poured can be divided into three sections, i.e. the initial segment formwork system and extended segment formwork system. Wall top can be poured into there are two the second fastening part in the formwork system of extended segment.First fastening part pour height be 3500mm;The height that pours of the second fastening part is 3000mm for the first time, and the height that pours of second of second fastening part is 2200mm。
As shown in Fig. 2, the construction method for pouring the second fastening part for the second time repeats step 7 and step 8.That is, first Secondary second fastening part pours after height 3000mm pours, and the concrete in the second fastening part reaches strong for the first time Degree is removed and the form surfacing 5 of the second fastening part lateral surface, vertical time stupefied 6, laterally main stupefied 7, vertical back cord for the first time is arranged in 10, block 9, return back to top upright bar 17 and U support.
As shown in figure 3, setting up second of second fastening part on the second fastening part top for the first time, template sets up structure Identical as first time, return back to top 17 height of upright bar and actually required matched, when necessary, can return back to top upright bar 17 it Between set up horizon bar, further increase the stability of support.Until being poured into exterior wall wall top.
Brief summary
Single side formwork system provided by the invention and the construction method poured using system progress exterior wall, flexible operation mode, According to outer wall of basement single side formwork construction operating condition, wall to be poured can be divided into multistage, be performed in multiple times pouring construction. The form surfacing 5 of second fastening part, vertical time stupefied 6, fitting be arranged in vertical stupefied 6 lateral surface transverse direction master stupefied 7 it is hanging Setting, it is only necessary to which back cord is withstood in the upright bar 17 that returns back to top.Therefore, the initial segment formwork system, the first time in the formwork system of extended segment are selected The outer wall of basement for pouring the second fastening part is this engineering template, establishes force analysis model, remaining position is as mark Standard, referring to implementation.
The foregoing is merely the preferable specific embodiments of the present invention, but scope of protection of the present invention is not limited thereto, The change or replacement that anyone skilled in the art is expected in the technical scope disclosed by the present invention should all be contained Lid is within protection scope of the present invention.

Claims (10)

1. single side formwork system, it is characterised in that: the formwork system is arranged in slope protection pile (1) side, including the initial segment branch die body The extended segment formwork system for being and being arranged in above the initial segment formwork system, the initial segment formwork system are arranged in sole plate (3) on, including the first fastening part, the support section of the first fastening part lateral surface is set and is embedded in sole plate (3) Interior earth anchor (4);It is between first fastening part medial surface and slope protection pile (1) concrete layer (2);
First fastening part includes vertical secondary stupefied (6), the fitting setting of form surfacing (5), setting in form surfacing (5) lateral surface In transverse direction master stupefied (7), vertical back cord (10), U-shaped anchor bolt (8) and the block (9) of vertical stupefied (6) lateral surface, U-shaped anchoring The setting of bolt (8) outward opening, U-shaped anchor bolt (8) one end is in concrete layer (2), two spiral shells of U-shaped anchor bolt (8) Tightening latch is protruding and sequentially passes through form surfacing (5), laterally main stupefied (7);
Block (9) is fixed on the tail portion of two shanks of bolt of U-shaped anchor bolt (8) by nut (13);
There are the gaps for being clamped two vertical back cords (10) of setting between block (9) and laterally main stupefied (7);
Extended segment formwork system includes at least one second fastening part, and second fastening part includes form surfacing (5), sets Set vertical time stupefied (6) of form surfacing (5) lateral surface, fitting setting vertical secondary stupefied (6) lateral surface transverse direction master stupefied (7), Vertical back cord (10), U-shaped anchor bolt (8), block (9), vertical L-type draw dowel (11) and lateral lever (12), U-shaped anchoring spiral shell The setting of bolt (8) outward opening, U-shaped anchor bolt (8) one end is in concrete layer (2), two bolts of U-shaped anchor bolt (8) Bar sequentially passes through form surfacing (5), laterally main stupefied (7) outward;
Block (9) is fixed on the tail portion of two shanks of bolt of U-shaped anchor bolt (8) by nut (13);
There are the gaps for being clamped two vertical back cords (10) of setting between block (9) and laterally main stupefied (7);
Vertical L-type draw dowel (11) include be embedded in short side dowel in the initial segment formwork system in concrete layer (2) and from It is pierced by between two vertical back cords (10) and outwardly extending long side dowel, long side dowel tail portion mantle fiber handles and pass through nut (13) fixation is tightened;Lateral lever (12) is arranged in the angle of long side dowel and vertical back cord (10).
2. single side formwork system as described in claim 1, which is characterized in that the earth anchor (4) is curved by the round steel of diameter 20mm It rolls over;Earth anchor (4) interval setting, the longitudinal pitch of adjacent earth anchor (4) are 500mm-700mm, the cross of adjacent earth anchor (4) It is 800mm-1000mm to spacing.
3. single side formwork system as described in claim 1, which is characterized in that support section includes diagonal brace (14), connecting rod (15) With gag lever post (16), gag lever post (16) is through setting between earth anchor (4);
The lateral surface of first fastening part is set at the top of diagonal brace (14), and diagonal brace (14) bottom is located on sole plate (3);
Pass through fastener fixing at the connecting node of diagonal brace (14) and gag lever post (16);
Connecting rod (15) one end is located at the angle of sole plate (3) Yu the first fastening part lateral surface, connecting rod (15) other end It rides upon on diagonal brace (14), the connecting node of connecting rod (15) and diagonal brace (14) passes through fastener fixing.
4. single side formwork system as described in claim 1, which is characterized in that the vertical back cord (10) is the work of specification 16# Word steel.
5. single side formwork system as described in claim 1, which is characterized in that vertical time stupefied (6) flitch for 50*100mm;It is horizontal It is made of to master stupefied (7) two steel pipes disposed in parallel;Diameter of steel tube is 48mm.
6. single side formwork system as described in claim 1, which is characterized in that form surfacing (5) is the two-sided overlay film of 15mm thickness Multi-layer board.
7. single side formwork system as described in claim 1, which is characterized in that vertical L-type draws dowel (11) by diameter 25mm's Round steel is bent.
8. single side formwork system as described in claim 1, which is characterized in that the second fastening part further includes return back to top upright bar (17) With the U support being arranged at the top of the upright bar that returns back to top (17);The setting of upright bar (17) bottom return back to top on sole plate (3), U holds in the palm opening upwards Setting and the vertical back cord of support (10).
9. the construction method that exterior wall pours is carried out using single side formwork system such as of any of claims 1-8, it is special Sign is that specific step is as follows for construction method:
Exterior wall height to be poured is segmented by step 1, and the height that pours of the first fastening part is less than in the initial segment formwork system Equal to 3500mm;The height that pours of single second fastening part is less than or equal to 3000mm in the formwork system of extended segment;
Step 2, according to the quantity of the second fastening part, in beginning section formwork system size after segmentation, extended segment formwork system The size of two fastening parts is stocked up;
Step 3, gag lever post (16) are arranged simultaneously in pre-buried earth anchor (4) in sole plate (3);The setting of earth anchor (4) interval, it is adjacent The longitudinal pitch of earth anchor (4) is 500mm-700mm, and the horizontal spacing of adjacent earth anchor (4) is 800mm-1000mm;
Step 4 sets up the first fastening part of the initial segment formwork system in slope protection pile (1) side;It is arranged form surfacing (5), Vertical time of the lateral surface installation stupefied (6) of form surfacing (5) installs laterally main stupefied (7) additional in vertical stupefied (6) lateral surface;It installs U-shaped Anchor bolt (8) and vertical back cord (10);
After completing the first fastening part, diagonal brace (14) and connecting rod (15) is arranged in step 5;Respectively by diagonal brace (14) and connecting rod (15) Connecting node, the connecting node fastener fixing of diagonal brace (14) and gag lever post (16);
Step 6 checks the initial segment formwork system, and after qualified, casting concrete pours height and is less than or equal to 3500mm;In coagulation Vertical L-type is drawn into the short side dowel embedment of dowel (11) wherein before native initial set;
Step 7, the concrete in be initiated section of formwork system reach intensity, and the first fastening part lateral surface is arranged in dismounting Support section, form surfacing (5), vertical time stupefied (6), lateral main stupefied (7), vertical back cord (10) and block (9);
Step 8 sets up the second fastening of extended segment formwork system right above slope protection pile (1) side, the initial segment formwork system Part;It is arranged form surfacing (5), in vertical time of the lateral surface installation stupefied (6) of form surfacing (5), in vertical stupefied (6) lateral surface Install laterally main stupefied (7) additional;U-shaped anchor bolt (8) and vertical back cord (10) are installed;Installation returns back to top upright bar (17), in the upright bar that returns back to top (17) close to vertical back cord (10) U support is installed when additional;
Step 9 checks the second fastening part, after qualified, casting concrete.
10. as claimed in claim 9 carry out the construction method that exterior wall pours using single side formwork system, which is characterized in that step In rapid two, the quantity of the second fastening part is greater than one in the formwork system of extended segment, the construction method weight of the second fastening part Multiple step 7 and step 8, until being poured into exterior wall wall top.
CN201810994533.4A 2018-08-29 2018-08-29 Single-side formwork supporting system and construction method for pouring outer wall by utilizing same Active CN109162296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810994533.4A CN109162296B (en) 2018-08-29 2018-08-29 Single-side formwork supporting system and construction method for pouring outer wall by utilizing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810994533.4A CN109162296B (en) 2018-08-29 2018-08-29 Single-side formwork supporting system and construction method for pouring outer wall by utilizing same

Publications (2)

Publication Number Publication Date
CN109162296A true CN109162296A (en) 2019-01-08
CN109162296B CN109162296B (en) 2023-10-24

Family

ID=64893330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810994533.4A Active CN109162296B (en) 2018-08-29 2018-08-29 Single-side formwork supporting system and construction method for pouring outer wall by utilizing same

Country Status (1)

Country Link
CN (1) CN109162296B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043032A (en) * 2019-05-04 2019-07-23 唐世飞 A kind of auxiliary system of the nonstandard structure formwork of building
CN110043023A (en) * 2019-04-30 2019-07-23 中建八局第三建设有限公司 A kind of bidirectional hydraulic for unilateral formwork frame body is from servo support device
CN110185065A (en) * 2019-06-19 2019-08-30 中天建设集团有限公司 With the construction method of construction joint substitution temperature post-cast strip
CN110242038A (en) * 2019-07-08 2019-09-17 中信国安建工集团有限公司 Basement cast-in-place concrete side wall construction technology
CN110878631A (en) * 2019-12-02 2020-03-13 中国水利水电第八工程局有限公司 Template system for construction of side wall on side of opening and construction method
CN111622496A (en) * 2020-06-22 2020-09-04 中国五冶集团有限公司 Super large shear force wall unilateral template reinforced structure
CN114086761A (en) * 2021-10-11 2022-02-25 中建四局土木工程有限公司 Template supporting structure
CN114525801A (en) * 2022-01-25 2022-05-24 北京建工集团有限责任公司 Multi-span height difference foundation slab structure and construction method thereof
CN114658219A (en) * 2022-04-18 2022-06-24 宁夏第三建筑有限公司 Single-side assembly type formwork erecting construction method
CN115075547A (en) * 2022-05-06 2022-09-20 中建二局深圳建投发展有限公司 Unilateral formwork supporting device and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040080902A (en) * 2003-03-12 2004-09-20 유대식 Construction method for concrete wall using wire and euro form racker system for promoting convenience on work
KR100746551B1 (en) * 2007-03-06 2007-08-06 (주)세건이엔지 The system and construction method to build apartment
CN101839061A (en) * 2010-05-06 2010-09-22 中国建筑第二工程局有限公司 Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof
CN102220806A (en) * 2011-03-30 2011-10-19 中联世纪建设集团有限公司 Construction method for supporting and reinforcing ultrahigh hanging single-sided vertical formwork
CN104196055A (en) * 2014-08-08 2014-12-10 山东万鑫建设有限公司 Construction method for frameworks on lower portion of basement exterior wall
CN204780994U (en) * 2015-06-11 2015-11-18 中建一局集团第六建筑有限公司 Underground continuous wall lining wall construction structure
CN205046848U (en) * 2015-09-11 2016-02-24 山东送变电工程公司 Gate -type steel sheet mould holder
CN107268634A (en) * 2017-06-27 2017-10-20 湖南省第六工程有限公司 Deep basal pit waist rail construction typified form system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040080902A (en) * 2003-03-12 2004-09-20 유대식 Construction method for concrete wall using wire and euro form racker system for promoting convenience on work
KR100746551B1 (en) * 2007-03-06 2007-08-06 (주)세건이엔지 The system and construction method to build apartment
CN101839061A (en) * 2010-05-06 2010-09-22 中国建筑第二工程局有限公司 Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof
CN102220806A (en) * 2011-03-30 2011-10-19 中联世纪建设集团有限公司 Construction method for supporting and reinforcing ultrahigh hanging single-sided vertical formwork
CN104196055A (en) * 2014-08-08 2014-12-10 山东万鑫建设有限公司 Construction method for frameworks on lower portion of basement exterior wall
CN204780994U (en) * 2015-06-11 2015-11-18 中建一局集团第六建筑有限公司 Underground continuous wall lining wall construction structure
CN205046848U (en) * 2015-09-11 2016-02-24 山东送变电工程公司 Gate -type steel sheet mould holder
CN107268634A (en) * 2017-06-27 2017-10-20 湖南省第六工程有限公司 Deep basal pit waist rail construction typified form system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043023A (en) * 2019-04-30 2019-07-23 中建八局第三建设有限公司 A kind of bidirectional hydraulic for unilateral formwork frame body is from servo support device
CN110043032A (en) * 2019-05-04 2019-07-23 唐世飞 A kind of auxiliary system of the nonstandard structure formwork of building
CN110185065A (en) * 2019-06-19 2019-08-30 中天建设集团有限公司 With the construction method of construction joint substitution temperature post-cast strip
CN110242038A (en) * 2019-07-08 2019-09-17 中信国安建工集团有限公司 Basement cast-in-place concrete side wall construction technology
CN110878631A (en) * 2019-12-02 2020-03-13 中国水利水电第八工程局有限公司 Template system for construction of side wall on side of opening and construction method
CN111622496A (en) * 2020-06-22 2020-09-04 中国五冶集团有限公司 Super large shear force wall unilateral template reinforced structure
CN114086761A (en) * 2021-10-11 2022-02-25 中建四局土木工程有限公司 Template supporting structure
CN114525801A (en) * 2022-01-25 2022-05-24 北京建工集团有限责任公司 Multi-span height difference foundation slab structure and construction method thereof
CN114658219A (en) * 2022-04-18 2022-06-24 宁夏第三建筑有限公司 Single-side assembly type formwork erecting construction method
CN114658219B (en) * 2022-04-18 2024-02-06 宁夏第三建筑有限公司 Construction method for single-side assembled formwork support
CN115075547A (en) * 2022-05-06 2022-09-20 中建二局深圳建投发展有限公司 Unilateral formwork supporting device and construction method

Also Published As

Publication number Publication date
CN109162296B (en) 2023-10-24

Similar Documents

Publication Publication Date Title
CN109162296A (en) Single side formwork system and the construction method poured using system progress exterior wall
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN104400898A (en) Vertical integral forming mould of novel prefabricated concrete segment and forming method thereof
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN107327050A (en) A kind of avoid-dismantle outer wall of basement flange single side formwork device and construction method
CN208949920U (en) Single side formwork system
CN103161313B (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN104695708A (en) Construction method for expansion joint formwork erection in narrow space of high-rise building external wall
CN113216252A (en) Expansion joint reinforcing device and method for multi-section continuous casting of underground pipe gallery
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN100547174C (en) The prefab form and the construction technology thereof of concrete flow passage gradual change fillet segment top board construction
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN208152107U (en) Steel-edged rubber water stop mounting device
CN219826106U (en) Single side inner wall and inner wall template system for existing brick masonry building
CN209260960U (en) It is a kind of to facilitate the wall for installing interim bearing diagonal
CN208235942U (en) One kind being used for shear wall interlayer joint part three-stage moldboard reinforcing tool
CN106049531A (en) Construction method for high-water-content ultra-soft soil box type multi-chamber cast-in-place frame tunnel
CN211646488U (en) A device that is used for subway lid to dig reverse construction method construction joint water repellent
CN206539007U (en) A kind of arch steel concrete wall formwork erecting structure
CN205875202U (en) Cast -in -place frame tunnel formwork system of high water content ultra -soft soil box multi -chambered
CN211114642U (en) Connection structure of security protection door and main wall body
CN107841997A (en) Gate pier and fan-shaped sealing built-in fitting primary concreting structure and method
CN211173065U (en) Basement outer wall construction joint anti-seepage template structure
CN211369523U (en) Template system of expansion joint shear force wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant