CN107268622A - A kind of resistance to plucking anchor foundation and its construction method - Google Patents

A kind of resistance to plucking anchor foundation and its construction method Download PDF

Info

Publication number
CN107268622A
CN107268622A CN201610215881.8A CN201610215881A CN107268622A CN 107268622 A CN107268622 A CN 107268622A CN 201610215881 A CN201610215881 A CN 201610215881A CN 107268622 A CN107268622 A CN 107268622A
Authority
CN
China
Prior art keywords
resistance
drilling
silk
waterproof explosive
detonator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610215881.8A
Other languages
Chinese (zh)
Inventor
言志信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Urban Construction
Original Assignee
Henan University of Urban Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Urban Construction filed Critical Henan University of Urban Construction
Priority to CN201610215881.8A priority Critical patent/CN107268622A/en
Publication of CN107268622A publication Critical patent/CN107268622A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/806Ground anchors involving use of explosives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0023Slurry
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0073Explosives

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of resistance to plucking anchor foundation, it includes the anchor rod body in beard and hair shape that oblique cutting enters ground.The anchor rod body is made up of resistance to drawing-down silk, and the waterproof explosive equipped with detonator is tied up in the resistance to bottom for drawing and attenuating silk, and the resistance to drawing-down silk is uniformly distributed in along circumferential direction around the waterproof explosive equipped with the detonator.The invention also discloses the basic construction method.The present invention is simple in construction, radical change form of construction work and base form, thus investment-saving, few spoir, protects environment.

Description

A kind of resistance to plucking anchor foundation and its construction method
Technical field
The present invention relates to a kind of resistance to plucking anchor foundation structure type, more particularly to a kind of resistance to plucking anchor foundation and its construction party Method.
Background technology
Anti_floating foundation mainly has heavy excavation basis, draws digging spread foundation, explosive expansion pile foundation etc.;Heavy excavation foundation class, which is meant, to be buried The basis of rammed earth is placed in the foundation ditch dug in advance and will backfill, it is constituted the resistance to plucking soil body with the backfill of disturbance, keeps base The stabilization of plinth;Digging spread foundation class is drawn to mean and be poured into the native tire scraped out mechanically or manually to draw with concrete and framework of steel reinforcement Basis, it be kept with natural rock-filled resistance to plucking basis on pull out stabilization;Explosion expanded piling foundation class is meant with concrete and reinforcing bar Skeleton is cast in the stub basis of the bellend in the native tire being molded with explosive expansion, and its resistance to plucking soil body is essentially close to intact day It is so native.
Either heavy excavation foundation class, still drawing digging spread foundation class, the construction of explosion expanded piling foundation class has larger difficulty, And exist that quantities is big, time-consuming, cost is high, environment is caused compared with havoc, but the drag that can be provided it is limited plus Gu the problems such as effect is not ideal enough, for example:The key dimension of heavy excavation foundation class is determined by its resistance to plucking stability requirement, is The requirement of stability is pulled out on meeting, it is necessary to increase key dimension, spoir certainly will be increased and the destruction to environment is aggravated.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of resistance to plucking anchor foundation simple in construction, investment reduction.
Another technical problem to be solved by this invention is the construction method of the resistance to plucking anchor foundation.
To solve the above problems, a kind of resistance to plucking anchor foundation of the present invention, it is characterised in that:It enters ground including oblique cutting The anchor rod body in beard and hair shape;The anchor rod body is made up of resistance to drawing-down silk, and the resistance to bottom for drawing and attenuating silk is tied up equipped with detonator Waterproof explosive, and the resistance to silk that draws and attenuates is uniformly distributed in week of the waterproof explosive equipped with the detonator along circumferential direction Enclose.
A kind of construction method of resistance to plucking anchor foundation as described above, comprises the following steps:
(1) Rock And Soil is set by design requirement and drilled;
(2) part waterproof explosive is placed in the bottom hole of the drilling, the ground near the drilling hole bottom is pushed open using its blast Weak folder mud in body crack;
(3) the waterproof explosive equipped with detonator is tied up in the bottom for the anchor rod body being made up of resistance to drawing-down silk, and make the silk of resistance to drawing-down It is uniformly distributed in along circumferential direction around the waterproof explosive equipped with the detonator;
(4) the waterproof explosive is placed in the drilling hole bottom;
(5) the slip casting into the drilling, makes injecting cement paste bury the waterproof explosive of anchor rod body institute band completely, and make it Thickness exceeds powder charge top, and detonate the waterproof explosive at once;
(6) it is suitable for reading to the drilling to refilling the injecting cement paste in the drilling, while crack grouting body of casting splits in country rock Gap.
The present invention has advantages below compared with prior art:
1st, first, the detonation gas produced by explosive charge of the present invention is formed to the drilling hole bed rock soil body consumingly impact compress The enough cavitys of size, form the anchoring body with bottom enlarged footing, needed for the anchor force provided can be sufficiently achieved by slip casting Withdrawal resistance;Second, the detonation gas produced by explosive charge is produced by force to the weak folder mud in drilling hole bed rock soil mass crack Strong effect, weakness folder mud is pushed open, will be improved after making the crack degree increase and structural change in Rock-soil Mass Structure face, filling and injecting slurry body With the internal Rock And Soil of raising(Rock And Soil around foot of hole)Physical and mechanical property;Third, being detonated at once after boring hole-bottom slurry-injection The explosive being buried, detonation strength drives resistance to drawing-down silk to be merged with injecting cement paste, i.e. driving is surrounded on the resistance to drawing in injecting cement paste Filament " disorderly such as fiber crops ", " in great confusion ", as " tangled skein of jute " blended closely with injecting cement paste;Fourth, detonation strength is driven Around dynamic injecting cement paste filling borehole bottom while Rock And Soil crack, the resistance to drawing-down silk of detonation strength driving beard and hair anchor pole is to rock Soil mass crack is scattered, and the resistance to drawing-down silk for especially driving beard and hair anchor pole by the injecting cement paste of detonation strength driving is penetrated dearly Around to drilling bottom among Rock And Soil crack, injecting cement paste by beard and hair it is anchor rod anchored in drilling while, tapping hole bottom cavity and Wall-rock crack, is formed using the injecting cement paste filled in drilling as core, is drawn by the way that the injecting cement paste in wall-rock crack and beard and hair anchor pole are resistance to Comprehensive, three-dimensional, the compound anchoring of filament extension, makes the safety of engineering be protected.
2nd, the present invention is simple in construction, radical change construction and and anchor type, significantly saved investment, reduce and abandon Soil, is protected environment.
Brief description of the drawings
The embodiment to the present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the invention.
Fig. 2 is powder charge section cross-sectional view before beard and hair anchor pole explosion of the present invention.
In figure:1-Rock And Soil, 2-injecting cement paste 3-drilling 4-anchor rod body, 5-wall-rock crack, 6-crack grouting 7-detonator of body 8-11-ground of resistance to drawing-down silk 9-waterproof explosive, 10-the wall of a borehole.
Embodiment
As shown in Figure 1 and Figure 2, a kind of resistance to plucking anchor foundation, it includes the anchor rod body 4 in beard and hair shape that oblique cutting enters ground 11. Anchor rod body 4 by it is resistance to drawing-down silk 8 constitute, i.e., by can occur under detonation the steel wire of moderate finite deformation or(With)Other silk thread structures Into.The waterproof explosive 9 equipped with detonator 7 is tied up in the resistance to bottom for drawing and attenuating silk 8, and resistance to drawing-down silk 8 is uniformly distributed along circumferential direction Around the waterproof explosive 9 equipped with detonator 7.
The construction method of the resistance to plucking anchor foundation, comprises the following steps:
(1) drilling 3 is set to Rock And Soil 1 by design requirement;
(2) part waterproof explosive 9 is placed in the bottom hole of drilling 3, pushed open using its blast near 3 bottom holes of drilling in the crack of Rock And Soil 1 Weak folder mud;
(3) the waterproof explosive 9 equipped with detonator 7 is tied up in the bottom for the anchor rod body 4 being made up of resistance to drawing-down silk 8, and make the silk of resistance to drawing-down 8 are uniformly distributed in around the waterproof explosive 9 equipped with detonator 7 along circumferential direction;
(4) waterproof explosive 9 is placed in 3 bottom holes of drilling;
(5) the slip casting into drilling 3, makes injecting cement paste 2 bury the waterproof explosive 9 of 4 bands of anchor rod body completely, and exceed its thickness Powder charge top, detonate waterproof explosive 9 at once;The crack of Rock And Soil 1 around the bottom of 2 filling borehole of detonation strength driving injecting cement paste 3 Meanwhile, detonation strength drives resistance to drawing-down silk 8 to be scattered to the wall of a borehole 10 and the crack of Rock And Soil 1;
(6) it is suitable for reading to drilling 3 to refilling injecting cement paste 2 in drilling 3, while crack grouting body 6 of casting is in wall-rock crack 5.Build Rise with drill 3 in injecting cement paste 2 be core, by the injecting cement paste 2 in wall-rock crack 5 and it is resistance to draw and attenuate the extension of silk 8 it is comprehensive, vertical Body, compound anchoring, so that engineering safety.

Claims (2)

1. a kind of resistance to plucking anchor foundation, it is characterised in that:It enters ground including oblique cutting(11)The anchor rod body in beard and hair shape(4); The anchor rod body(4)By the silk of resistance to drawing-down(8)Constitute, the silk of resistance to drawing-down(8)Bottom tie up equipped with detonator(7)Waterproof explosive (9), and make the silk of resistance to drawing-down(8)It is uniformly distributed in along circumferential direction equipped with the detonator(7)The waterproof explosive(9)'s Around.
2. a kind of construction method of resistance to plucking anchor foundation as claimed in claim 1, comprises the following steps:
(1) by design requirement to Rock And Soil(1)Drilling is set(3);
(2) by part waterproof explosive(9)It is placed in the drilling(3)Bottom hole, push the drilling open using its blast(3)Bottom hole is attached The nearly Rock And Soil(1)Weak folder mud in crack;
(3) by the silk of resistance to drawing-down(8)The anchor rod body of composition(4)Bottom tie up equipped with detonator(7)Waterproof explosive(9), and make The silk of resistance to drawing-down(8)It is uniformly distributed in along circumferential direction equipped with the detonator(7)The waterproof explosive(9)Around;
(4) by the waterproof explosive(9)It is placed in the drilling(3)Bottom hole;
(5) to the drilling(3)Interior slip casting, makes injecting cement paste(2)The anchor rod body is buried completely(4)The water resistant of institute's band is fried Medicine(9), and its thickness is exceeded powder charge top, detonate the waterproof explosive at once(9);
(6) to the drilling(3)Inside refill the injecting cement paste(2)To the drilling(3)It is suitable for reading, while crack grouting of casting Body(6)In wall-rock crack(5).
CN201610215881.8A 2016-04-09 2016-04-09 A kind of resistance to plucking anchor foundation and its construction method Pending CN107268622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610215881.8A CN107268622A (en) 2016-04-09 2016-04-09 A kind of resistance to plucking anchor foundation and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610215881.8A CN107268622A (en) 2016-04-09 2016-04-09 A kind of resistance to plucking anchor foundation and its construction method

Publications (1)

Publication Number Publication Date
CN107268622A true CN107268622A (en) 2017-10-20

Family

ID=60051955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610215881.8A Pending CN107268622A (en) 2016-04-09 2016-04-09 A kind of resistance to plucking anchor foundation and its construction method

Country Status (1)

Country Link
CN (1) CN107268622A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU42500U1 (en) * 2004-07-26 2004-12-10 Открытое акционерное общество "Всероссийский научно- исследовательский институт гидротехники им. Б.Е. Веденеева" ANCHOR PILES
CN102002947A (en) * 2010-12-06 2011-04-06 武汉大学 Explosion expanded internal anchor head prestressed anchor cable for strengthening weak rock and anchoring method thereof
CN103132515A (en) * 2011-11-30 2013-06-05 兰州大学 Calabash type anchor rod
CN103774651A (en) * 2012-10-26 2014-05-07 兰州大学 Olive-shaped anti-slip key grouted anchoring supporting blasting anchor rod
CN205502006U (en) * 2016-04-09 2016-08-24 河南城建学院 Resistance to plucking anchor foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU42500U1 (en) * 2004-07-26 2004-12-10 Открытое акционерное общество "Всероссийский научно- исследовательский институт гидротехники им. Б.Е. Веденеева" ANCHOR PILES
CN102002947A (en) * 2010-12-06 2011-04-06 武汉大学 Explosion expanded internal anchor head prestressed anchor cable for strengthening weak rock and anchoring method thereof
CN103132515A (en) * 2011-11-30 2013-06-05 兰州大学 Calabash type anchor rod
CN103774651A (en) * 2012-10-26 2014-05-07 兰州大学 Olive-shaped anti-slip key grouted anchoring supporting blasting anchor rod
CN205502006U (en) * 2016-04-09 2016-08-24 河南城建学院 Resistance to plucking anchor foundation

Similar Documents

Publication Publication Date Title
CN106677192A (en) Row pile anchoring cement soil pile continuous wall supporting structure and construction process thereof
CN206599785U (en) A kind of campshed anchor draws cement earth pile diaphragm wall supporting construction
CN205954624U (en) Soil quito cable resistance to plucking basis
CN205502006U (en) Resistance to plucking anchor foundation
CN205617356U (en) Star -shaped element - stock - ball basis
CN205712063U (en) Anchor pole-ball-star member basis
CN205617355U (en) Star -shaped element - stock - ball basis
CN107268622A (en) A kind of resistance to plucking anchor foundation and its construction method
CN107268596A (en) Star basis and its construction method
CN205617357U (en) Many cable resistance to plucking bases of soil base star center and arm end
CN205501987U (en) Soil many cable resistance to plucking bases of base spider arm end
CN107268658A (en) Anchoring resistance to plucking pressure in crack rock ground corner moves basis and its construction method
CN205502049U (en) Many cable resistance to plucking bases in soil base center and board angle
CN205502047U (en) Resistance to plucking and cling compound basis
CN107268591A (en) Soil base list rope anti_floating foundation and its construction method
CN205617410U (en) Upper plate - stock - ball basis
CN205617354U (en) Stock - ball - star -shaped element basis
CN205617408U (en) Stock - upper plate - ball basis
CN205712065U (en) Ball-anchor pole-star member basis
CN205712064U (en) A kind of ball-anchor pole-star member basis
CN106337423B (en) A kind of enhanced ruggedized construction of drag and its construction method
CN205954655U (en) Smooth basis of resistance to plucking
CN107268579A (en) Crack rock ground resistance to plucking pressure moves basis and its construction method
CN107268615A (en) Crack rock ground triangle anchoring resistance to plucking pressure moves basis and its construction method
CN205502003U (en) Beard and hair stock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020