CN205617357U - Many cable resistance to plucking bases of soil base star center and arm end - Google Patents
Many cable resistance to plucking bases of soil base star center and arm end Download PDFInfo
- Publication number
- CN205617357U CN205617357U CN201620288917.0U CN201620288917U CN205617357U CN 205617357 U CN205617357 U CN 205617357U CN 201620288917 U CN201620288917 U CN 201620288917U CN 205617357 U CN205617357 U CN 205617357U
- Authority
- CN
- China
- Prior art keywords
- beard
- backing plate
- star
- bolthole
- soil base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a many cable resistance to plucking bases of soil base star center and arm end, the star -shaped element that it includes in the embedding soil base and the upper surface is above ground level, several beard and hair stock and with backing plate and anchor slab that the beard and hair stock matches. Star -shaped element is equipped with the semi -girder that the several radially stretches out, and its center is equipped with an anchor rod hole I, every the outer end of semi -girder is equipped with an anchor rod hole II, the backing plate center is equipped with an anchor rod hole III, it is several the bottom of beard and hair stock is all by the anchor, and its top is equallyd divide and is do not passed star -shaped element anchor rod hole I or anchor rod hole II, and pass the backing plate anchor rod hole III with the anchor slab is connected to together, the beard and hair stock comprises resistant finedraw, and the water -resistant explosive who is equipped with the detonator is tied up to the lower part that should be able to bear or endure the finedraw, and makes resistant finedraw is in the same direction as girth direction evenly distributed in being equipped with the detonator around the water -resistant explosive. The utility model discloses simple structure has practiced thrift the investment, and the spoir is few.
Description
Technical field
The utility model relates to soil foundation stabilization and base form, particularly relates to soil base star centre and arm end many ropes anti_floating foundation.
Background technology
At present, most bases are resistance to compression basis, i.e. basis is primarily subjected to the vertical load of superstructure applying and meets deformation and stability requirement, is typically include isolated footing, strip footing, raft foundation etc..And anti_floating foundation mainly has heavy excavation basis, draws and dig spread foundation, explosion expanded piling basis etc.;Either heavy excavation foundation class, still draw and dig spread foundation class, the construction of explosion expanded piling foundation class all has bigger difficulty, and all there is quantities long, cost height big, time-consuming, environment is caused compared with havoc, but the problems such as the drag that can provide is limited, consolidation effect is not ideal enough, under the conditions of soil base, the problems referred to above are more prominent, and the stability on the large deformation of soil base and basis becomes the key issue that must solve.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of reduction to soil base disturbance, and improves resistance to compression, pulling test strength, and optimizes loading transfer mechanism, reduces soil base star centre and arm end many ropes anti_floating foundation of soil foundation deformation simultaneously.
For solving the problems referred to above, soil described in the utility model base star centre and arm end many ropes anti_floating foundation, it is characterised in that: it includes in an embedded soil base and the overhead star member of upper surface, several beard and hair anchor pole and the backing plate matching with described beard and hair anchor pole and anchor slab;Described star member is provided with several radially-protruding semi-girder, and its center is provided with a bolthole I;The outer end of each described semi-girder is provided with a bolthole II;Described backing plate center is provided with a bolthole III;The bottom of several described beard and hair anchor poles is all anchored, and its top passes through described bolthole I or the described bolthole II of described star member respectively, and the described bolthole III passing through described backing plate connects together with described anchor slab;Described beard and hair anchor pole is made up of resistance to drawing-down silk, and the waterproof explosive equipped with detonator is tied up in the bottom of this resistance to drawing-down silk, and makes described resistance to drawing-down silk be uniformly distributed in around equipped with the described waterproof explosive of described detonator along circumferential direction.
Described soil base is one or more in mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
Described star member is provided with fixture.
The quantity of described semi-girder is three and more than three.
An injected hole is had on described backing plate.
The thickness of the diameter of the described beard and hair anchor pole that the thickness of the diameter of the described beard and hair anchor pole being placed in bolthole II described in several described semi-girder, length and the described backing plate matching with it and anchor slab is respectively less than placed in bolthole I described in described star member center, length and the described backing plate matching with it and anchor slab.
The thickness of the diameter of the described beard and hair anchor pole being placed in bolthole II described in several described semi-girder, length and the described backing plate matching with it and anchor slab is all identical.
The utility model compared with prior art has the advantage that
1st, first, the impact compress consumingly at the bottom of drilling hole of detonation gas produced by explosive charge in the utility model, cause boring end surrounding ground base crushed, form the enough cavitys of size, forming the anchoring body with bottom enlarged footing by slip casting, the anchor force being provided can sufficiently achieve makes superstructure stable;They are two years old, detonation gas produced by explosive charge is to drilling hole subsoil ground strong effect, make surrounding ground base at the bottom of hole be compressed, the crack in soil base is pushed open simultaneously, the physical and mechanical property of internal soil base (foot of hole surrounding ground base) after filling and injecting slurry body, will be improved;They are three years old, at once detonate after boring hole-bottom slurry-injection buried explosive, while detonation strength drives surrounding ground basic capsule gap at the bottom of injecting cement paste filling borehole, scatter in the resistance to drawing-down crack in the wall of a borehole and soil base for the silk driving beard and hair anchor pole, especially the resistance to drawing-down silk of beard and hair anchor pole is driven to penetrate among boring end surrounding ground basic capsule gap dearly by the strong power-actuated injecting cement paste of detonation, injecting cement paste by anchor rod anchored for beard and hair in boring in while, cavity at the bottom of tapping hole and soil basic capsule gap, formed with the injecting cement paste of filling in holing as core, draw and attenuate the comprehensive of silk extension by the injecting cement paste in soil basic capsule gap and beard and hair anchor pole are resistance to, three-dimensional, compound anchoring, the safety making engineering is protected.
2nd, the utility model simple in construction, radical change construction and base form, save investment significantly, decreased spoir, make environment be protected.
Brief description
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
Fig. 1 is the sectional view that the utility model soil base four arm star centre and arm end five rope anti_floating foundation cross anchor cable axle.
Fig. 2 is top view of the present utility model.
Fig. 3 is the utility model beard and hair anchor pole originally powder charge section cross sectional representation.
In figure: 1 soil base 2 injecting cement paste 3 is holed, and 4 beard and hair anchor pole 5 soil basic capsule gap 6 star member 7 backing plate 8 anchor slab 9 crack grouting body 10 detonators 11 are resistance to draws and attenuates cavity 16 fixture 17 ground 18 soil cement cylinder 19 semi-girder at the bottom of silk 12 waterproof explosive 13 injected hole 14 the wall of a borehole 15 hole.
Detailed description of the invention
As shown in Fig. 1 ~ 3, soil base star centre and arm end many ropes anti_floating foundation, it includes in an embedded soil base 1 and star member the 6th, several beard and hair anchor poles 4 of upper surface above ground level 17 and the backing plate 7 matching with beard and hair anchor pole 4 and anchor slab 8.
Star member 6 is provided with several radially-protruding semi-girder 19, and its center is provided with a bolthole I;The outer end of each semi-girder 19 is provided with a bolthole II;Backing plate 7 center is provided with a bolthole III;The bottom of several beard and hair anchor poles 4 is all anchored, and its top passes through bolthole I or the bolthole II of star member 6 respectively, and the bolthole III passing through backing plate 7 connects together with anchor slab (8);Beard and hair anchor pole 4 is made up of resistance to drawing-down silk 11, and the waterproof explosive 12 equipped with detonator 10 is tied up in bottom of this resistance to drawing-down silk 11, and make resistance to drawing-down silk 11 along circumferential direction be uniformly distributed in equipped with detonator 10 waterproof explosive 12 around.
Wherein: soil base 1 is one or more in mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
Star member 6 is provided with fixture 16.
The quantity of semi-girder 19 is three and more than three.
An injected hole 13 is had on backing plate 7.
The thickness of the diameter of the beard and hair anchor pole 4 that the thickness of the diameter, length and the backing plate 7 matching with it and the anchor slab 8 that are placed in the beard and hair anchor pole 4 in several semi-girder 19 bolthole II is respectively less than placed in star member 6 central anchor rod aperture I, length and the backing plate 7 matching with it and anchor slab 8.
The thickness of the diameter of the beard and hair anchor pole 4 being placed in several semi-girder 19 bolthole II, length and the backing plate 7 matching with it and anchor slab 8 is all identical.
This soil base star centre and the construction method of arm end many ropes anti_floating foundation, comprise the following steps:
(1) flat base, will select location leveling;
(2) the corresponding central anchor rod aperture I of star member 6 and the bolthole II of each semi-girder 19 outer end punch in soil base 1, and center hole depth, and the hole of each semi-girder 19 outer end is shallow;
(3) the Grouting Pipe with nozzle is placed in the desired depth processing soil base 1 by the hole of step (2) gained, then uses the die-cut soil body of cement mortar, rotate and hoisting grouting pipe simultaneously, after consolidation, form soil cement cylinder 18;
(4), with the soil cement cylinder 18 that formed for star member 6 fulcrum, excavate by design requirement and pour the pit of star member 6;
(5) the axle of each the soil cement cylinder 18 being formed by design requirement edge arranges boring 3;
(6) by explosive payload 50 ~ 100g, for the second time explosive payload 100 ~ 200g, for the third time explosive payload 200 ~ 400g for the first time ..., explosive payload is gradually incremented by implements explosion, until expanding into cavity at the bottom of hole at the bottom of the hole of the boring 3 in each soil cement cylinder 18;
(7) measure the size of cavity 15 at the bottom of hole, particularly as follows:
1. get out the lining rope of the different length more than boring 3 degree of depth for the length and length is equivalent to design the waddy of cavity 15 diameter at the bottom of hole;
2. one end of two lining ropes is tied up to waddy two ends respectively, and on lining rope, put on dimension mark;
3. carry in cavity (15) at the bottom of described hole sent into by waddy by the other end of two lining ropes being waddy and carry up and down, when waddy one end sticks cavity 15 wall at the bottom of hole, and dimension mark that two on lining rope consistent when, waddy is i.e. horizontal, and waddy length now is cavity 15 diameter at the bottom of hole;
(8) pour star member 6 by design requirement;
(9) tying up the waterproof explosive 12 equipped with detonator 10 in the bottom of beard and hair anchor pole 4 being made up of resistance to drawing-down silk 11, and make resistance to drawing-down silk 11 along circumferential direction be uniformly distributed in equipped with detonator 10 waterproof explosive 12 around;
By beard and hair anchor pole 4 with waterproof explosive 12 be placed in corresponding soil cement cylinder 18 by the different boltholes I of star member 6 and bolthole II and to hole at the bottom of 3 holes;
(11) slip casting in boring 3, makes injecting cement paste 2 bury the waterproof explosive 12 that beard and hair anchor pole 4 is carried completely, and makes its thickness exceed powder charge top, at once detonating waterproof explosive 12;
(12) treat that injecting cement paste 2 consolidates relief beard and hair anchor pole 4 top and passes through the bolthole III at backing plate 7 center matching with beard and hair anchor pole 4, and Shi Hanzhang lock beard and hair anchor pole 4 top on anchor slab 8;
(13) suitable for reading to refilling injecting cement paste 2 to injected hole 13 in boring 3 by the injected hole 13 on backing plate 7, crack grouting body 9 of simultaneously casting is in soil basic capsule gap 5.
Claims (7)
1. soil base star centre and arm end many ropes anti_floating foundation, it is characterised in that: it includes in embedded soil base (1) and the star member (6) of upper surface (17) above ground level, several beard and hair anchor pole (4) and the backing plate (7) matching with described beard and hair anchor pole (4) and anchor slab (8);Described star member (6) is provided with several radially-protruding semi-girder (19), and its center is provided with a bolthole I;The outer end of each described semi-girder (19) is provided with a bolthole II;Described backing plate (7) center is provided with a bolthole III;The bottom of several described beard and hair anchor poles (4) is all anchored, and its top passes through described bolthole I or the described bolthole II of described star member (6) respectively, and the described bolthole III passing through described backing plate (7) connects together with described anchor slab (8);Described beard and hair anchor pole (4) is made up of resistance to drawing-down silk (11), the waterproof explosive (12) equipped with detonator (10) is tied up in bottom of this resistance to drawing-down silk (11), and make described resistance to drawing-down silk (11) along circumferential direction be uniformly distributed in equipped with described detonator (10) described waterproof explosive (12) around.
2. soil base star centre as claimed in claim 1 and arm end many ropes anti_floating foundation, it is characterised in that: described soil base (1) is one or more in mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
3. soil base star centre as claimed in claim 1 and arm end many ropes anti_floating foundation, it is characterised in that: described star member (6) is provided with fixture (16).
4. soil base star centre as claimed in claim 1 and arm end many ropes anti_floating foundation, it is characterised in that: the quantity of described semi-girder (19) is three and more than three.
5. soil base star centre as claimed in claim 1 and arm end many ropes anti_floating foundation, it is characterised in that: have an injected hole (13) on described backing plate (7).
6. soil base star centre as claimed in claim 1 and arm end many ropes anti_floating foundation, it is characterised in that: the thickness of the diameter of the described beard and hair anchor pole (4) that the thickness of the diameter, length and the described backing plate (7) matching with it and the anchor slab (8) that are placed in the described beard and hair anchor pole (4) in the described bolthole II of several described semi-girder (19) is respectively less than placed in bolthole I described in described star member (6) center, length and the described backing plate (7) matching with it and anchor slab (8).
7. soil base star centre as claimed in claim 1 and arm end many ropes anti_floating foundation, it is characterised in that: the thickness of the diameter of the described beard and hair anchor pole (4) being placed in the described bolthole II of several described semi-girder (19), length and the described backing plate (7) matching with it and anchor slab (8) is all identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620288917.0U CN205617357U (en) | 2016-04-09 | 2016-04-09 | Many cable resistance to plucking bases of soil base star center and arm end |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620288917.0U CN205617357U (en) | 2016-04-09 | 2016-04-09 | Many cable resistance to plucking bases of soil base star center and arm end |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205617357U true CN205617357U (en) | 2016-10-05 |
Family
ID=57030126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620288917.0U Expired - Fee Related CN205617357U (en) | 2016-04-09 | 2016-04-09 | Many cable resistance to plucking bases of soil base star center and arm end |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205617357U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268594A (en) * | 2016-04-09 | 2017-10-20 | 河南城建学院 | The many rope anti_floating foundations of soil base star centre and arm end and its construction method |
-
2016
- 2016-04-09 CN CN201620288917.0U patent/CN205617357U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268594A (en) * | 2016-04-09 | 2017-10-20 | 河南城建学院 | The many rope anti_floating foundations of soil base star centre and arm end and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102191772A (en) | Prefabricated reaming pile and construction method thereof | |
CN201835276U (en) | Prefabricated reaming pile | |
CN205954624U (en) | Soil quito cable resistance to plucking basis | |
CN205617356U (en) | Star -shaped element - stock - ball basis | |
CN205617355U (en) | Star -shaped element - stock - ball basis | |
CN205617357U (en) | Many cable resistance to plucking bases of soil base star center and arm end | |
CN205712063U (en) | Anchor pole-ball-star member basis | |
CN205502049U (en) | Many cable resistance to plucking bases in soil base center and board angle | |
CN205501987U (en) | Soil many cable resistance to plucking bases of base spider arm end | |
CN205617354U (en) | Stock - ball - star -shaped element basis | |
CN205502047U (en) | Resistance to plucking and cling compound basis | |
CN205617408U (en) | Stock - upper plate - ball basis | |
CN205617410U (en) | Upper plate - stock - ball basis | |
CN205712065U (en) | Ball-anchor pole-star member basis | |
CN205712064U (en) | A kind of ball-anchor pole-star member basis | |
CN205954658U (en) | Stock - star -shaped element - ball basis | |
CN205954655U (en) | Smooth basis of resistance to plucking | |
CN205502006U (en) | Resistance to plucking anchor foundation | |
CN205617405U (en) | Stock - star -shaped element - ball basis | |
CN205617409U (en) | Upper plate - stock - ball basis | |
CN107268591A (en) | Soil base list rope anti_floating foundation and its construction method | |
CN107268593A (en) | Star member-anchor pole-ball basis and its construction method | |
CN107268596A (en) | Star basis and its construction method | |
CN107268585A (en) | Ball-anchor pole-upper plate basis and its construction method | |
CN107268583A (en) | Ball-upper plate-anchor rod foundation and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 Termination date: 20200409 |
|
CF01 | Termination of patent right due to non-payment of annual fee |