CN205617354U - Stock - ball - star -shaped element basis - Google Patents

Stock - ball - star -shaped element basis Download PDF

Info

Publication number
CN205617354U
CN205617354U CN201620288903.9U CN201620288903U CN205617354U CN 205617354 U CN205617354 U CN 205617354U CN 201620288903 U CN201620288903 U CN 201620288903U CN 205617354 U CN205617354 U CN 205617354U
Authority
CN
China
Prior art keywords
bolthole
star member
anchor
anchor pole
backing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620288903.9U
Other languages
Chinese (zh)
Inventor
言志信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Urban Construction
Original Assignee
Henan University of Urban Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Urban Construction filed Critical Henan University of Urban Construction
Priority to CN201620288903.9U priority Critical patent/CN205617354U/en
Application granted granted Critical
Publication of CN205617354U publication Critical patent/CN205617354U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a stock the ball star -shaped element basis, it includes in the embedding soil base and the star -shaped element of upper surface and ground parallel and level, one or many stocks and with backing plate and anchor slab that the stock matches. Star -shaped element is equipped with the semi -girder that the several radially stretches out, and its center is equipped with an anchor rod hole I, the backing plate center is equipped with an anchor rod hole III, the stock includes the body of rod, establishes body of rod chassis bottom and with the several branches of body of rod lower part articulated, install the water -resistant explosive who takes the detonator under the chassis, and it is several branch is binded around the water -resistant explosive, bottom, the chassis of stock reach branch is all by the anchor, and its top is passed respectively star -shaped element corresponds the position anchor rod hole I, and passes the backing plate anchor rod hole III with the anchor slab is connected to together. The utility model discloses simple structure has changed construction and basic form at all, and it lands to show has practiced thrift the investment, has reduced the spoir.

Description

A kind of anchor pole-ball-star member basis
Technical field
The utility model relates to soil foundation stabilization and base form, particularly relates to a kind of anchor pole-ball-star member basis.
Background technology
At present, most bases are resistance to compression basis, i.e. basis is primarily subjected to the vertical load of superstructure applying and meets deformation and stability requirement, is typically include isolated footing, strip footing, raft foundation etc..And anti_floating foundation mainly has heavy excavation basis, draws and dig spread foundation, explosion expanded piling basis etc.;Either heavy excavation foundation class, still draw and dig spread foundation class, the construction of explosion expanded piling foundation class all has bigger difficulty, and all there is quantities long, cost height big, time-consuming, environment is caused compared with havoc, but the problems such as the drag that can provide is limited, consolidation effect is not ideal enough, under the conditions of soil base, the problems referred to above are more prominent, and the stability on the large deformation of soil base and basis becomes the key issue that must solve.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of reduction to soil base disturbance, and improves resistance to compression, pulling test strength, and optimizes loading transfer mechanism, reduces the anchor pole-ball-star member basis of soil foundation deformation simultaneously.
For solving the problems referred to above, a kind of anchor pole-ball described in the utility model-star member basis, it is characterised in that: it includes in an embedded soil base and upper surface is concordant with ground star member, one or more anchor pole and the backing plate matching with described anchor pole and anchor slab;Described star member is provided with several radially-protruding semi-girder, and its center is provided with a bolthole I;Described backing plate center is provided with a bolthole III;Described anchor pole includes the body of rod, the chassis being located at described body of rod bottom and the several poles with described body of rod lower hinge;It is provided with the waterproof explosive of detonator under described chassis, and several described pole is bundled in around described waterproof explosive;The bottom of described anchor pole, chassis and described pole are all anchored, and its top is each passed through the described bolthole I of described star member correspondence position, and the described bolthole III passing through described backing plate connects together with described anchor slab.
Described soil base is one or more in mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
Described star member is provided with fixture.
The quantity of described semi-girder is three and more than three.
An injected hole is had on described backing plate.
The outer end of each described semi-girder is provided with a bolthole II;And the top of described anchor pole is each passed through the described bolthole II of described star member correspondence position, and the described bolthole III passing through described backing plate connects together with described anchor slab.
The center of described star member is provided with a bolthole I, and the outer end of each described semi-girder is provided with a bolthole II;The top of described anchor pole is each passed through described bolthole I and the described bolthole II of described star member correspondence position, and the described bolthole III passing through described backing plate connects together with described anchor slab.
The length of described pole is more than the length of the described body of rod and the described chassis to described body of rod bottom for the described pole hinged place.
The utility model compared with prior art has the advantage that
1st, first, the impact compress consumingly at the bottom of drilling hole of detonation gas produced by explosive charge in the utility model, cause boring end surrounding ground base crushed, form the enough cavitys of size, forming the anchoring body with bottom steel reinforced concrete expanding head by slip casting, the anchor force being provided can sufficiently achieve makes superstructure stable;They are two years old, detonation gas produced by explosive charge is to drilling hole subsoil ground strong effect, make surrounding ground base at the bottom of hole be compressed, the crack in soil base is pushed open simultaneously, the physical and mechanical property of internal soil base (foot of hole surrounding ground base) after filling and injecting slurry body, will be improved;They are three years old, by by the blast of waterproof explosive equipped with detonator under chassis, anchor rod body bottom, the pole hinged with anchor rod body is scattered under detonation driving, the upper end of each pole is hinged with anchor rod body, scatter and just stop when touching cavity wall at the bottom of hole in lower end, erect cavity wall at the bottom of hole and and anchor rod body hinged place between, i.e. scatter for symmetry axis in anchor rod body, afterwards by cavity slip casting at the bottom of whole hole, form the spherical enlarged footing of armored concrete, and Shi Hanzhang and slip casting again, build anchoring comprehensive, three-dimensional, compound.
2nd, the utility model simple in construction, radical change construction and base form, save investment significantly, decreased spoir, make environment be protected.
Brief description
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
Fig. 1 is the sectional view that the utility model crosses three bolt shaft.
Fig. 2 is top view of the present utility model.
Fig. 3 is the sectional view that originally the utility model anchor pole crosses bolt shaft.
Fig. 4 is the utility model anchor pole originally powder charge section cross sectional representation.
In figure: 1 soil base 2 injecting cement paste 3 is holed soil cement cylinder 19 chassis, cavity 16 fixture 17 ground 18 at the bottom of 4 basic capsule gap 6 star member 7 backing plate 8 anchor slab 9 crack grouting body 10 detonator 11 pole 12 waterproof explosive 13 injected hole 14 the wall of a borehole 15 holes, anchor pole 5 soil.
Detailed description of the invention
As shown in Fig. 1 ~ 4, a kind of anchor pole-ball-star member basis, star member the 6th, one or more anchor pole 4 that it includes in an embedded soil base 1 and upper surface is concordant with ground 17 and the backing plate 7 matching with anchor pole 4 and anchor slab 8.
Star member 6 is provided with several radially-protruding semi-girder, and its center is provided with a bolthole I;Backing plate 7 center is provided with a bolthole III;Anchor pole 4 includes the body of rod, the chassis 19 being located at body of rod bottom and the several poles 11 with body of rod lower hinge;It is provided with the waterproof explosive 12 of detonator 10 under chassis 19, and several pole 11 is bundled in waterproof explosive 12 around;The bottom of anchor pole 4, chassis 19 and pole 11 are all anchored, and its top is each passed through the bolthole I of star member 6 correspondence position, and the bolthole III passing through backing plate 7 connects together with anchor slab 8.
Wherein: soil base 1 is one or more in mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
Star member 6 is provided with the fixture 16 for being connected with superstructure.
The quantity of semi-girder is three and more than three.
An injected hole 13 is had on backing plate 7.
The outer end of each semi-girder is provided with a bolthole II;And the top of anchor pole 4 is each passed through the bolthole II of star member 6 correspondence position, and the bolthole III passing through backing plate 7 connects together with anchor slab 8.
The center of star member 6 is provided with a bolthole I, and the outer end of each semi-girder is provided with a bolthole II;The top of anchor pole 4 is each passed through bolthole I and the bolthole II of star member 6 correspondence position, and the bolthole III passing through backing plate 7 connects together with anchor slab 8.
The length of pole 11 is more than the length of the body of rod and pole 11 hinged place to the chassis 19 of body of rod bottom.
The construction method on this anchor pole-ball-star member basis, comprises the following steps:
(1) flat base, will select location leveling;
(2) the corresponding central anchor rod aperture I of star member 6 and the bolthole II of each semi-girder outer end punch in soil base 1, and center hole depth, and the hole of each semi-girder outer end is shallow;
(3) the Grouting Pipe with nozzle is placed in the desired depth processing soil base 1 by the hole of step (2) gained, then uses cement mortar die-cut soil base 1, rotate and hoisting grouting pipe simultaneously, after consolidation, form soil cement cylinder 18;
(4), with the soil cement cylinder 18 that formed for star member 6 fulcrum, excavate by design requirement and pour the pit of star member 6;
(5) the axle of the soil cement cylinder 18 being formed by design requirement edge arranges boring (3) by following three kinds of situations;
A hole is bored in bolthole I position at corresponding star member 6 center;
A hole is bored in bolthole II position of corresponding each semi-girder outer end of star member 6;
A hole is all bored in bolthole II position of the bolthole I at corresponding star member 6 center and each semi-girder outer end, and the hole of center hole depth and each semi-girder outer end is shallow;
(6) by explosive payload 50 ~ 800g, for the second time explosive payload 100 ~ 800g, for the third time explosive payload 200 ~ 400g for the first time ..., explosive payload is gradually incremented by implements explosion, until expanding into cavity at the bottom of hole at the bottom of the hole of the boring 3 in each soil cement cylinder 18;
(7) measure the size of cavity 15 at the bottom of hole, particularly as follows:
1. get out the lining rope of the different length more than boring 3 degree of depth for the length and length is equivalent to design the waddy of cavity 15 diameter at the bottom of hole;
2. one end of two lining ropes is tied up to waddy two ends respectively, and on lining rope, put on dimension mark;
3. carry in waddy is sent into cavity 15 at the bottom of hole by the other end of two lining ropes being waddy and carry up and down, when waddy one end sticks cavity 15 wall at the bottom of hole, and dimension mark that two on lining rope consistent when, waddy is i.e. horizontal, and waddy length now is cavity 15 diameter at the bottom of hole;
(8) pour star member 6 by design requirement;
(9) the waterproof explosive 12 with detonator 10 is installed under the chassis 19 of anchor pole 4 body of rod bottom, and the pole 11 hinged with the body of rod is bundled in waterproof explosive 12 around;
By anchor pole 4 body of rod with waterproof explosive 12 be placed in by the different boltholes I of star member 6 and bolthole II corresponding soil cement cylinder 18 holed at the bottom of 3 holes, detonating charge at once;
(11), along the wall of a borehole 14 slip casting in boring 3, make injecting cement paste 2 be fully populated with cavity;
(12) treat that injecting cement paste 2 consolidates after-applied prestressing force and locks anchor pole 4 top on anchor slab 8;
(13) suitable for reading to refilling injecting cement paste 2 to injected hole 13 in boring 3 by the injected hole 13 on backing plate 7, crack grouting body 9 of simultaneously casting is in soil basic capsule gap 5.
The utility model is applicable to soil base, but is not limited to soil base, can slightly adjust its method and steps and i.e. can be used for rock and hard hard soil foundation.

Claims (8)

1. anchor pole-ball-star member basis, it is characterised in that: it includes in embedded soil base (1) and upper surface is concordant with ground (17) star member (6), one or more anchor pole (4) and the backing plate (7) matching with described anchor pole (4) and anchor slab (8);Described star member (6) is provided with several radially-protruding semi-girder, and its center is provided with a bolthole I;Described backing plate (7) center is provided with a bolthole III;Described anchor pole (4) includes the body of rod, the chassis (19) being located at described body of rod bottom and the several poles (11) with described body of rod lower hinge;It is provided with the waterproof explosive (12) of detonator (10) under described chassis (19), and several described pole (11) is bundled in described waterproof explosive (12) around;The bottom of described anchor pole (4), chassis (19) and described pole (11) are all anchored, its top is each passed through the described bolthole I of described star member (6) correspondence position, and the described bolthole III passing through described backing plate (7) connects together with described anchor slab (8).
2. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: described soil base (1) is one or more in mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
3. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: described star member (6) is provided with fixture (16).
4. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: the quantity of described semi-girder is three and more than three.
5. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: have an injected hole (13) on described backing plate (7).
6. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: the outer end of each described semi-girder is provided with a bolthole II;And the top of described anchor pole (4) is each passed through the described bolthole II of described star member (6) correspondence position, and the described bolthole III passing through described backing plate (7) connects together with described anchor slab (8).
7. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: the center of described star member (6) is provided with a bolthole I, and the outer end of each described semi-girder is provided with a bolthole II;The top of described anchor pole (4) is each passed through described bolthole I and the described bolthole II of described star member (6) correspondence position, and the described bolthole III passing through described backing plate (7) connects together with described anchor slab (8).
8. a kind of anchor pole-ball as claimed in claim 1-star member basis, it is characterised in that: the length of described pole (11) is more than the length of the described body of rod and described pole (11) hinged place to the described chassis (19) of described body of rod bottom.
CN201620288903.9U 2016-04-09 2016-04-09 Stock - ball - star -shaped element basis Expired - Fee Related CN205617354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620288903.9U CN205617354U (en) 2016-04-09 2016-04-09 Stock - ball - star -shaped element basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620288903.9U CN205617354U (en) 2016-04-09 2016-04-09 Stock - ball - star -shaped element basis

Publications (1)

Publication Number Publication Date
CN205617354U true CN205617354U (en) 2016-10-05

Family

ID=57029111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620288903.9U Expired - Fee Related CN205617354U (en) 2016-04-09 2016-04-09 Stock - ball - star -shaped element basis

Country Status (1)

Country Link
CN (1) CN205617354U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268588A (en) * 2016-04-09 2017-10-20 河南城建学院 A kind of anchor pole-ball-star member basis and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268588A (en) * 2016-04-09 2017-10-20 河南城建学院 A kind of anchor pole-ball-star member basis and its construction method

Similar Documents

Publication Publication Date Title
CN105040692A (en) Construction method of precast concrete pile body carrier pile
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN205617355U (en) Star -shaped element - stock - ball basis
CN205617356U (en) Star -shaped element - stock - ball basis
CN205712063U (en) Anchor pole-ball-star member basis
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN205954624U (en) Soil quito cable resistance to plucking basis
CN205617354U (en) Stock - ball - star -shaped element basis
CN205617408U (en) Stock - upper plate - ball basis
CN205712065U (en) Ball-anchor pole-star member basis
CN205617410U (en) Upper plate - stock - ball basis
CN205712064U (en) A kind of ball-anchor pole-star member basis
CN205954658U (en) Stock - star -shaped element - ball basis
CN205617357U (en) Many cable resistance to plucking bases of soil base star center and arm end
CN205502049U (en) Many cable resistance to plucking bases in soil base center and board angle
CN205617405U (en) Stock - star -shaped element - ball basis
CN205501987U (en) Soil many cable resistance to plucking bases of base spider arm end
CN107268593A (en) Star member-anchor pole-ball basis and its construction method
CN205502047U (en) Resistance to plucking and cling compound basis
CN205617409U (en) Upper plate - stock - ball basis
CN107268585A (en) Ball-anchor pole-upper plate basis and its construction method
CN107268583A (en) Ball-upper plate-anchor rod foundation and its construction method
CN205502006U (en) Resistance to plucking anchor foundation
CN205954655U (en) Smooth basis of resistance to plucking
CN107268653A (en) Anchor pole-upper plate-ball basis and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20200409

CF01 Termination of patent right due to non-payment of annual fee