CN205617410U CN201620288901.XU CN201620288901U CN205617410U CN 205617410 U CN205617410 U CN 205617410U CN 201620288901 U CN201620288901 U CN 201620288901U CN 205617410 U CN205617410 U CN 205617410U
Authority
CN
China
Prior art keywords
upper plate
bolthole
anchor pole
anchor
backing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620288901.XU
Other languages
Chinese (zh)
Inventor
言志信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Urban Construction
Original Assignee
Henan University of Urban Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Urban Construction filed Critical Henan University of Urban Construction
Priority to CN201620288901.XU priority Critical patent/CN205617410U/en
Application granted granted Critical
Publication of CN205617410U publication Critical patent/CN205617410U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an upper plate the stock ball basis, it includes in the embedding soil base and the upper plate of upper surface and ground parallel and level, one or many stocks and with backing plate and anchor slab that the stock matches. The upper plate is the polygon, and its center is equipped with an anchor rod hole I, the backing plate center is equipped with an anchor rod hole III, the stock include the body of rod and with the several branches of body of rod bottom articulated, it is several the bar water -resistant explosive of detonator is equipped with to branch binding, the two if integrative its axis with axis of the rod body is unanimous, the bottom of stock and several branch is all by the anchor, and its top is passed respectively the upper plate corresponds the position anchor rod hole I, and passes the backing plate anchor rod hole III with the anchor slab is connected to together. The utility model discloses simple structure has changed construction and basic form at all, and it lands to show has practiced thrift the investment, has reduced the spoir.

Description

Upper plate-anchor pole-ball basis
Technical field
The utility model relates to soil foundation stabilization and base form, particularly relates to upper plate-anchor pole-ball basis.
Background technology
At present, overwhelming majority basis is resistance to compression basis, i.e. basis is primarily subjected to vertical load that superstructure applies and full Foot deformation and stability requirement, be typically include isolated footing, strip footing, raft foundation etc..And anti_floating foundation mainly has greatly Excavation foundation, draw dig spread foundation, explosion expanded piling basis etc.;Either heavy excavation foundation class, still draws and digs spread foundation class, explosive expansion The construction of pile foundation class all has bigger difficulty, and all there is quantities long, cost height big, time-consuming, causes environment bigger Destroy, but the problem such as the drag that can provide is limited, consolidation effect is not ideal enough, under the conditions of soil base, the problems referred to above are more prominent Go out, and the stability on the large deformation of soil base and basis becomes the key issue that must solve.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of reduction to soil base disturbance, and improves resistance to compression, resists Pull out intensity, and optimize loading transfer mechanism, reduce the upper plate-anchor pole-ball basis of soil foundation deformation simultaneously.
For solving the problems referred to above, upper plate-anchor pole described in the utility model-ball basis, it is characterised in that: it includes one In embedded soil base and the upper surface upper plate concordant with ground, one or more anchor pole and the backing plate matching with described anchor pole and Anchor slab;Described upper plate is polygon, and its center is provided with a bolthole I;Described backing plate center is provided with a bolthole III;Described Anchor pole includes the body of rod and the several poles hinged with described body of rod bottom;The binding of several described poles is equipped with the bar shaped water resistant of detonator Explosive, the two is as consistent with described body of rod axis in its axis of one;The bottom of described anchor pole and several described pole are all anchored, Its top is each passed through the described bolthole I of described upper plate correspondence position, and passes through described bolthole III and the institute of described backing plate State anchor slab to connect together.
Described soil base is mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil In one or more.
Described upper plate is provided with fixture.
An injected hole is had on described backing plate.
Each angle of described upper plate is equipped with a bolthole II;And the top of described anchor pole is each passed through described upper plate pair Answer the described bolthole II of position, and the described bolthole III passing through described backing plate connects together with described anchor slab.
The center of described upper plate is provided with a bolthole I, and each angle is provided with a bolthole II;The top of described anchor pole It is each passed through described bolthole I and the described bolthole II of described upper plate correspondence position, and pass through the described anchor pole of described backing plate Hole III connects together with described anchor slab (8).
The utility model compared with prior art has the advantage that
1st, first, the impact compress consumingly at the bottom of drilling hole of detonation gas produced by explosive charge in the utility model, Cause boring end surrounding ground base crushed, form the enough cavitys of size, form band bottom armored concrete by slip casting and expand The anchoring body of major part, the anchor force being provided can sufficiently achieve makes superstructure stable;Its two, detonation produced by explosive charge Gas, to drilling hole subsoil ground strong effect, makes surrounding ground base at the bottom of hole be compressed, pushes away the crack in soil base simultaneously Open, the physical and mechanical property of internal soil base (foot of hole surrounding ground base) after filling and injecting slurry body, will be improved;Its three, By by anchor rod body bottom pole with explosive be placed in cavity at the bottom of drilling hole detonating charge, detonation strength drives anchor The pole that club shaft rises and bottom is hinged therewith is scattered around hinged, subsequently anchor rod body and its end under downward Action of Gravity Field End pole is all fallen, and just stops falling when bottom pole touches cavity wall at the bottom of hole, and several poles are supported at the bottom of hole with opening On cavity, afterwards by cavity slip casting at the bottom of whole hole, form the spherical enlarged footing of armored concrete, and Shi Hanzhang and again Slip casting, builds anchoring comprehensive, three-dimensional, compound.
2nd, the utility model simple in construction, radical change construction and base form, save investment significantly, decreased Spoir, makes environment be protected.
Brief description
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
Fig. 1 is the sectional view that the utility model crosses three bolt shaft.
Fig. 2 is top view of the present utility model.
Fig. 3 is the sectional view that originally the utility model anchor pole crosses bolt shaft.
Fig. 4 is the utility model anchor pole originally powder charge section cross sectional representation.
In figure: 1 soil base 2 injecting cement paste 3 is holed 4 anchor pole 5 soil basic capsule gap 6 upper plates 7 backing plate 8 anchor slab 9 crack grouting body 10 detonator 11 pole 12 waterproof explosive 13 injected holes Cavity 16 fixture 17 ground 18 soil cement cylinder at the bottom of 14 the wall of a borehole 15 holes.
Detailed description of the invention
As shown in Fig. 1 ~ 4, upper plate-anchor pole-ball basis, it includes in an embedded soil base 1 and upper surface and ground 17 Concordant upper plate the 6th, one or more anchor pole 4 and the backing plate 7 matching with anchor pole 4 and anchor slab 8.
Upper plate 6 is polygon (polygon includes triangle, quadrangle ...), and its center is provided with a bolthole I;Backing plate 7 Center is provided with a bolthole III;Anchor pole 4 includes the body of rod and the several poles 11 hinged with body of rod bottom;Several poles 11 bundle Equipped with the bar shaped waterproof explosive 12 of detonator 10, the two is as consistent with body of rod axis in its axis of one;The bottom of anchor pole 4 and several Bar 11 is all anchored, and its top is each passed through the bolthole I of upper plate 6 correspondence position, and passes through bolthole III and the anchor slab of backing plate 7 8 connect together.
Wherein: soil base 1 is mud, muck soil, cohesive soil, silt, loess, sand, artificial earth fill and rubble soil One or more in base.
Upper plate 6 is provided with the fixture 16 for being connected with superstructure.
An injected hole 13 is had on backing plate 7.
Each angle of upper plate 6 is equipped with a bolthole II;And the top of anchor pole 4 is each passed through upper plate 6 correspondence position Bolthole II, and pass through backing plate 7 bolthole III connect together with anchor slab 8.
The center of upper plate 6 is provided with a bolthole I, and each angle is provided with a bolthole II;The top of anchor pole 4 is worn respectively Cross bolthole I and the bolthole II of upper plate 6 correspondence position, and the bolthole III passing through backing plate 7 connects together with anchor slab 8.
The construction method on this upper plate-anchor pole-ball basis, comprises the following steps:
(1) flat base, will select location leveling;
(2) the corresponding central anchor rod aperture I of upper plate 6 and the bolthole II at each angle punch in soil base 1, and center hole depth, And the hole at each angle is shallow;
(3) the Grouting Pipe with nozzle is placed in the desired depth processing soil base 1 by the hole of step (2) gained, then With cement mortar die-cut soil base 1, rotate and hoisting grouting pipe simultaneously, after consolidation, form soil cement cylinder 18;
(4), with the soil cement cylinder 18 that formed for upper plate 6 fulcrum, excavate by design requirement and pour the pit of upper plate 6;
(5) the axle of the soil cement cylinder 18 being formed by design requirement edge arranges boring 3 by following three kinds of situations;
A hole is bored in bolthole I position at corresponding upper plate 6 center;
A hole is bored in bolthole II position at corresponding each angle of upper plate 6;
A hole is all bored in bolthole II position at the bolthole I at corresponding upper plate 6 center and each angle, and center hole depth and The hole at each angle is shallow;
(6) by explosive payload 50 ~ 100g, for the second time explosive payload 100 ~ 200g, for the third time explosive payload 200 ~ 400g for the first time ..., Explosive payload is gradually incremented by implements explosion, until expanding into cavity at the bottom of hole at the bottom of the hole of the boring 3 in each soil cement cylinder 18;
(7) measure the size of cavity 15 at the bottom of hole, particularly as follows:
1. getting out length, to be equivalent to cavity 15 at the bottom of design hole more than the lining rope of different length of boring 3 degree of depth and length straight The waddy in footpath;
2. one end of two lining ropes is tied up to waddy two ends respectively, and on lining rope, put on dimension mark;
3. carry in waddy is sent into cavity 15 at the bottom of hole by the other end of two lining ropes being waddy and carry up and down, working as wood Rod one end stick the dimension mark on cavity 15 wall, and two lining ropes at the bottom of hole consistent when, waddy is i.e. horizontal, wood now Rod length is cavity 15 diameter at the bottom of hole;
(8) pour upper plate 6 by design requirement;
(9) with the bar shaped waterproof explosive 12 equipped with detonator 10 as core, by the several poles hinged with anchor pole 4 body of rod bottom 11 are bundled in about, and make its center line consistent with body of rod axis;
By anchor pole 4 body of rod with waterproof explosive 12 be placed in corresponding cement by the bolthole I of upper plate 6 and bolthole II Soil cylinder 18 is holed at the bottom of 3 holes, detonating charge at once;
(11), along the wall of a borehole 14 slip casting in boring 3, make injecting cement paste 2 be fully populated with cavity;
(12) treat that injecting cement paste 2 consolidates after-applied prestressing force and locks anchor pole 4 top on anchor slab 8;
(13) suitable for reading to refilling injecting cement paste 2 to injected hole 13 in boring 3 by the injected hole 13 on backing plate 7, water simultaneously Casting crack grouting body 9 is in soil basic capsule gap 5.
The utility model is applicable to soil base, but is not limited to soil base, can slightly adjust its method and steps i.e. available In rock and hard hard soil foundation.

Claims (6)

1. upper plate-anchor pole-ball basis, it is characterised in that: it includes in embedded soil base (1) and upper surface and ground (17) Concordant upper plate (6), one or more anchor pole (4) and the backing plate (7) matching with described anchor pole (4) and anchor slab (8);On described Plate (6) is polygon, and its center is provided with a bolthole I;Described backing plate (7) center is provided with a bolthole III;Described anchor pole (4) body of rod and the several poles (11) hinged with described body of rod bottom are included;Several described poles (11) bundle equipped with detonator (10) bar shaped waterproof explosive (12), the two is as consistent with described body of rod axis in its axis of one;The bottom of described anchor pole (4) and Several described poles (11) are all anchored, and its top is each passed through the described bolthole I of described upper plate (6) correspondence position, and wears The described bolthole III crossing described backing plate (7) connects together with described anchor slab (8).
2. upper plate-anchor pole as claimed in claim 1-ball basis, it is characterised in that: described soil base (1) is mud, Muddy Bottoms One or more in soil, cohesive soil, silt, loess, sand, artificial earth fill and foundation of gravelly soil.
3. upper plate-anchor pole as claimed in claim 1-ball basis, it is characterised in that: described upper plate (6) is provided with fixture (16).
4. upper plate-anchor pole as claimed in claim 1-ball basis, it is characterised in that: described backing plate has an injected hole on (7) (13).
5. upper plate-anchor pole as claimed in claim 1-ball basis, it is characterised in that: each angle of described upper plate (6) is equipped with One bolthole II;And the top of described anchor pole (4) is each passed through the described bolthole II of described upper plate (6) correspondence position, and Connect together through the described bolthole III of described backing plate (7) with described anchor slab (8).
6. upper plate-anchor pole as claimed in claim 1-ball basis, it is characterised in that: the center of described upper plate (6) is provided with one Bolthole I, and each angle is provided with a bolthole II;The top of described anchor pole (4) is each passed through described upper plate (6) correspondence position Described bolthole I and described bolthole II, and pass through described backing plate (7) described bolthole III be connected with described anchor slab (8) To together.
CN201620288901.XU 2016-04-09 2016-04-09 Upper plate - stock - ball basis Expired - Fee Related CN205617410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620288901.XU CN205617410U (en) 2016-04-09 2016-04-09 Upper plate - stock - ball basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620288901.XU CN205617410U (en) 2016-04-09 2016-04-09 Upper plate - stock - ball basis

Publications (1)

Publication Number Publication Date
CN205617410U true CN205617410U (en) 2016-10-05

Family

ID=57030158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620288901.XU Expired - Fee Related CN205617410U (en) 2016-04-09 2016-04-09 Upper plate - stock - ball basis

Country Status (1)

Country Link
CN (1) CN205617410U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268655A (en) * 2016-04-09 2017-10-20 河南城建学院 Upper plate-anchor pole-ball basis and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268655A (en) * 2016-04-09 2017-10-20 河南城建学院 Upper plate-anchor pole-ball basis and its construction method

Similar Documents

Publication Publication Date Title
CN105040692B (en) A kind of construction method of precast concrete pile body carrier pile
CN205617356U (en) Star -shaped element - stock - ball basis
CN205617355U (en) Star -shaped element - stock - ball basis
CN205712063U (en) Anchor pole-ball-star member basis
CN205954624U (en) Soil quito cable resistance to plucking basis
CN205617410U (en) Upper plate - stock - ball basis
CN205617408U (en) Stock - upper plate - ball basis
CN205617354U (en) Stock - ball - star -shaped element basis
CN205954658U (en) Stock - star -shaped element - ball basis
CN205712064U (en) A kind of ball-anchor pole-star member basis
CN205712065U (en) Ball-anchor pole-star member basis
CN205617357U (en) Many cable resistance to plucking bases of soil base star center and arm end
CN205501987U (en) Soil many cable resistance to plucking bases of base spider arm end
CN205502049U (en) Many cable resistance to plucking bases in soil base center and board angle
CN205617409U (en) Upper plate - stock - ball basis
CN205502047U (en) Resistance to plucking and cling compound basis
CN205617405U (en) Stock - star -shaped element - ball basis
CN107268593A (en) Star member-anchor pole-ball basis and its construction method
CN205502006U (en) Resistance to plucking anchor foundation
CN204080792U (en) A kind of embedding rock Anchor anti-slide piles of combined type implanting round steel
CN107268585A (en) Ball-anchor pole-upper plate basis and its construction method
CN107268583A (en) Ball-upper plate-anchor rod foundation and its construction method
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill
CN205954655U (en) Smooth basis of resistance to plucking
CN107268591A (en) Soil base list rope anti_floating foundation and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20200409

CF01 Termination of patent right due to non-payment of annual fee