CN107217747A - A kind of novel fabricated connector for building - Google Patents
A kind of novel fabricated connector for building Download PDFInfo
- Publication number
- CN107217747A CN107217747A CN201710295103.9A CN201710295103A CN107217747A CN 107217747 A CN107217747 A CN 107217747A CN 201710295103 A CN201710295103 A CN 201710295103A CN 107217747 A CN107217747 A CN 107217747A
- Authority
- CN
- China
- Prior art keywords
- building
- connector
- novel fabricated
- connecting plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 238000010276 construction Methods 0.000 abstract description 28
- 238000005516 engineering process Methods 0.000 description 6
- 239000002699 waste material Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
Abstract
The invention belongs to Architectural Equipment technical field, more particularly to a kind of novel fabricated connector for building.Novel fabricated connector for building, including pre-embedded steel slab, embedded bar and connecting plate.Pre-embedded steel slab and embedded bar are cast in the connection end connected required for concrete wall by a kind of novel fabricated connector for building involved in the present invention in use, quickly it is connected by the high-strength bolt through connecting plate between connector, last connecting plate and high-strength bolt are sealed by concrete;This makes it possible to accelerate speed of application on the premise of assembled architecture intensity is ensured, efficiency of construction is improved.In addition, novel fabricated connector for building is simple in construction, and it is easy to install, it is adapted to promote the use of.
Description
Technical field
The invention belongs to Architectural Equipment technical field, more particularly to a kind of novel fabricated connector for building.
Background technology
Assembled architecture begins to arouse people's interest in early 20th century, is realized finally to the sixties.English, method, Soviet Union
Lian Deng states attempt first.Because the construction speed of assembled architecture is fast, and production cost is relatively low, rapidly all over the world
Popularization is come.Assembled architecture refers to the building in assemble in site with prefabricated component.The advantage of this building is to build
Speed is fast, and climate conditionality is small, saves labour and can improve construction quality.Everyone by can the design of oneself take
The house of oneself is built, wall can be dismantled repeatedly, can reuse will not produce building waste due to demolishing walls.However,
Existing assembled architecture element joints technology has following drawback:
1st, constructional column needs supporting module to increase construction volume at component wall connecting;
2nd, constructional column needs to want colligation constructional column reinforcing bar, constructional difficulties and increase construction volume at component wall connecting;
3rd, wall will add diagonal brace before non-casting concrete, increase potential safety hazard;
4th, wall will add diagonal brace before non-casting concrete and take construction site,
5th, wall adds diagonal brace increase store keeping intensity;
6th, existing construction technology uses superposed floor and vertical member(Such as wall, beam)Connection bottom will only set support and take construction
Place;
7th, using superposed floor and vertical member(Such as wall, beam)Connect bottom increase store keeping intensity;
8th, using superposed floor and vertical member(Such as wall, beam)Connect bottom increase potential safety hazard;
9th, the position such as stair, elevator Cast-in-situ Beam is excessive.
10th, first pipe cross manages imperfect everywhere.
It is greatly limited, hinders in construction intensity, construction speed, safe construction, civilized construction, construction quality in a word
The development of assembled architecture is hindered.
A kind of novel fabricated connector for building of the present invention, novel fabricated connector for building is being used
During pre-embedded steel slab and embedded bar are cast between the connection end connected required for concrete wall, connector and passed through
High-strength bolt through connecting plate is quickly connected, and last connecting plate and high-strength bolt are sealed by concrete;This
Sample can just accelerate speed of application on the premise of assembled architecture intensity is ensured, improve efficiency of construction.In addition, the new assembling
Formula connector for building it is simple in construction, it is easy to install, be adapted to promote the use of.
The content of the invention
In order to overcome defect present in background technology, the technical solution adopted for the present invention to solve the technical problems is:
A kind of novel fabricated connector for building, including pre-embedded steel slab, embedded bar and connecting plate, the side of the pre-embedded steel slab are consolidated
Surely there is embedded bar, the opposite side of the pre-embedded steel slab is fixed with connecting plate, and the connecting plate is provided with bolt hole, the connection
It is fixed together between part by the high-strength bolt through bolt hole.
It is preferred that the embedded bar number at least two, the bottom of the embedded bar is provided with crotch.
It is preferred that the connecting plate number at least two.
A kind of novel fabricated connector for building involved in the present invention, novel fabricated connector for building makes
Pre-embedded steel slab and embedded bar is cast in during between the connection end connected required for concrete wall, connector logical
The high-strength bolt crossed through connecting plate is quickly connected, and last connecting plate and high-strength bolt are sealed by concrete;
This makes it possible to accelerate speed of application on the premise of assembled architecture intensity is ensured, efficiency of construction is improved, potential safety hazard is reduced,
Construction intensity is reduced, standard assemblied rate is improved, construction cost is saved, construction quality is improved, using position extensively, be can be used for
Wall, beam, top, post, ladder, the quick connection at position such as encorbelment, adjusted between 0 ° to 360 ° using angle, reduce construction waste,
And the limitation of existing mounting technology is perfectly carried out the breakthrough of a matter.In addition, novel fabricated connector for building
It is simple in construction, it is easy to install, it is adapted to promote the use of.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is a kind of structural representation of novel fabricated connector for building of the invention;
Fig. 2 is a kind of use state of novel fabricated connector for building of the invention with reference to figure one;
Fig. 3 is a kind of use state of novel fabricated connector for building of the invention with reference to figure two;
Wherein:1st, pre-embedded steel slab;2nd, embedded bar;3rd, connecting plate;4th, bolt hole;5th, high-strength bolt;6th, crotch;7th, concrete
Wall.
Embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.Accompanying drawing is simplified schematic diagram, only with signal side
Formula illustrates the basic structure of the present invention, therefore it only shows the composition relevant with the present invention.
Refer to Fig. 1, Fig. 2 and Fig. 3, a kind of novel fabricated connector for building, including pre-embedded steel slab 1, embedded bar 2
With connecting plate 3, the side of the pre-embedded steel slab 1 is fixed with embedded bar 2, and the opposite side of the pre-embedded steel slab 1 is fixed with connection
Plate 3, the connecting plate 3, which is provided with to fix by the high-strength bolt 5 through bolt hole 4 between bolt hole 4, the connector, to be connected
It is connected together, the number of the embedded bar 2 is two, and the bottom of the embedded bar 2 is provided with crotch 6, the connecting plate 3
Number is two.
A kind of novel fabricated connector for building involved in the present invention, novel fabricated connector for building makes
Pre-embedded steel slab and embedded bar is cast in during between the connection end connected required for concrete wall, connector logical
The high-strength bolt crossed through connecting plate is quickly connected, and last connecting plate and high-strength bolt are sealed by concrete;
This makes it possible to accelerate speed of application on the premise of assembled architecture intensity is ensured, efficiency of construction is improved, potential safety hazard is reduced,
Construction intensity is reduced, standard assemblied rate is improved, construction cost is saved, construction quality is improved, using position extensively, be can be used for
Wall, beam, top, post, ladder, the quick connection at position such as encorbelment, adjusted between 0 ° to 360 ° using angle, reduce construction waste,
And the limitation of existing mounting technology is perfectly carried out the breakthrough of a matter.In addition, novel fabricated connector for building
It is simple in construction, it is easy to install, it is adapted to promote the use of.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.It is right
For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or
Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or
Among changing still in the protection domain of the invention.
Claims (3)
1. a kind of novel fabricated connector for building, including pre-embedded steel slab(1), embedded bar(2)And connecting plate(3), it is special
Levy and be:The pre-embedded steel slab(1)Side be fixed with embedded bar(2), the pre-embedded steel slab(1)Opposite side be fixed with company
Fishplate bar(3), the connecting plate(3)It is provided with bolt hole(4), by through bolt hole between the connector(4)High intensity
Bolt(5)It is fixed together.
2. a kind of novel fabricated connector for building according to claim 1, it is characterised in that the embedded bar
(2)Number at least two, the embedded bar(2)Bottom be provided with crotch(6).
3. a kind of novel fabricated connector for building according to claim 1, it is characterised in that the connecting plate(3)
Number at least two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710295103.9A CN107217747A (en) | 2017-04-28 | 2017-04-28 | A kind of novel fabricated connector for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710295103.9A CN107217747A (en) | 2017-04-28 | 2017-04-28 | A kind of novel fabricated connector for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107217747A true CN107217747A (en) | 2017-09-29 |
Family
ID=59943631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710295103.9A Pending CN107217747A (en) | 2017-04-28 | 2017-04-28 | A kind of novel fabricated connector for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107217747A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503446A (en) * | 2017-09-30 | 2017-12-22 | 沈阳建筑大学 | A kind of U-shaped steel bar connector connection Shear-wall Connecting Beam Used structure and assembly method |
CN108589932A (en) * | 2018-03-12 | 2018-09-28 | 许仲群 | A kind of pad nail and superimposed sheet and laminated structure member with ribbing with pad nail |
CN111962690A (en) * | 2020-07-18 | 2020-11-20 | 北京住总第一开发建设有限公司 | Assembly type building wall connecting structure and construction method thereof |
CN113668367A (en) * | 2021-09-02 | 2021-11-19 | 中铁十一局集团第五工程有限公司 | Hollow pier diaphragm plate pouring construction method |
CN115627842A (en) * | 2022-12-22 | 2023-01-20 | 中冶建筑研究总院有限公司 | Assembled concrete shear force wall horizontal connection structure |
CN115653154A (en) * | 2022-12-28 | 2023-01-31 | 中冶建筑研究总院有限公司 | Assembled steel sheet concrete basis |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2107775A1 (en) * | 1991-04-05 | 1992-10-06 | Jack Slater | Web, Beam and Frame System for a Building Structure |
CN101851965A (en) * | 2010-05-21 | 2010-10-06 | 北京时空筑诚建筑设计有限公司 | Reinforced concrete sway wall, sway wall assembly and production method thereof |
CN203569753U (en) * | 2013-10-21 | 2014-04-30 | 天颂建设集团有限公司 | Three-dimensional adjustable curtain wall structure |
CN204152019U (en) * | 2014-10-14 | 2015-02-11 | 山东乾元泽孚科技股份有限公司 | A kind of integral wall module |
CN204753843U (en) * | 2015-07-14 | 2015-11-11 | 江苏建筑职业技术学院 | PC primary and secondary roof beam bolted connection node |
CN105484388A (en) * | 2015-11-18 | 2016-04-13 | 福建工程学院 | Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof |
CN106436960A (en) * | 2016-08-18 | 2017-02-22 | 上海闵轩钢结构工程有限公司 | Novel dry-type connected totally prefabricated shear wall system |
CN207079730U (en) * | 2017-04-28 | 2018-03-09 | 胡德 | A kind of novel fabricated connector for building |
-
2017
- 2017-04-28 CN CN201710295103.9A patent/CN107217747A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2107775A1 (en) * | 1991-04-05 | 1992-10-06 | Jack Slater | Web, Beam and Frame System for a Building Structure |
CN101851965A (en) * | 2010-05-21 | 2010-10-06 | 北京时空筑诚建筑设计有限公司 | Reinforced concrete sway wall, sway wall assembly and production method thereof |
CN203569753U (en) * | 2013-10-21 | 2014-04-30 | 天颂建设集团有限公司 | Three-dimensional adjustable curtain wall structure |
CN204152019U (en) * | 2014-10-14 | 2015-02-11 | 山东乾元泽孚科技股份有限公司 | A kind of integral wall module |
CN204753843U (en) * | 2015-07-14 | 2015-11-11 | 江苏建筑职业技术学院 | PC primary and secondary roof beam bolted connection node |
CN105484388A (en) * | 2015-11-18 | 2016-04-13 | 福建工程学院 | Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof |
CN106436960A (en) * | 2016-08-18 | 2017-02-22 | 上海闵轩钢结构工程有限公司 | Novel dry-type connected totally prefabricated shear wall system |
CN207079730U (en) * | 2017-04-28 | 2018-03-09 | 胡德 | A kind of novel fabricated connector for building |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503446A (en) * | 2017-09-30 | 2017-12-22 | 沈阳建筑大学 | A kind of U-shaped steel bar connector connection Shear-wall Connecting Beam Used structure and assembly method |
CN108589932A (en) * | 2018-03-12 | 2018-09-28 | 许仲群 | A kind of pad nail and superimposed sheet and laminated structure member with ribbing with pad nail |
CN111962690A (en) * | 2020-07-18 | 2020-11-20 | 北京住总第一开发建设有限公司 | Assembly type building wall connecting structure and construction method thereof |
CN113668367A (en) * | 2021-09-02 | 2021-11-19 | 中铁十一局集团第五工程有限公司 | Hollow pier diaphragm plate pouring construction method |
CN115627842A (en) * | 2022-12-22 | 2023-01-20 | 中冶建筑研究总院有限公司 | Assembled concrete shear force wall horizontal connection structure |
CN115653154A (en) * | 2022-12-28 | 2023-01-31 | 中冶建筑研究总院有限公司 | Assembled steel sheet concrete basis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107217747A (en) | A kind of novel fabricated connector for building | |
CN203145194U (en) | Internal diaphragm joint of variable flange steel I-beam and square concrete filled steel tubular column | |
CN202831235U (en) | Assembled pitch joint of rectangular steel pipe column and H-shaped steel girder of internally installed sleeve | |
CN106337500A (en) | Modularized assembly type steel structure house building system | |
CN207079730U (en) | A kind of novel fabricated connector for building | |
CN103276806B (en) | A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces | |
CN103276804B (en) | A kind of industrialization assembling hetermorphiscal column steel work prestressing force center support system | |
CN102936968A (en) | Inner steel frame reinforced structure of pseudo-classic architecture and construction method thereof | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN106869567A (en) | A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN107100265A (en) | A kind of prefabricated house construction structure and its construction method | |
CN107762161A (en) | A kind of energy-saving assembled system of steel residential structure and installation method | |
CN213805845U (en) | Steel frame structure of steel structure building intermediate column | |
CN202945820U (en) | Inner steel frame reinforced structure of pseudo-classic architecture | |
CN202544138U (en) | Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam | |
CN109518950B (en) | Support-free tool-based template system applied to assembled cast-in-place section and use method thereof | |
CN204753837U (en) | High steadiness girder steel | |
CN1120280C (en) | Medium- and high-rise steel structure earthquake-resistant building system | |
CN203856069U (en) | High-rise building steel structure | |
CN205907808U (en) | Take prefabricated balcony device of assembled of bracket | |
CN108915083A (en) | A kind of novel fabricated clod wash heavy wall structural steel frame-Bracing Systems | |
CN210263373U (en) | Cold-formed thin-walled steel structure of high-strength steel frame-superposed corrugated steel plate wall anti-side | |
CN206646639U (en) | A kind of interlayer attachment structure of assembled architecture | |
CN215167155U (en) | Prefabricated component of assembled building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170929 |