- CN202544138U CN202544138U CN2012202179934U CN201220217993U CN202544138U CN 202544138 U CN202544138 U CN 202544138U CN 2012202179934 U CN2012202179934 U CN 2012202179934U CN 201220217993 U CN201220217993 U CN 201220217993U CN 202544138 U CN202544138 U CN 202544138U
- Authority
- CN
- China
- Prior art keywords
- concrete
- frame
- column
- filled steel
- steel tubular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses an opening connecting node of a concrete-filled steel tubular frame column and a reinforced concrete frame beam, wherein a beam hole is formed in the concrete-filled steel tubular frame column; the reinforced concrete frame beam penetrates through the beam hole; and a hoop beam is arranged along the outer wall of the concrete-filled steel tubular frame column. Through test verification, an opening reinforcement position at a beam-column node section of a concrete-filled steel tubular column test specimen which is reinforced by opening a hole according to the technical scheme provided by the utility model is not destroyed; compared with a concrete-filled steel tubular column without a hole, the ultimate bearing capacity of the concrete-filled steel tubular column test specimen reinforced by opening the hole is not reduced, and all of which means that the connecting node of the concrete-filled steel tubular column and the reinforced concrete frame beam can be reinforced by opening the hole. For the concrete-filled steel tubular frame column with the hole, after the concrete-filled steel tubular column test specimen reinforced by opening the hole is effectively reinforced at the open hole of the beam-column node via taking effective measures, a beam-column opening reinforcement node is a safe, economical, practical and conveniently-constructed beam-column node; and the opening connecting node of the concrete-filled steel tubular frame column and the reinforced concrete frame beam is easy and convenient to construct, reasonable in stress, reliable in node bearing capacity, convenient and practical and can ensure the node according with the design requirement.
Description
Technical field
The utility model is a kind of steel tube concrete frame puncheon of structural engineering design and construction and perforate connected node of rc-frame-beam of being used for, and belongs to the renovation technique of the perforate connected node of steel tube concrete frame puncheon and rc-frame-beam.
Background technology
Development along with Urbanization in China; Large Space at Lower Part or super highrise building are more and more, in this type of building, because pillar bears very big axial pressure; Architectural design requires the pillar size can not be excessive again, thereby often adopts steel core concrete column or profile steel concrete column in the engineering.Characteristics such as steel core concrete column has that supporting capacity is high, the cross section is little, plasticity and good toughness, shock resistance are strong; Overall economic efficiency is good; Be used with high-strength concrete, can give full play to the high-strength concrete advantages of high strength, in engineering, have a wide range of applications.But; When adopting the reinforced concrete cast-in-situ beam slab, need to solve the connected node problem of steel core concrete column and reinforced concrete beam, general employing such as open reinforced hole, establish shear plate, methods such as light and shade bracket or twin beams leap; But above-mentioned bean column node difficulty of construction is big, process is loaded down with trivial details; The design and fabrication required precision is high, has brought very big workload for design and construction, thus node problems can solve be one of the key that promote of steel core concrete column.
The utility model content
The purpose of the utility model is to consider the problems referred to above and provides a kind of construction simple and convenient; Reasonable stress; Ultimate bearing capacity of joints is reliable, can guarantee that node adheres to specification, the perforate connected node of convenient and practical steel tube concrete frame puncheon and rc-frame-beam.
The technical scheme of the utility model is: the perforate connected node of steel tube concrete frame puncheon of the utility model and rc-frame-beam; Wherein steel tube concrete frame puncheon is provided with Liang Dong; The reinforced concrete Vierendeel girder passes from Liang Dongzhong, and along the outer wall of steel tube concrete frame puncheon the hoop beam is set.
Above-mentioned hoop depth of beam is identical with the height of rc-frame-beam.
The above and below of above-mentioned Liang Dong is respectively arranged with reinforcing ring.
The hole periphery of above-mentioned Liang Dong is provided with peg.
The hole cross sectional area size of above-mentioned Liang Dong is identical with the cross sectional area size of the rc-frame-beam that needs to connect.
Above-mentioned hoop beam includes vertical muscle and stirrup.
The utility model is provided with Liang Dong owing to be employed in steel tube concrete frame puncheon; Rc-frame-beam passes from Liang Dongzhong; And along the outer wall of frame column the structure of hoop beam is set, through verification experimental verification, all press the steel core concrete column test specimen of the utility model scheme perforate reinforcing; All there is not to destroy position in the reinforcement for openings of bean column node section; Its ultimate bearing capacity is compared with perforate steel core concrete column not, occurs reducing phenomenon, explain steel core concrete column with the connected node place of rc-frame-beam can reinforcement for openings.For the perforate steel core concrete column, after the bean column node tapping was taked effective strengthening measure, beam column reinforcement for openings node was a kind of bean column node of safe, economic, practical, easy construction.The utility model is that a kind of construction is simple and convenient, reasonable stress, and ultimate bearing capacity of joints is reliable, can guarantee that node adheres to specification, the perforate connected node of convenient and practical steel tube concrete frame puncheon and rc-frame-beam.
Description of drawings
Fig. 1 is the perforate elevational schematic view of the utility model steel tube concrete frame puncheon;
Fig. 2 is the perforate floor map of the utility model steel tube concrete frame puncheon;
Fig. 3 is the sketch map of the utility model steel tube concrete frame puncheon and floor plate muscle;
Fig. 4 is the scheme of installation of the utility model steel tube concrete frame puncheon and rc-frame-beam and hoop beam.
The specific embodiment
Embodiment:
The structural representation of the utility model is like Fig. 1,2,3, shown in 4; The perforate connected node of steel tube concrete frame puncheon of the utility model and rc-frame-beam; Wherein steel tube concrete frame puncheon 1 is provided with beam hole 2; Rc-frame-beam 3 passes from beam hole 2, and along the outer wall of frame column 1 hoop beam 4 is set.
The height of above-mentioned hoop beam 4 is identical with the height of rc-frame-beam 3.
The above and below in above-mentioned beam hole 2 is respectively arranged with reinforcing ring 5.
The hole periphery in above-mentioned beam hole 2 is provided with peg 6.
The hole cross sectional area size in above-mentioned beam hole 2 is identical with the cross sectional area size of the rc-frame-beam 3 that needs to connect.
Above-mentioned hoop beam 4 includes vertical muscle 41 and stirrup 42.
The utility model is when construction; Earlier will be with the steel tube concrete frame puncheon installation in position in beam hole 2; Then along the reinforcing bar of the outer wall colligation hoop beam 4 of steel tube concrete frame puncheon; And peg 6 is set at hoop beam and steel tube concrete frame puncheon junction, and again rc-frame-beam 3 is passed from the beam hole 2 of steel tube concrete frame puncheon, build the concrete of node area at last.
Through verification experimental verification; All press the steel core concrete column test specimen that this programme perforate is reinforced; All there is not to destroy position in the reinforcement for openings of bean column node section; Its ultimate bearing capacity is compared with perforate steel core concrete column not, occurs reducing phenomenon, explain steel tube concrete frame puncheon with the connected node place of rc-frame-beam can reinforcement for openings.For the perforate steel tube concrete frame puncheon; After the bean column node tapping is taked effective strengthening measure; Beam column reinforcement for openings node is a kind of bean column node of safe, economic, practical, easy construction, and the bean column node reinforcement for openings scheme of using in the design is feasible.
The application example of the utility model is following: more than 130,000 square metre of Shenzhen Jia Hui new city building area, and superstructure is made up of five high-rise high buildings, and five high buildings prop up podium through the six layers of frame in bottom and join together.Four commercial and residential buildings are arranged in five high buildings, the curved arrangement in plane, above 31 layers of ground, high 100 meters; A high building is an office building, above 39 layers of ground, 139 meters of height; Podium is a building for commercial use, and three layers of basements are for garage and equipment are used the room.Because of the needs of building function, four commercial and residential building podiums adopt the frame supported shear wall structure system below six layers, and frame column 1 adopts the concrete filled steel tube cylinder.
Totally 53 on concrete filled steel tube cylinder, column section diameter D=1500mm, strength grade of concrete C60.The steel pipe of concrete filled steel tube cylinder is formed by the weldering of Q235 roll of steel plate; Thickness of steel pipe 16mm; On steel pipe, have the beam position to open the beam hole 2 of 400X700, let the steel concrete beam steel directly pass, construction easily; Accelerate construction speed, practiced thrift great amount of investment, improved the construction quality of node simultaneously.This project was completed in 1999 and is come into operation, and present circumstances is good.
Claims (6)
1. the perforate connected node of steel tube concrete frame puncheon and rc-frame-beam is characterized in that steel tube concrete frame puncheon (1) is provided with Liang Dong (2), and rc-frame-beam (3) passes from Liang Dong (2); One week of outer wall along steel tube concrete frame puncheon (1) is provided with hoop beam (4).
2. the perforate connected node of steel tube concrete frame puncheon according to claim 1 and rc-frame-beam is characterized in that the height of above-mentioned hoop beam (4) is identical with the height of rc-frame-beam (3).
3. the perforate connected node of steel tube concrete frame puncheon according to claim 1 and rc-frame-beam is characterized in that the above and below of above-mentioned Liang Dong (2) is respectively arranged with reinforcing ring (5).
4. the perforate connected node of steel tube concrete frame puncheon according to claim 1 and rc-frame-beam is characterized in that the hole periphery of above-mentioned Liang Dong (2) is provided with peg (6).
5. the perforate connected node of steel tube concrete frame puncheon according to claim 1 and rc-frame-beam is characterized in that the hole cross sectional area size of above-mentioned Liang Dong (2) is identical with the cross sectional area size of the rc-frame-beam (3) of needs connection.
6. the perforate connected node of steel tube concrete frame puncheon according to claim 1 and rc-frame-beam is characterized in that above-mentioned hoop beam (4) includes vertical muscle (41) and stirrup (42).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202179934U CN202544138U (en) | 2012-05-15 | 2012-05-15 | Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202179934U CN202544138U (en) | 2012-05-15 | 2012-05-15 | Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202544138U true CN202544138U (en) | 2012-11-21 |
Family
ID=47164792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012202179934U Expired - Fee Related CN202544138U (en) | 2012-05-15 | 2012-05-15 | Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202544138U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103397704A (en) * | 2013-08-01 | 2013-11-20 | 香港华艺设计顾问(深圳)有限公司 | Connected node of concrete filled steel tube combination column and reinforced concrete beams |
CN107012988A (en) * | 2017-05-25 | 2017-08-04 | 哈尔滨工业大学 | A kind of corrugated steel tube reinforced column |
CN113136943A (en) * | 2021-04-14 | 2021-07-20 | 清华大学 | Connecting joint of concrete filled steel tubular column and concrete beam |
CN113175261A (en) * | 2021-04-06 | 2021-07-27 | 中国十七冶集团有限公司 | Nuclear five-level civil air defense high-density beam-column plate node structure and construction method |
-
2012
- 2012-05-15 CN CN2012202179934U patent/CN202544138U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103397704A (en) * | 2013-08-01 | 2013-11-20 | 香港华艺设计顾问(深圳)有限公司 | Connected node of concrete filled steel tube combination column and reinforced concrete beams |
CN107012988A (en) * | 2017-05-25 | 2017-08-04 | 哈尔滨工业大学 | A kind of corrugated steel tube reinforced column |
CN113175261A (en) * | 2021-04-06 | 2021-07-27 | 中国十七冶集团有限公司 | Nuclear five-level civil air defense high-density beam-column plate node structure and construction method |
CN113175261B (en) * | 2021-04-06 | 2022-05-13 | 中国十七冶集团有限公司 | Nuclear five-level civil air defense high-density beam-column plate node structure and construction method |
CN113136943A (en) * | 2021-04-14 | 2021-07-20 | 清华大学 | Connecting joint of concrete filled steel tubular column and concrete beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202831235U (en) | Assembled pitch joint of rectangular steel pipe column and H-shaped steel girder of internally installed sleeve | |
CN105649360A (en) | Integral assembling type building system and installing method | |
CN203866966U (en) | Novel assembly type frame core tube steel structure residential housing system | |
CN105863110A (en) | Modular assembling type cold-bent thin-wall type steel wall board structural system | |
CN103924797A (en) | Country prefabricated steel structure residence system and construction method thereof | |
CN203808235U (en) | Integral special-shaped column structure of prefabricated assembly | |
CN210887559U (en) | Low multi-storey steel structure residential system | |
CN202544138U (en) | Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam | |
CN202202412U (en) | Rectangular steel pipe concrete special-shaped column-steel beam framework middle node | |
CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
CN103938730A (en) | Combination node for connecting concrete beam with round steel tube concrete column through unbonded prestressed ribs and ordinary steel bars | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN102505849A (en) | Construction method of membrane shell ribbed floor formwork supporting system | |
CN108625491B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam L shape connecting node | |
CN113323189A (en) | Assembled heat-preservation energy-saving shear wall based on channel steel connecting piece and implementation method | |
CN203462587U (en) | Penetration steel bar type joint of angle steel connection type rectangular concrete-filled steel tube column and steel beam | |
CN203514534U (en) | Steel channel web inserted type connection joint structure between steel girders and square concrete-filled steel-tubular column | |
CN102535640B (en) | Multidirectional rotation structure node for reinforced concrete column and construction method for multidirectional rotation structure node | |
CN204266370U (en) | Prefabricated SRC-S-RC post beam shear wall supports floor assembling system | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN103741961A (en) | Aseismic strengthening method for adding pin key and hidden beam for prefabricated round hole plate of existing building | |
CN202202415U (en) | Side node of rectangular steel pipe concrete special-shaped column and steel beam framework | |
CN108412036B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN203613796U (en) | Recoverable eave tile bolt formwork system of steel-reinforced concrete column | |
CN203361332U (en) | Prefabricated assembly type frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20200515 |