CN113136943A - Connecting joint of concrete filled steel tubular column and concrete beam - Google Patents

Connecting joint of concrete filled steel tubular column and concrete beam Download PDF

Info

Publication number
CN113136943A
CN113136943A CN202110402619.5A CN202110402619A CN113136943A CN 113136943 A CN113136943 A CN 113136943A CN 202110402619 A CN202110402619 A CN 202110402619A CN 113136943 A CN113136943 A CN 113136943A
Authority
CN
China
Prior art keywords
concrete
steel pipe
steel
column
concrete beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110402619.5A
Other languages
Chinese (zh)
Other versions
CN113136943B (en
Inventor
王法承
肖明
王建涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN202110402619.5A priority Critical patent/CN113136943B/en
Publication of CN113136943A publication Critical patent/CN113136943A/en
Application granted granted Critical
Publication of CN113136943B publication Critical patent/CN113136943B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185—Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38—Connections for building structures in general
    • E04B1/58—Connections for building structures in general of bar-shaped building elements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62—Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92—Protection against other undesired influences or dangers
    • E04B1/98—Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to the technical field of civil engineering, in particular to a connecting node of a concrete filled steel tubular column and a concrete beam. The connected node includes the steel core concrete column, the concrete beam, U-shaped steel corbel and post-cast concrete, the steel core concrete column includes the steel pipe, post concrete and first connecting piece, be equipped with first connecting hole on the pipe wall of steel pipe, first connecting piece sets up in first connecting hole, first connecting piece includes first section and second section, first section is located the steel pipe and is wrapped by post concrete, the second section is located the outside of steel pipe, the concrete beam includes first muscle and roof beam concrete of indulging, the concrete beam has first end and second end, the first end of concrete beam, inject the back between the pipe wall of U-shaped steel corbel and steel pipe and pour the chamber, post-cast concrete pours in the back and pours intracavity and cladding second section. The connecting node has the advantages of short construction period, easy guarantee of construction quality, good anti-seismic performance, low cost and the like.

Description

Connecting joint of concrete filled steel tubular column and concrete beam
Technical Field
The invention relates to the technical field of civil engineering, in particular to a connecting node of a concrete filled steel tubular column and a concrete beam.
Background
The concrete filled steel tubular column-concrete beam frame structure in the related technology mainly has two types, the first type is an integral cast-in-place concrete filled steel tubular column-concrete beam frame structure, and the second type is a full-assembly concrete filled steel tubular column-concrete beam frame structure. The first frame structure has the problems of long construction period, difficulty in controlling construction quality and the like. The second frame structure has the problems of inconvenient hoisting construction, poor overall anti-seismic performance and the like.
Disclosure of Invention
The present invention is directed to solving, at least to some extent, one of the technical problems in the related art.
Therefore, the embodiment of the invention provides a connecting node of a concrete filled steel tubular column and a concrete beam, which has good seismic performance.
The connection node of the concrete filled steel tubular column and the concrete beam comprises the following components:
the steel tube concrete column is a pouring type concrete column and comprises a steel tube, column concrete and a first connecting piece, the column concrete is poured in the steel tube, a first connecting hole which penetrates through the tube wall in the inward and outward directions is formed in the tube wall of the steel tube, the first connecting piece penetrates through the first connecting hole, the first connecting piece comprises a first section and a second section, the first section is located in the steel tube and is coated by the column concrete, and the second section is located on the outer side of the steel tube;
the concrete beam is a precast concrete beam, the concrete beam comprises a first longitudinal bar, a beam stirrup and beam concrete, the first longitudinal bars extend along the extending direction of the concrete beam, the beam stirrups are arranged at intervals along the extending direction of the concrete beam and are fixedly connected with the first longitudinal bars, at least a portion of the beam stirrup and the first longitudinal bar are concrete-clad with the beam, the concrete beam having first and second ends opposite in an extending direction of the concrete beam, the first end portion is disposed adjacent to the steel pipe with respect to the second end portion in an extending direction of the concrete beam, the first end part is arranged on the outer side of the steel pipe, the first end part and the steel pipe are spaced in the extending direction of the concrete beam, and a connecting plate is arranged at the lower end of the first end part;
the concrete beam comprises a U-shaped steel bracket, wherein the U-shaped steel bracket comprises a bottom plate and two side plates, each of the bottom plate and the two side plates is fixedly connected with the pipe wall of the steel pipe, the first end part is positioned in the U-shaped steel bracket, the connecting plate is fixedly connected with the bottom plate, and a rear pouring cavity is defined among the first end part of the concrete beam, the U-shaped steel bracket and the pipe wall of the steel pipe; and
and the post-cast concrete is poured in the post-casting cavity and coats the second section.
The connecting joint of the concrete-filled steel tubular column and the concrete beam has the advantages of short construction period, easy guarantee of construction quality, good anti-seismic performance, low cost and the like.
In some embodiments, the first connecting member is provided in plurality, and the plurality of first connecting members are arranged at intervals in the up-down direction.
In some embodiments, the first connection hole is an elongated hole extending in an up-down direction, and each of the plurality of first connection members is disposed in the same first connection hole.
In some embodiments, the outer peripheral surface of the first connector is spaced apart from the bore wall of the first connection bore.
In some embodiments, the concrete-filled steel tube column further includes a second connecting member, a second connecting hole penetrating through the tube wall in the inward and outward direction is formed in the tube wall of the steel tube, the second connecting hole and the first connecting hole are arranged at intervals in the circumferential direction of the steel tube, the second connecting member penetrates through the second connecting hole and is connected with a hole wall of the second connecting hole, the second connecting member includes a third section and a fourth section, the third section is located in the steel tube and is coated by the column concrete, and the fourth section is located outside the steel tube and is coated by the post-cast concrete.
In some embodiments, the second connecting member is provided in plurality, and the plurality of second connecting members are arranged at intervals in the up-down direction.
In some embodiments, further comprising a floor slab, the floor slab being a cast-in-place floor slab, the floor slab being provided on an upper portion of the concrete beam, the floor slab comprises second longitudinal bars and floor slab concrete, the second longitudinal bars extend along the extension direction of the concrete beam, the beam stirrup including a first portion and a second portion, the first portion being encased by the beam concrete, the second part extends out of the beam concrete upwards and is fixedly connected with the second longitudinal bar, a through hole penetrating through the pipe wall in the inner and outer directions is arranged on the pipe wall of the steel pipe, the second longitudinal bar passes through the through hole and comprises a fifth section and a sixth section, the fifth section is positioned in the steel pipe and is coated by the column concrete, the sixth section is located outside the steel pipe and is coated with the floor concrete, and the second portion is coated with the floor concrete.
In some embodiments, a stiffening grid is arranged at the perforation, and the stiffening grid is positioned outside the steel pipe and fixedly connected with the pipe wall of the steel pipe.
In some embodiments, the steel pipe is a rectangular pipe, a first reinforcing plate is arranged between two adjacent side surfaces of the steel pipe, the first reinforcing plate is arranged in the steel pipe, the first reinforcing plate has a first connecting portion and a second connecting portion, the first connecting portion is fixedly connected with one of the two adjacent side surfaces of the steel pipe, and the second connecting portion is fixedly connected with the other of the two adjacent side surfaces of the steel pipe.
In some embodiments, each of the concrete beam and the U-shaped steel brackets is provided with a plurality of the concrete beams and the U-shaped steel brackets, the plurality of the U-shaped steel brackets are arranged at intervals along the circumferential direction of the steel pipe, a second reinforcing plate is arranged between two adjacent U-shaped steel brackets, the second reinforcing plate is provided with a third connecting portion and a fourth connecting portion, the third connecting portion is fixedly connected with one of two adjacent U-shaped steel brackets, and the fourth connecting portion is fixedly connected with the other of two adjacent U-shaped steel brackets.
Drawings
Fig. 1 is a structural view of a connection node of a concrete filled steel tubular column and a concrete beam according to an embodiment of the present invention.
Fig. 2 is a longitudinal sectional view of fig. 1.
Fig. 3 is a view from a-a of fig. 2.
Fig. 4 is a schematic view of the structure of fig. 1 at a concrete beam.
Reference numerals: a connection node 100;
a steel pipe concrete column 1; a steel pipe 101; a first connection hole 1011; an L-shaped steel plate 1013; channel steel 1014; a cross-shaped lacing strip 1015; a first reinforcing plate 1016; column concrete 102; a first connecting member 103; a first section 1031; a second segment 1032; a second connector 104; a third segment 1041; a fourth section 1042; a perforation 105; a stiffening grid 106;
a concrete beam 2; a first longitudinal rib 201; a third longitudinal rib 202; beam concrete 203; a first end 204; a connecting plate 205; a beam stirrup 206;
u-shaped steel corbels 3; a base plate 301; plug weld hole 3011; side plates 302; a second reinforcing plate 303;
post-pouring concrete 4;
a floor 5; a second longitudinal rib 501; the fifth paragraph 5011; the sixth stage 5012; floor slab concrete 502.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
As shown in fig. 1 to 4, a connection node 100 for a concrete filled steel tubular column and a concrete beam according to an embodiment of the present invention includes a concrete filled steel tubular column 1, a concrete beam 2, a U-shaped steel bracket 3, and post-cast concrete 4.
The steel pipe concrete column 1 is a pouring type steel pipe concrete column. That is, the concrete filled steel tubular column 1 is cast and formed at a construction site.
The steel core concrete column 1 comprises a steel core 101, column concrete 102 and a first connecting member 103, the column concrete 102 being cast inside the steel core 101. The pipe wall of the steel pipe 101 is provided with a first connecting hole 1011 penetrating through the pipe wall in the inward and outward direction, the first connecting piece 103 penetrates through the first connecting hole 1011, the first connecting piece 103 comprises a first section 1031 and a second section 1032, the first section 1031 is located in the steel pipe 101 and is coated by the column concrete 102, and the second section 1032 is located on the outer side of the steel pipe 101.
Wherein, inward means: the direction adjacent to the center line of the steel pipe 101 on a plane perpendicular to the center line of the steel pipe 101, outward means: a direction away from the center line of the steel pipe 101 on a plane perpendicular to the center line of the steel pipe 101. The inward and outward directions are indicated by arrows B in fig. 3. Steel pipe 101 has an outer peripheral surface and an inner peripheral surface, the inner peripheral surface of steel pipe 101 being adjacent to the centerline of steel pipe 101 on a plane perpendicular to the centerline of steel pipe 101, and the outer peripheral surface of steel pipe 101 being distant from the centerline of steel pipe 101 on a plane perpendicular to the centerline of steel pipe 101.
The concrete beam 2 is a precast concrete beam 2. That is, the concrete girder 2 is prefabricated for a factory, not cast-in-place.
Concrete beam 2 includes first muscle 201, beam stirrup 206 and roof beam concrete 203 of indulging, and first muscle 201 of indulging extends along concrete beam's extending direction, and beam stirrup 206 sets up and indulges muscle 201 fixed connection with first along concrete beam's extending direction interval, and at least part and the first muscle 201 of indulging of beam stirrup 206 are wrapped by roof beam concrete 203. The concrete beam 2 has a first end 204 and a second end opposite in the extending direction of the concrete beam, the first end 204 is disposed adjacent to the steel pipe 101 opposite to the second end in the extending direction of the concrete beam, the first end 204 is disposed outside the steel pipe 101 and the first end 204 and the steel pipe 101 are spaced apart in the extending direction of the concrete beam, and a connection plate 205 is disposed at a lower end of the first end 204.
The U-shaped steel corbel 3 comprises a bottom plate 301 and two side plates 302, each of the bottom plate 301 and the two side plates 302 is fixedly connected with the pipe wall of the steel pipe 101, the first end portion 204 of the concrete beam 2 is located in the U-shaped steel corbel 3, and the connecting plate 205 is fixedly connected with the bottom plate 301. A rear pouring cavity is defined among the first end 204 of the concrete beam 2, the U-shaped steel corbels 3 and the wall of the steel pipe 101, and the rear pouring concrete 4 is poured in the rear pouring cavity and covers the second section 1032.
Each of the bottom plate 301 and the two side plates 302 is fixedly connected with the wall of the steel pipe 101, the first end 204 of the concrete beam 2 is located in the U-shaped steel corbel 3 and the connecting plate 205 is fixedly connected with the bottom plate 301. In other words, the connection plate 205 is connected to the wall of the steel pipe 101 via the U-shaped steel corbel 3. Thus, the force of the concrete beam 2 can be transmitted to the steel pipes 101 of the steel tubular concrete column 1 through the connection plate 205 and the U-shaped steel brackets 3.
On one hand, since the concrete beam 2 is the precast concrete beam 2, the steel pipe 101 and the U-shaped steel corbel 3 of the steel pipe concrete beam 2 can also be fixedly connected in advance in a factory, and therefore, the connection between the U-shaped steel corbel 3 and the connecting plate 205 and the pouring of the column concrete 102 and the post-cast concrete 4 are only required to be performed in a construction site. Therefore, compared with the integral cast-in-place concrete filled steel tubular column-concrete beam frame structure, the connecting node 100 of the concrete filled steel tubular column and the concrete beam according to the embodiment of the invention has the advantages of small on-site wet work workload and small on-site construction workload, so that the construction period is shorter, and the construction quality is easier to ensure.
On the other hand, since the post-cast concrete 4 is cast in the post-cast cavity defined between the first end 204 of the concrete beam 2, the U-shaped steel corbel 3 and the wall of the steel tube 101, the force of the concrete beam 2 may be transmitted to the steel tube 101 of the concrete filled steel tube column 1 through the connecting plate 205, the U-shaped steel corbel 3 and also to the concrete filled steel tube column 1 through the post-cast concrete 4. And because the first section 1031 of the first connecting member 103 is located inside the steel tube 101 and is coated by the column concrete 102, and the second section 1032 of the first connecting member 103 is located outside the steel tube 101 and is coated by the post-cast concrete 4, the force of the post-cast concrete 4 can be more transmitted to the column concrete 102 of the steel tube concrete column 1 through the first connecting member 103, and thus, the force of the concrete beam 2 can be more directly transmitted to the column concrete 102 of the steel tube concrete column 1 through the post-cast concrete 4 and the first connecting member 103, thereby reducing the stress of the steel tube 101. Therefore, compared with a full-assembly type steel pipe concrete column-concrete beam frame structure, the integral rigidity of the connecting joint can be greatly improved, and the improvement of the earthquake-resistant performance of a building is facilitated. In addition, because the stress of the steel tube 101 is less, the steel tube 101 with a thinner tube wall can be used for the steel tube concrete column 1, and the material cost is saved.
Therefore, the connection node 100 of the concrete filled steel tubular column and the concrete beam according to the embodiment of the present invention has the advantages of short construction period, easy guarantee of construction quality, good earthquake resistance, low cost, etc.
Hereinafter, a concrete filled steel tubular column and concrete beam connecting node 100 according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, a connection node 100 for a concrete filled steel tubular column and a concrete beam according to an embodiment of the present invention includes a concrete filled steel tubular column 1, a concrete beam 2, a U-shaped steel bracket 3, and post-cast concrete 4.
The steel tube concrete column 1 is a pouring type concrete column, the steel tube concrete column 1 comprises a steel tube 101, column concrete 102 and a first connecting piece 103, and the column concrete 102 is poured in the steel tube 101. The pipe wall of the steel pipe 101 is provided with a first connecting hole 1011 penetrating through the pipe wall in the inward and outward directions, the first connecting piece 103 penetrates through the first connecting hole 1011, the first connecting piece 103 comprises a first section 1031 and a second section 1032, the first section 1031 is located in the steel pipe 101 and is coated by the column concrete 102, and the second section 1032 is located on the outer side of the steel pipe 101
Preferably, the column concrete 102 is high-strength concrete with a strength grade not lower than C60, thereby further improving the integrity of the connection node 100.
In some embodiments, the steel pipe 101 is a rectangular pipe, a first reinforcing plate 1016 is disposed between two adjacent side surfaces of the steel pipe 101, the first reinforcing plate 1016 is disposed in the steel pipe 101, the first reinforcing plate 1016 has a first connection portion and a second connection portion, the first connection portion is fixedly connected to one of the two adjacent side surfaces of the steel pipe 101, and the second connection portion is fixedly connected to the other of the two adjacent side surfaces of the steel pipe 101.
Therefore, the rigidity of the steel pipe 101 can be effectively increased by using the first reinforcing plate 1016, the load transmitted from the concrete beam 2 to the column concrete 102 is increased, and the integrity of the connection node 100 is enhanced.
Preferably, the first reinforcing plates 1016 are arranged in two layers at intervals in the up-down direction, the first reinforcing plate 1016 of the upper layer is located at the upper part of the connection node, and the first reinforcing plate 1016 of the lower layer is located at the lower part of the connection node. For example, the first reinforcing plate 1016 of the upper layer is positioned at the upper portion of the concrete beam 2, and the first reinforcing plate 1016 of the lower layer is positioned at the lower portion of the concrete beam 2.
In some embodiments, the steel tube 101 includes a cross batten 1015, four L-shaped steel plates 1013, and four channels 1014, each of the batten, the four L-shaped steel plates 1013, and the four channels 1014 extends in an up-down direction, the four L-shaped steel plates 1013 are sequentially spliced to form a rectangular tube, the four channels 1014 are respectively welded to four ends of the cross batten 1015, and one channel 1014 is welded between two adjacent L-shaped steel plates 1013.
From this, not only can serve as vertical stiffening rib through four channel-section steels 1014, increased steel pipe 101's rigidity, avoided the construction phase to pour the pipe wall buckling problem that post concrete 102 arouses, effectively reduce steel pipe 101's cross-section width-thickness ratio, can increase steel pipe 101 through cross lacing 1015 moreover to post concrete 102's constraint effect, be favorable to improving the wholeness of steel core concrete column 1. In addition, the steel pipe 101 with the built-in channel 1014 and the cross-shaped lacing 1015 can weaken the influence of the concrete pumping side wall pressure on the initial stress of the steel pipe 101.
Preferably, two adjacent L-shaped steel plates 1013 are welded to the corresponding channel 1014 by the same weld. Therefore, the welding process is reduced, the production efficiency of the steel pipe 101 is further improved, and the construction cost is further reduced.
Preferably, the L-shaped steel plate 1013 is a cold-formed high-strength thin-walled steel plate having a strength of not less than Q460. Therefore, the sectional area of the steel pipe concrete column 1 is effectively reduced.
The concrete beam 2 includes a first longitudinal rib 201 and a beam concrete 203, the first longitudinal rib 201 extends in an extending direction of the concrete beam, and the first longitudinal rib 201 is covered with the beam concrete 203. The concrete beam 2 has a first end 204 and a second end opposite in the extending direction of the concrete beam, the first end 204 is disposed adjacent to the steel pipe 101 opposite to the second end in the extending direction of the concrete beam, the first end 204 is disposed outside the steel pipe 101 and the first end 204 and the steel pipe 101 are spaced apart in the extending direction of the concrete beam, and a connection plate 205 is disposed at a lower end of the first end 204.
The concrete beam 2 is a precast concrete beam 2, and in some embodiments, as shown in fig. 4, the concrete beam 2 further includes a third longitudinal rib 202. Wherein the first muscle 201 of indulging is located the non-coincide part of concrete beam 2, and the first muscle 201 of indulging adopts prestressing strand, and the third is indulged the muscle 202 and is located the lower part of concrete beam 2, and the third is indulged the muscle 202 and is the anchor reinforcing bar. Therefore, the beam section height and midspan deflection can be reduced, the connection node 100 is suitable for a large-span structure, and the field hoisting efficiency can be further improved.
Preferably, the connecting plate 205 is connected to the third longitudinal rib 202 by welding. Thereby, an effective force transfer of the concrete beam 2 to the steel core concrete column 1 is achieved.
The U-shaped steel corbel 3 comprises a bottom plate 301 and two side plates 302, each of the bottom plate 301 and the two side plates 302 is fixedly connected with the pipe wall of the steel pipe 101, the first end portion 204 of the concrete beam 2 is located in the U-shaped steel corbel 3, and the connecting plate 205 is fixedly connected with the bottom plate 301. A rear pouring cavity is defined among the first end 204 of the concrete beam 2, the U-shaped steel corbels 3 and the wall of the steel pipe 101, and the rear pouring concrete 4 is poured in the rear pouring cavity and covers the second section 1032.
Preferably, the first end portion 204 includes a slope portion, so that the connection area of the post-cast concrete 4 and the first end portion 204 can be increased by using the slope portion, thereby being beneficial to further increasing the integrity of the connection node 100, increasing the load carrying proportion of the column concrete 102, and effectively avoiding the local buckling failure of the steel pipe 101 in the core region of the node.
Of course, in other embodiments, the first end portion may also be provided with a connecting groove with a notch facing the steel pipe, so that the connecting groove can be used to increase the connecting area of the post-cast concrete and the first end portion, which is beneficial to further increase the integrity of the connecting node 100.
Preferably, as shown in fig. 1, plug welding holes 3011 are formed in the bottom plate 301, and the connecting plate 205 and the bottom plate 301 are plug welded through the plug welding holes 3011, so that the connection stability of the connecting plate 205 and the bottom plate 301 is improved, and the force transmission reliability from the connecting plate 205 to the U-shaped steel bracket 3 is improved.
Preferably, the first connector 103 is a peg.
Preferably, the outer circumferential surface of the first connector 103 is disposed spaced apart from the hole wall of the first connection hole 1011. Therefore, the column concrete 102 can flow out of the steel pipe 101 through the interval between the first connecting piece 103 and the hole wall of the first connecting hole 1011, so that the column concrete 102 and the post-cast concrete 4 can be integrally formed by one-time casting, and the overall rigidity and the seismic performance of the connecting node 100 can be further improved.
In some embodiments, the first connecting member 103 is provided in plurality, and the plurality of first connecting members 103 are arranged at intervals in the up-down direction. Therefore, more force of the concrete beam 2 can be directly transmitted to the column concrete 102 of the steel tube concrete column 1 through the post-cast concrete 4 and the first connecting piece 103, the stress of the steel tube 101 is further reduced, and the improvement of the earthquake-resistant performance of the building and the saving of the material cost of the building are further facilitated.
In some embodiments, the first connection hole 1011 is an elongated hole extending in the up-down direction, and each of the plurality of first connectors 103 is disposed in the same first connection hole 1011. Therefore, the number of the first connecting holes 1011 is small, so that the steel pipe connecting structure is convenient to process and manufacture, the production efficiency of the steel pipe 101 is further improved, and the construction cost is further reduced.
In some embodiments, the steel pipe concrete column 1 further includes a second connecting member 104, a second connecting hole penetrating through the pipe wall in the inward and outward direction is formed in the pipe wall of the steel pipe 101, the second connecting hole and the first connecting hole 1011 are arranged at intervals in the circumferential direction of the steel pipe 101, the second connecting member 104 penetrates through the second connecting hole and is connected with the hole wall of the second connecting hole, the second connecting member 104 includes a third section 1041 and a fourth section 1042, the third section 1041 is located in the steel pipe 101 and is coated by the column concrete 102, and the fourth section 1042 is located outside the steel pipe 101 and is coated by 4 sections of post-cast concrete.
Thus, the second connector 104 can increase the interface interaction between the post-cast concrete 4 and the wall of the steel pipe 101, which is beneficial to further improving the integrity of the connection node 100. In addition, the combined action of the concrete beam 2 and the post-cast concrete 4 can be further increased by using the second connecting piece 104, so that the load bearing proportion of the column concrete 102 can be further increased, and the local buckling of the pipe wall of the steel pipe 101 can be further effectively avoided.
Preferably, the post-cast concrete 4 is high-strength concrete with a strength grade not lower than C60, thereby further improving the integrity of the connection node 100.
Preferably, the second connector 104 is a penetration type shear pin.
Preferably, the second connection member 104 is provided in plurality, and the plurality of second connection members 104 are provided at intervals in the up-down direction. Thereby, it is advantageous to further improve the integrity of the connection node 100.
In some embodiments, the connection node 100 further includes a floor slab 5, the floor slab 5 is a cast-in-place floor slab 5, the floor slab 5 is disposed on an upper portion of the concrete beam 2, the floor slab 5 includes a second longitudinal rib 501 and a floor slab concrete 502, the second longitudinal rib 501 extends along an extending direction of the concrete beam, the beam stirrup 206 includes a first portion and a second portion, the first portion is covered by the beam concrete 203, the second portion extends upward out of the beam concrete 203 and is fixedly connected with the second longitudinal rib 501, a through hole 105 is formed in a wall of the steel pipe 101 and penetrates through the wall in an inner and outer direction, the second longitudinal rib 501 passes through the through hole 105, the second longitudinal rib 501 includes a fifth section 5011 and a sixth section 5012, the fifth section 5011 is located in the steel pipe 101 and is covered by the column concrete 102, the sixth section 5012 is located outside the steel pipe 101 and is covered by the floor slab concrete 502, and the second portion is covered by the floor slab concrete 502.
The second is indulged muscle 501 and is located the coincide part of concrete beam 2 and floor 5, and the muscle 501 is indulged to floor 5 and concrete beam 2 sharing second promptly, and the second is indulged muscle 501 and is passed node core area through perforation 105, from this, can further strengthen connected node 100's wholeness, has weakened concrete beam 2 and floor 5 juncture reinforcing bar crowded phenomenon densely, is favorable to further improving the anti-seismic performance of building.
In some embodiments, the second longitudinal rib 501 is a non-prestressed longitudinal rib.
In some embodiments, a stiffening grid 106 is disposed at the through hole 105, and the stiffening grid 106 is located outside the steel pipe 101 and is fixedly connected to the wall of the steel pipe 101. Thus, the use of the stiffening grid 106 effectively reduces the adverse effects of the perforations 105 on the pipe wall.
In some embodiments, each of the concrete beams 2 and the U-shaped steel brackets 3 is provided in plurality, the plurality of concrete beams 2 and the plurality of U-shaped steel brackets 3 are in one-to-one correspondence, the plurality of U-shaped steel brackets 3 are arranged at intervals along the circumferential direction of the steel pipe 101, a second reinforcing plate 303 is provided between two adjacent U-shaped steel brackets 3, the second reinforcing plate 303 has a third connecting portion and a fourth connecting portion, the third connecting portion is fixedly connected with one of the two adjacent U-shaped steel brackets 3, and the fourth connecting portion is fixedly connected with the other of the two adjacent U-shaped steel brackets 3.
Thereby, the integrity of the connection node 100 may be effectively enhanced. Preferably, the second reinforcing plates 303 are arranged in two layers at intervals in the up-down direction, the second reinforcing plate 303 at the upper layer is located at the upper part of the connection node, and the second reinforcing plate 303 at the lower layer is located at the lower part of the connection node. For example, the second reinforcing plate 303 at the upper layer is positioned at the upper part of the U-shaped steel bracket 3, and the second reinforcing plate 303 at the lower layer is positioned at the lower part of the U-shaped steel bracket 3.
For example, as shown in fig. 1 to 4, the connection node is a middle node, four concrete beams 2 and four U-shaped steel brackets 3 are provided, four concrete beams 2 and four U-shaped steel brackets 3 correspond to each other one by one, and the four concrete beams 2 are uniformly distributed along the circumferential direction of the steel pipe 101. Correspondingly, each of the first connecting members 103, the first connecting holes 1011, the second connecting members 104 and the second connecting holes is provided in four groups, and the four groups of the first connecting members 103, the four groups of the first connecting holes 1011, the four groups of the second connecting members 104, the four groups of the second connecting holes, the four concrete beams 2 and the four U-shaped steel brackets 3 are in one-to-one correspondence.
Preferably, as shown in fig. 1 and 3, each set of first connectors 103 is provided in two rows, and the two rows of first connectors 103 corresponding to the same concrete beam 2 are symmetrically provided; each set of the second connecting members 104 is also provided in two rows, and the two rows of the second connecting members 104 corresponding to the same concrete beam 2 are symmetrically provided.
Of course, in other embodiments, the connection node may also be an edge node, in which case, there are three concrete beams 2 and three U-shaped steel brackets 3 each, and the three concrete beams 2 and the three U-shaped steel brackets 3 correspond to each other one by one, and the three concrete beams 2 are uniformly distributed along the circumferential direction of the steel pipe 101. Correspondingly, each of the first connecting piece 103, the first connecting hole 1011, the second connecting piece 104 and the second connecting hole is provided with three groups, and the three groups of the first connecting pieces 103, the three groups of the first connecting holes 1011, the three groups of the second connecting pieces 104, the three groups of the second connecting holes, the three concrete beams 2 and the three U-shaped steel brackets 3 are in one-to-one correspondence.
In still other embodiments, the connection node may also be an angle node, in which case, there are two concrete beams 2 and two U-shaped steel brackets 3 each, and there are two concrete beams 2 and two U-shaped steel brackets 3 in one-to-one correspondence, and the two concrete beams 2 are uniformly distributed along the circumferential direction of the steel pipe 101. Correspondingly, each of the first connecting pieces 103, the first connecting holes 1011, the second connecting pieces 104 and the second connecting holes is provided with two sets, and the two sets of the first connecting pieces 103, the two sets of the first connecting holes 1011, the two sets of the second connecting pieces 104, the two sets of the second connecting holes, the two concrete beams 2 and the two U-shaped steel brackets 3 are in one-to-one correspondence.
The construction method of the connection node 100 according to the embodiment of the present invention includes the steps of:
prefabricating the concrete beam 2 in a factory, and arranging a connecting plate 205 at the first end 204 of the concrete beam 2;
the steel pipe 101 is manufactured in a factory, the U-shaped steel corbel 3 is fixedly welded on the pipe wall of the steel pipe 101, a first connecting hole 1011, a second connecting hole and a through hole 105 are formed in the steel pipe 101, a second connecting piece 104 is welded at the second connecting hole, and a stiffening grid 106 is fixedly connected at the through hole 105;
erecting a steel pipe 101 on a construction site;
hoisting the concrete beam 2, placing the concrete beam 2 on the U-shaped steel bracket 3, and fixedly connecting the connecting plate 205 with the bottom plate 301;
laying a second longitudinal bar 501 on a construction site, and fixing a first connecting piece 103 in a first connecting hole 1011;
pouring the column concrete 102 and the post-cast concrete 4, wherein the column concrete 102 and the post-cast concrete 4 are integrally formed;
and pouring floor slab concrete 502 at the overlapped part of the concrete beam 2 and the floor slab 5.
After the above steps are completed, after the concrete is cured to the specified strength, the subsequent construction process can be continued.
The processing sequence of the steel pipe 101 is: four channel beams 1014 are respectively welded at four ends of the cross batten 1015, and then the channel beams 1014 and the two corresponding L-shaped steel plates 1013 are welded and fixed through a long welding seam.
The first connecting member 103 may be positioned in the first connecting hole 1011 by a locator or a wire.
After the steel pipe 101 is erected at a construction site, the steel pipe 101 and the U-shaped steel corbels 3 fixed on the steel pipe 101 serve as construction supports and formworks. After the post-cast concrete 4 is poured, the U-shaped steel bracket 3, the post-cast concrete 4 and the concrete beam 2 share the load in the use stage.
Preferably, a part of the beam stirrup 206 of the concrete beam 2 extends upward out of the beam concrete, the part of the beam stirrup 206 is fixedly connected with the second longitudinal bar 501, and the part of the beam stirrup 206 is covered by the floor slab concrete 502.
According to the connecting node 100 provided by the embodiment of the invention, the high bearing characteristics of the high-strength steel pipe and the prestressed concrete are fully exerted, the load bearing proportion of the column concrete is effectively increased after the steel pipe in the core area of the node is provided with the connecting hole and the stud, the problem of local buckling of the high-strength thin-wall steel pipe in the node area is avoided, and the integral working performance of the node is ensured by pouring the column concrete in situ and pouring the concrete afterwards. The defects of large size, heavy self weight, difficulty in quick construction or poor integrity of the traditional cast-in-place or fully assembled concrete filled steel tubular column-concrete can be effectively overcome. The construction efficiency and the structural performance of the concrete filled steel tubular column-concrete beam mixed structure are effectively improved, and the concrete filled steel tubular column-concrete beam mixed structure is applied to logistics, storage, industrial plants and other multi-layer buildings, has better economic benefits and technical advantages, and has wide prospect.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are therefore not to be considered limiting of the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; may be mechanically coupled, may be electrically coupled or may be in communication with each other; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
In the present disclosure, the terms "one embodiment," "some embodiments," "an example," "a specific example," or "some examples" and the like mean that a specific feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present disclosure. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art within the scope of the present invention.

Claims (10)

1.一种钢管混凝土柱和混凝土梁的连接节点,其特征在于,包括:1. a connection node of a concrete filled steel tube column and a concrete beam, is characterized in that, comprises: 钢管混凝土柱,所述钢管混凝土柱为浇筑式混凝土柱,所述钢管混凝土柱包括钢管、柱混凝土和第一连接件,所述柱混凝土浇筑在所述钢管内,所述钢管的管壁上设有在内外方向上贯通所述管壁的第一连接孔,所述第一连接件穿过所述第一连接孔,所述第一连接件包括第一段和第二段,所述第一段位于所述钢管内且被所述柱混凝土包覆,所述第二段位于所述钢管的外侧;The CFST column is a pouring type concrete column, the CFST column includes a steel pipe, a column concrete and a first connector, the column concrete is poured in the steel pipe, and the pipe wall of the steel pipe is provided with a steel pipe. There is a first connecting hole penetrating the pipe wall in the inner and outer directions, the first connecting piece passes through the first connecting hole, the first connecting piece includes a first section and a second section, the first connecting piece passes through the first connecting hole. a segment is located within the steel pipe and is clad by the column concrete, the second segment is located outside the steel pipe; 混凝土梁,所述混凝土梁为预制混凝土梁,所述混凝土梁包括第一纵筋、梁箍筋和梁混凝土,所述第一纵筋沿所述混凝土梁的延伸方向延伸,所述梁箍筋沿所述混凝土梁的延伸方向间隔开地设置且与所述第一纵筋固定连接,所述梁箍筋的至少一部分和所述第一纵筋被所述梁混凝土包覆,所述混凝土梁具有在所述混凝土梁的延伸方向上相对的第一端部和第二端部,所述第一端部在所述内外方向上相对所述第二端部邻近所述钢管设置,所述第一端部设置在所述钢管的外侧且所述第一端部和所述钢管在所述混凝土梁的延伸方向上间隔开,所述第一端部的下端设有连接板;A concrete beam, the concrete beam is a prefabricated concrete beam, the concrete beam includes a first longitudinal reinforcement, a beam stirrup and a beam concrete, the first longitudinal reinforcement extends along the extension direction of the concrete beam, and the beam stirrup spaced apart along the extension direction of the concrete beam and fixedly connected to the first longitudinal reinforcement, at least a part of the beam stirrup and the first longitudinal reinforcement are covered by the beam concrete, the concrete beam It has a first end portion and a second end portion opposite in the extending direction of the concrete beam, the first end portion is disposed adjacent to the steel pipe relative to the second end portion in the inside-outside direction, and the first end portion is disposed adjacent to the steel pipe. one end portion is arranged on the outside of the steel pipe and the first end portion and the steel pipe are spaced apart in the extending direction of the concrete beam, the lower end of the first end portion is provided with a connecting plate; U形钢牛腿,所述U形钢牛腿包括底板和两个侧板,所述底板和两个所述侧板中的每一者与所述钢管的管壁固定连接,所述第一端部位于所述U形钢牛腿内且所述连接板与所述底板固定连接,所述混凝土梁的所述第一端部、所述U形钢牛腿和所述钢管的管壁之间限定出后浇筑腔;和U-shaped steel corbel, the U-shaped steel corbel includes a bottom plate and two side plates, each of the bottom plate and the two side plates is fixedly connected with the pipe wall of the steel pipe, the first The end is located in the U-shaped steel corbel and the connecting plate is fixedly connected with the bottom plate, and the first end of the concrete beam, the U-shaped steel corbel and the pipe wall of the steel pipe are connected. to define a post-cast cavity; and 后浇混凝土,所述后浇混凝土浇筑在所述后浇筑腔内且包覆所述第二段。Post-cast concrete, which is placed in the post-cast cavity and covers the second section. 2.根据权利要求1所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述第一连接件设有多个,多个所述第一连接件沿上下方向间隔开地设置。2 . The connection node of the CFST column and the concrete beam according to claim 1 , wherein a plurality of the first connecting pieces are provided, and the plurality of the first connecting pieces are spaced apart in the up-down direction. 3 . 3.根据权利要求2所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述第一连接孔为沿上下方向延伸的长条形孔,多个所述第一连接件中的每一者设置在同一所述第一连接孔内。3 . The connection node of the concrete-filled steel tubular column and the concrete beam according to claim 2 , wherein the first connection hole is an elongated hole extending in the up-down direction, and the plurality of first connection pieces Each is disposed within the same first connection hole. 4.根据权利要求1-3中任一项所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述第一连接件的外周面与所述第一连接孔的孔壁间隔开地设置。4. The connection node of a concrete filled steel tubular column and a concrete beam according to any one of claims 1 to 3, wherein the outer peripheral surface of the first connection member is spaced apart from the hole wall of the first connection hole set up. 5.根据权利要求4所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述钢管混凝土柱进一步包括第二连接件,所述钢管的管壁上设有在内外方向上贯通所述管壁的第二连接孔,所述第二连接孔与所述第一连接孔沿所述钢管的周向上间隔开地设置,所述第二连接件穿过所述第二连接孔且与所述第二连接孔的孔壁相连,所述第二连接件包括第三段和第四段,所述第三段位于所述钢管内且被所述柱混凝土包覆,所述第四段位于所述钢管的外侧且被所述后浇混凝土包覆。5 . The connection node of the CFST column and the concrete beam according to claim 4 , wherein the CFST column further comprises a second connecting piece, and the pipe wall of the steel pipe is provided with a penetrating joint in the inner and outer directions. 6 . The second connection hole of the pipe wall, the second connection hole and the first connection hole are arranged spaced apart along the circumferential direction of the steel pipe, and the second connection piece passes through the second connection hole and is connected with the first connection hole. The hole walls of the second connecting hole are connected, the second connecting piece includes a third section and a fourth section, the third section is located in the steel pipe and is covered by the column concrete, and the fourth section Located on the outside of the steel pipe and clad by the post-cast concrete. 6.根据权利要求5所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述第二连接件设有多个,多个所述第二连接件沿上下方向间隔开地设置。6 . The connection node of the concrete filled steel tubular column and the concrete beam according to claim 5 , wherein a plurality of the second connecting elements are provided, and the plurality of the second connecting elements are spaced apart along the up-down direction. 7 . 7.根据权利要求1-3中任一项所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,进一步包括楼板,所述楼板为现浇式楼板,所述楼板设在所述混凝土梁的上部,所述楼板包括第二纵筋和楼板混凝土,所述第二纵筋沿所述混凝土梁的延伸方向延伸,所述梁箍筋包括第一部分和第二部分,所述第一部分被所述梁混凝土包覆,所述第二部分向上伸出所述梁混凝土且与所述第二纵筋固定连接,所述钢管的管壁上设有在内外方向上贯通所述管壁的穿孔,所述第二纵筋穿过所述穿孔,所述第二纵筋包括第五段和第六段,所述第五段位于所述钢管内且被所述柱混凝土包覆,所述第六段位于所述钢管的外侧且被所述楼板混凝土包覆,所述第二部分被所述楼板混凝土包覆。7. The connection node of the concrete-filled steel tubular column and the concrete beam according to any one of claims 1-3, characterized in that, further comprising a floor slab, the floor slab is a cast-in-place floor slab, and the floor slab is provided on the concrete The upper part of the beam, the floor plate includes a second longitudinal reinforcement and a floor concrete, the second longitudinal reinforcement extends along the extension direction of the concrete beam, the beam stirrup includes a first part and a second part, the first part is The beam is covered with concrete, the second part extends upward from the beam concrete and is fixedly connected with the second longitudinal reinforcement, and the pipe wall of the steel pipe is provided with perforations penetrating the pipe wall in the inner and outer directions , the second longitudinal rib passes through the through hole, the second longitudinal rib includes a fifth section and a sixth section, the fifth section is located in the steel pipe and is covered by the column concrete, and the first Six sections are located outside the steel tube and are clad by the floor concrete, and the second section is clad by the floor concrete. 8.根据权利要求7所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述穿孔处设有加劲格栅,所述加劲格栅位于所述钢管的外侧且与所述钢管的管壁固定连接。8 . The connection node of the CFST column and the concrete beam according to claim 7 , wherein the perforation is provided with a stiffening grid, and the stiffening grid is located on the outside of the steel pipe and is connected to the steel pipe. 9 . Pipe wall fixed connection. 9.根据权利要求1-3中任一项所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述钢管为矩形管,所述钢管的相邻两个侧面之间设有第一加强板,所述第一加强板设置在所述钢管内,所述第一加强板具有第一连接部和第二连接部,所述第一连接部与所述钢管的相邻两个侧面中的一者固定连接,所述第二连接部与所述钢管的相邻两个侧面中的另一者固定连接。9 . The connection node of a concrete-filled steel tube column and a concrete beam according to any one of claims 1 to 3, wherein the steel pipe is a rectangular pipe, and a second side is provided between two adjacent side surfaces of the steel pipe. a reinforcing plate, the first reinforcing plate is arranged in the steel pipe, the first reinforcing plate has a first connecting part and a second connecting part, and the first connecting part is adjacent to two side surfaces of the steel pipe One of them is fixedly connected, and the second connecting part is fixedly connected with the other of the two adjacent side surfaces of the steel pipe. 10.根据权利要求1-3中任一项所述的钢管混凝土柱和混凝土梁的连接节点,其特征在于,所述混凝土梁和所述U形钢牛腿中的每一者设有多个,多个所述混凝土梁和多个所述U形钢牛腿一一对应,多个所述U形钢牛腿沿所述钢管的周向间隔开地设置,相邻两个所述U形钢牛腿之间设有第二加强板,所述第二加强板具有第三连接部和第四连接部,所述第三连接部与相邻两个所述U形钢牛腿中的一者固定连接,所述第四连接部与相邻两个所述U形钢牛腿中的另一者固定连接。10. The connection node of a concrete filled steel tubular column and a concrete beam according to any one of claims 1-3, wherein each of the concrete beam and the U-shaped steel corbel is provided with a plurality of , a plurality of the concrete beams and a plurality of the U-shaped steel corbels are in one-to-one correspondence, and the plurality of the U-shaped steel corbels are arranged at intervals along the circumference of the steel pipe, and two adjacent U-shaped steel corbels are arranged A second reinforcing plate is arranged between the steel corbels, the second reinforcing plate has a third connecting part and a fourth connecting part, and the third connecting part is connected to one of the two adjacent U-shaped steel corbels. The fourth connecting part is fixedly connected with the other of the adjacent two U-shaped steel corbels.
CN202110402619.5A 2021-04-14 2021-04-14 Connecting joint of concrete filled steel tubular column and concrete beam Active CN113136943B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110402619.5A CN113136943B (en) 2021-04-14 2021-04-14 Connecting joint of concrete filled steel tubular column and concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110402619.5A CN113136943B (en) 2021-04-14 2021-04-14 Connecting joint of concrete filled steel tubular column and concrete beam

Publications (2)

Publication Number Publication Date
CN113136943A true CN113136943A (en) 2021-07-20
CN113136943B CN113136943B (en) 2022-04-22

Family

ID=76812556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110402619.5A Active CN113136943B (en) 2021-04-14 2021-04-14 Connecting joint of concrete filled steel tubular column and concrete beam

Country Status (1)

Country Link
CN (1) CN113136943B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605601A (en) * 2021-09-16 2021-11-05 上海市房屋建筑设计院有限公司 Trapezoidal steel pipe column and splicing structure and method thereof
CN115233813A (en) * 2022-07-12 2022-10-25 中冶赛迪工程技术股份有限公司 Beam with snap-on connection plate
CN115928882A (en) * 2022-12-13 2023-04-07 西安交通大学 A prefabricated composite structure hybrid connection node suitable for coastal areas
CN116044200A (en) * 2023-01-10 2023-05-02 武汉大学 Concrete-filled steel tube concrete reinforced concrete column top node structure and method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000226888A (en) * 1999-02-04 2000-08-15 Taisei Corp Connection structure between concrete filled steel pipe columns and beams
CN101691782A (en) * 2009-09-30 2010-04-07 华南理工大学 Node for thin-wall steel tube regenerative mixed column and reinforced concrete beam and construction method thereof
CN202544138U (en) * 2012-05-15 2012-11-21 香港华艺设计顾问(深圳)有限公司 Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam
KR20140012827A (en) * 2012-07-23 2014-02-04 홍종국 The pillar and girder connecting structure for a building
CN104563305A (en) * 2015-01-16 2015-04-29 济南轨道交通集团有限公司 Connecting joint of concrete overlapped beam and steel pipe concrete column and construction method
CN105569191A (en) * 2016-01-23 2016-05-11 安徽鸿路钢结构(集团)股份有限公司 Steel-encased concrete composite beam-steel pipe column connection joint
CN205776802U (en) * 2016-06-29 2016-12-07 天津市建筑设计院 Reinforced beam and the connecting joint structure of rectangular steel-tube concrete column
CN107503442A (en) * 2017-09-07 2017-12-22 中国五洲工程设计集团有限公司 A kind of assembled connecting node of steel core concrete column and girder steel
CN207685996U (en) * 2017-12-01 2018-08-03 广西建工集团第五建筑工程有限责任公司 A kind of steel core concrete column and beam main tendon connecting node
CN109339226A (en) * 2018-11-16 2019-02-15 华侨大学 A prefabricated reinforced concrete beam-column connection node structure
CN109403545A (en) * 2018-11-22 2019-03-01 中国十七冶集团有限公司 A kind of high assembly rate concrete-filled steel tubular frame structural system and connection method
CN109707040A (en) * 2019-01-22 2019-05-03 江苏金砼预制装配建筑发展有限公司 A kind of assembly concrete frame beam column connecting structure of the steel pipe with U-shaped steel corbel
CN111424713A (en) * 2020-03-19 2020-07-17 清华大学 Suspension tunnel and construction method thereof
CN215053928U (en) * 2021-04-14 2021-12-07 清华大学 Connecting joint of concrete filled steel tubular column and concrete beam

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000226888A (en) * 1999-02-04 2000-08-15 Taisei Corp Connection structure between concrete filled steel pipe columns and beams
CN101691782A (en) * 2009-09-30 2010-04-07 华南理工大学 Node for thin-wall steel tube regenerative mixed column and reinforced concrete beam and construction method thereof
CN202544138U (en) * 2012-05-15 2012-11-21 香港华艺设计顾问(深圳)有限公司 Opening connecting node of concrete-filled steel tubular frame column and reinforced concrete frame beam
KR20140012827A (en) * 2012-07-23 2014-02-04 홍종국 The pillar and girder connecting structure for a building
CN104563305A (en) * 2015-01-16 2015-04-29 济南轨道交通集团有限公司 Connecting joint of concrete overlapped beam and steel pipe concrete column and construction method
CN105569191A (en) * 2016-01-23 2016-05-11 安徽鸿路钢结构(集团)股份有限公司 Steel-encased concrete composite beam-steel pipe column connection joint
CN205776802U (en) * 2016-06-29 2016-12-07 天津市建筑设计院 Reinforced beam and the connecting joint structure of rectangular steel-tube concrete column
CN107503442A (en) * 2017-09-07 2017-12-22 中国五洲工程设计集团有限公司 A kind of assembled connecting node of steel core concrete column and girder steel
CN207685996U (en) * 2017-12-01 2018-08-03 广西建工集团第五建筑工程有限责任公司 A kind of steel core concrete column and beam main tendon connecting node
CN109339226A (en) * 2018-11-16 2019-02-15 华侨大学 A prefabricated reinforced concrete beam-column connection node structure
CN109403545A (en) * 2018-11-22 2019-03-01 中国十七冶集团有限公司 A kind of high assembly rate concrete-filled steel tubular frame structural system and connection method
CN109707040A (en) * 2019-01-22 2019-05-03 江苏金砼预制装配建筑发展有限公司 A kind of assembly concrete frame beam column connecting structure of the steel pipe with U-shaped steel corbel
CN111424713A (en) * 2020-03-19 2020-07-17 清华大学 Suspension tunnel and construction method thereof
CN215053928U (en) * 2021-04-14 2021-12-07 清华大学 Connecting joint of concrete filled steel tubular column and concrete beam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王书磊等: "装配式钢筋混凝土柱-钢梁节点抗弯性能有限元分析", 《铁道科学与工程学报》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605601A (en) * 2021-09-16 2021-11-05 上海市房屋建筑设计院有限公司 Trapezoidal steel pipe column and splicing structure and method thereof
CN115233813A (en) * 2022-07-12 2022-10-25 中冶赛迪工程技术股份有限公司 Beam with snap-on connection plate
CN115928882A (en) * 2022-12-13 2023-04-07 西安交通大学 A prefabricated composite structure hybrid connection node suitable for coastal areas
CN116044200A (en) * 2023-01-10 2023-05-02 武汉大学 Concrete-filled steel tube concrete reinforced concrete column top node structure and method
CN116044200B (en) * 2023-01-10 2024-05-17 武汉大学 Column top node structure and method for concrete filled steel tube reinforced concrete column

Also Published As

Publication number Publication date
CN113136943B (en) 2022-04-22

Similar Documents

Publication Publication Date Title
CN113136943B (en) Connecting joint of concrete filled steel tubular column and concrete beam
US9518401B2 (en) Open web composite shear connector construction
CN112922231A (en) Fabricated concrete beam-column joint and construction method thereof
CN110792165B (en) Prefabricated assembly type concrete beam column joint connecting device and method
CN108571070B (en) Prefabricated steel tube concrete ring beam connecting structure and construction method
CN102418387B (en) Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof
CN113062476B (en) Heavy-load large-span combined beam-column structure and construction method
CN209637112U (en) A steel pipe concrete pouring body with tension bars
CN215053928U (en) Connecting joint of concrete filled steel tubular column and concrete beam
CN110984367B (en) Prefabricated building frame structure component and construction method thereof
CN106894544B (en) Embedded single-layer steel plate-concrete combined shear wall and construction method thereof
CN115653105B (en) A connection structure between frame column and reinforced concrete beam and construction method thereof
CN106592821B (en) Side-standing type integral forming structure and method of shear steel plate and one side reinforcing mesh
CN212453065U (en) Assembled building frame structure member
CN209989954U (en) Conversion node of upper steel pipe column and lower floor reinforced concrete column
CN109577520B (en) Steel pipe concrete key connection shear wall column structure and assembly method
CN111021553A (en) A connection node of precast concrete column and steel beam with inner clapboard
CN215888962U (en) Thin-bottom groove type prestressed concrete superposed beam
CN113175080B (en) A prefabricated reinforced concrete structure and connection node
CN215330707U (en) Prefabricated assembled shear force wall
CN214657748U (en) Anchor-clamping connection prefabricated steel reinforced concrete frame
JP2697532B2 (en) How to build an architectural frame
CN112814205A (en) Prefabricated assembly type shear wall and construction method thereof
CN113719030A (en) Thin-bottom groove type prestressed concrete superposed beam
CN116289579B (en) Ground system beam connection construction method of assembled pier stud

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant