CN107199437A - A kind of steel anchor beam section preparation method - Google Patents

A kind of steel anchor beam section preparation method Download PDF

Info

Publication number
CN107199437A
CN107199437A CN201610148268.9A CN201610148268A CN107199437A CN 107199437 A CN107199437 A CN 107199437A CN 201610148268 A CN201610148268 A CN 201610148268A CN 107199437 A CN107199437 A CN 107199437A
Authority
CN
China
Prior art keywords
line
web
plate
welding
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610148268.9A
Other languages
Chinese (zh)
Other versions
CN107199437B (en
Inventor
孙峰伟
吴德强
李斐
姚新国
杨毅龙
尤华军
吴鸿胜
姜光辉
雷新强
孙现新
聂锟
韩超群
翟银伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION, China Railway 15th Bureau Group Co Ltd filed Critical 5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
Priority to CN201610148268.9A priority Critical patent/CN107199437B/en
Publication of CN107199437A publication Critical patent/CN107199437A/en
Application granted granted Critical
Publication of CN107199437B publication Critical patent/CN107199437B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

A kind of steel anchor beam section preparation method, including:Step 1: horizontal moulding bed positioning, the polishing of bonding wire region on bottom plate (N2);Step 2: installing the first dividing plate (N5a) and second partition (N6a) to line, spot welding is fixed, and width presses center line alignment installation;Step 3: installing web (N1) by line, spot welding is fixed;Step 4: installing top plate (N4) to line, each system line, hookup wire, rod member home record width, height dimension are checked;Step 5: installing bearing plate (N7) to line and the unit piece that (NJ7) be prefabricated into of putting more energy into, putting more energy into (NJ1);Put more energy into Step 6: being soldered after (NJ1), finally group weldering outside bearing plate (N7) unit piece;Step 7: to being put more energy into (N3, N5, N6) outside line erecting and welding case, longitudinal spacing plate and anchor plate (N8).

Description

A kind of steel anchor beam section preparation method
Technical field
The present invention relates to a kind of steel anchor beam section preparation method, more specifically, one kind is used for steel structure bridge Steel anchor beam section preparation method.
Background technology
Girder or the bridge that arch rib material is steel, are commonly referred to as steel bridge.Bridge pier, bridge tower, floorings etc. Other materials can be then steel, concrete etc..Steel structure bridge mainly include highway steel structure bridge and The major class of railway steel structure bridge two, currently, transport development China as the infrastructure given priority to, Development is very rapid, also promotes the development of science of bridge building.Particularly in recent years, steel structure bridge due to Have many advantages and widely used by engineering circles.In country《Mid-long term railway network plan》In it is bright Really propose, to the year two thousand twenty, china railway operation mileage is up to 100,000 km, and main busy trunk lines are real Now separate lines for passenger and freight, the km of planning construction new line about 1.6 ten thousand, planning is that the km of two wires 1.3 ten thousand is built in wired increasing, Great opportunity is provided for the construction of railroad bridge, also will bring bigger for China railways bridge steel plate Development.In bridge steel development from now on, the high intensity, solderable of science of bridge building development need is complied with Property, the good high performance bridge steel of anti-breaking property, fatigability, weatherability will be the main of bridge steel development Direction.
At present, the development of Bridges in Our Country steel is slower, and it is high that current bridge steel also rests on traditional low-alloy In strength steel level, bridge main is with the kind of steel:14MnNbQ, 16Mnq, SET355, SM490C and novel weathering resistant bridge steel etc..The main member of bridge steel structure include steel plate, section bar, High-strength bolt, cast steel etc., and the full weldering built up by these or bolted and welded structure.These steel grades are all deposited In the weakness that some can not overcome, such as thickness of slab effect is serious, welding performance is bad, low strength, and And do not possess good weather resistance.Meanwhile, steel structural bridge beam is complicated, there is certain manufacture Difficulty, partial component only has large-scale steel mill, shipyard to build, between bridge member manufacturing enterprise In the presence of very big technological gap.
The content of the invention
The invention provides a kind of steel anchor beam section preparation method, this method has preparation easy, quick, The advantageous effects of Stability Analysis of Structures and good weatherability.
In order to realize the purpose of the application, the technical scheme that the application is used is:
A kind of steel anchor beam section preparation method, comprises the following steps:
Step one
Horizontal moulding bed positioning on bottom plate (N2), the polishing of bonding wire region, draw center line, web alignment line, First dividing plate (N5a) assembly line, second partition (N6a) assembly line, web (N1) assembly line, Case is put more energy into (N5, N6) assembly line outside;
Step 2
First dividing plate (N5a) and second partition (N6a) is installed to line, spot welding is fixed, second every Plate (N6a) and web (N1) full penetration, each reserved 3mm in width both sides welding Amount of contraction, width presses center line alignment installation;
Step 3
By line install web (N1), spot welding is fixed, web (N1) should pull in advance center line, Suspension cable center line, web alignment line, bearing plate (bearing plate N7), (NJ1) assembly line of putting more energy into, Case is put more energy into (N5, N6) assembly line, top plate (N4) assembly line outside, with the anchor pad of web during line On the basis of plate machined surface, the web alignment lines of two coxostermums aligns peace with the web alignment line on bottom plate Dress, it is ensured that the polishing of anchor plate and two coxostermums is held out against;
Weld seam along web and bottom plate adds temporary support, is arranged a pair every 400mm, Ran Houjin Row diaphragm plate and web, the welding of bottom plate, and web and base plate interior angle welding, welding grooving Type, after taking out temporary support after weld seam cooling, welding sequence is:First the facade of welding N6a dividing plates two melts Saturating weld seam, then the trihedral angle weld seam of N5a dividing plates is welded, finally weld the angle of web and bottom plate box house Weld seam, is strictly detected to weld seam, smooth to all arc craters and the defect reconditioning transfinited;
Step 4
Top plate N4 is installed to line, each system line, hookup wire, rod member home record width, height gauge is checked It is very little, special survey port sizes, tack welding after passed examination, by welding condition carry out top plate with The T-shaped groove welding of web, member bar turning completes web and bottom plate penetration weld;
Step 5
Bearing plate bearing plate N7 is installed to line and the unit piece that NJ7 is prefabricated into of putting more energy into, put more energy into NJ1, Because insert space is narrow and small, and bearing plate N7 requires penetration with web, therefore, takes from the inside to the outside Room for manoeuvre welded and installed, first group weldering is close to top plate side bearing plate N7 unit pieces, then organizes weldering and put more energy into NJ1, Rigidity support should be increased before welding bearing plate bearing plate N7 with anti-deformation, bearing plate N7 is adopted with web With band steel sleeve single face welding and double face shaping welding procedure, groove is faced outwardly;
Step 6
It is soldered after NJ1, finally group weldering outside bearing plate N7 unit pieces notice that polishing is held out against during spelling In face of neat;
Step 7
To the N3, N5, N6, longitudinal spacing plate N9 and anchor plate N8 of being put more energy into outside line erecting and welding case, note The direction on meaning N8 inclined-planes,
Weld seam detection, rod member correction, lifting is flat to hole Ni Zhifu drill mould bases after physical dimension detection inspection declaration is qualified Platform, corrects each position line of rod member, requires to coordinate using steel band according to main longitudinal grider drill jig frame drilling construction figure Carry out positioning and fine positioning at the beginning of rod member.Positioning uses locating template by rod member top flange, bottom wing after finishing Edge and web positioning hole Ni Zhifu drill go out.Drill jig frame only completes the drilling of rod member positioning hole group, in operating process Steel band must be used strictly to control the positioning spacing of rod member front and rear gaps group, make error<1.0mm;
Using bore template, pairing rod member positioning hole carries out hole Ni Zhifu drill hole successively;
Hole group's burr is removed, rod member inspection declaration;The technique connection of bottom plate termination is cut off by line, to cutting after cutting Position burr etc. is cut to be polished;Carry out mark, mark etc., including numbering, direction, overall inspection declaration.
Brief description of the drawings
By purely providing unlimited example, with reference, the further characteristic of the present invention and advantage will Become apparent from, wherein:
The schematic diagram of the step of Fig. 1 shows one embodiment of the application one;
The schematic diagram of the step of Fig. 2 shows one embodiment of the application two;
The schematic diagram of the step of Fig. 3 shows one embodiment of the application three;
The schematic diagram of the step of Fig. 4 shows one embodiment of the application four;
The schematic diagram of the step of Fig. 5 shows one embodiment of the application five;
The schematic diagram of the step of Fig. 6 shows one embodiment of the application six;
The schematic diagram of the step of Fig. 7 shows one embodiment of the application seven;
Fig. 8 shows the bottom plate line schematic diagram of one embodiment of the application;
Fig. 9 shows the web line schematic diagram of one embodiment of the application.
Wherein, N2 is that bottom plate, N5a, N6a are that dividing plate, N1 are that web, N4 are top plate, pressure-bearing Plate N7 be bearing plate, NJ1 to put more energy into, N3, N5, N6 be put more energy into outside case, N8 is anchor plate.
Embodiment
The embodiment of the application is described below with reference to accompanying drawing 1-9:
The main longitudinal grider steel construction part main member of steel structure bridge be H type beams, maximum thickness of slab 80mm, Girder steel principal weld is one-level full penetration weld, is to girder steel Weld seam quality control and weld industry Emphasis, girder steel, which is coupled, uses high-strength bolt, and drilling precision and hole group's size Control are another big emphasis.
Progress upright method of hull section construction welding equipment, its work on horizontal moulding bed (or platform) are taken in the assembling of steel anchor beam section Skill flow is as follows:
Step one
Horizontal moulding bed positioning on bottom plate N2, the polishing of bonding wire region, draw center line, web alignment line, Dividing plate N5a, N6a assembly line, web N1 assembly lines, N5, N6 assembly line of putting more energy into outside case, in detail See accompanying drawing 1.
Step 2
Dividing plate N5a, N6a are installed to line, spot welding is fixed.N6a and web full penetration, width Each welding contracted quantity for having reserved 3mm in direction both sides, notices that width aligns by center line and installs, The direction of elliptical aperture on N6a is noted simultaneously.
Step 3
Web N1 is installed by line, spot welding is fixed.Web should pull center line, suspension cable center in advance Line, web alignment line, bearing plate bearing plate N7, NJ1 assembly lines of putting more energy into, dividing plate N5, N6 dress Distribution, top plate N4 assembly lines, refer to accompanying drawing 2.Anchor plate machined surface during line using web is base Standard, noting the web alignment line of two coxostermums all should align installation with the web alignment line on bottom plate, with Ensure that the polishing of anchor plate and two coxostermums is held out against.
In order to prevent welding deformation, needed along the weld seam of web and bottom plate plus temporary support, every 400 A pair of arrangement, is then carried out the welding of diaphragm plate and web, bottom plate by welding procedure, and web with The angle welding of base plate interior, is welded into groove profile.Temporary support is taken out after weld seam is cooled down.Note welding Sequentially it is:The first facade melt-through weld of welding N6a dividing plates two, then weld the trihedral angle weldering of N5a dividing plates Stitch (first vertical position welding, rear downhand welding), finally weld the angle welding of web and bottom plate box house, weld seam is entered The strict detection of row, all arc craters and all necessary reconditioning of the defect transfinited are smooth.
Step 4
Top plate N4 is installed to line, each system line, hookup wire, rod member home record width, height gauge is checked It is very little, special survey port sizes.Tack welding after passed examination.By welding condition carry out top plate with The T-shaped groove welding of web.Member bar turning, completes web and bottom plate penetration weld.
Step 5
Bearing plate bearing plate N7 is installed to line and the unit piece that NJ7 is prefabricated into of putting more energy into, put more energy into NJ1. Because insert space is narrow and small, and bearing plate N7 requires penetration with web, therefore, takes from the inside to the outside Room for manoeuvre welded and installed, first group weldering is close to top plate side bearing plate N7 unit pieces, then organizes weldering and put more energy into NJ1. Rigidity support should be increased before welding bearing plate bearing plate N7 with anti-deformation.Bearing plate N7 is adopted with web With band steel sleeve single face welding and double face shaping welding procedure, groove is faced outwardly.
Step 6
It is soldered after NJ1, finally group weldering outside bearing plate N7 unit pieces notice that polishing is held out against during spelling In face of neat.
Step 7
To the N3, N5, N6, longitudinal spacing plate N9 and anchor plate N8 of being put more energy into outside line erecting and welding case, note The direction on meaning N8 inclined-planes.
Weld seam detection, rod member correction, lifting is flat to hole Ni Zhifu drill mould bases after physical dimension detection inspection declaration is qualified Platform, corrects each position line of rod member, requires to coordinate using steel band according to main longitudinal grider drill jig frame drilling construction figure Carry out positioning and fine positioning at the beginning of rod member.Positioning uses locating template by rod member top flange, bottom wing after finishing Edge and web positioning hole Ni Zhifu drill go out.Drill jig frame only completes the drilling of rod member positioning hole group, in operating process Steel band must be used strictly to control the positioning spacing of rod member front and rear gaps group, make error<1.0mm;
Using bore template, pairing rod member positioning hole carries out hole Ni Zhifu drill hole successively;
Hole group's burr is removed, rod member inspection declaration.
The technique connection of bottom plate termination is cut off by line, cutting part burr etc. is polished after cutting.
Carry out mark, mark etc., including numbering, direction.Overall inspection declaration.

Claims (2)

1. a kind of steel anchor beam section preparation method, it is characterised in that comprise the following steps as:
Step one
Horizontal moulding bed positioning on bottom plate (N2), the polishing of bonding wire region, draw center line, web alignment line, First dividing plate (N5a) assembly line, second partition (N6a) assembly line, web (N1) assembly line, Case is put more energy into (N5, N6) assembly line outside;
Step 2
First dividing plate (N5a) and second partition (N6a) is installed to line, spot welding is fixed, second every Plate (N6a) and web (N1) full penetration, each reserved 3mm in width both sides welding Amount of contraction, width presses center line alignment installation;
Step 3
By line install web (N1), spot welding is fixed, web (N1) should pull in advance center line, Suspension cable center line, web alignment line, bearing plate (N7), (NJ1) assembly line of putting more energy into, outside case Put more energy into (N5, N6) assembly line, top plate (N4) assembly line, added during line with the anchor plate of web On the basis of work face, the web alignment lines of two coxostermums aligns installation with the web alignment line on bottom plate, Ensure that the polishing of anchor plate and two coxostermums is held out against;
Weld seam along web and bottom plate adds temporary support, is arranged a pair every 400mm, Ran Houjin Row diaphragm plate and web, the welding of bottom plate, and web and base plate interior angle welding, welding grooving Type, after taking out temporary support after weld seam cooling, welding sequence is:First the facade of welding N6a dividing plates two melts Saturating weld seam, then the trihedral angle weld seam of N5a dividing plates is welded, finally weld the angle of web and bottom plate box house Weld seam, is strictly detected to weld seam, smooth to all arc craters and the defect reconditioning transfinited;
Step 4
Top plate N4 is installed to line, each system line, hookup wire, rod member home record width, height gauge is checked It is very little, special survey port sizes, tack welding after passed examination, by welding condition carry out top plate with The T-shaped groove welding of web, member bar turning completes web and bottom plate penetration weld;
Step 5
Bearing plate (N7) is installed to line and the unit piece being prefabricated into of putting more energy into, put more energy into (NJ1), due to Insert space is narrow and small, and bearing plate (N7) requires penetration with web, therefore, takes and moves back from the inside to the outside Welded and installed is walked, first group is welded close to top plate side bearing plate (N7) unit piece, then organizes weldering and put more energy into (NJ1), Rigidity support should be increased before welding bearing plate (N7) with anti-deformation, bearing plate (N7) is adopted with web With band steel sleeve single face welding and double face shaping welding procedure, groove is faced outwardly;
Step 6
It is soldered and puts more energy into after (NJ1), finally group weldering outside bearing plate (N7) unit piece is noted during spelling Meaning polishing is held out against in face of neat;
Step 7
To being put more energy into (N3, N5, N6) outside line erecting and welding case, longitudinal spacing plate and anchor plate (N8),
Weld seam detection, rod member correction, lifting is flat to hole Ni Zhifu drill mould bases after physical dimension detection inspection declaration is qualified Platform, corrects each position line of rod member, requires to coordinate using steel band according to main longitudinal grider drill jig frame drilling construction figure Carry out positioning and fine positioning at the beginning of rod member.Positioning uses locating template by rod member top flange, bottom wing after finishing Edge and web positioning hole Ni Zhifu drill go out.Drill jig frame only completes the drilling of rod member positioning hole group, in operating process Steel band must be used strictly to control the positioning spacing of rod member front and rear gaps group, make error<1.0mm;
Using bore template, pairing rod member positioning hole carries out hole Ni Zhifu drill hole successively;
Hole group's burr is removed, rod member inspection declaration;The technique connection of bottom plate termination is cut off by line, to cutting after cutting Position burr etc. is cut to be polished;Carry out mark, mark etc., including numbering, direction, overall inspection declaration.
2. steel anchor beam section preparation method according to claim 1, it is characterised in that step 3 In trihedral angle weld seam using first vertical position welding, the method for rear downhand welding is carried out.
CN201610148268.9A 2016-03-16 2016-03-16 A kind of steel anchor beam segment preparation method Expired - Fee Related CN107199437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610148268.9A CN107199437B (en) 2016-03-16 2016-03-16 A kind of steel anchor beam segment preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610148268.9A CN107199437B (en) 2016-03-16 2016-03-16 A kind of steel anchor beam segment preparation method

Publications (2)

Publication Number Publication Date
CN107199437A true CN107199437A (en) 2017-09-26
CN107199437B CN107199437B (en) 2019-06-07

Family

ID=59904017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610148268.9A Expired - Fee Related CN107199437B (en) 2016-03-16 2016-03-16 A kind of steel anchor beam segment preparation method

Country Status (1)

Country Link
CN (1) CN107199437B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374513A (en) * 2018-03-26 2018-08-07 北京筑福建筑事务有限责任公司 A kind of additional elevator platform uses the tiling steel plate structure and its construction method of H-type rib
CN111761262A (en) * 2020-06-16 2020-10-13 武汉一冶钢结构有限责任公司 Manufacturing method of main cable anchor box
CN113042981A (en) * 2021-04-21 2021-06-29 中国水利水电第十工程局有限公司 End column structure assembling tool and rigid water-stopping herringbone gate manufacturing method
CN113798630A (en) * 2021-09-26 2021-12-17 湖南中飞幕墙有限公司 Assembly welding process for steel structural member of building
CN113833107A (en) * 2021-10-17 2021-12-24 山西潇河建筑产业有限公司 Conversion truss and welding method of truss nodes thereof
CN114211150A (en) * 2021-12-30 2022-03-22 武船重型工程股份有限公司 Node welding method for double-layer truss bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961157Y (en) * 2006-10-16 2007-10-17 经纬纺织机械股份有限公司 Full section subassembly ring spinning frame
CN202099719U (en) * 2011-05-23 2012-01-04 江苏沪宁钢机股份有限公司 Steel truss bridge
CN104196166A (en) * 2014-09-01 2014-12-10 江苏沪宁钢机股份有限公司 Ultra-large type combined H-section steel column and manufacturing method thereof
CN104805961A (en) * 2015-03-10 2015-07-29 中建钢构江苏有限公司 Steel column provided with thick plates, special-shaped skew bracket and truss layer and manufacturing method of steel column
CN105081593A (en) * 2015-08-05 2015-11-25 武船重型工程股份有限公司 Manufacturing method of steel cable tower anchorage section
CN105290724A (en) * 2015-10-09 2016-02-03 江苏中铁山桥重工有限公司 Manufacturing process for lower chords of bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961157Y (en) * 2006-10-16 2007-10-17 经纬纺织机械股份有限公司 Full section subassembly ring spinning frame
CN202099719U (en) * 2011-05-23 2012-01-04 江苏沪宁钢机股份有限公司 Steel truss bridge
CN104196166A (en) * 2014-09-01 2014-12-10 江苏沪宁钢机股份有限公司 Ultra-large type combined H-section steel column and manufacturing method thereof
CN104805961A (en) * 2015-03-10 2015-07-29 中建钢构江苏有限公司 Steel column provided with thick plates, special-shaped skew bracket and truss layer and manufacturing method of steel column
CN105081593A (en) * 2015-08-05 2015-11-25 武船重型工程股份有限公司 Manufacturing method of steel cable tower anchorage section
CN105290724A (en) * 2015-10-09 2016-02-03 江苏中铁山桥重工有限公司 Manufacturing process for lower chords of bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374513A (en) * 2018-03-26 2018-08-07 北京筑福建筑事务有限责任公司 A kind of additional elevator platform uses the tiling steel plate structure and its construction method of H-type rib
CN111761262A (en) * 2020-06-16 2020-10-13 武汉一冶钢结构有限责任公司 Manufacturing method of main cable anchor box
CN111761262B (en) * 2020-06-16 2022-03-18 武汉一冶钢结构有限责任公司 Manufacturing method of main cable anchor box
CN113042981A (en) * 2021-04-21 2021-06-29 中国水利水电第十工程局有限公司 End column structure assembling tool and rigid water-stopping herringbone gate manufacturing method
CN113042981B (en) * 2021-04-21 2022-02-01 中国水利水电第十工程局有限公司 End column structure assembling tool and rigid water-stopping herringbone gate manufacturing method
CN113798630A (en) * 2021-09-26 2021-12-17 湖南中飞幕墙有限公司 Assembly welding process for steel structural member of building
CN113833107A (en) * 2021-10-17 2021-12-24 山西潇河建筑产业有限公司 Conversion truss and welding method of truss nodes thereof
CN114211150A (en) * 2021-12-30 2022-03-22 武船重型工程股份有限公司 Node welding method for double-layer truss bridge

Also Published As

Publication number Publication date
CN107199437B (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN107199437A (en) A kind of steel anchor beam section preparation method
CN102277825B (en) Steel truss bridge and method for fabricating same
CN107253026B (en) A kind of multidirectional four anchor heads overall steel anchor beam production method
CN104060523B (en) A kind of ultra-large type bridge box beam component, jig frame special and its assemble method
CN107201718B (en) A kind of main longitudinal grider preparation method of steel structure bridge
CN101691787B (en) Converse construction process for middle-high steel structure building
CN102839747A (en) Construction method for steel structure truss of super high-rise special structure
CN103184766B (en) Large steel structure and manufacturing method thereof
CN101440667A (en) Mounting method for wide span single layer rain shed reticulated shell structure
CN105862589A (en) Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes
CN107498269A (en) A kind of large-scale ship reception chamber manufacture method suitable for dry type ship railway carriage or compartment room
CN108103938A (en) A kind of double deck module solid trial assembly method of large steel girder
CN202099719U (en) Steel truss bridge
CN108678398B (en) Pre-assembly method for steel structure truss of reinforced layer of super high-rise building
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN104695624A (en) Large-cross-section box column and processing technology thereof
CN104070316A (en) Welding H-shaped steel splicing assembly device and use method thereof
CN103612712A (en) Method for manufacturing bed-jig with aluminum alloy in segmented mode
CN114043171B (en) Manufacturing method of curve cable tower steel anchor box
CN103321324A (en) Truss nodal region super-thick steel plate wall and building method thereof
CN103481022A (en) Manufacturing method of pier column template
CN103495793A (en) Improved construction method for hoisting and welding large-tonnage cast steel component complex joints
CN201605527U (en) Steel structure bent cap additionally arranged at top of pier stud
CN206070351U (en) A kind of high intensity bridge floor steel box-girder
CN203248094U (en) Large-diameter ultra-deep vertical shaft sinking headframe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.1 Xiangtan Road, Hongqiao District, Tianjin

Patentee after: THE 5TH CONSTRUCTION COMPANY LTD. OF CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY 15TH CONSTRUCTION BUREAU GROUP Co.,Ltd.

Address before: 200070 new road, Zhabei District, Zhabei District, Shanghai, 6

Patentee before: CHINA RAILWAY 15TH CONSTRUCTION BUREAU GROUP Co.,Ltd.

Patentee before: THE 5TH CONSTRUCTION COMPANY LTD. OF CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

CF01 Termination of patent right due to non-payment of annual fee