CN107191677A - A kind of oil-gas pipeline protector and its construction method - Google Patents

A kind of oil-gas pipeline protector and its construction method Download PDF

Info

Publication number
CN107191677A
CN107191677A CN201710481860.5A CN201710481860A CN107191677A CN 107191677 A CN107191677 A CN 107191677A CN 201710481860 A CN201710481860 A CN 201710481860A CN 107191677 A CN107191677 A CN 107191677A
Authority
CN
China
Prior art keywords
oil
gas pipeline
cement mixing
mixing method
blotter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710481860.5A
Other languages
Chinese (zh)
Inventor
朱小金
吴建军
王德港
赵廷建
武尚伟
李博
郭雷刚
李小刚
杨超
张彩龙
李维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN201710481860.5A priority Critical patent/CN107191677A/en
Publication of CN107191677A publication Critical patent/CN107191677A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/11Accessories therefor, e.g. anchors for the detection or protection of pipes in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L57/00Protection of pipes or objects of similar shape against external or internal damage or wear

Abstract

The invention belongs to oil-gas pipeline protection technology field, specifically related to a kind of oil-gas pipeline protector and its construction method, including cement mixing method, armored concrete binder, blotter, reinforced concrete cover plate, oil-gas pipeline and ground, oil-gas pipeline is embedded in ground, cement mixing method is inserted in ground vertically, cement mixing method quantity is at least 2 rows and is located at oil-gas pipeline both sides respectively, armored concrete binder is all connected with the top of cement mixing method, reinforced concrete cover plate is connected between at the top of 2 armored concrete binders, blotter paving is filled between oil-gas pipeline and reinforced concrete cover plate, there is space between blotter and reinforced concrete cover plate, purpose be road and bridge in means of transportation with oil-gas pipeline mutually across, during wearing, ensure the operation security of oil-gas pipeline, the technology of the present invention construction is simple, structure stress is clear and definite, to protection pipeline, remarkable result will be had by maintaining the safe operation of pipeline, helpful reference can be provided for the construction of similar engineering.

Description

A kind of oil-gas pipeline protector and its construction method
Technical field
The invention belongs to oil-gas pipeline protection technology field, and in particular to a kind of oil-gas pipeline protector and its construction party Method.
Background technology
With China's rapid development of economy, institute before being even more as the oil-gas pipeline and means of transportation of energy infrastructure The speed development not having, oil-gas pipeline is gradually spread in each corner.The buried depth of oil-gas pipeline is shallower, typically deep left in 1m The right side, and the pressure in pipe is general all larger, has from 1MPa to about 10MPa.
Road and bridge in means of transportation are criss-cross arranged with oil-gas pipeline, mutually across, wear phenomenon and just become increasingly prevalent .Mutually across, wear during, it is ensured that the operation security of facility is most important.
The content of the invention
The purpose of the present invention be road and bridge in means of transportation with oil-gas pipeline mutually across, wear during, it is ensured that Oil/Gas Pipe The operation security of line.
Therefore, the invention provides a kind of oil-gas pipeline protector, including cement mixing method, the reinforced concrete soil series Beam, blotter, reinforced concrete cover plate, oil-gas pipeline and ground, oil-gas pipeline are embedded in ground, and cement mixing method is vertical Insert in ground, cement mixing method quantity is at least 2 rows and is located at oil-gas pipeline both sides, the top of cement mixing method respectively It is all connected between at the top of armored concrete binder, 2 armored concrete binders connecting reinforced concrete cover plate, blotter paving is filled out Between oil-gas pipeline and reinforced concrete cover plate, there is space between blotter and reinforced concrete cover plate.
The height in described space is 3-5cm.
A kind of construction method of oil-gas pipeline protector, construction procedure is that the position of oil-gas pipeline 1) is determined in ground Put;2) in oil-gas pipeline both sides construction cement mixing method;3) in the top construction reinforced bar concrete binder of cement mixing method; 4) height that blotter and blotter are filled out on oil-gas pipeline upper berth is less than armored concrete system depth of beam, in blotter The position of upper mark oil-gas pipeline;5) it is capped reinforced concrete cover plate at the top of armored concrete binder.
Described need to locally expose ground during determination oil-gas pipeline position in ground by oil-gas pipeline.
Top cast-in-place shaping of the described armored concrete binder in cement mixing method.
Beneficial effects of the present invention:This oil-gas pipeline protector and its construction method that the present invention is provided, including water Soil mixing pile, armored concrete binder, blotter, reinforced concrete cover plate, oil-gas pipeline and ground, oil-gas pipeline are embedded in In ground, cement mixing method is inserted in ground vertically, and cement mixing method quantity is at least 2 rows and is located at oil-gas pipeline respectively It is all connected with connecting reinforcing bar between at the top of armored concrete binder, 2 armored concrete binders at the top of both sides, cement mixing method Concrete cover, blotter paving is filled between oil-gas pipeline and reinforced concrete cover plate, blotter and reinforced concrete earth mulch There is space to form one " culvert " between plate, the purpose of protection oil-gas pipeline is reached, therefore, this kind of oil-gas pipeline protection Technical pattern is simple, easy to operate, to protecting pipeline, maintaining the safe operation of pipeline by the guard technology with remarkable result.
Brief description of the drawings
The present invention is described in further details below with reference to accompanying drawing.
Fig. 1 is oil-gas pipeline protection section structure schematic diagram.
Description of reference numerals:1st, cement mixing method;2nd, armored concrete binder;3rd, blotter;4th, armored concrete Cover plate;5th, oil-gas pipeline;6th, ground;7th, space.
Embodiment
Embodiment 1:
As shown in figure 1, a kind of oil-gas pipeline protector, including cement mixing method 1, armored concrete binder 2, rubble Bed course 3, reinforced concrete cover plate 4, oil-gas pipeline 5 and ground 6, oil-gas pipeline 5 are embedded in ground 6, and cement mixing method 1 is vertical Insert in ground 6, the quantity of cement mixing method 1 is at least 2 rows and is located at the both sides of oil-gas pipeline 5 respectively, cement mixing method 1 Top is all connected with connecting reinforced concrete cover plate 4, rubble between the top of 2,2 armored concrete binders of armored concrete binder 2 The paving of bed course 3 is filled between oil-gas pipeline 5 and reinforced concrete cover plate 4, is had between blotter 3 and reinforced concrete cover plate 4 Space 7;There is space 7 so as to be formed one " culvert " between blotter 3 and reinforced concrete cover plate 4, blotter 3, Base 6, culvert and reinforced concrete cover plate 4 play the purpose of protection oil-gas pipeline 5, this kind of oil-gas pipeline guard technology structure jointly Simply, it is easy to operate, to protecting pipeline, maintaining the safe operation of pipeline that there is the guard technology of remarkable result.
The height in described space 7 is 3-5cm.The described intensity of armored concrete binder 2 is met after requirement, is applied thereon Work reinforced concrete cover plate 4, leaves 3~5cm space between reinforced concrete cover plate 4 and blotter 3, play slow well Antidetonation and drainage are rushed, increases the protective effect to oil-gas pipeline 5.
Embodiment 2:
As shown in figure 1, on the basis of embodiment 1, a kind of construction procedure of oil-gas pipeline protector is:1) in ground The position of oil-gas pipeline 5 is determined in 6;2) in the both sides of oil-gas pipeline 5 construction cement mixing method 1;Cement mixing method 1 and oil gas The distance between pipeline 5 meets safety management requirement;3) in the top construction reinforced bar concrete binder 2 of cement mixing method 1;4) Height of the height less than armored concrete binder 2 of blotter 3 and blotter 3 is filled out on the upper berth of oil-gas pipeline 5, in rubble pad The position of oil-gas pipeline 5 is marked on layer 3;5) it is capped reinforced concrete cover plate 4 at the top of armored concrete binder 2.The protection Structure construction is completed, determined through Bearing Capacity of Composite Foundation experiment after meeting requirement, you can as the safeguard structure of oil-gas pipeline 5, Technology construction is simple, and structure stress clearly, to protecting pipeline, maintaining the safe operation of pipeline to have remarkable result, can be The construction of similar engineering provides helpful reference.
Ground 6 need to be exposed by oil-gas pipeline 5 is local, prevent in cement mixing method 1 during described embedded oil-gas pipeline 5 Work progress in oil-gas pipeline 5 cause damage.
Described armored concrete binder 2 is in the cast-in-place shaping in top of cement mixing method 1, described cement mixing method After 1 intensity is qualified after testing, in construction reinforced bar concrete binder 2 thereon, by cement mixing method 1 and armored concrete binder 2 are linked to be entirety.Suit measures to local conditions, simple to operate, practicality and stability are strong.
It is exemplified as above be only to the present invention for example, do not constitute the limitation to protection scope of the present invention, it is all It is to be belonged to the same or analogous design of the present invention within protection scope of the present invention.

Claims (5)

1. a kind of oil-gas pipeline protector, it is characterised in that:Including cement mixing method (1), armored concrete binder (2), Blotter (3), reinforced concrete cover plate (4), oil-gas pipeline (5) and ground (6), oil-gas pipeline (5) are embedded in ground (6), Cement mixing method (1) is inserted in ground (6) vertically, and cement mixing method (1) quantity is at least 2 rows and is located at Oil/Gas Pipe respectively Armored concrete binder (2), 2 armored concrete binder (2) tops are all connected with the top of line (5) both sides, cement mixing method (1) Connect reinforced concrete cover plate (4) between portion, blotter (3) paving fill in oil-gas pipeline (5) and reinforced concrete cover plate (4) it Between, there are space (7) between blotter (3) and reinforced concrete cover plate (4).
2. oil-gas pipeline protector as claimed in claim 1, it is characterised in that:The height in described space (7) is 3- 5cm。
3. a kind of construction method of oil-gas pipeline protector, it is characterised in that:Construction procedure is
1) position of oil-gas pipeline (5) is determined in ground (6);
2) in oil-gas pipeline (5) both sides construction cement mixing method (1);
3) in the top construction reinforced bar concrete binder (2) of cement mixing method (1);
4) height that blotter (3) and blotter (3) are filled out on oil-gas pipeline (5) upper berth is less than armored concrete binder (2) Height, on blotter (3) mark oil-gas pipeline (5) position;
5) in the top capping reinforced concrete cover plate (4) of armored concrete binder (2).
4. the construction method of oil-gas pipeline protector as claimed in claim 3, it is characterised in that:It is described in ground (6) Oil-gas pipeline (5) locally need to be exposed ground (6) during the position of middle determination oil-gas pipeline (5).
5. the construction method of oil-gas pipeline protector as claimed in claim 3, it is characterised in that:Described armored concrete Top cast-in-place shaping of the binder (2) in cement mixing method (1).
CN201710481860.5A 2017-06-22 2017-06-22 A kind of oil-gas pipeline protector and its construction method Pending CN107191677A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710481860.5A CN107191677A (en) 2017-06-22 2017-06-22 A kind of oil-gas pipeline protector and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710481860.5A CN107191677A (en) 2017-06-22 2017-06-22 A kind of oil-gas pipeline protector and its construction method

Publications (1)

Publication Number Publication Date
CN107191677A true CN107191677A (en) 2017-09-22

Family

ID=59879551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710481860.5A Pending CN107191677A (en) 2017-06-22 2017-06-22 A kind of oil-gas pipeline protector and its construction method

Country Status (1)

Country Link
CN (1) CN107191677A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826230A (en) * 2019-01-18 2019-05-31 南通市市政工程设计院有限责任公司 A kind of town road pipeline reinforcement protection structure and its construction method
CN109888712A (en) * 2019-03-14 2019-06-14 济南轨道交通集团有限公司 The backfill protection structure and method of deep basal pit top high-voltage power pipeline
CN110296273A (en) * 2019-05-09 2019-10-01 四川迪森沃克建筑装饰工程有限公司 Water pipe Fast Installation structure for museum
CN110984217A (en) * 2019-12-16 2020-04-10 上海市机械施工集团有限公司 Protection method for underground pipeline chase in building construction
CN112081996A (en) * 2020-08-26 2020-12-15 广东九万里建设集团有限公司 Environment-friendly construction method for shallow-buried flexible pipeline
CN113089715A (en) * 2021-03-16 2021-07-09 珠海市规划设计研究院 Protection method for bypass pipeline
CN113789734A (en) * 2021-09-16 2021-12-14 广州机施建设集团有限公司 Oil pipeline group protection box culvert structure
CN114753231A (en) * 2022-05-11 2022-07-15 宁波市政工程建设集团股份有限公司 Frame beam lattice bridge structure for crossing underground pipeline and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202450501U (en) * 2012-01-11 2012-09-26 中国水电顾问集团成都勘测设计研究院 Bricking drainage structure for stilling pool
CN103032096A (en) * 2012-12-13 2013-04-10 中铁四局集团第二工程有限公司 Cold-proof construction method of tunnel central ditch of severe cold area
CN103643689A (en) * 2013-12-06 2014-03-19 上海申元岩土工程有限公司 Pipe type underground water drainage blind ditch and construction technology and application thereof
CN103882880A (en) * 2014-04-16 2014-06-25 中冶集团武汉勘察研究院有限公司 Buried type side slope drainage system and construction method thereof
CN104631492A (en) * 2015-01-06 2015-05-20 济南轨道交通集团有限公司 Underground arch top plate mounting method
CN104652581A (en) * 2015-01-27 2015-05-27 北京锄禾环保技术有限公司 Multi-stage slope anchoring structure for realizing rainwater and sewage separation
CN204875404U (en) * 2015-08-17 2015-12-16 苏州同尚工程设计咨询有限公司 Pre -buried formula pipeline intersecting structure in road surface
CN105672450A (en) * 2016-02-16 2016-06-15 上海市城市建设设计研究总院 Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN105953078A (en) * 2016-04-29 2016-09-21 中国冶集团有限公司 Protection device and protection method of high-pressure gas pipeline
CN205711788U (en) * 2016-04-06 2016-11-23 周永禄 A kind of underground piping protection is contained
CN207333947U (en) * 2017-06-22 2018-05-08 中交二公局第五工程有限公司 A kind of oil-gas pipeline protective device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202450501U (en) * 2012-01-11 2012-09-26 中国水电顾问集团成都勘测设计研究院 Bricking drainage structure for stilling pool
CN103032096A (en) * 2012-12-13 2013-04-10 中铁四局集团第二工程有限公司 Cold-proof construction method of tunnel central ditch of severe cold area
CN103643689A (en) * 2013-12-06 2014-03-19 上海申元岩土工程有限公司 Pipe type underground water drainage blind ditch and construction technology and application thereof
CN103882880A (en) * 2014-04-16 2014-06-25 中冶集团武汉勘察研究院有限公司 Buried type side slope drainage system and construction method thereof
CN104631492A (en) * 2015-01-06 2015-05-20 济南轨道交通集团有限公司 Underground arch top plate mounting method
CN104652581A (en) * 2015-01-27 2015-05-27 北京锄禾环保技术有限公司 Multi-stage slope anchoring structure for realizing rainwater and sewage separation
CN204875404U (en) * 2015-08-17 2015-12-16 苏州同尚工程设计咨询有限公司 Pre -buried formula pipeline intersecting structure in road surface
CN105672450A (en) * 2016-02-16 2016-06-15 上海市城市建设设计研究总院 Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN205711788U (en) * 2016-04-06 2016-11-23 周永禄 A kind of underground piping protection is contained
CN105953078A (en) * 2016-04-29 2016-09-21 中国冶集团有限公司 Protection device and protection method of high-pressure gas pipeline
CN207333947U (en) * 2017-06-22 2018-05-08 中交二公局第五工程有限公司 A kind of oil-gas pipeline protective device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826230A (en) * 2019-01-18 2019-05-31 南通市市政工程设计院有限责任公司 A kind of town road pipeline reinforcement protection structure and its construction method
CN109826230B (en) * 2019-01-18 2021-03-30 南通市市政工程设计院有限责任公司 Municipal road pipeline reinforcement protection structure and construction method thereof
CN109888712A (en) * 2019-03-14 2019-06-14 济南轨道交通集团有限公司 The backfill protection structure and method of deep basal pit top high-voltage power pipeline
CN110296273A (en) * 2019-05-09 2019-10-01 四川迪森沃克建筑装饰工程有限公司 Water pipe Fast Installation structure for museum
CN110984217A (en) * 2019-12-16 2020-04-10 上海市机械施工集团有限公司 Protection method for underground pipeline chase in building construction
CN112081996A (en) * 2020-08-26 2020-12-15 广东九万里建设集团有限公司 Environment-friendly construction method for shallow-buried flexible pipeline
CN113089715A (en) * 2021-03-16 2021-07-09 珠海市规划设计研究院 Protection method for bypass pipeline
CN113789734A (en) * 2021-09-16 2021-12-14 广州机施建设集团有限公司 Oil pipeline group protection box culvert structure
CN114753231A (en) * 2022-05-11 2022-07-15 宁波市政工程建设集团股份有限公司 Frame beam lattice bridge structure for crossing underground pipeline and construction method thereof
CN114753231B (en) * 2022-05-11 2024-01-30 宁波市政工程建设集团股份有限公司 Frame beam lattice bridge structure crossing underground pipeline and construction method thereof

Similar Documents

Publication Publication Date Title
CN107191677A (en) A kind of oil-gas pipeline protector and its construction method
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN204356594U (en) Non-fragment orbit expensive soil cutting-bedding construction
CN105155376A (en) Non-pressed pipeline reinforcing structure for road surface and construction method for non-pressed pipeline reinforcing structure
CN207333947U (en) A kind of oil-gas pipeline protective device
CN101311418A (en) Exchange filling method for deep-foundation pit and large area equipment foundation
CN106758561A (en) Across karez consolidation roadbed of high-speed structure
EP3118375B1 (en) Method for improving an inwards stability of a levee
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN102817298B (en) Construction method on permafrost
Raju et al. Ground improvement: principles and applications in Asia
CN204875404U (en) Pre -buried formula pipeline intersecting structure in road surface
CN202644589U (en) Soft soil geology pre-stress tube pile static pressing anti-soil-squeezing structure
CN102787608B (en) Gravity type foundation pit supporting system under vacuum effect and construction method
CN203905032U (en) Large pond cutting protection structure
CN205576638U (en) Consolidate roadbed structure who handles newly -built railway karst foundation
CN202925538U (en) Rammer used in construction on frozen earth
CN209669910U (en) A kind of karst ground treatment crosses over the combination pile slab structure of larger molten chamber
CN105088916B (en) Road surface pipeline monitor Node Protection structure
CN103542174A (en) Pipe laying method for subsidence area of coal mine
CN102635044A (en) Treating method of dynamic compacter for excavation roadbed
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
CN109183811B (en) Deformation-resistant foundation pit supporting structure and construction method thereof
CN104631425B (en) A kind of flyash of accelerating arranges the method oozing consolidation
CN105544570A (en) Connecting structure for earth rock cofferdam seepage-proof geomembrane and concrete cofferdam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination