CN107190761A - A kind of artificial bamboo raft cofferdam and its process for constructing - Google Patents

A kind of artificial bamboo raft cofferdam and its process for constructing Download PDF

Info

Publication number
CN107190761A
CN107190761A CN201710541545.7A CN201710541545A CN107190761A CN 107190761 A CN107190761 A CN 107190761A CN 201710541545 A CN201710541545 A CN 201710541545A CN 107190761 A CN107190761 A CN 107190761A
Authority
CN
China
Prior art keywords
cofferdam
bamboo
bamboo raft
lower floor
raft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710541545.7A
Other languages
Chinese (zh)
Inventor
林煜
王淼元
王海涛
孙东
刘卫民
张汉卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
Original Assignee
CCCC Tianjin Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Dredging Co Ltd, CCCC TDC Environmental Engineering Co Ltd filed Critical CCCC Tianjin Dredging Co Ltd
Priority to CN201710541545.7A priority Critical patent/CN107190761A/en
Publication of CN107190761A publication Critical patent/CN107190761A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Abstract

The invention belongs to artificial bamboo raft cofferdam field, more particularly to a kind of artificial bamboo raft cofferdam and its process for constructing, the artificial bamboo raft cofferdam is divided into upper strata bamboo raft cofferdam and lower floor's bamboo raft cofferdam, lower floor's bamboo raft cofferdam includes Liang Lie lower floors bamboo raft, lower floor's bamboo raft includes lower floor's bamboo and wrings the iron wire of lower floor's bamboo, the length of part of the lower floor's bamboo in soil exposes the length of the part of soil not less than lower floor's bamboo, built between two row lower floor's bamboo rafts in lower floor cofferdam, the upper strata bamboo raft cofferdam includes two row upper strata bamboo rafts, the upper strata bamboo of the upper strata bamboo raft is vertically squeezed into the lower floor cofferdam.The present invention provides one kind and cofferdam is reinforced by using bamboo raft, cofferdam is reached intensity requirement and requirement for height, both ensure that cofferdam is not collapsed, artificial bamboo raft cofferdam and its process for constructing of enough hydraulic reclamation capacity have been ensured again.

Description

A kind of artificial bamboo raft cofferdam and its process for constructing
Technical field
The invention belongs to artificial bamboo raft cofferdam field, more particularly to a kind of artificial bamboo raft cofferdam and its process for constructing.
Background technology
At present, need to build cofferdam in some projects of my company, and cofferdam needs to run through in some cases simultaneously Built in fish pond.However, 1 meter of fish pond mean depth, bottom shale is mud, excavator can not construct.And Bangladesh's rainy season Arrive in advance, fish pond draining, bed mud drying effect be not good, it is artificial to build difficult.
Therefore, cofferdam is reinforced by using bamboo raft there is provided one kind based on these problems, cofferdam is reached intensity requirement And requirement for height, it both ensure that cofferdam was not collapsed, the artificial bamboo raft cofferdam and its build side of enough hydraulic reclamation capacity ensured again Method has important practical significance.
The content of the invention
Present invention technical problem present in solution known technology provides one kind and cofferdam is added by using bamboo raft Gu, cofferdam is reached intensity requirement and requirement for height, both ensure that cofferdam is not collapsed, the people of enough hydraulic reclamation capacity has been ensured again Work bamboo raft cofferdam and its process for constructing.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
A kind of artificial bamboo raft cofferdam, the artificial bamboo raft cofferdam is divided into upper strata bamboo raft cofferdam and lower floor's bamboo raft cofferdam, described Lower floor's bamboo raft cofferdam includes Liang Lie lower floors bamboo raft, and lower floor's bamboo raft includes lower floor's bamboo and wrings the iron wire of lower floor's bamboo, The length of part of the lower floor's bamboo in soil exposes the length of the part of soil not less than lower floor's bamboo, and lower floor encloses Weir is built between two row lower floor's bamboo rafts, and the upper strata bamboo raft cofferdam includes two row upper strata bamboo rafts, the upper strata bamboo raft Upper strata bamboo vertically squeezed into the lower floor cofferdam, the upper strata bamboo expose the part of soil length be the upper strata Two times of the length of part of the bamboo in soil, bag soil is piled up between the two row upper strata bamboo rafts.
The present invention can also use following technical scheme:
In above-mentioned artificial bamboo raft cofferdam, further, lower floor cofferdam top edge lower floor's bamboo raft top Along high 10-20cm.
In above-mentioned artificial bamboo raft cofferdam, further, do not connected in any manner between the upper strata bamboo.
In above-mentioned artificial bamboo raft cofferdam, further, the Liang Lie lower floors bamboo raft bottom is at a distance of 4m, and top is apart 1.5m, height 1.5m, the two row upper strata bamboo raft is at a distance of 1m, height 0.5m.
In above-mentioned artificial bamboo raft cofferdam, further, the native size of the bag is a length of 40cm, a width of 30cm, thickness For 10cm, and using 2-3-2-3-2 stacking mode, i.e. first layer piles up two row, and the second layer piles up three row, and third layer two is arranged, 4th layer of three row, by that analogy.
A kind of process for constructing in artificial bamboo raft cofferdam, the process for constructing in the artificial bamboo raft cofferdam is used to build any of the above-described Artificial bamboo raft cofferdam described in.
In the process for constructing in above-mentioned artificial bamboo raft cofferdam, further, the process for constructing in the artificial bamboo raft cofferdam Comprise the following steps:
Step one:Liang Lie lower floors bamboo raft is accomplished fluently, length is squeezed into not less than 1.5 meters, lower floor's bamboo raft top is away from 1.5 meters, bottom width 4 Rice, it is high 1.5 meters, every 2 meters with 8# iron wire doublings, and Invited-for is beaten on Liang Lie lower floors bamboo raft, and wring, to can not manually rock institute Shu Lianglie lower floors bamboo raft;
Step 2:The lower floor cofferdam is built between Liang Lie lower floors bamboo raft, and the lower floor cofferdam is tamped;
Step 3:Two row upper strata bamboo rafts are vertically squeezed on lower floor cofferdam top, two 1 meter of upper strata bamboo raft spacing of row are high 0.5 meter, the upper strata bamboo is squeezed into twice of soil 1m, i.e. exposed portion length;
Step 4:Described two row upper strata bamboo rafts in pile up bag soil, often pile up one layer and tamped with mallet, formed it is 1 meter wide, Upper strata bamboo raft cofferdam 0.5 meter high.
The present invention has the advantages and positive effects of:
1st, the present invention mire retaining, shale it is dilute it is soft in the case of, artificial bamboo raft cofferdam is built, by using bamboo raft to cofferdam Reinforced, cofferdam is reached intensity requirement and requirement for height, both ensure that cofferdam is not collapsed, ensured that enough hydraulic reclamations hold again Amount.
2nd, the present invention solves the problem of cofferdam is settled, and cofferdam can produce 10 due to one time --- 20cm sedimentation, therefore enclose Weir is higher by 20 centimeters of bamboo raft when building.
3rd, the intensity of present invention increase bamboo raft, reduces deformation, if the mode for beating Invited-for with iron wire fastens two row bamboo rafts, iron Density when silk piles up influence bag soil, therefore do not use any material to connect, but bamboo is squeezed into soil 1m i.e. exposed division Divide length twice, increases the intensity of bamboo raft with this, reduces deformation.
4th, the present invention uses 2-3-2-3-2 stacking mode, it is ensured that piled up between bag soil closely knit.
5th, the present invention solves the problem of cofferdam collapses serious by bamboo raft solid, if without using bamboo raft solid, daily Precipitation cause water in mire can not emptying, mire shale is dilute soft, build cofferdam settling amount it is big and be unable to reach design will Ask, according to actual measurement, when averagely building more than 1.7 meters, cofferdam is collapsed seriously, it is impossible to meet dredging and reclamation requirement.
Brief description of the drawings
Technical scheme is described in further detail below with reference to drawings and examples, but should Know, these accompanying drawings only design for task of explanation, therefore not as the restriction of the scope of the invention.In addition, except non-specifically Point out, these accompanying drawings are meant only to conceptually illustrate structure construction described herein, without to be drawn to scale.
Fig. 1 is the structural representation of the present invention.
In figure:
1st, upper strata bamboo raft cofferdam;2nd, upper strata bamboo;3rd, lower floor's bamboo;4th, iron wire;5th, lower floor cofferdam;6th, bag soil.
Embodiment
Firstly, it is necessary to explanation, illustrated below by by way of example the present invention glue sprayer concrete structure, Feature and advantage etc., but all descriptions are intended merely to what is illustrated, and should not be construed as appointing present invention formation What is limited.In addition, any single technical characteristic for being described by or implying in the mentioned each embodiments of this paper, or it is shown Or implicit any single technical characteristic in the drawings, still can continue between these technical characteristics (or its equivalent) into Row any combination is deleted, so as to obtain the more other embodiments of the invention that may do not referred to directly herein.In addition, For the sake of simplifying drawing, same or like technical characteristic may be indicated only at one in the same figure.
It will be understood that, when it is said that part ' attach ' into another part, it can be directly connected to another part or There may be intermediate member.On the contrary, when it is said that part " being directly connected to " is arrived into another part, then it represents that in the absence of pars intermedia Part.
Fig. 1 gives the structural representation of the present invention, illustrates the present invention with regard to Fig. 1 below.
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing Describe in detail as follows:
A kind of artificial bamboo raft cofferdam, the artificial bamboo raft cofferdam is divided into upper strata bamboo raft cofferdam 1 and lower floor's bamboo raft cofferdam, described Lower floor's bamboo raft cofferdam includes Liang Lie lower floors bamboo raft, and lower floor's bamboo raft includes lower floor's bamboo 3 and wrings the iron wire of lower floor's bamboo 3 4, the length of part of the lower floor's bamboo 3 in soil exposes the length of the part of soil not less than lower floor's bamboo 3, under Layer cofferdam 5 is built between two row lower floor's bamboo rafts, and the upper strata bamboo raft cofferdam 1 includes two row upper strata bamboo rafts, it is described on The upper strata bamboo 2 of layer bamboo raft is vertically squeezed into the lower floor cofferdam 5, and the upper strata bamboo 2 exposes the length of the part of soil For two times of the length of part of the upper strata bamboo 2 in soil, bag soil 6 is piled up between the two row upper strata bamboo rafts.
The present invention mire retaining, shale it is dilute it is soft in the case of, build artificial bamboo raft cofferdam, cofferdam entered by using bamboo raft Row is reinforced, and cofferdam is reached intensity requirement and requirement for height, both ensure that cofferdam is not collapsed, and has ensured that enough hydraulic reclamations hold again Amount.
It is pointed out that the top edge of the lower floor cofferdam 5 high 10-20cm in lower floor's bamboo raft upper edge.
The present invention solves the problem of cofferdam is settled, and cofferdam can produce 10 due to one time --- 20cm sedimentation, therefore cofferdam 20 centimeters of bamboo raft is higher by during build.
It is pointed out that not connected in any manner between the upper strata bamboo 2.
The intensity of present invention increase bamboo raft, reduces deformation, if fastened two row bamboo rafts with 4 dozens of Invited-for of iron wire mode, iron Density when silk 4 piles up influence bag soil 6, therefore do not use any material to connect, but bamboo is squeezed into soil 1m and exposed Twice of partial-length, increases the intensity of bamboo raft with this, reduces deformation.
It is pointed out that the Liang Lie lower floors bamboo raft bottom is at a distance of 4m, top is at a distance of 1.5m, height 1.5m, described two Upper strata bamboo raft is arranged at a distance of 1m, height 0.5m.
It is pointed out that native 6 sizes of the bag are a length of 40cm, a width of 30cm, thickness is 10cm, and uses 2-3-2- 3-2 stacking mode, i.e. first layer pile up two row, and the second layer piles up three row, and third layer two is arranged, the 4th layer of three row, by that analogy.
The present invention uses 2-3-2-3-2 stacking mode, it is ensured that piled up between bag soil 6 closely knit.
In summary, the present invention can provide one kind and cofferdam is reinforced by using bamboo raft, cofferdam is reached intensity requirement And requirement for height, it both ensure that cofferdam was not collapsed, the artificial bamboo raft cofferdam of enough hydraulic reclamation capacity ensured again.
A kind of process for constructing in artificial bamboo raft cofferdam, the process for constructing in the artificial bamboo raft cofferdam is used to build any of the above-described Artificial bamboo raft cofferdam described in.
It is pointed out that the process for constructing in the artificial bamboo raft cofferdam comprises the following steps:
Step one:Liang Lie lower floors bamboo raft is accomplished fluently, length is squeezed into not less than 1.5 meters, lower floor's bamboo raft top is away from 1.5 meters, bottom width 4 Rice, it is high 1.5 meters, every 2 meters with the doubling of 8# iron wires 4, and Invited-for is beaten on Liang Lie lower floors bamboo raft, and wring, to can not manually rock Liang Lie lower floors bamboo raft;
Step 2:The lower floor cofferdam 5 is built between Liang Lie lower floors bamboo raft, and the lower floor cofferdam 5 is tamped;
Step 3:Two row upper strata bamboo rafts are vertically squeezed on the top of lower floor cofferdam 5, two 1 meter of upper strata bamboo raft spacing of row are high 0.5 meter, the upper strata bamboo 2 is squeezed into twice of soil 1m, i.e. exposed portion length;
Step 4:Described two row upper strata bamboo rafts in pile up bag soil 6, often pile up one layer and tamped with mallet, formed it is 1 meter wide, Upper strata bamboo raft cofferdam 1 0.5 meter high.
If without using bamboo raft solid, daily precipitation cause water in fish pond can not emptying, fish pond shale is dilute soft, is repaiied Build cofferdam settling amount greatly and be unable to reach design requirement, according to actual measurement, when averagely building more than 1.7 meters, cofferdam is collapsed sternly Weight, it is impossible to meet hydraulic reclamation requirement.Artificial bamboo raft cofferdam can ensure 2 meters of cofferdam height and firm, can compared to common earth cofferdam Accommodate 0.3 meter of * 36 ten thousand square metres=10.8 ten thousand stere more.Calculated according to monovalent 14.6 yuan/cubic metre of quantities:
Yuan/cubic metre=157.68 ten thousand yuan of 10.8 ten thousand stere * 14.6;
Expendable property bamboo, bag of cement etc. amount to about 2.65 ten thousand yuan;
About 0.92 ten thousand yuan of labour cost;
Direct benefit:Ten thousand yuan of 157.68-2.65-0.92=154.11.
Indirect benefit:Reduce the later maintenance in cofferdam;Construction speed is fully ensured that, completes to apply before node of both working out a scheme Work task.
The present invention solves the problem of cofferdam collapses serious by bamboo raft solid, if without using bamboo raft solid, it is strong daily Precipitation cause water in mire can not emptying, mire shale is dilute soft, and it is big and be unable to reach design requirement to build cofferdam settling amount, According to actual measurement, when averagely building more than 1.7 meters, cofferdam is collapsed seriously, it is impossible to meet dredging and reclamation requirement.
In summary, the present invention can provide one kind and cofferdam is reinforced by using bamboo raft, cofferdam is reached intensity requirement And requirement for height, it both ensure that cofferdam was not collapsed, the process for constructing in the artificial bamboo raft cofferdam of enough hydraulic reclamation capacity ensured again.
The present invention is described in detail above example, but the content is only presently preferred embodiments of the present invention, no The practical range for limiting the present invention can be considered as.Any changes and modifications in accordance with the scope of the present application, Within the patent covering scope that the present invention should still be belonged to.

Claims (7)

1. a kind of artificial bamboo raft cofferdam, it is characterised in that:The artificial bamboo raft cofferdam is divided into upper strata bamboo raft cofferdam and lower floor's bamboo raft Cofferdam, lower floor's bamboo raft cofferdam includes Liang Lie lower floors bamboo raft, and lower floor's bamboo raft includes lower floor's bamboo and wrings lower floor bamboo The iron wire of son, the length of part of the lower floor's bamboo in soil exposes the length of the part of soil not less than lower floor's bamboo Degree, lower floor cofferdam is built between two row lower floor's bamboo rafts, and the upper strata bamboo raft cofferdam includes two row upper strata bamboo rafts, described The upper strata bamboo of upper strata bamboo raft is vertically squeezed into the lower floor cofferdam, and the length for the part that the upper strata bamboo exposes soil is Two times of the length of part of the upper strata bamboo in soil, bag soil is piled up between the two row upper strata bamboo rafts.
2. artificial bamboo raft cofferdam according to claim 1, it is characterised in that:The lower floor cofferdam top edge lower floor The high 10-20cm in bamboo raft upper edge.
3. artificial bamboo raft cofferdam according to claim 1, it is characterised in that:Any side is not used between the upper strata bamboo Formula is connected.
4. artificial bamboo raft cofferdam according to claim 1, it is characterised in that:The Liang Lie lower floors bamboo raft bottom at a distance of 4m, Top is at a distance of 1.5m, height 1.5m, and the two row upper strata bamboo raft is at a distance of 1m, height 0.5m.
5. artificial bamboo raft cofferdam according to claim 1, it is characterised in that:The native size of the bag is a length of 40cm, a width of 30cm, thickness is 10cm, and using 2-3-2-3-2 stacking mode, i.e. first layer piles up two row, and the second layer piles up three row, the Three layer of two row, the 4th layer of three row, by that analogy.
6. a kind of process for constructing in artificial bamboo raft cofferdam, it is characterised in that:The process for constructing in the artificial bamboo raft cofferdam is used to build Make the artificial bamboo raft cofferdam described in claim any one of 1-5.
7. the process for constructing in artificial bamboo raft cofferdam according to claim 6, it is characterised in that:The artificial bamboo raft cofferdam Process for constructing comprises the following steps:
Step one:Liang Lie lower floors bamboo raft is accomplished fluently, length is squeezed into not less than 1.5 meters, lower floor's bamboo raft top is away from 1.5 meters, 4 meters of bottom width, It is high 1.5 meters, every 2 meters with 8# iron wire doublings, and Invited-for is beaten on Liang Lie lower floors bamboo raft, and wring, it is described to can not manually rock Liang Lie lower floors bamboo raft;
Step 2:The lower floor cofferdam is built between Liang Lie lower floors bamboo raft, and the lower floor cofferdam is tamped;
Step 3:Two row upper strata bamboo rafts are vertically squeezed on lower floor cofferdam top, two 1 meter of upper strata bamboo raft spacing of row are high by 0.5 Rice, the upper strata bamboo is squeezed into twice of soil 1m, i.e. exposed portion length;
Step 4:Described two row upper strata bamboo rafts in pile up bag soil, often pile up one layer and tamped with mallet, formed it is 1 meter wide, 0.5 meter High upper strata bamboo raft cofferdam.
CN201710541545.7A 2017-07-05 2017-07-05 A kind of artificial bamboo raft cofferdam and its process for constructing Pending CN107190761A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710541545.7A CN107190761A (en) 2017-07-05 2017-07-05 A kind of artificial bamboo raft cofferdam and its process for constructing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710541545.7A CN107190761A (en) 2017-07-05 2017-07-05 A kind of artificial bamboo raft cofferdam and its process for constructing

Publications (1)

Publication Number Publication Date
CN107190761A true CN107190761A (en) 2017-09-22

Family

ID=59881324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710541545.7A Pending CN107190761A (en) 2017-07-05 2017-07-05 A kind of artificial bamboo raft cofferdam and its process for constructing

Country Status (1)

Country Link
CN (1) CN107190761A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552360A (en) * 2019-08-06 2019-12-10 中交一公局第二工程有限公司 Double-row steel pipe pile cofferdam construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292648A (en) * 1994-04-25 1995-11-07 Fujita Corp Construction of artificial island
JP2003020625A (en) * 2001-07-11 2003-01-24 National Institute For Rural Engineering Method for reinforcing soil structure bank body
JP2004183347A (en) * 2002-12-04 2004-07-02 Yujiro Inaba Pipe line installation method for columnar article and load introduction reinforcement foundation
US20100232878A1 (en) * 2009-03-10 2010-09-16 Vitaly Boris Feygin Universal Framed Cofferdam
WO2012037889A1 (en) * 2010-09-21 2012-03-29 Chang Yushun Receiving bag assembly and method for fabricating same and embankment formed thereof
CN104594368A (en) * 2015-01-28 2015-05-06 泰昌建设有限公司 Bamboo raft pile oversized cofferdam and construction method for sea reclamation by adopting same
CN204456151U (en) * 2015-01-28 2015-07-08 泰昌建设有限公司 Bamboo raft dowel super large cofferdam
CN105256763A (en) * 2014-07-18 2016-01-20 中交上海航道勘察设计研究院有限公司 Diking method based on bamboo raft frame structure
CN205591239U (en) * 2016-04-07 2016-09-21 广州市水电建设工程有限公司 Cofferdam structure
CN206829161U (en) * 2017-07-05 2018-01-02 中交天航环保工程有限公司 A kind of artificial bamboo raft cofferdam

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292648A (en) * 1994-04-25 1995-11-07 Fujita Corp Construction of artificial island
JP2003020625A (en) * 2001-07-11 2003-01-24 National Institute For Rural Engineering Method for reinforcing soil structure bank body
JP2004183347A (en) * 2002-12-04 2004-07-02 Yujiro Inaba Pipe line installation method for columnar article and load introduction reinforcement foundation
US20100232878A1 (en) * 2009-03-10 2010-09-16 Vitaly Boris Feygin Universal Framed Cofferdam
WO2012037889A1 (en) * 2010-09-21 2012-03-29 Chang Yushun Receiving bag assembly and method for fabricating same and embankment formed thereof
CN105256763A (en) * 2014-07-18 2016-01-20 中交上海航道勘察设计研究院有限公司 Diking method based on bamboo raft frame structure
CN104594368A (en) * 2015-01-28 2015-05-06 泰昌建设有限公司 Bamboo raft pile oversized cofferdam and construction method for sea reclamation by adopting same
CN204456151U (en) * 2015-01-28 2015-07-08 泰昌建设有限公司 Bamboo raft dowel super large cofferdam
CN205591239U (en) * 2016-04-07 2016-09-21 广州市水电建设工程有限公司 Cofferdam structure
CN206829161U (en) * 2017-07-05 2018-01-02 中交天航环保工程有限公司 A kind of artificial bamboo raft cofferdam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江西省交通厅公路管理局戴崇安编: "《石拱桥施工》", 31 August 1982, 北京人民交通出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552360A (en) * 2019-08-06 2019-12-10 中交一公局第二工程有限公司 Double-row steel pipe pile cofferdam construction method

Similar Documents

Publication Publication Date Title
CN106351242A (en) Deepwater high-flow-rate exposed high-strength steep rock sea area steel trestle and construction method thereof
CN103205965B (en) Root pressure grouting pile and construction method thereof
CN103046543A (en) Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement
CN203855974U (en) Three-dimensional-drainage flexible geocell eco-bag side slope
CN109610436A (en) A kind of sectional type blast-filled ground processing method
CN107190761A (en) A kind of artificial bamboo raft cofferdam and its process for constructing
CN103882832A (en) Multi-stage sea reclamation method and sea reclamation cofferdam structure
CN106869147A (en) One kind is in marine site ultra-deep without support fore shaft collar tie beam
CN206829161U (en) A kind of artificial bamboo raft cofferdam
CN205917724U (en) Do not have marine fan of grout and inlay rock single pile basis
CN101314942A (en) Wave breaker of inverse T shaped pipe wall pile
CN206553854U (en) A kind of ruggedized construction of retaining wall and roadbed
CN206173757U (en) Protection road bed of mud pit
CN102373675A (en) Fabricated culvert member and construction method thereof
CN208152063U (en) A kind of superelevation infiltration coefficient sand ovum stratum Groundwater Control system
CN206599787U (en) A kind of layer of sand catch pit dewatering device
CN109706914A (en) It is a kind of to be layered the blast-filled ground method for processing foundation drained downwards
CN106013164A (en) Construction method for multifunctional trestle of foundation pit
CN103114605B (en) Anti-seepage drainage layer structure and construction method
CN206143805U (en) Novel bank protection retaining wall
CN202323906U (en) Assembly type culvert component
CN206279520U (en) A kind of prefabricated sheet pile and earth-retaining building structure
CN105672252B (en) A kind of controllable exhaust apparatus and its construction method for being used for construction of prefabricated piles in gassiness soil layer
CN204456055U (en) A kind of embankment foundation reinforcing structure facility
CN209429054U (en) Seepage prevention of dam founda structure in ultra-deep thick-covering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170922