CN107175639A - A kind of construction method of unwrapping wire spline and curve unwrapping wire - Google Patents

A kind of construction method of unwrapping wire spline and curve unwrapping wire Download PDF

Info

Publication number
CN107175639A
CN107175639A CN201710511024.7A CN201710511024A CN107175639A CN 107175639 A CN107175639 A CN 107175639A CN 201710511024 A CN201710511024 A CN 201710511024A CN 107175639 A CN107175639 A CN 107175639A
Authority
CN
China
Prior art keywords
unwrapping wire
segmental arc
spline
curve
tape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710511024.7A
Other languages
Chinese (zh)
Inventor
白瑞忠
王奇维
杨晓伟
郑建军
薛国栋
郭钦涛
姚渊
刘维刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Work San Construction Group Co Ltd Is Built In Shaanxi
Original Assignee
Work San Construction Group Co Ltd Is Built In Shaanxi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Work San Construction Group Co Ltd Is Built In Shaanxi filed Critical Work San Construction Group Co Ltd Is Built In Shaanxi
Priority to CN201710511024.7A priority Critical patent/CN107175639A/en
Publication of CN107175639A publication Critical patent/CN107175639A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking

Abstract

The invention discloses the construction method of a kind of unwrapping wire spline and curve unwrapping wire, the spline includes chi plate, the tape that two ends are fixed on chi plate and the curvature adjusting means that the tape curvature is adjusted, and the tape is the shaped form steel band of adjustable in length;The curvature adjusting means includes multiple adjusting rods that is arranged on and on the chi plate and can move up and down, multiple adjusting rods are laid along the width of the chi plate, length direction of multiple adjusting rods along the chi plate is laid at grade, and adjusting rod upper end branch is withstood in the tape;Construction method includes step:First, treat that layout point is delivered;2nd, unwrapping wire curve unwrapping wire is treated.The present invention is simple in construction, reasonable in design and using easy to operate, when carrying out payingoff construction to curve using the spline, it will treat that unwrapping wire curve point segmental arc carries out setting-out, each segmental arc carries out unwrapping wire using the tape of the spline by setting-out simultaneously, with can realizing high-accuracy high-efficiency rate unwrapping wire expeditiously unwrapping wire.

Description

A kind of construction method of unwrapping wire spline and curve unwrapping wire
Technical field
The invention belongs to building construction measurement technical field, more particularly, to a kind of unwrapping wire spline and curve unwrapping wire Construction method.
Background technology
With the fast development of China's economy, the development of modern architecture becomes more diverse.Building system becomes increasingly complex, advised Mould is more and more huger, structure type is more and more novel.The labyrinth system formed is combined by various structures to be progressively applied to Among modern architecture.
In practice of construction, when carrying out unwrapping wire to curved portions such as plan arrangement, the abutment wall lines of curved-surface building, tradition is bent Line line-putting method is utilized in the Measurement results of engineering axis point position in rectangular coordinate system or polar coordinate system, is surveyed with total powerstation etc. Measuring appratus, which is delivered, arrives construction area, and two neighboring layout point is connected with straight line respectively, many of approximate camber line are formed Side shape broken line, its major defect is:Unwrapping wire precision is relatively low, and construction quality deviation is relatively large;Inefficiency, unwrapping wire time It is long;Difficulty is big when delivering other control lines or verification as datum axis.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that it is bent to provide a kind of unwrapping wire The construction method of line chi and curve unwrapping wire, the spline is simple in construction, reasonable in design and using easy to operate, using the spline When carrying out payingoff construction to curve, it will treat that unwrapping wire curve point segmental arc carries out setting-out, while each segmental arc uses the chi of the spline Band carries out unwrapping wire by setting-out, with can realizing high-accuracy high-efficiency rate unwrapping wire expeditiously unwrapping wire.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of unwrapping wire spline, its feature exists In:The tape being fixed on including chi plate, two ends on chi plate and the curvature adjusting means that the tape curvature is adjusted, it is described Tape is the shaped form steel band of adjustable in length;The curvature adjusting means includes multiple be arranged on the chi plate and above and below energy Mobile adjusting rod, multiple adjusting rods are laid along the width of the chi plate, and multiple adjusting rods are along the chi The length direction of plate is laid at grade, and the upper end branch of the adjusting rod is withstood in the tape.
A kind of above-mentioned unwrapping wire spline, it is characterized in that:Multiple adjusting rods are equally laid.
A kind of above-mentioned unwrapping wire spline, it is characterized in that:The chi plate, tape and adjusting rod are arranged at same plane On.
A kind of above-mentioned unwrapping wire spline, it is characterized in that:The chi plate is square-section aluminium alloy plate, the length of the chi plate Degree is 2m~3m, width is 100mm~120mm and its thickness is 20mm~30mm.
A kind of above-mentioned unwrapping wire spline, it is characterized in that:The distance between two neighboring described adjusting rod be 130mm~ 160mm, the length of the adjusting rod is not more than 300mm.
A kind of above-mentioned unwrapping wire spline, it is characterized in that:The installation installed for the adjusting rod is provided with the chi plate The mounting hole installed for the adjusting rod is offered on bearing, the erection support.
A kind of above-mentioned unwrapping wire spline, it is characterized in that:The adjusting rod is adjusting screw rod, and the mounting hole is internal thread Hole.
Present invention also offers a kind of construction method of curve unwrapping wire, it is characterised in that this method comprises the following steps:
Step 1: treating that layout point is delivered:According to the method for conventional unwrapping wire, it is pointed to treat on unwrapping wire curve in construction area N treat that layout point is delivered, and to treating that layout point is numbered described in n;
Treat that layout point will treat that unwrapping wire curve is divided into a segmental arc described in n, wherein the chord length of each segmental arc is not more than The distance between two end points of tape described in the spline, wherein n is positive integer and n >=3;
Step 2: treating unwrapping wire curve unwrapping wire:Unwrapping wire is carried out respectively to the individual segmental arc in step one, the individual segmental arc Line-putting method all same;
Wherein, to described when i-th of segmental arc carries out unwrapping wire in unwrapping wire curve, process is as follows, and wherein i is to the individual arc The numbering of section, i be positive integer and i=1,2 ..., n-1:
Step 201, segmental arc full-page proof make:With reference to construction drawing, i-th of segmental arc full-page proof is made;
Step 202, spline adjustment:The two ends of the chi plate are individually placed in step 201 at i-th of segmental arc full-page proof, The tape is set to be overlapped with i-th of segmental arc full-page proof by adjusting the adjusting rod;
Step 203, segmental arc unwrapping wire:The spline after being adjusted in step 202 is put into the construction area of step one, Two end points of tape of the spline is overlapped with two end points of i-th of segmental arc, i-th of arc is drawn along the tape Section, completes the unwrapping wire process of i-th of segmental arc;
Step 204, multiplicating step 201 to step 203, until completing the setting-out of a segmental arc.
A kind of above-mentioned construction method for carrying out unwrapping wire to curve using the spline, it is characterized in that:Wait to put in step one Before sampling point is delivered, the design curve for treating unwrapping wire curve is drawn out using CAD software, CAD software is recycled and by n The design curve is divided into an individual design segmental arc by waypoint, and the n waypoints described in step one n with treating layout point one by one Correspondence, the design coordinate of each waypoint obtains the setting-out coordinate for treating layout point after Coordinate Conversion.
A kind of above-mentioned construction method for carrying out unwrapping wire to curve using the spline, it is characterized in that:Described in step one Multiple adjusting rods are equally laid in spline;
Before i-th of segmental arc full-page proof makes in step 201, including procedure below:
Step 2011, two end points for first delivering out i-th of segmental arc full-page proof;
Step 2012, in CAD software by it is corresponding with i-th of segmental arc full-page proof it is described design segmental arc two ends carry out Line formation design straightway;
Step 2013, design point are chosen:Computer is used in CAD software by the design straightway in step 2012 Q Along ent of upper insertion, does a vertical line vertical with the design straightway, by the vertical line on each Along ent Intersection point with the design segmental arc is as design point;
Step 2014, by the design coordinate of the design point in step 2013 pass through after Coordinate Conversion deliver arrive step In 2011 between two end points of i-th of segmental arc full-page proof, encryption layout point is formed.
The present invention has advantages below compared with prior art:
1st, the spline used is simple in construction and processing and fabricating is easy, and input cost is relatively low.
2nd, the spline used includes chi plate, the two ends tape being fixed on chi plate and tape curvature is adjusted Curvature adjusting means, tape is the shaped form steel band of adjustable in length;Curvature adjusting means include it is multiple be arranged on chi plate on and The adjusting rod that can be moved up and down, multiple adjusting rods are laid along the width of chi plate, length side of multiple adjusting rods along chi plate To laying from left to right at grade, the upper end of adjusting rod, which is propped up, to be withstood in tape, and chi plate, tape and adjusting rod are respectively provided with At grade, it is easy to processing.
3rd, the end of tape in the present invention is connected with chi plate, when being installed to spline, and the length of tape can be with Regulation, meets the curve of different curvature, applied widely and easy to adjust.
When the 4th, carrying out the construction of unwrapping wire to curve using the spline in the present invention, it will treat that unwrapping wire curve is divided into first (n-1) after individual segmental arc, unwrapping wire is carried out respectively to (n-1) individual segmental arc, i-th of segmental arc in unwrapping wire curve is then treated and carries out unwrapping wire When, first with reference to construction drawing, i-th of segmental arc full-page proof is made, curve is then made by adjusting adjusting rod according to i-th of segmental arc full-page proof The tape of chi is overlapped with i-th of segmental arc full-page proof, and i-th of segmental arc is drawn finally by the spline after adjustment, and the construction method will After unwrapping wire curve divide into (n-1) individual segmental arc, each (n-1) individual segmental arc is segmented according to the quantity of adjusting rod again, together When the straight line connection between two neighboring adjusting rod be converted to by curve by tape connected, and traditional curve unwrapping wire is usually Unwrapping wire is directly carried out on unwrapping wire curve is treated, and two neighboring layout point is connected by straight line, therefore using in the present embodiment What construction method unwrapping wire was completed treats that unwrapping wire curve precision is high, while improving the efficiency of construction of unwrapping wire.
In summary, the spline is simple in construction, reasonable in design in the present invention and use is easy to operate, using the spline When carrying out payingoff construction to curve, it will treat that unwrapping wire curve point segmental arc carries out setting-out, while each segmental arc uses the chi of the spline Band carries out unwrapping wire by setting-out, with can realizing high-accuracy high-efficiency rate unwrapping wire expeditiously unwrapping wire.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the structural representation of spline of the present invention.
Fig. 2 is Fig. 1 A portions enlarged drawing.
Fig. 3 is the construction method FB(flow block) of curve unwrapping wire of the present invention.
Description of reference numerals:
1-chi plate;2-adjusting rod;3-tape;4-erection support.
Embodiment
A kind of unwrapping wire spline as shown in Figure 1 and Figure 2, including chi plate 1, two ends are fixed on the and of tape 3 on chi plate 1 The curvature adjusting means that the curvature of tape 3 is adjusted, the tape 3 is the shaped form steel band of adjustable in length;It is described Curvature adjusting means includes multiple adjusting rods 2 that is arranged on and on the chi plate 1 and can move up and down, and multiple adjusting rods 2 are equal Laid along the width of the chi plate 1, length direction of multiple adjusting rods 2 along the chi plate 1 is laid in same plane On, the upper end of adjusting rod 2, which is propped up, to be withstood in the tape 3.
When actual use, one end of the chi plate 1 and one end of the steel band are connected by screw or be welded and fixed, institute The other end and the steel band for stating chi plate 1 are attached by fixture or screw, because according to bent curvature of a curve, it is necessary to institute The curvature for stating steel band is adjusted, then the length of steel band can be adjusted, then the steel band end and the end of chi plate 1 Connection in, at least one end is dismountable.
Meanwhile, the adjustable in length of the adjusting rod 2, and according to treating the bent curvature of a curve of unwrapping wire, it is necessary to the steel band Curvature is adjusted, and can be attached, can also passed through by magnet adsorption between the end of the adjusting rod 2 and the steel band Screw is welded and fixed connection, preferably mode connects for screw, neck is set in the end of the adjusting rod 2, by the steel band After being arranged in the neck, it is fixedly connected by screw.
The tape 3 is the steel band with certain plasticity, if because when tape 3 is the components such as the rope made of hemp or chain, phase Tape 3 between adjacent two adjusting rods 2 is tension, then now tape 3 is that multiple straightways constitute approximate curve, Reduce the precision that unwrapping wire is carried out to the curve.
The spline is utilized using contour gauge, action into the method such as line and compasses line, realizes and the curve is entered Row is quick, efficiently, accurately unwrapping wire.
The principle of contour gauge:Measuring instrument is the center of circle, and ranging is radius, and special scoring tool is dynamic point, directly draws institute Need curve.
In the present embodiment, multiple adjusting rods 2 are equally laid.
When actual use, multiple adjusting rods 2 are equally laid successively along the width of the chi plate 1, its In first adjusting rod 2 with close to the distance between one end of the chi plate 1 of first adjusting rod 2, last The individual adjusting rod 2 and the distance between other end of the chi plate 1 close to last adjusting rod 2 are with adjacent two The distance between the individual adjusting rod 2 is identical, is easy to be determined the distance between two neighboring described adjusting rod 2, simultaneously Be conducive to being adjusted the curvature of the steel band according to the distance between two neighboring described adjusting rod 2.
When actual use, the distance between two neighboring described adjusting rod 2 is 130mm~160mm, the adjusting rod 2 Length is not more than 300mm.
When actual use, the distance between two neighboring described adjusting rod 2 is smaller, and putting after unwrapping wire is carried out to the curve Knot fruit is more accurate.
In the present embodiment, the distance between two neighboring described adjusting rod 2 preferably is 130mm.
When actual use, the height of the adjusting rod 2 is determined according to the action of the curve, excellent in the present embodiment The height of the adjusting rod 2 of choosing is 400mm.
In the present embodiment, the chi plate 1, tape 3 and adjusting rod 2 are respectively provided with grade.
In the present embodiment, the chi plate 1 is square-section aluminium alloy plate, and the length of the chi plate 1 is that 2m~3m, width are 100mm~120mm and its thickness are 20mm~30mm.
When actual use, the chi plate 1 is preferably rectangular configuration and is primarily to facilitate processing, while being easy to and the regulation Bar 2 is attached, and preferably aluminium alloy plate is due to that aluminium alloy plate can realize that multiplicating is used in turn and lighter weight.
When actual use, the end of the tape 3 is connected with the end of the chi plate 1, and the end of the chi plate 1 is institute The end of the same side of rectangular aluminium alloy plate is stated, and the threshold value of two chi plates 1 is rectangular aluminium alloy plate length.
In the present embodiment, the distance between two neighboring described adjusting rod 2 is 130mm~160mm, the adjusting rod 2 Length is not more than 300mm.
In the present embodiment, the erection support 4 installed for the adjusting rod 2, the erection support are provided with the chi plate 1 The mounting hole installed for the adjusting rod 2 is offered on 4.
In the present embodiment, the adjusting rod 2 is adjusting screw rod, and the mounting hole is internal thread hole.
When actual use, the adjusting rod 2 is the distance between its upper end and the chi plate 1 adjustable rod member, preferably For adjusting screw rod, in practical adjustments, adjusting screw rod can reach the effect of fine setting, while being easily installed and adjusting.
When actual use, the short transverse insertion of chi plate 1 described in the adjusting screw rod rock is installed on the chi plate 1 again.
When actual use, the adjusting screw rod can be laid at an angle with the chi plate 1, as long as can reach to described The purpose that the curvature of steel band is adjusted, preferably by the adjusting screw rod and the vertical runs of chi plate 1, it is more straight during regulation See, the curvature that can be carried out according to actual conditions quickly and accurately to the steel band is finely adjusted.
When actual use, the adjusting screw rod preferably is arranged on the chi plate 1 by the erection support 4, due to The chi plate 1 is rectangular aluminium alloy plate, and rigidity is smaller, and in order to reduce the quality of the spline, the rectangular aluminium alloy plate For hollow-core construction, the adjusting screw rod is inserted directly on the chi plate 1, processed complex, and connects not firm, Support to the adjusting rod 2 is unstable, is unfavorable for carrying out unwrapping wire to the curve, therefore, is set on the chi plate 1 and supplies institute State adjusting rod 2 installation erection support 4, and offered on the erection support 4 for the adjusting rod 2 install mounting hole, The inwall of the mounting hole is provided with the screw thread used cooperatively with the adjusting screw rod.
When actual use, locking nut is provided with the adjusting screw rod, it is therefore an objective to the adjusting rod 2 completed to regulation Progress is spacing, prevents from producing dislocation between the adjusting rod 2 and the chi plate 1 during unwrapping wire, influences unwrapping wire result.
A kind of construction method of curve unwrapping wire as shown in Figure 3, this method comprises the following steps:
Step 1: treating that layout point is delivered:According to the method for conventional unwrapping wire, it is pointed to treat on unwrapping wire curve in construction area N treat that layout point is delivered, and to treating that layout point is numbered described in n;
Treat that layout point will treat that unwrapping wire curve is divided into (n-1) individual segmental arc described in n, wherein the chord length of each segmental arc is not More than the distance between 3 two end points of tape described in the spline, wherein n is positive integer and n >=3;
Step 2: treating unwrapping wire curve unwrapping wire:Unwrapping wire is carried out respectively to (n-1) individual described segmental arc in step one, (n-1) is individual The line-putting method all same of the segmental arc;
Wherein, process is as follows when i-th segmental arc in unwrapping wire curve carries out unwrapping wire to described, and wherein i is individual to (n-1) The numbering of the segmental arc, i be positive integer and i=1,2 ..., (n-1):
Step 201, segmental arc full-page proof make:With reference to construction drawing, i-th of segmental arc full-page proof is made;
Step 202, spline adjustment:The two ends of the chi plate 1 are individually placed in step 201 at i-th of segmental arc full-page proof, The tape 3 is set to be overlapped with i-th of segmental arc full-page proof by adjusting the adjusting rod 2;
Step 203, segmental arc unwrapping wire:The spline after being adjusted in step 202 is put into the construction area of step one, Two end points of tape 3 of the spline is overlapped with two end points of i-th of segmental arc, i-th of arc is drawn along the tape 3 Section, completes the unwrapping wire process of i-th of segmental arc;
Step 204, multiplicating step 201 to step 203, until completing the setting-out of (n-1) individual segmental arc.
During practice of construction, in step one, the quantity for treating layout point is not less than 3, if the number for treating layout point Measure for two when, it is described to treat that unwrapping wire curve carry out segmental arc segmentation, can be completed using conventional curvature unwrapping wire.
During practice of construction, unwrapping wire curve generally circular arc line is treated, by adjusting between the adjusting rod 2 and the chi plate 1 Distance, after making the curvature of the tape 3 identical with the curvature of (i-1) individual segmental arc full-page proof, treat (i-1) of unwrapping wire curve Individual segmental arc is carried out after unwrapping wire, is carried out when the unwrapping wire of i-th of segmental arc of unwrapping wire curve, without carrying out to the curvature of tape 3 again Adjustment.
If when segmental arc composition of the unwrapping wire curve for different curvature, by adjust the adjusting rod 2 and the chi plate 1 it Between distance, after making the curvature of the tape 3 identical with the curvature of corresponding segmental arc full-page proof, treat the corresponding arc of unwrapping wire curve After Duan Jinhang unwrapping wire, repeat step 202 readjusts the distance between the adjusting rod 2 and described chi plate 1, and progress is next not The unwrapping wire of unwrapping wire curve segmental arc is treated with curvature.
During practice of construction, traditional curve line-putting method is utilized in engineering axis in rectangular coordinate system or polar coordinate system The Measurement results of point position, are delivered with measuring instruments such as total powerstations and arrive construction area, two neighboring layout point is connected with straight line respectively Pick up and, form the polygon broken line of an approximate camber line, unwrapping wire precision is relatively low, and construction quality deviation is relatively large, work effect Rate is low, and the unwrapping wire time is long, and difficulty is big when delivering other control lines or verification as datum axis;Unwrapping wire is treated in the present embodiment bent Line is carried out in the construction method of unwrapping wire, after being divided into (n-1) individual described segmental arc after unwrapping wire curve first, individual to (n-1) described Segmental arc carries out unwrapping wire respectively, then, first with reference to construction drawing, is done when i-th of segmental arc carries out unwrapping wire in unwrapping wire curve to described Go out i-th of segmental arc full-page proof, then segmental arc full-page proof makes the chi of the spline by adjusting the adjusting rod 2 according to i-th Band 3 is overlapped with segmental arc full-page proof described in i-th, draws i-th of segmental arc finally by the spline after adjustment, the construction method After (n-1) individual segmental arc will be divide into after unwrapping wire curve, again by quantity of each (n-1) individual described segmental arc according to the adjusting rod 2 It is segmented, is connected while the straight line connection between two neighboring adjusting rod 2 is converted into curve by the tape 3, and is passed The curve unwrapping wire of system is usually that unwrapping wire is directly carried out on unwrapping wire curve is treated, and two neighboring layout point is connected by straight line, because This treats that unwrapping wire curve precision is high using what the construction method unwrapping wire in the present embodiment was completed, while improving the construction effect of unwrapping wire Rate.
Before treating that layout point is delivered in the present embodiment, in step one, drawn out using CAD software and described treat unwrapping wire curve Design curve, recycles CAD software and the design curve is divided into (n-1) individual design segmental arc, n institute by n waypoint Waypoint is stated with treating that layout point is corresponded described in step one n, the design coordinate of each waypoint is through Coordinate Conversion The setting-out coordinate for treating layout point is obtained afterwards.
During practice of construction, the general CAD software by computer of the construction drawing is drawn and formed, and in the construction drawing The design curve radius of curvature be, it is known that therefore by computer using CAD software to the design curve carry out During segmentation, the principle preferentially divided using same curvature is carried out.
During practice of construction, the chord length of each design segmental arc is identical with the distance between the two ends of tape 3, preferably The distance between described two ends of tape 3 are identical with the length of the chi plate 1, i.e., the end of described tape 3 with the chi plate 1 End is connected.
In the present embodiment, multiple adjusting rods 2 are equally laid in spline described in step one;
Before i-th of segmental arc full-page proof makes in step 201, including procedure below:
Step 2011, two end points for first delivering out i-th of segmental arc full-page proof;
Step 2012, in CAD software by it is corresponding with i-th of segmental arc full-page proof it is described design segmental arc two ends carry out Line formation design straightway;
Step 2013, design point are chosen:Computer is used in CAD software by the design straightway in step 2012 Q Along ent of upper insertion, does a vertical line vertical with the design straightway, by the vertical line on each Along ent Intersection point with the design segmental arc is as design point;
The quantity Q of the Along ent is identical with the quantity of adjusting rod 2 in the spline, and wherein Q is not less than 11 just Integer;
Step 2014, by the design coordinate of the design point in step 2013 pass through after Coordinate Conversion deliver arrive step In 2011 between two end points of i-th of segmental arc full-page proof, encryption layout point is formed.
During practice of construction, Q is the total quantity of adjusting rod 2 in the spline, and the position of the encryption layout point is institute State the location of front end of adjusting rod 2.
During practice of construction, being produced on smooth ground or interim artificial platform for i-th of segmental arc full-page proof is carried out, and is kept away Exempt from error occur when being adjusted to the spline, the unwrapping wire of the measured curve is produced deviation, influence construction quality And construction speed.
It is described above, only it is presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, it is every according to the present invention Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. a kind of unwrapping wire spline, it is characterised in that:Including chi plate (1), two ends be fixed on tape (3) on chi plate (1) and The curvature adjusting means that the tape (3) curvature is adjusted, the tape (3) is the shaped form steel band of adjustable in length; The curvature adjusting means includes multiple adjusting rods (2) that is arranged on and on the chi plate (1) and can move up and down, multiple tune Pole (2) is laid along the width of the chi plate (1), length direction of multiple adjusting rods (2) along the chi plate (1) Lay at grade, the upper end branch of the adjusting rod (2) is withstood in the tape (3).
2. according to a kind of unwrapping wire spline described in claim 1, it is characterised in that:Multiple adjusting rods (2) are between waiting Away from laying.
3. according to a kind of unwrapping wire spline described in claim 1 or 2, it is characterised in that:The chi plate (1), tape (3) and Adjusting rod (2) is respectively provided with grade.
4. according to a kind of unwrapping wire spline described in claim 1 or 2, it is characterised in that:The chi plate (1) is square-section Aluminium alloy plate, the length of the chi plate (1) is 2m~3m, width is 100mm~120mm and its thickness is 20mm~30mm.
5. according to a kind of unwrapping wire spline described in claim 4, it is characterised in that:The two neighboring adjusting rod (2) it Between distance be 130mm~160mm, the length of the adjusting rod (2) is not more than 300mm.
6. according to a kind of unwrapping wire spline described in claim 1 or 2, it is characterised in that:Confession is provided with the chi plate (1) The erection support (4) that the adjusting rod (2) is installed.
7. according to a kind of unwrapping wire spline described in claim 6, it is characterised in that:The adjusting rod (2) is adjusting screw rod, The mounting hole is internal thread hole.
8. a kind of construction method for carrying out unwrapping wire to curve using spline as claimed in claim 1, it is characterised in that this method Comprise the following steps:
Step 1: treating that layout point is delivered:According to the method for conventional surveying and locating, it is pointed to treat on setting-out curve in construction area N treat that layout point is delivered, and to treating that layout point is numbered described in n;
Treat that layout point will treat that setting-out curve is divided into (n-1) individual segmental arc described in n, wherein the chord length of each segmental arc is not more than The distance between tape (3) two described in the spline end points, wherein n is positive integer and n >=3;
Step 2: treating setting-out curve unwrapping wire:Unwrapping wire is carried out respectively to (n-1) individual described segmental arc in step one, (n-1) is individual described The line-putting method all same of segmental arc;
Wherein, to described when i-th of segmental arc carries out unwrapping wire in setting-out curve, process is as follows, and wherein i is described in individual to (n-1) The numbering of segmental arc, i be positive integer and i=1,2 ..., n-1:
Step 201, segmental arc full-page proof make:With reference to construction drawing, i-th of segmental arc full-page proof is made;
Step 202, spline adjustment:The two ends of the chi plate (1) are individually placed in step 201 at i-th of segmental arc full-page proof, led to Cross and adjust the adjusting rod (2) and the tape (3) is overlapped with i-th of segmental arc full-page proof;
Step 203, segmental arc unwrapping wire:The spline after being adjusted in step 202 is put into the construction area of step one, makes institute Two end points of tape (3) for stating spline are overlapped with two end points of i-th of segmental arc, and i-th of arc is drawn along the tape (3) Section, completes the unwrapping wire process of i-th of segmental arc;
Step 204, multiplicating step 201 to step 203, until completing the setting-out of (n-1) individual segmental arc.
9. according to the construction method described in claim 8, it is characterised in that:Before treating that layout point is delivered in step one, using CAD Software on Drawing goes out the design curve for treating setting-out curve, recycles CAD software and by n waypoint by the design curve It is divided into (n-1) individual design segmental arc, the n waypoints are with treating that layout point is corresponded described in step one n, each described point The design coordinate of section point obtains the setting-out coordinate for treating layout point after Coordinate Conversion.
10. according to the construction method described in claim 9, it is characterised in that:Multiple tune in spline described in step one Pole (2) is equally laid;
Before i-th of segmental arc full-page proof makes in step 201, including procedure below:
Step 2011, two end points for first delivering out i-th of segmental arc full-page proof;
Step 2012, in CAD software by it is corresponding with i-th of segmental arc full-page proof it is described design segmental arc two ends carry out line Form design straightway;
Step 2013, design point are chosen:It will be inserted in CAD software using computer on the design straightway in step 2012 Enter Q Along ent, a vertical line vertical with the design straightway is done on each Along ent, by the vertical line and institute The intersection point of design segmental arc is stated as design point;
Step 2014, by the design coordinate of the design point in step 2013 by being delivered after Coordinate Conversion in step 2011 Between two end points of i-th of segmental arc full-page proof, encryption layout point is formed.
CN201710511024.7A 2017-06-29 2017-06-29 A kind of construction method of unwrapping wire spline and curve unwrapping wire Pending CN107175639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710511024.7A CN107175639A (en) 2017-06-29 2017-06-29 A kind of construction method of unwrapping wire spline and curve unwrapping wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710511024.7A CN107175639A (en) 2017-06-29 2017-06-29 A kind of construction method of unwrapping wire spline and curve unwrapping wire

Publications (1)

Publication Number Publication Date
CN107175639A true CN107175639A (en) 2017-09-19

Family

ID=59845553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710511024.7A Pending CN107175639A (en) 2017-06-29 2017-06-29 A kind of construction method of unwrapping wire spline and curve unwrapping wire

Country Status (1)

Country Link
CN (1) CN107175639A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021741A (en) * 2019-12-14 2020-04-17 中冶天工集团有限公司 Method for paying off irregular large-diameter arc
CN113465582A (en) * 2021-05-27 2021-10-01 中铁隧道局集团建设有限公司 Arc-shaped positioning pay-off device capable of being adjusted and reused and pay-off method thereof
CN113846537A (en) * 2021-09-28 2021-12-28 杭州建工集团有限责任公司 Curved surface adjusting tool and method for quickly paving and pasting curve-arranged square bricks by using same

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191107959A (en) * 1911-03-30 1912-03-21 John Russel Berg Adjustable Curve Ruler.
GB191500615A (en) * 1914-07-02 1915-12-02 Paul Daniel Edouard Huguenin Improvements in Curve-drawing Instruments.
FR745101A (en) * 1933-05-05
GB639360A (en) * 1948-04-12 1950-06-28 Hall Harding Ltd Improvements in or relating to adjustable curve rulers
FR996500A (en) * 1949-10-03 1951-12-19 Apparatus for setting fiexible rules, for example rules for drawings and layouts
FR1538538A (en) * 1967-07-20 1968-09-06 Drawing instrument
CH641098A5 (en) * 1980-06-10 1984-02-15 Elger Gerd Getea Konstruktions Adjustable curved ruler for the reproducible drawing of any desired curved shapes
CN2093100U (en) * 1991-01-05 1992-01-15 刘凤岐 Adjustable big radius arc drawing instrument
CN2136146Y (en) * 1992-10-29 1993-06-16 郗春祥 Adjustable spline for drawing curve
CN1463807A (en) * 2002-06-05 2003-12-31 北新建材(集团)有限公司 Process for the manufacture of cold rolling accurate super narrow steel strip and apparatus thereof
CN204988282U (en) * 2015-08-07 2016-01-20 中国十七冶集团有限公司 Curve building element measures lofting instrument
CN105773565A (en) * 2016-04-12 2016-07-20 中冶建工集团有限公司 Sliding type straight line drawing device and multi-straight-line layout method adopting sliding type straight line drawing device
CN205426007U (en) * 2016-03-16 2016-08-03 新疆维吾尔自治区计量测试研究院 Full -automatic standard device of image formula standard steel tape
KR20170001266A (en) * 2015-06-26 2017-01-04 삼성중공업 주식회사 a measuring apparatus for curved surfaces
CN206855428U (en) * 2017-06-29 2018-01-09 陕西建工第三建设集团有限公司 A kind of unwrapping wire spline

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR745101A (en) * 1933-05-05
GB191107959A (en) * 1911-03-30 1912-03-21 John Russel Berg Adjustable Curve Ruler.
GB191500615A (en) * 1914-07-02 1915-12-02 Paul Daniel Edouard Huguenin Improvements in Curve-drawing Instruments.
GB639360A (en) * 1948-04-12 1950-06-28 Hall Harding Ltd Improvements in or relating to adjustable curve rulers
FR996500A (en) * 1949-10-03 1951-12-19 Apparatus for setting fiexible rules, for example rules for drawings and layouts
FR1538538A (en) * 1967-07-20 1968-09-06 Drawing instrument
CH641098A5 (en) * 1980-06-10 1984-02-15 Elger Gerd Getea Konstruktions Adjustable curved ruler for the reproducible drawing of any desired curved shapes
CN2093100U (en) * 1991-01-05 1992-01-15 刘凤岐 Adjustable big radius arc drawing instrument
CN2136146Y (en) * 1992-10-29 1993-06-16 郗春祥 Adjustable spline for drawing curve
CN1463807A (en) * 2002-06-05 2003-12-31 北新建材(集团)有限公司 Process for the manufacture of cold rolling accurate super narrow steel strip and apparatus thereof
KR20170001266A (en) * 2015-06-26 2017-01-04 삼성중공업 주식회사 a measuring apparatus for curved surfaces
CN204988282U (en) * 2015-08-07 2016-01-20 中国十七冶集团有限公司 Curve building element measures lofting instrument
CN205426007U (en) * 2016-03-16 2016-08-03 新疆维吾尔自治区计量测试研究院 Full -automatic standard device of image formula standard steel tape
CN105773565A (en) * 2016-04-12 2016-07-20 中冶建工集团有限公司 Sliding type straight line drawing device and multi-straight-line layout method adopting sliding type straight line drawing device
CN206855428U (en) * 2017-06-29 2018-01-09 陕西建工第三建设集团有限公司 A kind of unwrapping wire spline

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中华人民共和国机械工业部: "《划线工工艺学》", 科学普及出版社, pages: 97 - 98 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021741A (en) * 2019-12-14 2020-04-17 中冶天工集团有限公司 Method for paying off irregular large-diameter arc
CN113465582A (en) * 2021-05-27 2021-10-01 中铁隧道局集团建设有限公司 Arc-shaped positioning pay-off device capable of being adjusted and reused and pay-off method thereof
CN113846537A (en) * 2021-09-28 2021-12-28 杭州建工集团有限责任公司 Curved surface adjusting tool and method for quickly paving and pasting curve-arranged square bricks by using same

Similar Documents

Publication Publication Date Title
CN206855428U (en) A kind of unwrapping wire spline
CN107175639A (en) A kind of construction method of unwrapping wire spline and curve unwrapping wire
CN104110140B (en) Net rack node location adjusting device and location adjusting method
CN106436579A (en) Linear control method and linear control device for sectional beam with specially-shaped cross section through short-line pedestal matching method
CN111523172A (en) Bridge forming linear analysis method for main cable of spatial special-shaped cable surface suspension bridge
CN206410623U (en) It is a kind of to indulge the survey tool that bone is installed for ship hull plate
CN107066762B (en) Design method for cable-stayed bridge equidirectional rotation stay cable
CN103132455A (en) Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method
CN204662448U (en) Building the intelligent water-cooled system of concrete in mass
CN106638318A (en) Method for positioning anchor point of beam end of cable stayed bridge and installation method of cable guide pipe
CN107336346A (en) A kind of beam making bench
CN110594536B (en) Verticality adjusting method for tower equipment
CN105778934A (en) Three-dimensional control masonry method based on oven body masonry construction of coke oven
CN106238212A (en) A kind of cathode line jig and cathode line location adjust construction method
CN103806924A (en) Steel form carrier variable camber gear for concrete lining for cave depot
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN114970978B (en) Dynamic planning method for single vibrating trolley construction track in complex area
CN105241437A (en) Hyperbola steel reinforced concrete cooling tower cylinder wall construction measuring method
CN108705669A (en) A kind of prefabricated case beam bellows coordinate location device and localization method
CN109750603A (en) The Geometry monitoring system and monitoring method constructed in conjunction with segment girder construction short line casting
CN106311932B (en) It is a kind of to bend the high bar bending fixing device of precision
CN203742619U (en) Steel mold trolley arc changing device for tunnel concrete lining
CN206982971U (en) A kind of beam making bench
CN108827253B (en) Method for installing, positioning and measuring pipeline bracket of snowmobile ski track
CN208803727U (en) A kind of steel column hoop support device preventing the outer unstability of cast-in-situ reinforced concrete oblique circular cylinder plane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination