CN107165129A - Canyon Area high dam hydroelectric project slag ditch-water flow guide system - Google Patents

Canyon Area high dam hydroelectric project slag ditch-water flow guide system Download PDF

Info

Publication number
CN107165129A
CN107165129A CN201710591772.0A CN201710591772A CN107165129A CN 107165129 A CN107165129 A CN 107165129A CN 201710591772 A CN201710591772 A CN 201710591772A CN 107165129 A CN107165129 A CN 107165129A
Authority
CN
China
Prior art keywords
slag
checkdam
area
ditch
scupper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710591772.0A
Other languages
Chinese (zh)
Inventor
张超
李永红
李玉珠
吴显伟
陈世全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201710591772.0A priority Critical patent/CN107165129A/en
Publication of CN107165129A publication Critical patent/CN107165129A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

Disclosed by the invention is that the one kind in Hydraulic and Hydro-Power Engineering field is used for Canyon Area high dam hydroelectric project slag ditch-water flow guide system and its construction method, including the checkdam being arranged in the cheuch of tributary, the checkdam is located at the upstream that Large-scale Underground Tunnels And Chambers are exported, slag area is set to behind the dam of checkdam, the bottom of the checkdam is provided with drainage culvert, the upstream side of checkdam is provided with scupper, and the barrel of the scupper passes through mountain forest, and outlet is located at the downstream in slag area or other Channel slopes in the cheuch of tributary.By the comprehensive utilization of two kinds of drainage patterns, scupper hole footpath can be reduced, shorten drainage culvert length, hence it is evident that reduce construction costs, reduce difficulty of construction, while enhancing adaptability of the scupper to unfavorable geological condition.And scupper and drainage culvert can be realized periodically to be overhauled in turn, extends system service life, it is ensured that the safety of dam engineering construction period.

Description

Canyon Area high dam hydroelectric project slag ditch-water flow guide system
Technical field
It is used for Canyon Area high dam hydroelectric project slag ditch-water the present invention relates to Hydraulic and Hydro-Power Engineering field, more particularly to one kind Flow guide system and its construction method.
Background technology
At present, many large-scale high dam hydroelectric project is just being built in Southwestern China region high mountain and steep gorge area, such as double Jiangkou, Liang He Mouth, Ye Batan, white crane beach etc., these engineering construction difficulty are big, build year limit for length, and have substantial amounts of construction waste in engineering construction Need to store up or transport, also need to arrange all kinds of construction auxiliary equipment, the available construction site in Dan Jinba areas does not almost have, because This, only the tributary cheuch by the use of Dam Site as large-scale blocks ditch type Dumping Sites, but these tributary cheuches cuttings are deeper, with stream The features such as amount is big, suspended load is more, rich withered changes in flow rate is big, ditch water process that must be scientific and reasonable to cheuch progress.
At present, the ditch water disposal plan typically used includes:(1) checkdam+scupper, (2) checkdam+drainage ditch, (3) Checkdam+culvert pipe.But there is certain deficiency and shortcoming in these schemes:
For scheme (1):When flow is larger, it is necessary to build big cross section water discharge tunnel, but tunnel section is big to geology bar Part requires very high, and difficulty of construction is big, and cost is very high;
For scheme (2):Drainage ditch need to take cheuch floor area, it is difficult to adapt to the topography and landform character of Canyon Area;
For scheme (3):Containing the suspended load such as sand, stone, branch more than the ditch-water of southwest, culvert pipe longtime running easily blocking or Structural wear, and culvert pipe is embedded in underground and is difficult to possess maintenance condition, and culvert pipe discharge capacity is limited.
In recent years, need to build lower level outlet, cavern's spillway, emptying tunnel on the tributary ditch valleyside slope of some high dam engineerings Or the huge underground cavity such as access tunnel, and the traffic condition in Canyon Area and cheuch is complicated, how to reduce the freight volume for slag charge, and energy It is engineer's urgent problem to be solved to facilitate slag.It can overcome the shortcomings of traditional ditch water disposal plan it is therefore proposed that a kind of, and The convenient ditch-water flow guide system of slag and construction method have great importance for Canyon Area high dam construction of hydropower plant.
The content of the invention
To overcome drawbacks described above, the technical problems to be solved by the invention present in existing slag ditch engineering of water treatment It is:Ditch-water, and the convenient ditch-water flow guide system of slag and construction method can smoothly be drained by providing one kind.
The technical solution adopted for the present invention to solve the technical problems is:
Canyon Area high dam hydroelectric project slag ditch-water flow guide system, including the checkdam being arranged in the cheuch of tributary, it is described Checkdam is set to slag area after being located at the upstream that Large-scale Underground Tunnels And Chambers are exported, the dam of checkdam, and the bottom of the checkdam is provided with Drainage culvert, the upstream side of checkdam is provided with scupper, and the barrel of the scupper passes through mountain forest, and outlet is located in the cheuch of tributary The downstream in slag area or other Channel slopes.
It is further that the checkdam is core-wall or the native stone checkdam of sloping core, its design altitude is higher than major flood season 10 years One meets water level, the up stream slope ratio no more than 1: 1.75 of the checkdam, downstream slope ratio no more than 1: 1.5.
It is further that the upstream slope-protection of the checkdam uses rock facing, 50~100cm of thickness.
It is further that the scupper input elevation met withered phase river water level elevation higher than 5 years one.
It is further that the drainage culvert is divided into two sections, and the first segment length, which is met, can pass through the requirement of checkdam, second Segment length, which is met, can pass through the requirement in slag area.
It is further that the slag divides into the area of slag one and the area of slag two, the wherein area of slag two is located at the area of slag one Top, the up stream slope ratio no more than 1: 1.75 in slag area, downstream slope ratio no more than 1: 1.75.
It is further that the side slope behind the checkdam dam where Large-scale Underground Tunnels And Chambers outlet is described provided with collection slag platform The elevation for collecting slag platform is located between slag area elevation and huge underground cavity outlet elevation.
It is further to be additionally provided with collection slag sidewalk in the side slope where the collection slag platform, collects slag sidewalk from collection slag platform Extend to each construction point of Large-scale Underground Tunnels And Chambers.
The construction method of Canyon Area high dam hydroelectric project slag ditch-water flow guide system, comprises the following steps:
Before a, major project go into operation, collection slag platform and collection slag sidewalk are built in side slope middle, hydraulic tunnel etc. is met large-scale The construction blasting of cavern is slagged tap needs, and explosion rock ballast material can be piled up by modes such as drop shafts on collection slag platform, note preventing slag Go to river, cause choking channel;
B, according to tributary cheuch surrounding geographical environmental planning scupper route, then build and complete ditch water treatment system Scupper structure;
C, in the withered phase interim earth rock cofferdam built by heap and carry out raceway groove and dammed, make current from scupper water conservancy diversion;
D, under earth rock cofferdam protection dry work complete the drainage culvert of checkdam bottom, heap builds native stone checkdam afterwards Design altitude is reached, is met the need for First Year flood season passes the flood period;
E, after First Year flood season, the drainage culvert for the slag area bottom that starts to construct, and containing with the draining of checkdam bottom Pipe is connected;
F, the explosion rock ballast material push-in river course that will collect slag platform, heap build the area of slag one and reach design altitude;
It will dam before g, Second Year flood and be removed with earth rock cofferdam, and form final river course ditch water treatment system;
H, in the established area of slag one, subsequent construction can continue the rock ballast of slag sidewalk being pushed into river course, form heap The area of slag two, reaches design altitude.
It is further, after step g completes river course ditch water treatment system, to carry out periodic inspection to scupper, It can be carried out in the withered phase, build water-retaining cofferdam at hole first so that current are fully incorporated drainage culvert, then scupper is carried out Check or repair;If drainage culvert occurs to block or destroyed, it can also be repaired in the withered phase, build dash at hole first Cofferdam so that current are fully incorporated scupper, are then repaired to drainage culvert.
The beneficial effects of the invention are as follows:
1st, the drainage gallery of ditch water treatment system is made up of scupper and drainage culvert, and so a part of current pass through draining Hole water conservancy diversion, another part current can so reduce scupper hole footpath by culvert pipe water conservancy diversion, because drainage culvert length is general remote small In scupper length, hence it is evident that reduce construction costs, difficulty of construction is reduced, while enhancing scupper to unfavorable geological condition Adaptability;
2nd, scupper and drainage culvert can be realized periodically overhauls in turn, extends system service life, it is ensured that dam The safety of construction phase of project;
3rd, cleverly design collects slag platform, facilitates the needs of slagging tap of Large-scale Underground Tunnels And Chambers etc., it is therefore prevented that rock ballast goes to river what is caused Environmental issue, significantly reduces the freight volume of rock ballast transhipment, and slag is also very convenient in cheuch, significantly reduces cost.
Brief description of the drawings
Fig. 1 is arrangement schematic diagram in structural plan of the present invention.
Fig. 2 is checkdam of the present invention and slag plot structure schematic diagram.
Mark is 1- tributaries cheuch, 2- checkdams, 3- Large-scale Underground Tunnels And Chambers, 4- slags area, 5- drainage culverts, 6- rows in figure Water hole, 7- collection slag platforms, 8- collection slag sidewalks, the area of 41- slags one, the area of 42- slags two.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the present invention includes the checkdam 2 being arranged in tributary cheuch 1, and the checkdam 2 is located at big Slag area 4 is set to behind the upstream that type cavity group 3 is exported, the dam of checkdam 2, the bottom of the checkdam 2 is provided with drainage culvert 5, the upstream side of checkdam 2 is provided with scupper 6, and the barrel of the scupper 6 passes through mountain forest, and outlet is located at heap in tributary cheuch 1 The downstream in slag area 4 or other Channel slopes.Traditional ditch water treatment system typically all only has a kind of drainage pattern, otherwise pass through row Water hole draining, otherwise by drainage culvert draining, and the present invention is comprehensively utilized two kinds of drainage patterns, it is possible to decrease engineering is made Valency.During normal use, scupper 6 and drainage culvert 5 carry out draining simultaneously, and two kinds can be used when needing to be overhauled The mode of pipeline draining in turn is overhauled, and can so extend system service life, it is ensured that the safety of dam engineering construction period.
Because checkdam 2 is to stop ditch-water, the important barrier of slag behind protection dam, it is therefore desirable to enough elevation and stably Property, the present invention meets water level, the checkdam for 10 years one using core-wall or the native stone checkdam of sloping core, its design altitude higher than major flood season 2 up stream slope ratio no more than 1: 1.75, downstream slope ratio no more than 1: 1.5, to ensure its stability.
In order to slow down checkdam 2 by upstream ditch-water impact erosion, rock facing is used to the upstream side of water fender 2, enrockment is thick Spend for 50~100cm.
The input elevation of scupper 6 met withered phase river water level elevation higher than 5 years one, facilitated dry season to construct.
The drainage culvert 5 is divided into two sections, and the first segment length, which is met, can pass through the requirement of checkdam 2, and the second segment length expires Foot can pass through the requirement in slag area 4, so as to reach the purpose for draining ditch-water from the bottom of slag area 4, by drainage culvert, 5 points are two Duan Xianhou constructs, to meet construction requirement and draining needs.
After the completion of flow guide system construction, it just can start that slag area 4 is carried out to plan, in order to reach orderly slag Purpose, is the area 41 of slag one and the area 42 of slag two by 4 points of the slag area, and the wherein area 42 of slag two is located at the upper of the area 41 of slag one Side, the up stream slope ratio no more than 1: 1.75 in slag area 4, downstream slope ratio no more than 1: 1.75.The area 41 of slag one is mainly to tributary Cheuch 1 is filled and led up, and reaches the purpose of lay a good foundation, while also certain support action is played to checkdam 2, then again thereon Side sets slag two area 42, upstream and downstream slope than settings can ensure the stability in slag area 4, it is to avoid there is landslide and mud-rock flow etc. Accident.
Further, in order to improve the operating efficiency of slag, where Large-scale Underground Tunnels And Chambers 3 are exported behind the dam of checkdam 2 Side slope provided with collection slag platform 7, the elevation of the collection slag platform 7 be located at the elevation of slag 4 and the outlet elevation of Large-scale Underground Tunnels And Chambers 3 it Between.In work progress, first debris can be deposited on collection slag platform 7, be then pushed into again in slag area 4, to reach at concentration The purpose of reason.
Because the construction point of Large-scale Underground Tunnels And Chambers 3 is more, collection slag sidewalk 8 can be set in the side slope where the collection slag platform 7, Collection slag sidewalk 8 extends to each construction point of Large-scale Underground Tunnels And Chambers 3 from collection slag platform 7.
The construction method of Canyon Area high dam hydroelectric project slag ditch-water flow guide system, comprises the following steps:
Before a, major project go into operation, collection slag platform and collection slag sidewalk are built in side slope middle, hydraulic tunnel etc. is met large-scale The construction blasting of cavern is slagged tap needs, and explosion rock ballast material can be piled up by modes such as drop shafts on collection slag platform, note preventing slag Go to river, cause choking channel;
B, according to tributary cheuch surrounding geographical environmental planning scupper route, then build and complete ditch water treatment system Scupper structure;
C, in the withered phase interim earth rock cofferdam built by heap and carry out raceway groove and dammed, make current from scupper water conservancy diversion;
D, under earth rock cofferdam protection dry work complete the drainage culvert of checkdam bottom, heap builds native stone checkdam afterwards Design altitude is reached, is met the need for First Year flood season passes the flood period;
E, after First Year flood season, the drainage culvert for the slag area bottom that starts to construct, and containing with the draining of checkdam bottom Pipe is connected;
F, the explosion rock ballast material push-in river course that will collect slag platform, heap build the area of slag one and reach design altitude;
It will dam before g, Second Year flood and be removed with earth rock cofferdam, and form final river course ditch water treatment system;
H, in the established area of slag one, subsequent construction can continue the rock ballast of slag sidewalk being pushed into river course, form heap The area of slag two, reaches design altitude.
When planning scupper route in stepb, it is necessary to meet the outlet of scupper positioned at the downstream in slag area or straight Connect in other fluid stream channels of importing.Construction is completed before checkdam preferably arrives in First Year flood season in step d, it is to avoid flood season river Construction is impacted, slow whole project progress is dragged, drainage culvert can be arranged as required to many, to possess enough aerial drainages Ability.After the completion of the construction of whole ditch-water flow guide system, if system run all right, it just can start the construction in slag area, it is first First heap be provided as based on the area of slag one, the area of slag one mainly to cheuch carry out fills and leads up compacting, make cheuch formed one it is flat Open plane, then sets the area of slag two, to meet the follow-up slag requirement of engineering, Liang Ge slags area all should above it again Meet construction requirement of the upstream and downstream slope than no more than 1: 1.75, it is to avoid the accidents such as landslide and mud-rock flow occur.
After the completion of the ditch water treatment system construction of whole river course, it can be carried out during its operation to inspect periodically maintenance, if Periodic inspection carried out to scupper, can be carried out in the withered phase, build water-retaining cofferdam at hole first so that current are fully incorporated row Water culvert pipe, is then checked or is repaired to scupper;If drainage culvert occurs to block or destroyed, it can also be carried out in the withered phase Repair, build water-retaining cofferdam at hole first so that current are fully incorporated scupper, and then drainage culvert is repaired.Phase For a kind of traditional ditch water treatment system for only possessing drain function, the system is more flexible, runs more reliable and more stable, dimension Shield is also more convenient.

Claims (10)

1. Canyon Area high dam hydroelectric project slag ditch-water flow guide system, including the checkdam (2) being arranged in tributary cheuch (1), The checkdam (2) is set to slag area (4) after being located at the upstream that Large-scale Underground Tunnels And Chambers (3) are exported, the dam of checkdam (2), and it is special Levying is:The bottom of the checkdam (2) is provided with drainage culvert (5), and the upstream side of checkdam (2) is provided with scupper (6), the row The barrel in water hole (6) passes through mountain forest, and outlet is located at the downstream in slag area (4) or other Channel slopes in the cheuch of tributary.
2. Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 1, it is characterized in that:The checkdam (2) be the native stone checkdam of core-wall or sloping core, its design altitude meets water level for 10 years one higher than major flood season, the checkdam (2) it is upper Swim slope ratio no more than 1: 1.75, downstream slope ratio no more than 1: 1.5.
3. Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 2, it is characterized in that:The checkdam (2) upstream slope-protection uses rock facing, 50~100cm of thickness.
4. Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 1, it is characterized in that:The scupper (6) input elevation met withered phase river water level elevation higher than 5 years one.
5. Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 1, it is characterized in that:The draining is contained Pipe (5) is divided into two sections, and the first segment length, which is met, can pass through the requirement of checkdam (2), and the second segment length, which is met, can pass through slag area (4) requirement.
6. Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 1, it is characterized in that:The slag area It is the area of slag one (41) and the area of slag two (42) to divide (4), and the wherein area of slag two (42) is located at the top in the area of slag one (41), slag The up stream slope ratio no more than 1: 1.75 in area (4), downstream slope ratio no more than 1: 1.75.
7. the Canyon Area high dam hydroelectric project slag ditch-water flow guide system as described in claim 1~6 any one claim, It is characterized in that:Side slope behind checkdam (2) dam where Large-scale Underground Tunnels And Chambers (3) outlet is provided with collection slag platform (7), the collection The elevation of slag platform (7) is located between slag area elevation and huge underground cavity outlet elevation.
8. Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 7, it is characterized in that:The collection slag is put down Collection slag sidewalk (8) is additionally provided with side slope where platform (7), collection slag sidewalk (8) extends to Large-scale Underground Tunnels And Chambers from collection slag platform (7) (3) each construction point.
9. the construction method of Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 8, it is characterized in that, Comprise the following steps:
Before a, major project go into operation, collection slag platform and collection slag sidewalk are built in side slope middle, the huge underground cavities such as hydraulic tunnel are met Construction blasting slag tap needs, explosion rock ballast material can be piled up by modes such as drop shafts on collection slag platform, note preventing slag from going to river, Cause choking channel;
B, according to tributary cheuch surrounding geographical environmental planning scupper route, then build and complete the draining of ditch water treatment system Hole structure;
C, in the withered phase interim earth rock cofferdam built by heap and carry out raceway groove and dammed, make current from scupper water conservancy diversion;
D, under earth rock cofferdam protection dry work complete the drainage culvert of checkdam bottom, heap is built native stone checkdam and reached afterwards Design altitude, meets the need for First Year flood season passes the flood period;
E, after First Year flood season, start construct slag area bottom drainage culvert, and with the drainage culvert phase of checkdam bottom Connection;
F, the explosion rock ballast material push-in river course that will collect slag platform, heap build the area of slag one and reach design altitude;
It will dam before g, Second Year flood and be removed with earth rock cofferdam, and form final river course ditch water treatment system;
H, in the established area of slag one, subsequent construction can continue the rock ballast of slag sidewalk being pushed into river course, form slag two Area, reaches design altitude.
10. the construction method of Canyon Area high dam hydroelectric project slag ditch-water flow guide system as claimed in claim 9, its feature It is:After step g completes river course ditch water treatment system, to carry out periodic inspection to scupper, it can be carried out in the withered phase, first Water-retaining cofferdam is built at hole so that current are fully incorporated drainage culvert, and then scupper is checked or repaired;If draining Culvert pipe occurs to block or destroyed, and it can also be repaired in the withered phase, builds water-retaining cofferdam at hole first so that current are whole Scupper is introduced, then drainage culvert is repaired.
CN201710591772.0A 2017-07-19 2017-07-19 Canyon Area high dam hydroelectric project slag ditch-water flow guide system Pending CN107165129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710591772.0A CN107165129A (en) 2017-07-19 2017-07-19 Canyon Area high dam hydroelectric project slag ditch-water flow guide system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710591772.0A CN107165129A (en) 2017-07-19 2017-07-19 Canyon Area high dam hydroelectric project slag ditch-water flow guide system

Publications (1)

Publication Number Publication Date
CN107165129A true CN107165129A (en) 2017-09-15

Family

ID=59817104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710591772.0A Pending CN107165129A (en) 2017-07-19 2017-07-19 Canyon Area high dam hydroelectric project slag ditch-water flow guide system

Country Status (1)

Country Link
CN (1) CN107165129A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858990A (en) * 2017-12-13 2018-03-30 中国电建集团成都勘测设计研究院有限公司 The arrangement of Canyon Area high dam ditch engineering of water treatment
CN108193651A (en) * 2018-03-15 2018-06-22 中国电建集团成都勘测设计研究院有限公司 Water consolidates separate type ditch water process scupper arrangement
CN109162258A (en) * 2018-09-10 2019-01-08 中国五环工程有限公司 Band the industrial enterprise's slag library T Xing Ba and its dry zoning round-robin method
CN109371918A (en) * 2018-11-27 2019-02-22 中国电建集团华东勘测设计研究院有限公司 With the dam structure and its construction method faced forever in conjunction with multi-functional drainage box culvert
CN109404019A (en) * 2018-12-25 2019-03-01 中国电建集团成都勘测设计研究院有限公司 Surrounding rock of chamber pays protecting system and cavern's structure in advance
CN110258469A (en) * 2019-06-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The flat system in synthesis field for high-mountain gorge areas construction of hydropower plant
CN110284596A (en) * 2019-07-17 2019-09-27 中建一局华江建设有限公司 A kind of arch building ventilation mouth stealthy ornamental structure and its construction method
CN111636384A (en) * 2020-06-08 2020-09-08 大连理工大学 A concrete gravity dam for precipitous river valley topography
CN111765824A (en) * 2020-07-01 2020-10-13 中国水利水电第十六工程局有限公司 Method for dismantling old dam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19808328A1 (en) * 1998-02-27 1999-09-02 Schleich Civil engineering complex for water power generation incorporating buildings and water treatment
CN104264635A (en) * 2014-09-23 2015-01-07 国家电网公司 Construction technology of slag stacking behind concrete faced rock-fill dam
CN104695386A (en) * 2015-04-09 2015-06-10 中国电建集团成都勘测设计研究院有限公司 Blocking and discharge structure and method for ditch water treatment
CN105672208A (en) * 2016-04-12 2016-06-15 中国电建集团成都勘测设计研究院有限公司 Water drainage structure used for cutting off valley to construct slag yard and construction method of water drainage structure
CN205954559U (en) * 2016-08-18 2017-02-15 中国电建集团成都勘测设计研究院有限公司 A ditch water treatment structure that is used for large -scale sediment field of blocking
CN206928250U (en) * 2017-07-19 2018-01-26 中国电建集团成都勘测设计研究院有限公司 Canyon Area high dam hydroelectric project slag field ditch-water flow guide system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19808328A1 (en) * 1998-02-27 1999-09-02 Schleich Civil engineering complex for water power generation incorporating buildings and water treatment
CN104264635A (en) * 2014-09-23 2015-01-07 国家电网公司 Construction technology of slag stacking behind concrete faced rock-fill dam
CN104695386A (en) * 2015-04-09 2015-06-10 中国电建集团成都勘测设计研究院有限公司 Blocking and discharge structure and method for ditch water treatment
CN105672208A (en) * 2016-04-12 2016-06-15 中国电建集团成都勘测设计研究院有限公司 Water drainage structure used for cutting off valley to construct slag yard and construction method of water drainage structure
CN205954559U (en) * 2016-08-18 2017-02-15 中国电建集团成都勘测设计研究院有限公司 A ditch water treatment structure that is used for large -scale sediment field of blocking
CN206928250U (en) * 2017-07-19 2018-01-26 中国电建集团成都勘测设计研究院有限公司 Canyon Area high dam hydroelectric project slag field ditch-water flow guide system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858990A (en) * 2017-12-13 2018-03-30 中国电建集团成都勘测设计研究院有限公司 The arrangement of Canyon Area high dam ditch engineering of water treatment
CN107858990B (en) * 2017-12-13 2023-09-01 中国电建集团成都勘测设计研究院有限公司 Diversion construction method of arrangement structure of canyon area high dam ditch water treatment engineering
CN108193651A (en) * 2018-03-15 2018-06-22 中国电建集团成都勘测设计研究院有限公司 Water consolidates separate type ditch water process scupper arrangement
CN109162258A (en) * 2018-09-10 2019-01-08 中国五环工程有限公司 Band the industrial enterprise's slag library T Xing Ba and its dry zoning round-robin method
CN109371918B (en) * 2018-11-27 2023-07-25 中国电建集团华东勘测设计研究院有限公司 Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN109371918A (en) * 2018-11-27 2019-02-22 中国电建集团华东勘测设计研究院有限公司 With the dam structure and its construction method faced forever in conjunction with multi-functional drainage box culvert
CN109404019A (en) * 2018-12-25 2019-03-01 中国电建集团成都勘测设计研究院有限公司 Surrounding rock of chamber pays protecting system and cavern's structure in advance
CN109404019B (en) * 2018-12-25 2024-02-27 中国电建集团成都勘测设计研究院有限公司 Cave surrounding rock pre-supporting system and cave structure
CN110258469A (en) * 2019-06-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The flat system in synthesis field for high-mountain gorge areas construction of hydropower plant
CN110284596A (en) * 2019-07-17 2019-09-27 中建一局华江建设有限公司 A kind of arch building ventilation mouth stealthy ornamental structure and its construction method
CN110284596B (en) * 2019-07-17 2024-04-12 中建一局华江建设有限公司 Invisible decoration structure of arch building ventilation opening and construction method thereof
CN111636384A (en) * 2020-06-08 2020-09-08 大连理工大学 A concrete gravity dam for precipitous river valley topography
CN111765824A (en) * 2020-07-01 2020-10-13 中国水利水电第十六工程局有限公司 Method for dismantling old dam
CN111765824B (en) * 2020-07-01 2023-10-03 中国水利水电第十六工程局有限公司 Method for removing old dam

Similar Documents

Publication Publication Date Title
CN107165129A (en) Canyon Area high dam hydroelectric project slag ditch-water flow guide system
CN103061327B (en) Comprehensive water control technique for dump
CN206928250U (en) Canyon Area high dam hydroelectric project slag field ditch-water flow guide system
CN103953008A (en) Modified mixed dam applicable to tailings ponds
CN102107990A (en) Stepped riverine wetland water purification method
CN106192871A (en) Protection arrangement for debris flow gully
CN104088219B (en) A kind of Construction of Hydropower Engineering interim bridge spanning the river structure and construction method
CN107119624A (en) The countermeasure system and implementation of large-scale Dumping Sites in a kind of debris flow gully
CN111305211B (en) Method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method
CN103603666B (en) Tailing pond sand excavation method
CN107858990B (en) Diversion construction method of arrangement structure of canyon area high dam ditch water treatment engineering
CN103628488A (en) Damming method of tailing subdam
CN206592151U (en) A kind of stifled row's integrated structure of rich water karst tunnel
CN103046564B (en) Comprehensive water controlling method applicable to waste dumps with confined water at waste dump bases
CN103046536B (en) A kind of refuse dump integral harness measure being suitable for soft foundation
CN206052635U (en) For the protection arrangement of debris flow gully
CN205894032U (en) Mud -rock flow row who combines with road leads structure
CN101705668B (en) Damming water conservancy project construction structure constructed in flowing water and construction method thereof
CN206173879U (en) Gravity dam construction diversion structure
CN215122670U (en) Semiarid refuse dump side slope vegetation restoration structure of high-efficient rainfall of utilizing
CN104264642A (en) Drainage tunnel and drainage method for ditch water treatment
CN208395782U (en) Using the row's guide structure for dynamically stopping silt storage capacity separation mud-rock flow
CN204875703U (en) A cross adfluxion sediment weir for hydraulic and hydroelectric engineering
CN104947630A (en) Over-current slag collecting weir for water conservancy and hydropower engineering and construction method thereof
CN204080759U (en) Ditch water treatment drainage tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication