CN206592151U - A kind of stifled row's integrated structure of rich water karst tunnel - Google Patents

A kind of stifled row's integrated structure of rich water karst tunnel Download PDF

Info

Publication number
CN206592151U
CN206592151U CN201720157271.7U CN201720157271U CN206592151U CN 206592151 U CN206592151 U CN 206592151U CN 201720157271 U CN201720157271 U CN 201720157271U CN 206592151 U CN206592151 U CN 206592151U
Authority
CN
China
Prior art keywords
karst
tunnel
integrated structure
rich water
scupper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720157271.7U
Other languages
Chinese (zh)
Inventor
刘宁
潘益斌
张洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201720157271.7U priority Critical patent/CN206592151U/en
Application granted granted Critical
Publication of CN206592151U publication Critical patent/CN206592151U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to a kind of stifled row's integrated structure of rich water karst tunnel.The purpose of this utility model is to provide a kind of simple in construction, easy construction, the stifled row's integrated structure of lower-cost rich water karst tunnel, to strengthen the quantitative excretion of liner structure and realization to karst water.The technical solution of the utility model is:A kind of stifled row's integrated structure of rich water karst tunnel, it is characterised in that:In the original liner structure of tunnel and karst intersection arrangement stiffener concrete lining structure;The karst bottom, remote tunnel side are disposed with scupper, graded broken stone filter layer and concrete block wall are sequentially provided between karst and scupper, concrete block wall is provided with some drainpipes that graded broken stone filter layer and scupper are connected through concrete block wall.The utility model is applied to hydraulic tunnel, traffic tunnel, water delivery gas pipeline, underground pipe gallery that karst area is built etc..

Description

A kind of stifled row's integrated structure of rich water karst tunnel
Technical field
The utility model is related to a kind of stifled row's integrated structure of rich water karst tunnel.The water built suitable for karst area Work tunnel, traffic tunnel, water delivery gas pipeline, underground pipe gallery etc..
Background technology
Karst is one of common geological disaster in the underground engineering constructions such as railway, highway, water conservancy and hydropower, mine working. The landform that 15% is there are about on the earth is karst features, and many countries are annual all because of different degrees of tunnel karst disaster in the world Cause huge economic loss.China is vast in territory, and it is mountain area to have 70%, and geographical geological conditions is sufficiently complex, is rock in the world Molten distribution most wide country, it is western built and positioned at karst area occupy sizeable proportion in tunnel is built, in these tunnels In, because the presence of karst unfavorable geology disaster to the construction and operation of tunnel causes serious threat.Positioned at tunnel top plate, Bottom plate and the solution cavity of side caving in suddenly in construction or chip off-falling cause the heavy damage of Wall Rock of Tunnel and supporting construction, and Trigger a large amount of landslides, have a strong impact on the normal construction of tunnel.The Geological Hazards such as large-scale water burst, prominent mud, into One of middle most serious, most common geological disaster are built for China's karst area tunnel, large-scale gushing water, prominent mud not only jeopardize Tunnel construction safety, influences construction speed, once improper measures, tunnel can often built up, and rear operating environment is severe, and earth's surface is ecological Deteriorate, the production and life given people causes heavy losses.
Tunnel occur water burst dash forward mud when, the conventional more principle use based on " row ", drainage sunk well mainly passes through secretly Ditch, pipeline, culvert, drain cavern etc. dam exclusion underground water.But this processing method based on " row " generate it is many tight The geological disaster of weight and environmental problem, such as surface subsidence, surface subsidence deformation, dry pool wellspring, farmland water shortage, forest are withered Deng, had a strong impact on around the ecological balance.Meanwhile, this regulation principle, cause the operation of the tunnel after lining cutting there is also Very big future trouble.
The content of the invention
The technical problems to be solved in the utility model is:For above-mentioned problem, there is provided a kind of simple in construction, construction The stifled row's integrated structure of convenient, lower-cost rich water karst tunnel, to strengthen liner structure and realize quantitative row to karst water Let out.
The technical scheme that the utility model is used is:A kind of stifled row's integrated structure of rich water karst tunnel, it is characterised in that: In the original liner structure of tunnel and karst intersection arrangement stiffener concrete lining structure;
The karst bottom, remote tunnel side are disposed with scupper, are sequentially provided between karst and scupper Graded broken stone filter layer and concrete block wall, concrete block wall pass through concrete block wall connection level with broken provided with some The drainpipe of stone filter layer and scupper.
The depth that the drainpipe enters graded broken stone filter layer is more than 1m.
The thickness of the graded broken stone filter layer is 1.5~2m.
The thickness of the concrete block wall is 1.5~2m.
The scupper size is 3m.
The stiffener concrete lining structural thickness is more than or equal to 50cm.
The beneficial effects of the utility model are:The utility model realizes the reinforcement to structure and the quantitative row to underground water Put, be effectively reduced the water pressure acted on liner structure, it is ensured that structure safety, and the silt that karst is gushed out is entered Processing is gone, it is ensured that the permanently effective operation of drainage effect and scupper.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment.
Embodiment
As shown in figure 1, the present embodiment is a kind of stifled row's integrated structure of rich water karst tunnel, feelings are disclosed according to karst Condition, in the original liner structure 2 of tunnel and the intersection of karst 4 arrangement stiffener concrete lining structure 3, the structural thickness It is difficult to be less than 50cm, and carries out arrangement of reinforcement, is dashed forward water burst and prominent mud with resisting karst 4, it is ensured that the safety of original liner structure.
Scupper 8 is arranged in the bottom of karst 4, away from the side of tunnel 1, scupper size requires about 3m, to ensure hole It is interior that there is enough spaces to be constructed.In karst 4 and the intersection of scupper 8, the He of graded broken stone filter layer 5 is sequentially arranged Concrete block wall 6, concrete block wall 6 is provided with some through the connection graded broken stone of concrete block wall 6 filter layer 5 and row The drainpipe 7 in water hole 8.
The thickness of graded broken stone filter layer 5 is general in 1.5~2m in the present embodiment, and main function is reply karst 4 The blocking that block stone, silt for inside gushing out etc. may be caused to scupper 8 and drainpipe 7, it is ensured that drainage effect, and one can be played Fixed cushioning effect.
The thickness of concrete block wall 6 is general in 1.5~2m in this example, and main function is resistant to the high pressure of karst 4 Prominent water burst, to ensure the plugging effect to karst 4.
Drainpipe 7 need to enter the certain depth of graded broken stone filter layer 5 (being more than 1m) in the present embodiment, it is ensured that in filter layer Water can be discharged in time, reduce the water pressure acted on stiffener concrete lining structure 3 and concrete block wall 6.
Certainly, described above is not limitation of the utility model, and the utility model is also not limited to the example above, this skill The those of ordinary skill in art field, in the range of the utility model, change, addition or the replacement made should all belong to this reality With new protection domain.

Claims (6)

1. a kind of stifled row's integrated structure of rich water karst tunnel, it is characterised in that:In the original liner structure of tunnel (2) and karst (4) intersection arrangement stiffener concrete lining structure (3);
Karst (4) bottom, away from tunnel (1) side be disposed with scupper (8), karst (4) and scupper (8) it Between be sequentially provided with graded broken stone filter layer (5) and concrete block wall (6), concrete block wall (6) is provided with some through mixed Solidifying grave wall connection graded broken stone filter layer (5) and the drainpipe (7) of scupper (8).
2. the stifled row's integrated structure of rich water karst tunnel according to claim 1, it is characterised in that:The drainpipe (7) is entered The depth for entering graded broken stone filter layer (5) is more than 1m.
3. the stifled row's integrated structure of rich water karst tunnel according to claim 1 or 2, it is characterised in that:The graded broken stone The thickness of filter layer (5) is 1.5~2m.
4. the stifled row's integrated structure of rich water karst tunnel according to claim 1, it is characterised in that:The concrete block wall (6) thickness is 1.5~2m.
5. the stifled row's integrated structure of rich water karst tunnel according to claim 1, it is characterised in that:Scupper (8) chi Very little is 3m.
6. the stifled row's integrated structure of rich water karst tunnel according to claim 1, it is characterised in that:The stiffener coagulation Native liner structure (3) thickness is more than or equal to 50cm.
CN201720157271.7U 2017-02-21 2017-02-21 A kind of stifled row's integrated structure of rich water karst tunnel Active CN206592151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720157271.7U CN206592151U (en) 2017-02-21 2017-02-21 A kind of stifled row's integrated structure of rich water karst tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720157271.7U CN206592151U (en) 2017-02-21 2017-02-21 A kind of stifled row's integrated structure of rich water karst tunnel

Publications (1)

Publication Number Publication Date
CN206592151U true CN206592151U (en) 2017-10-27

Family

ID=60125373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720157271.7U Active CN206592151U (en) 2017-02-21 2017-02-21 A kind of stifled row's integrated structure of rich water karst tunnel

Country Status (1)

Country Link
CN (1) CN206592151U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979644A (en) * 2018-08-07 2018-12-11 中电建路桥集团有限公司 A kind of rich water tunnel solution cavity collapses processing and tunnel excavation construction method
CN109026020A (en) * 2018-08-07 2018-12-18 中电建路桥集团有限公司 A kind of rich water tunnel karst cave treatment and excavation method
CN110656955A (en) * 2019-11-06 2020-01-07 四川省交通勘察设计研究院有限公司 Tunnel structure penetrating through karst channel and method for tunnel penetrating through karst channel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979644A (en) * 2018-08-07 2018-12-11 中电建路桥集团有限公司 A kind of rich water tunnel solution cavity collapses processing and tunnel excavation construction method
CN109026020A (en) * 2018-08-07 2018-12-18 中电建路桥集团有限公司 A kind of rich water tunnel karst cave treatment and excavation method
CN109026020B (en) * 2018-08-07 2021-03-23 中电建路桥集团有限公司 Water-rich tunnel karst cave treatment and excavation method
CN110656955A (en) * 2019-11-06 2020-01-07 四川省交通勘察设计研究院有限公司 Tunnel structure penetrating through karst channel and method for tunnel penetrating through karst channel

Similar Documents

Publication Publication Date Title
CN204312099U (en) Tunnel Gushing based on environmental protection prevents and treats system
CN102352757B (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
Liu et al. Geological investigation and treatment measures against water inrush hazard in karst tunnels: A case study in Guiyang, southwest China
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
AU2014308405A1 (en) An artificial dam of distributed coal mine underground reservoir and its constructing method
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN206592151U (en) A kind of stifled row's integrated structure of rich water karst tunnel
CN107165129A (en) Canyon Area high dam hydroelectric project slag ditch-water flow guide system
CN102182464A (en) Construction structure and construction method of channel structure
CN103321233B (en) The preparation method of groundwater resources retracting device in landslide deep layer draining and sliding mass
CN111305211B (en) Method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method
Zhai et al. A reinforcement method of floor grouting in high-water pressure working face of coal mines: a case study in Luxi coal mine, North China
CN103967496A (en) Novel method suitable for valley type tailings stacking dam slope tailings recovery
CN102720511A (en) Tunnel construction structure for draining and desilting
Chen et al. Investigation on seepage field distribution and structural safety performance of small interval tunnel in water-rich region
Sun et al. Technologies for large cross-section subsea tunnel construction using drilling and blasting method
CN108374674A (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
Zhang et al. Discussion on the design of water blocking and drainage limit of water-rich mountain tunnel in ecologically fragile area
CN105484791A (en) Comprehensive tunnel drainage, precipitation and pressure reduction construction method
CN205604255U (en) Dark foundation pit retaining structure seam stagnant water planar arrangement structure
CN110080784B (en) Tunnel excavation and reinforcement method for penetrating through water-rich sandy stratum
Fan et al. Water pressure and stress characteristics of lining structure in water rich karst tunnel
CN201982103U (en) Construction structure of channel structure
CN105297670A (en) Method for constructing ten-thousand-li channel for water diversion and radically treating Taklimakan desert
CN204662384U (en) A diversion tunnel adverse slope drainage structures for high ground water level

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant