CN107153950A CN201710475826.7A CN201710475826A CN107153950A CN 107153950 A CN107153950 A CN 107153950A CN 201710475826 A CN201710475826 A CN 201710475826A CN 107153950 A CN107153950 A CN 107153950A
Authority
CN
China
Prior art keywords
flow
workflow
server
function end
record
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710475826.7A
Other languages
Chinese (zh)
Inventor
谢清钟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd filed Critical GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201710475826.7A priority Critical patent/CN107153950A/en
Publication of CN107153950A publication Critical patent/CN107153950A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of workform management system based on workflow, server is stored when receiving the flow execution record that any function end is sent and generates downstream execute instruction, and flow execute instruction is sent to specified function end;Flow is performed record after flow instruction is completed and sent to server by any function end.Advantage is that work order completes each step from report barrier to maintenance and flowed according to set workflow;In every flow, system can all be recorded to the execution of flow, and generate the execute instruction of downstream.Related personnel can be notified to handle oneself responsible step work in time by way of message simultaneously.System can perform time point by recording implementation procedure, and pre-arranged downstream is instructed, the accurate complete whole workflow of embodiment.Company can make quick adjustment according to these data to links deficiency, improve service quality, and lift corporate image.

Description

A kind of workform management system based on workflow
Technical field
The present invention relates to a kind of financial system workform management system, more particularly to a kind of workform management system based on workflow System.
Background technology
In financial system, when automatic teller machine breaks down, the maintenance that the banking unit in client can be to automatic teller machine Company is ensured that service companies send work order according to defect content to attendant.Work order is attendant's machine maintenance Important component, the completion of a work order is needed by multiple links:From bank's report barrier to Information Management Department, Information Management Department Distribute leaflets are to attendant, and attendant is according to work order information machine maintenance, and attendant completes maintenance and turned in a report to related negative People's examination & verification is blamed, Information Management Department is eventually passed back to.This process has very strong process, and each step is required for specification, safeguards The Each point in time of personnel's machine maintenance is required for record, and the work that so could preferably calculate attendant takes, simultaneously The space for whether having optimization can be drawn by time-consuming be estimated of Each point in time, operating efficiency is preferably provided.And show It is that the personnel of each step are difficult the timely grasp real-time intermediate links of work order, for example, do not know that work order is stopped in which step in fact Stagnant, work order was the problems such as which step went out problem.
The content of the invention
In order to solve the above-mentioned technical problem, present invention aims at provide a kind of workform management system based on workflow.
A kind of workform management system based on workflow of the present invention, including:Server, described server difference Connect following each function ends:Client, Data Enter end, work order actuating station, management end;Characterized in that, described server Stored when receiving the flow execution record that any function end is sent and generate downstream execute instruction, by flow Execute instruction is sent to specified function end;Any function end completes to perform to record by flow after flow is instructed to send to service Device.
Described any function end is connected by wechat interface with server.
Described server sets up workflow engines, is connected provided with activity modules with function end.
Described workflow engines are pre-configured with js configuration files with configuration flow direction, the menu address of incision;Look into The class for looking for next link to perform.
Described workflow engines set up related business operation class, to right according to the flow direction of js configuration files The flow operations link answered carries out related business logical operation, and changes the related flow of the flow state of correlation, record Perform record.
Correspondence flow is reverse back to the flow by described workflow engines when the related executor's examination & approval of flow are retracted Initial point, waits work order actuating station to resubmit flow.
A kind of workform management system based on workflow of the present invention, the advantage is that, work order is from report barrier to maintenance Each step is completed to flow according to set workflow;In every flow, system all can perform progress to flow Record, and generate the execute instruction of downstream.By way of message related personnel can be notified to handle oneself in time simultaneously Responsible step work.System can perform time point by recording implementation procedure, and pre-arranged downstream is instructed, accurate The true complete whole workflow of embodiment.Service companies can make quick adjustment according to these data to links deficiency, Improve service quality, lift corporate image.
Brief description of the drawings
Fig. 1 is the structural representation of the workform management system of the invention based on workflow;
Fig. 2 is the schematic flow sheet of the workform management system of the invention based on workflow.
Embodiment
As shown in figure 1, a kind of workform management system based on workflow of the present invention mainly includes server, it is described Server can pass through wechat interface or other network interfaces respectively and connect each function end.The function end includes but is not limited to visitor Family end, Data Enter end, work order actuating station, management end.Client is usually the banking unit using financial terminals such as automatic teller machines; Data Enter end is usually the phone customer service of service companies;Work order actuating station is usually the intelligent mobile dress that attendant is equipped with Put;Management end is usually the administrative staff of flow supervision and quality monitoring;Server can be cloud server or maintenance Home server of company etc., server sets up workflow engines, is connected provided with activity modules with function end.Work as service Device is stored when receiving the flow execution record that any function end is sent and generates downstream execute instruction, will be flowed Journey execute instruction is sent to specified function end;Any function end completes to perform to record by flow after flow is instructed to send to service Device.Described workflow engines are pre-configured with js configuration files with configuration flow direction, the menu address of incision;Search next The class that link is performed.According to the flow direction of js configuration files, related business operation class is set up, to corresponding flow operations ring Save and carry out related business logical operation, and change the flow state of correlation, the flow of record correlation and perform record.Work as flow When related executor's examination & approval are retracted, correspondence flow is reverse back to the initial point of the flow, waits work order actuating station to resubmit stream Journey.Ensure that work order is all in supervision recording status in real time by being completed at the beginning of generation to work order, and the flow direction of work order and lower one stream Cheng Suoxu execution is all previously generated, and reduce work order influences whole efficiency in a certain link card list.
Workflow by client as shown in Fig. 2 carry out machine report barrier to service companies, and report barrier mode can have a variety of, For example:Hindered by wechat report(Special wechat public number);By the service hotline switching corporate information management for dialing service companies Department(That is Data Enter end), then confirmed by related personnel, carry out report barrier typing, finally distribute and safeguard work order to work accordingly Make personnel.
Bank client by reporting barrier channel to be ensured to the Data Enter end of service companies accordingly;
Information manager carries out distribute leaflets after confirming for corresponding report barrier machine, and specifies the life of service engineer's machine maintenance Into work order;
Service engineer is received after work order, is performed work order and is reached on-site maintenance machine.Correlation machine is filled in after completion Maintenance report and submission;
By the configuration of system flow, the maintenance report that service engineer submits is examined to management end, can perform and retract or examine Criticize and pass through.Retract and be directly returned to engineer and rewrite and submit;After examination & approval pass through, the association attributes of machine can just become More;
After management end examination & approval pass through, audited by system configuration to Data Enter end, after information manager's examination & verification is errorless, meeting Related return visit is carried out to bank client, to confirm the implementation status of work order, finally terminates flow.
The processing node that the operation of all flows and flow are presently in, all being serviced device all record, in order to When follow the trail of, inquiry record.All operation users for touching flow, the implementation status of current work order, work order can be checked at any time Examination & verification situation, for consulting whether flow completes and examination & approval situation at any time.
For those skilled in the art, technical scheme that can be as described above and design, make other each Corresponding change and deformation are planted, and all these change and deformation should all belong to the protection model of the claims in the present invention Within enclosing.

Claims (6)

1. a kind of workform management system based on workflow, including:Server, described server connects following each functions respectively End:Client, Data Enter end, work order actuating station, management end;Characterized in that, described server receive it is described any Function end send flow perform record when is stored and generates downstream execute instruction, by flow execute instruction send to Specify function end;Flow is performed record after flow instruction is completed and sent to server by any function end.
2. system according to claim 1, it is characterised in that described any function end passes through wechat interface and server Connection.
3. system according to claim 1 or 2, it is characterised in that described server sets up workflow engines, is provided with Activity modules are connected with function end.
4. system according to claim 3, it is characterised in that described workflow engines are pre-configured with js configuration files With configuration flow direction, the menu address of incision;Search the class that next link is performed.
5. system according to claim 4, it is characterised in that described workflow engines are according to the stream of js configuration files Cheng Fangxiang, sets up related business operation class, related business logical operation is carried out to corresponding flow operations link, and repair Change the flow state of correlation, the flow of record correlation and perform record.
6. system according to claim 5, it is characterised in that described workflow engines are examined as the related executor of flow When batch retracting, correspondence flow is reverse back to the initial point of the flow, waits work order actuating station to resubmit flow.
CN201710475826.7A 2017-06-21 2017-06-21 A kind of workform management system based on workflow Pending CN107153950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710475826.7A CN107153950A (en) 2017-06-21 2017-06-21 A kind of workform management system based on workflow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710475826.7A CN107153950A (en) 2017-06-21 2017-06-21 A kind of workform management system based on workflow

Publications (1)

Publication Number Publication Date
CN107153950A true CN107153950A (en) 2017-09-12

Family

ID=59795852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710475826.7A Pending CN107153950A (en) 2017-06-21 2017-06-21 A kind of workform management system based on workflow

Country Status (1)

Country Link
CN (1) CN107153950A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107992537A (en) * 2017-11-24 2018-05-04 金蝶软件(中国)有限公司 Service attribute transmission method, device, computer equipment and storage medium
CN109325689A (en) * 2018-09-26 2019-02-12 深圳中广核工程设计有限公司 A kind of nuclear power plant maintenance mans single electron system and method
CN109559401A (en) * 2017-09-22 2019-04-02 福建福清核电有限公司 A kind of intelligent work order actuator and its application method
CN109783470A (en) * 2018-12-13 2019-05-21 中国平安人寿保险股份有限公司 Owner's follow-up mechanism, method and the storage medium of database subsystem
CN110189221A (en) * 2019-05-22 2019-08-30 深圳前海微众银行股份有限公司 Exhibition industry adjusts to the greatest extent method, apparatus, equipment and computer readable storage medium
CN110263054A (en) * 2019-05-30 2019-09-20 世纪龙信息网络有限责任公司 Auditing system, checking method, device and the computer equipment of SQL work order
CN113836873A (en) * 2021-08-27 2021-12-24 厦门云评众联科技有限公司 Electronic manuscript management method and process management method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038640A (en) * 2007-04-09 2007-09-19 华为技术有限公司 Worksheets priority level administration method and system, and worksheets process method and system
CN101047574A (en) * 2007-05-08 2007-10-03 中国移动通信集团福建有限公司 Monitoring device for flow working form in working flow
CN102496088A (en) * 2011-12-14 2012-06-13 河北省电力公司通信中心 Method for improving executive force of power communication overhaul core flow
CN103617066A (en) * 2013-12-16 2014-03-05 中国农业银行股份有限公司 Workflow engine and implementation method thereof
CN106408170A (en) * 2016-08-30 2017-02-15 北京北信源软件股份有限公司 Electronic worksheet processing method, workflow engine and electronic worksheet system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038640A (en) * 2007-04-09 2007-09-19 华为技术有限公司 Worksheets priority level administration method and system, and worksheets process method and system
CN101047574A (en) * 2007-05-08 2007-10-03 中国移动通信集团福建有限公司 Monitoring device for flow working form in working flow
CN102496088A (en) * 2011-12-14 2012-06-13 河北省电力公司通信中心 Method for improving executive force of power communication overhaul core flow
CN103617066A (en) * 2013-12-16 2014-03-05 中国农业银行股份有限公司 Workflow engine and implementation method thereof
CN106408170A (en) * 2016-08-30 2017-02-15 北京北信源软件股份有限公司 Electronic worksheet processing method, workflow engine and electronic worksheet system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109559401A (en) * 2017-09-22 2019-04-02 福建福清核电有限公司 A kind of intelligent work order actuator and its application method
CN107992537A (en) * 2017-11-24 2018-05-04 金蝶软件(中国)有限公司 Service attribute transmission method, device, computer equipment and storage medium
CN107992537B (en) * 2017-11-24 2020-05-08 金蝶软件(中国)有限公司 Service attribute transmission method, device, computer equipment and storage medium
CN109325689A (en) * 2018-09-26 2019-02-12 深圳中广核工程设计有限公司 A kind of nuclear power plant maintenance mans single electron system and method
CN109783470A (en) * 2018-12-13 2019-05-21 中国平安人寿保险股份有限公司 Owner's follow-up mechanism, method and the storage medium of database subsystem
CN109783470B (en) * 2018-12-13 2024-02-06 中国平安人寿保险股份有限公司 Owner tracking device, method and storage medium of database subsystem
CN110189221A (en) * 2019-05-22 2019-08-30 深圳前海微众银行股份有限公司 Exhibition industry adjusts to the greatest extent method, apparatus, equipment and computer readable storage medium
CN110189221B (en) * 2019-05-22 2023-06-13 深圳前海微众银行股份有限公司 Method, apparatus, device and computer readable storage medium for performing industry-spreading adjustment
CN110263054A (en) * 2019-05-30 2019-09-20 世纪龙信息网络有限责任公司 Auditing system, checking method, device and the computer equipment of SQL work order
CN110263054B (en) * 2019-05-30 2021-11-09 世纪龙信息网络有限责任公司 SQL work order auditing system, method and device and computer equipment
CN113836873A (en) * 2021-08-27 2021-12-24 厦门云评众联科技有限公司 Electronic manuscript management method and process management method

Similar Documents

Publication Publication Date Title
CN107153950A (en) A kind of workform management system based on workflow
CN110210708A (en) The management method that barcode scanning based on mobile terminal is reported for repairment
CN101094051B (en) System and method for synchronizing comparison of data consistency
CN108971807B (en) Intelligent management control method and management system for field welding construction process
CN107391747A (en) Community management method, apparatus, system, storage medium and server
CN107332722A (en) The method for removing and system of a kind of fault message
CN207321306U (en) A kind of wisdom vehicle washing system
CN105656696A (en) Maintenance system and method
CN104270787A (en) Full-automatic closed-loop control method of wireless network work order
CN207731322U (en) One kind managing system for auto parts flow line production
CN108241960A (en) A kind of OA collaborative office management systems
CN102480383B (en) A kind of log information message processing method and device
CN100356731C (en) Method for tracking communication information between net elements
CN111666504A (en) Method and system for rapidly declaring fault
CN107979174B (en) Workflow operation method based on power grid operation management system
CN106921519A (en) A kind of method that IP route closure is carried out based on automatic dispatching and workflow management
CN106899082A (en) A kind of protective relaying device remote diagnosis method and system
CN103581953A (en) Association method for wireless drive test data and signaling monitoring data
CN113543185B (en) Automatic-opening-assistance-based 5G high-density base station rapid operation method and system
CN113011834B (en) Metering automation equipment system archive data circulation monitoring method
CN115081645A (en) Modern power supply system power failure first-aid repair method based on intelligent map
CN112702196A (en) Automatic fault processing method and system
CN101409637B (en) Alarm interactive automatic processing method for communication network management system
CN202711311U (en) Electric power first-aid repair remote control system
CN106980950B (en) Material supply management method and system based on mobile social contact

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170912