CN107144191A - A kind of step demolition of strip mines bore distribution method - Google Patents

A kind of step demolition of strip mines bore distribution method Download PDF

Info

Publication number
CN107144191A
CN107144191A CN201710456624.8A CN201710456624A CN107144191A CN 107144191 A CN107144191 A CN 107144191A CN 201710456624 A CN201710456624 A CN 201710456624A CN 107144191 A CN107144191 A CN 107144191A
Authority
CN
China
Prior art keywords
blasthole
quick
mrow
area
fried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710456624.8A
Other languages
Chinese (zh)
Other versions
CN107144191B (en
Inventor
肖双双
马力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201710456624.8A priority Critical patent/CN107144191B/en
Publication of CN107144191A publication Critical patent/CN107144191A/en
Application granted granted Critical
Publication of CN107144191B publication Critical patent/CN107144191B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention provides a kind of step demolition of strip mines bore distribution method, belongs to opencast mining technical field.During step demolition of strip mines cloth hole, the rectangular area for including quick-fried area is determined according to quick-fried area's shape first;Further according to pitch-row, reject, the cloth hole in rectangular area such as burden, side eye distance;Then the blasthole outside quick-fried area's scope is deleted;Finally, mobile burden, the less blasthole of side eye distance, eye distance or the larger position supplement blasthole of burden on side.The present invention can realize quick-fried area it is in irregular shape in the case of simple and quick cloth hole, and make cloth hole uniform, regular, so as to improve drilling and loading rate, improve demolition effect, reduce production cost.

Description

A kind of step demolition of strip mines bore distribution method
Technical field
The invention belongs to opencast mining technical field, and in particular to a kind of step demolition of strip mines bore distribution method.
Background technology
At present, the method for step demolition of strip mines cloth hole mainly has two kinds, and one is opened from close to the side of step bench crest Begin, from front to back cloth hole by row;Two are on rear side of the quick-fried area boundary line, from back to front cloth hole by row, and adjust front-seat hole position Or perforations adding.It is more regular that the former is applied to quick-fried area's shape, especially step bench crest more straight situation;The latter is applied to quick-fried Boundary line is the situation of the straight line perpendicular to step direction of propulsion on rear side of area.It is such as ellipse when quick-fried area's shape is very irregular When, above-mentioned bore distribution method is difficult to carry out, and is easily caused blasthole line for wave, is unfavorable for rig and blasting agent mixing vehicle standard It is turned into industry, reduction drilling and charging efficiency.
The content of the invention
The problem of existing for prior art, it is uniform that the present invention provides a kind of simple and easy to apply, cloth hole, it is possible to increase drilling and The step demolition of strip mines bore distribution method of loading rate.
The technical solution adopted by the present invention is:A kind of step demolition of strip mines bore distribution method, comprises the following steps:
A. rectangular area is determined
Abscissa smallest point (2), the abscissa x of abscissa maximum point (3) in Qu Bao areas (1)2、x3, ordinate maximum point (4), the ordinate y of ordinate smallest point (5)4、y5, with (x2,y4)、(x3,y4)、(x3,y5)、(x2,y5) it is summit, make rectangle Region (6);
In the case of known to each apex coordinate in quick-fried area, x2=min (xi), x3=max (xi), y4=max (yi), y5= min(yi);
B. the cloth hole in rectangular area
In the range of rectangular area (6), the one of opposing straight from both boundary line (8) on rear side of bench crest (7), quick-fried area Side, according to minimum burden W, side eye distance L, arranges first blasthole (9), first row blasthole is arranged according to pitch-row a, and according to cloth Hole mode and array pitch b, from the lateral opposite side in quick-fried area cloth hole by row.Wherein, W, L, a, b are according to opencut rock mass physical power Learn property and explosion is empirically determined.
Odd row blasthole number To round symbol;
Even rows blasthole number
Blasthole row
C. the blasthole outside quick-fried area's scope is deleted
Check that blasthole whether in the range of quick-fried area, deletes the blasthole outside quick-fried area's scope;
D. blasthole is adjusted
For side eye distance or the less blasthole of burden (11), blasthole is moved by blasthole moving direction (12), makes its side Eye distance reaches that L or burden reach minimum burden W;
E. blasthole is supplemented
Blasthole for closing on bench crest, if the midpoint of adjacent two blastholes line is along line perpendicular bisector direction to quick-fried area The length L on borderpMinimum burden W more than or equal to 2 times, i.e. Lp>=2W, then mend on adjacent two blastholes line perpendicular bisector Blasthole is filled, the burden for making the blasthole (13) of supplement is minimum burden;
Equally, for closing on the blasthole on other quick-fried area borders, if the midpoint of adjacent two blastholes line is vertically divided equally along line The length L on line direction to quick-fried area borderpSide eye distance L more than or equal to 2 times, i.e. Lp>=2L, then vertically put down in adjacent two blastholes line Blasthole is supplemented on separated time, the side eye distance for making the blasthole of supplement is L.
Judge boundary line (8) whose more straight method is on rear side of bench crest (7) and quick-fried area:Take the vertical seat on both all summits Scale value ypi(i=1,2 ..., N), ybj(j=1,2 ..., M), N is the number of vertex of bench crest (7), and M is boundary line on rear side of quick-fried area (8) number of vertex, y is calculated using following formula respectivelypi、ybjMeansquaredeviationσp、σb, the small person of mean square deviation is more straight;
In formula, upFor ypiThe average of (i=1,2 ..., N);ubFor ybjThe average of (j=1,2 ..., M).
Computer judge blasthole whether the method in the range of quick-fried area:Cross blasthole and make a horizontal line, statistics blasthole both sides water Horizontal line and the intersection point number on quick-fried area border, if the number of both sides intersection point is all odd number, the blasthole is in quick-fried area, otherwise in quick-fried area Outside;Wherein, if two end points on quick-fried some side of area are all above made horizontal line, then it is assumed that the side is with horizontal line without friendship Point.
What the present invention was reached has the technical effect that:Overcome the shortcomings of conventional surface ore deposit bench blasting cloth hole, realize any quick-fried Simple and quick cloth hole under area's shape, and make cloth hole uniform, regular, so as to improve drilling and loading rate, improve explosion effect Really, production cost is reduced.
Brief description of the drawings
Quick-fried areas and coordinate system schematic diagram of the Fig. 1 for the present invention;
Fig. 2 is the present invention by the hypothesis quick-fried area's cloth hole schematic diagram of rectangle;
Fig. 3 is blasthole schematic diagram outside the quick-fried area of deletion of the present invention.
Fig. 4 adjusts schematic diagram for the blasthole of the present invention.
Fig. 5 is that conventional method arranges blasthole schematic diagram.
In figure:1-quick-fried area, 2-abscissa smallest point, 3-abscissa maximum point, 4-ordinate maximum point, 5-vertical sit Mark boundary line, 9-the first blasthole, 10-the second big gun on rear side of smallest point, 6-rectangular area, 7-bench crest, 8-quick-fried area Hole, the less blasthole of 11-burden, 12-blasthole moving direction, the blasthole of 13-supplement.
W-minimum burden, L-side eye distance, a-pitch-row, b-reject, LpThe midpoint of-adjacent two blastholes line is along even The length on line perpendicular bisector direction to quick-fried area border.
Embodiment
The present invention is further described by taking certain step demolition of strip mines cloth hole as an example below in conjunction with the accompanying drawings.
A. rectangular area is determined
Certain quick-fried area 1 of the opencut is as shown in figure 1, abscissa smallest point 2, the horizontal seat of abscissa maximum point 3 in Qu Bao areas 1 Mark x2=6.4, x3=69.9, ordinate maximum point 4, the ordinate y of ordinate smallest point 54=45.5, y5=6.7, with (x2, y4)、(x3,y4)、(x3,y5)、(x2,y5) it is summit, make rectangular area 6, a length of 69.9-6.4=63.5m in rectangular area is a width of 45.5-6.7=38.8m.
B. the cloth hole in rectangular area
B1 determines cloth hole direction
Judge boundary line (8) whose more straight method is on rear side of bench crest (7) and quick-fried area:Take the vertical seat on both all summits Scale value ypi(i=1,2 ..., N), ybj(j=1,2 ..., M), N is the number of vertex of bench crest (7), and M is boundary line on rear side of quick-fried area (8) number of vertex, y is calculated using following formula respectivelypi、ybjMeansquaredeviationσp、σb, the small person of mean square deviation is more straight;
In formula, upFor ypiThe average of (i=1,2 ..., N);ubFor ybjThe average of (j=1,2 ..., M).
From Fig. 1 it is measurable go out bench crest 7 on the ordinate of each point be respectively:38.8、41.9、44.2、45.5、44.9、 45.1, N be 6, upFor 43.4, on rear side of quick-fried area on boundary line 8 ordinate of each point be respectively 15.5,12.4,10.8,11.8, 9.3rd, 8.1,7.5,6.7,7.6,10.7, M is 10, ubFor 10.1, the vertical of all summits of bench crest 7 can be calculated according to above formula The meansquaredeviationσ of coordinate valuep=2.57, the meansquaredeviationσ of the ordinate value on quick-fried area's rear side all summits in boundary line 8b=2.60.
σpb, illustrate that bench crest 7 is more straight, therefore, from the cloth hole by row of boundary line 8 on rear side of the lateral quick-fried area of bench crest 7 one.
B2 cloth holes in rectangular area according to blasting parameter
According to opencut rock mass physical mechanical property and explosion experience, its minimum burden W=5m, side eye distance L are determined =4m, pitch-row a=8m, rejects b=6m.Illustrate cloth hole process by taking triangle pattern as an example:
According to minimum burden W, side eye distance L, first blasthole 9 is arranged, as shown in Figure 2.It is every in first left side of blasthole 9 A blasthole is arranged every horizontal range 8m, until beyond rectangular area.In the perpendicular bisector of first, second line of blasthole 10 Upper first blasthole close to location arrangements second row of the side of boundary line 8 away from first blasthole vertical range 6m on rear side of quick-fried area, Using horizontal range 8m as remaining blasthole of arranged for interval second row.According to edge away from determining that the 3rd ranked first blasthole position with array pitch Put, be sequentially arranged remaining blasthole respectively arranged.
Blasthole row is
Odd row blasthole number
Even rows blasthole number
C. the blasthole outside quick-fried area's scope is deleted
Check that blasthole whether in the range of quick-fried area, deletes the blasthole outside quick-fried area's scope, as shown in Figure 3;
Computer judge blasthole whether the method in the range of quick-fried area:Cross blasthole and make a horizontal line, statistics blasthole both sides water Horizontal line and the intersection point number on quick-fried area border, if the number of both sides intersection point is all odd number, the blasthole is in quick-fried area, otherwise in quick-fried area Outside.Wherein, if two end points on quick-fried some side of area are all above made horizontal line, then it is assumed that the side is with horizontal line without friendship Point.Such as cross first blasthole 9 and make a horizontal line, first left side of blasthole 9 is without intersection point, and right side there are two intersection points, illustrates first Individual blasthole 9 is outside quick-fried area.
D. blasthole is adjusted
For side eye distance or the less blasthole 11 of burden, blasthole is moved by blasthole moving direction 12 in Fig. 4, makes its side Eye distance reaches that 4m or burden reach 5m;
E. blasthole is supplemented
Blasthole for closing on bench crest, if the midpoint of adjacent two blastholes line is along line perpendicular bisector direction to quick-fried area The length L on borderpMinimum burden W more than or equal to 2 times, i.e. Lp>=2W=10m, then vertically divide equally in adjacent two blastholes line Blasthole is supplemented on line, the burden for making the blasthole 13 of supplement is minimum burden W=5m, as shown in Figure 4.
Equally, for closing on the blasthole on other quick-fried area borders, if the midpoint of adjacent two blastholes line is vertically divided equally along line The length L on line direction to quick-fried area borderpSide eye distance L more than or equal to 2 times, i.e. Lp>=2L=8m, then hang down in adjacent two blastholes line Blasthole is supplemented on straight bisector, the side eye distance for making the blasthole of supplement is L=4m.
Final steel for shot is as shown in figure 4, most of blasthole is easy to rig and blasting agent mixing on the straight line being parallel to each other Car operation, improves its operating efficiency.And conventional method arrangement blasthole as shown in figure 5, blasthole line be wave, make rig Frequently moved in drilling and blasting agent mixing vehicle powder charge process to multiple directions, reduce its production efficiency.
Above by taking triangle pattern as an example, other patterns such as rectangle are equally applicable.

Claims (3)

1. a kind of step demolition of strip mines bore distribution method, it is characterised in that:Comprise the following steps:
A. rectangular area is determined
Abscissa smallest point (2), the abscissa x of abscissa maximum point (3) in Qu Bao areas (1)2、x3, it is ordinate maximum point (4), vertical The ordinate y of coordinate smallest point (5)4、y5, with (x2,y4)、(x3,y4)、(x3,y5)、(x2,y5) it is summit, make rectangular area (6);
In the case of known to each apex coordinate in quick-fried area, x2=min (xi), x3=max (xi), y4=max (yi), y5=min (yi);
B. the cloth hole in rectangular area
In the range of rectangular area (6), the side of opposing straight, root from both boundary line (8) on rear side of bench crest (7), quick-fried area According to minimum burden W, side eye distance L, first blasthole (9) is arranged, first row blasthole is arranged according to pitch-row a, and according to cloth hole side Formula and array pitch b, from the lateral opposite side in quick-fried area cloth hole by row, wherein, W, L, a, b are according to opencut rock mass physical mechanical property Matter and explosion are empirically determined;
Odd row blasthole number To round symbol;
Even rows blasthole number
Blasthole row
C. the blasthole outside quick-fried area's scope is deleted
Check that blasthole whether in the range of quick-fried area, deletes the blasthole outside quick-fried area's scope;
D. blasthole is adjusted
For side eye distance or the less blasthole of burden (11), blasthole is moved by blasthole moving direction (12), makes its side eye distance Reach that L or burden reach minimum burden W;
E. blasthole is supplemented
Blasthole for closing on bench crest, if the midpoint of adjacent two blastholes line is along line perpendicular bisector direction to quick-fried area border Length LpMinimum burden W more than or equal to 2 times, i.e. Lp>=2W, then supplement big gun on adjacent two blastholes line perpendicular bisector Hole, the burden for making the blasthole (13) of supplement is minimum burden;
Equally, for closing on the blasthole on other quick-fried area borders, if the midpoint of adjacent two blastholes line is along line perpendicular bisector side To the length L to quick-fried area borderpSide eye distance L more than or equal to 2 times, i.e. Lp>=2L, then in adjacent two blastholes line perpendicular bisector Upper supplement blasthole, the side eye distance for making the blasthole of supplement is L.
2. a kind of step demolition of strip mines bore distribution method as claimed in claim 1, it is characterised in that:Judge bench crest (7) and Boundary line (8) whose more straight method is on rear side of quick-fried area:Take the ordinate value y on both all summitspi(i=1,2 ..., N), ybj (j=1,2 ..., M), N is the number of vertex of bench crest (7), and M is the number of vertex of boundary line (8) on rear side of quick-fried area, is distinguished using following formula Calculate ypi、ybjMeansquaredeviationσp、σb, the small person of mean square deviation is more straight;
<mrow> <msub> <mi>&amp;sigma;</mi> <mi>p</mi> </msub> <mo>=</mo> <msqrt> <mrow> <mfrac> <mn>1</mn> <mi>N</mi> </mfrac> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msup> <mrow> <mo>(</mo> <msub> <mi>y</mi> <mrow> <mi>p</mi> <mi>i</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>u</mi> <mi>p</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </msqrt> </mrow>
<mrow> <msub> <mi>&amp;sigma;</mi> <mi>b</mi> </msub> <mo>=</mo> <msqrt> <mrow> <mfrac> <mn>1</mn> <mi>M</mi> </mfrac> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>M</mi> </munderover> <msup> <mrow> <mo>(</mo> <msub> <mi>y</mi> <mrow> <mi>b</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>u</mi> <mi>b</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </msqrt> </mrow> 1
In formula, upFor ypiThe average of (i=1,2 ..., N);ubFor ybjThe average of (j=1,2 ..., M).
3. a kind of step demolition of strip mines bore distribution method as claimed in claim 1, it is characterised in that:Computer judges that blasthole is Method in the range of Fou Bao areas:Cross blasthole and make a horizontal line, statistics blasthole both sides horizontal line and the intersection point number on quick-fried area border, If the number of both sides intersection point is all odd number, the blasthole is in quick-fried area, otherwise outside quick-fried area;Wherein, if quick-fried some side of area Two end points are all above made horizontal line, then it is assumed that the side is with horizontal line without intersection point.
CN201710456624.8A 2017-06-16 2017-06-16 A kind of step demolition of strip mines bore distribution method Expired - Fee Related CN107144191B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710456624.8A CN107144191B (en) 2017-06-16 2017-06-16 A kind of step demolition of strip mines bore distribution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710456624.8A CN107144191B (en) 2017-06-16 2017-06-16 A kind of step demolition of strip mines bore distribution method

Publications (2)

Publication Number Publication Date
CN107144191A true CN107144191A (en) 2017-09-08
CN107144191B CN107144191B (en) 2018-07-24

Family

ID=59781567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710456624.8A Expired - Fee Related CN107144191B (en) 2017-06-16 2017-06-16 A kind of step demolition of strip mines bore distribution method

Country Status (1)

Country Link
CN (1) CN107144191B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108917504A (en) * 2018-05-20 2018-11-30 贵州新联爆破工程集团有限公司 A kind of adaptive method for arranging of blasthole
CN110567330A (en) * 2019-08-19 2019-12-13 西北矿冶研究院 blasting method for safely and efficiently recovering irregular ore pillars in goaf
CN111207639A (en) * 2020-03-20 2020-05-29 本钢板材股份有限公司 Method for overcoming large chassis line resistance through deep hole blasting of strip mine
CN112161533A (en) * 2020-09-29 2021-01-01 四川中鼎爆破工程有限公司 Step blasting hole distribution method
CN114117854A (en) * 2021-11-23 2022-03-01 北京奥信化工科技发展有限责任公司 Intelligent hole distribution method for blast holes in any polygonal area
CN114427814A (en) * 2022-01-28 2022-05-03 北京理工大学 Automatic arrangement method and system for blast holes and electronic equipment
CN114543603A (en) * 2021-11-23 2022-05-27 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method and device for determining mine blasting side hole distance
CN115060127A (en) * 2022-06-10 2022-09-16 大昌建设集团有限公司 Blasting method and system for equidistantly-distributed hole steps, storage medium and intelligent terminal

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050010385A1 (en) * 1999-09-08 2005-01-13 Heck Jay Howard Blasting method
WO2007096734A1 (en) * 2006-02-20 2007-08-30 Institute Of Communications And Information Technologies, Kyrgyz-Russian Slavic University Method for drilling-and-blasting operations at open pits
CN102147218A (en) * 2011-01-13 2011-08-10 广东宏大爆破股份有限公司 Reverse hole distributing method used in longhole bench blasting
EP2915950A1 (en) * 2014-03-04 2015-09-09 Sandvik Mining and Construction Oy Apparatus and method for designing and modifying drilling pattern for bench drilling
CN106123713A (en) * 2016-06-30 2016-11-16 本钢板材股份有限公司 A kind of opencut medium-length hole blasting bore distribution method and blasting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050010385A1 (en) * 1999-09-08 2005-01-13 Heck Jay Howard Blasting method
WO2007096734A1 (en) * 2006-02-20 2007-08-30 Institute Of Communications And Information Technologies, Kyrgyz-Russian Slavic University Method for drilling-and-blasting operations at open pits
CN102147218A (en) * 2011-01-13 2011-08-10 广东宏大爆破股份有限公司 Reverse hole distributing method used in longhole bench blasting
EP2915950A1 (en) * 2014-03-04 2015-09-09 Sandvik Mining and Construction Oy Apparatus and method for designing and modifying drilling pattern for bench drilling
CN106123713A (en) * 2016-06-30 2016-11-16 本钢板材股份有限公司 A kind of opencut medium-length hole blasting bore distribution method and blasting method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108917504A (en) * 2018-05-20 2018-11-30 贵州新联爆破工程集团有限公司 A kind of adaptive method for arranging of blasthole
CN108917504B (en) * 2018-05-20 2020-12-01 保利新联爆破工程集团有限公司 Self-adaptive arrangement method for blast holes
CN110567330A (en) * 2019-08-19 2019-12-13 西北矿冶研究院 blasting method for safely and efficiently recovering irregular ore pillars in goaf
CN110567330B (en) * 2019-08-19 2021-12-31 西北矿冶研究院 Blasting method for safely and efficiently recovering irregular ore pillars in goaf
CN111207639A (en) * 2020-03-20 2020-05-29 本钢板材股份有限公司 Method for overcoming large chassis line resistance through deep hole blasting of strip mine
CN112161533A (en) * 2020-09-29 2021-01-01 四川中鼎爆破工程有限公司 Step blasting hole distribution method
CN114117854A (en) * 2021-11-23 2022-03-01 北京奥信化工科技发展有限责任公司 Intelligent hole distribution method for blast holes in any polygonal area
CN114543603A (en) * 2021-11-23 2022-05-27 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method and device for determining mine blasting side hole distance
CN114117854B (en) * 2021-11-23 2022-07-29 北京奥信化工科技发展有限责任公司 Intelligent hole distribution method for blast holes in any polygonal area
CN114543603B (en) * 2021-11-23 2023-07-28 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Determination method and device for mine blasting edge hole distance
CN114427814A (en) * 2022-01-28 2022-05-03 北京理工大学 Automatic arrangement method and system for blast holes and electronic equipment
CN114427814B (en) * 2022-01-28 2022-10-14 北京理工大学 Automatic blast hole arrangement method and system and electronic equipment
CN115060127A (en) * 2022-06-10 2022-09-16 大昌建设集团有限公司 Blasting method and system for equidistantly-distributed hole steps, storage medium and intelligent terminal
CN115060127B (en) * 2022-06-10 2024-02-20 大昌建设集团有限公司 Equidistant hole distribution step blasting method, equidistant hole distribution step blasting system, storage medium and intelligent terminal

Also Published As

Publication number Publication date
CN107144191B (en) 2018-07-24

Similar Documents

Publication Publication Date Title
CN107144191A (en) A kind of step demolition of strip mines bore distribution method
CN105488562B (en) A kind of layout of polygon method based on multiple-factor particle cluster algorithm
CN106247877B (en) A kind of hypervelocity symmetrically forces kerve method without cutting hole deviation line
CN108021933A (en) Neural network recognization model and recognition methods
CN113389534A (en) Method for predicting propagation of horizontal well intimate-cutting fracturing fracture and optimizing design parameters
CN111692931B (en) Intelligent hole distribution method for tunnel blasting
CN109933860A (en) Shale gas pressure break horizontal well cluster spacing optimization method
CN106593448A (en) Mining method for surface coal mine
CN103218749B (en) Three-dimensional well drilling rail anticollision verification method
CN107292008A (en) A kind of drawing anchor testing method for simulating real ship anchor recess
CN107576235B (en) Blasting method for strip mine in arid region
CN204678995U (en) The advanced pre-quick-fried big gun pore structure of severe inclined thick coal seam exploitation top coal
CN205445689U (en) Efficiency of film cooling is improved structure
CN203161272U (en) High-position similar-E-shaped ventilation system for coal face
CN104089548A (en) Fan-shaped arrangement blast mining method
CN103953348A (en) Method for controlling carrier plate by cooperative utilization of goaf coal gangue of large dip angle/sharply inclined coal seam
CN104282033A (en) Integrated lane changing behavior simulation method oriented towards vehicle animation simulation
CN106969676A (en) It is a kind of to improve the cloth hole method for trimming of demolition effect based on RTK blastholes location technology
CN102700895A (en) Pipe belt conveyor with stable transition sections and method for determining transition sections of pipe belt conveyor
CN206957681U (en) Well pattern for fireflood development
CN110047141B (en) Three-dimensional model updating method for open pit mining status
CN104879128A (en) Steep-dip ultra-thick coalbed mining technique based on top-coal advancing pre-detonation weakening
CN109506537B (en) Method for determining bench blasting pile width of surface mine
CN220772048U (en) Small-section tunnel blast hole arrangement structure
CN103726850A (en) Open-pit mining method for triangular ore quantity between layered flat deposit strip areas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724

Termination date: 20210616