CN107143989A - A kind of integrated air-line system and its installation method - Google Patents

A kind of integrated air-line system and its installation method Download PDF

Info

Publication number
CN107143989A
CN107143989A CN201710446483.1A CN201710446483A CN107143989A CN 107143989 A CN107143989 A CN 107143989A CN 201710446483 A CN201710446483 A CN 201710446483A CN 107143989 A CN107143989 A CN 107143989A
Authority
CN
China
Prior art keywords
airduct
integrated
line system
module
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710446483.1A
Other languages
Chinese (zh)
Inventor
汤毅
陈晓文
乔培华
许光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Installation Engineering Group Co Ltd
Original Assignee
Shanghai Installation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Installation Engineering Group Co Ltd filed Critical Shanghai Installation Engineering Group Co Ltd
Priority to CN201710446483.1A priority Critical patent/CN107143989A/en
Publication of CN107143989A publication Critical patent/CN107143989A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0227Ducting arrangements using parts of the building, e.g. air ducts inside the floor, walls or ceiling of a building
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0245Manufacturing or assembly of air ducts; Methods therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Civil Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of integrated air-line system and its installation method.A kind of integrated air-line system, including some integrated airduct modules, the integrated airduct module includes shared support and some airduct units, airduct fixing device and bracket fixing device are arranged at intervals on the shared support, the airduct unit is fixed on the shared support side by side by the airduct fixing device, the two ends of the airduct unit set attachment means, the shared support is fixed in building structure by the bracket fixing device, and adjacent integrated airduct module is connected by the attachment means of correspondence airduct unit.A kind of integrated air-line system of the present invention, integrated airduct module can connect various airduct units as needed in the factory, form customizable standard module, finally be transported to job site, carry out integral hoisting and installation, form integrated air-line system.

Description

A kind of integrated air-line system and its installation method
Technical field
The invention belongs to the technical field of airduct, more particularly to a kind of integrated air-line system and its installation method.
Background technology
With the development of china's overall national strength and building technology, there is increasing high-rise building in each city and large-scale Comprehensive commercial body is in planning and designing and construction period, in these buildings, can generally set air conditioning wind pipe is special to stand Pipe well, function or the airduct of different size material are used for installing varying number, difference.
Traditional airduct can only be assembled by root when mounted, and not only construction progress is slow, is likely to result in prolonging for duration By mistake, and often Existential Space is not enough and cause intermediate conduit to be difficult to install between pipeline;During Pipe installing, the past contact in scene Construct, led because of crossed construction while with other electromechanical (such as water pipe, crane span structure, wire casing, equipment), civil engineering and decoration specialty The Coordination of cause is big, because construction environment is severe, a large amount of rubbish and dust is easily accessible in airduct, subsequent rinse and tune is added The difficulty of examination, more comes into operation and causes all kinds of hidden danger in the future.In addition, traditional airduct connection and insulation can often run into construction sky Between narrow (airduct rear wall is close to pipe well metope) the problem of, increase the difficulty of construction, this can cause under the installation quality of airduct Drop;Furthermore, although each pipeline section can realize that batch production is prefabricated, but the connection of every section of pipe group also needs artificial operation, easily causes flange Junction inleakage is big, while add construction cost and the various disputes that disturb residents, and does not meet building for green building and green construction If trend.
The content of the invention
In order to improve the installation effectiveness and installation quality of airduct, the present invention provides a kind of integrated air-line system and its installation side Method.
The integrated air-line system technical scheme of the present invention is as follows:
A kind of integrated air-line system, including some integrated airduct modules, the integrated airduct module include shared support, with And some airduct units, airduct fixing device and bracket fixing device, the airduct list are arranged at intervals on the shared support Member is fixed on the shared support side by side by the airduct fixing device, and the two ends of the airduct unit set connection dress Put, the shared support is fixed in building structure by the bracket fixing device, it is right that adjacent integrated airduct module passes through The attachment means of airduct unit are answered to connect.
Beneficial effects of the present invention are as follows:
A kind of integrated air-line system of the present invention, integrated airduct module can connect various airducts as needed in the factory Unit, forms customizable standard module, is finally transported to job site, carries out integral hoisting and installation, forms integrated airduct system System.Because a kind of integrated prefabricated degree of air-line system batch production of the present invention is higher, therefore, the installation of integrated air-line system is by material Material, environment and technology restriction are relatively fewer, it is to avoid cause because of insufficient space the airduct of centre to be difficult to what is installed between airduct Problem, can improve the installation quality of airduct, save making material, avoid the various wastings of resources of job site and the production of rubbish Give birth to, be conducive to green construction.
Further, for more easily fixed airduct unit, described integrated airduct when making integrated airduct module In system, the airduct fixing device includes U-shaped plate, is arranged on the fixed plate and anchor ear bar at the U-shaped plate two ends, described The two ends of anchor ear bar are bolted on U-shaped plate, and the airduct unit is fixed on the U-shaped plate by anchor ear bar, institute Airduct fixing device is stated to be fixed on the shared support by fixed plate.In order to avoid making integrated airduct module process remittance It is middle because of the damage of integrated airduct module caused by airduct unit and airduct fixing device grazing, the U-shaped plate and described armful The part that strap is contacted with the airduct unit sets rubber blanket.
Further, in order to preferably install in integrated air-line system, described integrated air-line system, the airduct unit Both sides hanger is set, the hanger is suspended on the hook set in building structure.
In addition, in order to prevent integrated air-line system from deforming when mounted, in described integrated air-line system, the wind The inside of pipe unit sets stiffener.
In addition, in order to more easily install in integrated air-line system, described integrated air-line system, the attachment means are Common plate flange connecting apparatus or angle steel flange attachment means, the end of the attachment means set sealed rubber plate.
Further, in order to preferably install in integrated air-line system, described integrated air-line system, in addition to landing branch Frame, the floor stand is sheathed on outside the airduct unit, and the floor stand is fixed on floor.
Further, installed in order to stronger in integrated air-line system, described integrated air-line system, the shared branch The quantity of frame is at least 2.
Further, in order to ensure that integrated airduct module does not sustain damage in installation process, described integrated airduct system In system, in addition to protecting frame, the integrated airduct module is arranged on inside the protecting frame.
The present invention also provides a kind of installation method of above-mentioned integrated air-line system, and technical scheme is as follows:
A kind of installation method of above-mentioned integrated air-line system, comprises the following steps:
Some airduct units, are fixed on described by the 1st step side by side by the airduct fixing device in the factory
On shared support, some integrated airduct modules are formed;
2nd step, integrated airduct module is transported to job site, integrated airduct module is checked, really
Recognize pipe group specification, auxiliary accessory, heat-insulating property etc. and meet installation requirement;
3rd step, is lifted integrated airduct module to installation site using mobile platform haul method;
Integrated airduct module, is fixed on by the 4th step by spaced bracket fixing device on shared support
Installation site, the attachment means set by airduct unit end connect adjacent integrated airduct module
Get up;
5th step, repeats the 3rd step and the 4th step, until integrated airduct module is fully completed and is fixedly connected,
Form integrated air-line system;
6th step, is rinsed and seal tightness test to integrated air-line system, close to being carried out at the opening of each airduct unit Envelope, integrated air-line system connects ground lead.
Beneficial effects of the present invention are as follows:
A kind of installation method of integrated air-line system of the present invention, integrated airduct module can connect as needed in the factory Various airduct units are connect, customizable standard module is formed, job site is finally transported to, integral hoisting and installation is carried out, are formed Integrated air-line system.Because a kind of prefabricated degree of installation method batch production of integrated air-line system of the present invention is higher, therefore, collection Installation into air-line system is relatively fewer by material, environment and technology restriction, it is to avoid cause between airduct because of insufficient space The problem of middle airduct is difficult to install, the installation quality of airduct can be improved, making material is saved, avoids the various of job site The wasting of resources and the generation of rubbish, be conducive to green construction.
Further, for the more preferable fixed airduct unit in installation process, the installation of described integrated air-line system In method, in the 4th step, first, hanger is set by the both sides of airduct unit, the airduct unit is suspended in building structure On the hook of setting.
Further, in order that integrated air-line system is in installation process, the position of hanger and hook can be mutually right Should, more preferable supported collection in the installation method of described integrated air-line system, in the 1st step, first, passes through BIM into air-line system Modeling, determines that the length of each airduct unit, the position being arranged on airduct unit of hanger and hook are arranged on building knot Position on structure.
Further, in order to ensure that integrated airduct module does not sustain damage in installation process, described integrated airduct system In the installation method of system, in the 1st step, after some integrated airduct modules are formed, protection is set in the periphery of integrated airduct module Frame;In 3rd step, lifted by integrated airduct module to installation site, remove protecting frame.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of integrated air-line system of the present invention;
Fig. 2 is a kind of top view of integrated air-line system of the present invention;
Fig. 3 is a kind of side view of integrated air-line system of the present invention;
Fig. 4 is a kind of schematic diagram of the airduct fixing device of integrated air-line system of the present invention;
Fig. 5 is a kind of schematic diagram of the integrated airduct module of integrated air-line system of the present invention.
Embodiment
A kind of integrated air-line system and its installation method proposed by the present invention are made below in conjunction with the drawings and specific embodiments It is further described.According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted That accompanying drawing is using very simplified form and uses non-accurately ratio, only to it is convenient, lucidly aid in illustrating this hair The purpose of bright embodiment.
Embodiment 1:
Referring to figs. 1 to Fig. 5, a kind of integrated air-line system, including some integrated airduct modules, the integrated airduct module bag Include interval setting airduct fixing device 3 and support on shared support 1 and some airduct units 2, the shared support 1 solid Determine device 4, the airduct unit 2 is fixed on the shared support 1 side by side by the airduct fixing device 3, the airduct The two ends of unit 2 set attachment means 5, and the shared support 1 is fixed in building structure 9 by the bracket fixing device 4, Adjacent integrated airduct module is connected by the attachment means 5 of correspondence airduct unit 2.
A kind of integrated air-line system of the present embodiment, integrated airduct module can connect various wind as needed in the factory Pipe unit 2, forms customizable standard module, is finally transported to job site, carries out integral hoisting and installation, forms integrated airduct System.Because a kind of integrated prefabricated degree of air-line system batch production of the present embodiment is higher, therefore, the installation of integrated air-line system It is by material, environment and technology restriction relatively fewer, it is to avoid to cause the airduct of centre to be difficult to pacify between airduct because of insufficient space The problem of dress, the installation quality of airduct can be improved, making material, the various wastings of resources for avoiding job site and rubbish is saved Produce, be conducive to green construction.
It is described in order to more easily fix airduct unit 2 when making integrated airduct module as preferably embodiment Integrated air-line system in, the airduct fixing device 3 includes U-shaped plate 3a, is arranged on the fixed plate at the U-shaped plate 3a two ends 3b and anchor ear bar 3c, the two ends of the anchor ear bar 3c are bolted on U-shaped plate 3a, and the airduct unit 2 is by embracing Strap 3c is fixed on the U-shaped plate 3a, and the airduct fixing device 3 is fixed on the shared support 1 by fixed plate 3b. In order to avoid making during integrated airduct module process is converged because airduct unit becomes a common practice with collecting caused by airduct fixing device grazing The damage of tube module, the part that the U-shaped plate 3b and the anchor ear bar 3c are contacted with the airduct unit 2 sets rubber blanket.
As preferably embodiment, in order to preferably install integrated air-line system, the both sides of the airduct unit 2 are set Hanger 6, the hanger 6 is suspended on the hook 7 set in building structure 9.Hook 7 is set to be installed in integrated airduct module When play temporarily fixed effect.In addition, hook 7 also provides fulcrum for integrated airduct module.
As preferably embodiment, in order to prevent integrated air-line system from deforming when mounted, described collection becomes a common practice In guard system, the inside of the airduct unit 2 sets stiffener.
As preferably embodiment, in order to more easily install in integrated air-line system, described integrated air-line system, The attachment means 5 are common plate flange connecting apparatus or angle steel flange attachment means, and the end of the attachment means 5 sets sealing Rubber slab.
As preferably embodiment, in order to preferably install in integrated air-line system, described integrated air-line system, also Including floor stand 8, the floor stand 8 is sheathed on outside the airduct unit 2, and the floor stand 8 is fixed on floor.
As preferably embodiment, installed in order to stronger in integrated air-line system, described integrated air-line system, The quantity of the shared support 1 is at least 2.
It is described in order to ensure that integrated airduct module does not sustain damage in installation process as preferably embodiment In integrated air-line system, in addition to protecting frame 10, the integrated airduct module is arranged on inside the protecting frame 10.
Embodiment 2:
Referring to figs. 1 to Fig. 5, a kind of installation method of the integrated air-line system of embodiment 1 comprises the following steps:
Some airduct units 2, are fixed on by the 1st step side by side by the airduct fixing device 3 in the factory
On the shared support 1, some integrated airduct modules are formed;
2nd step, integrated airduct module is transported to job site, integrated airduct module is checked, really
Recognize pipe group specification, auxiliary accessory, heat-insulating property etc. and meet installation requirement;
3rd step, is lifted integrated airduct module to installation site, such as installation position using mobile platform haul method
Put in building, then integrated airduct module is hung in by installation site using hoist engine pulley system;As pacified
Integrated airduct module is then hung to installation site laggard by holding position in building external region using tower crane
Luggage is matched somebody with somebody.Integrated airduct module should be tied up firmly, during lifting, vertical lower must not stand in lifting
People, when integrated airduct module is stainless steel or aluminium sheet, should carry out anti-corrosion exhausted on steel wire rope and suspender
Edge measure, the electrochemistry for preventing carbon steel class material from being formed after directly being contacted with the sheet material of integrated airduct module
Corrosion;
4th step, is consolidated integrated airduct module by spaced bracket fixing device 4 on shared support 1
Installation site is scheduled on, the attachment means 5 set by the end of airduct unit 2 are by adjacent integrated airduct
Module is connected, and such as integrated airduct module is provided with floor stand 8, then in bracket fixing device 4
After the completion of fixation, then carry out the fixation of floor stand 8;
5th step, repeats the 3rd step and the 4th step, until integrated airduct module is fully completed and is fixedly connected,
Form integrated air-line system;
6th step, is rinsed and seal tightness test to integrated air-line system, to the opening of each airduct unit 2
Place is sealed, and integrated air-line system connects ground lead.
A kind of installation method of integrated air-line system of the present embodiment, integrated airduct module can be as needed in the factory Various airduct units are connected, customizable standard module is formed, job site is finally transported to, integral hoisting and installation, shape is carried out Into integrated air-line system.Because a kind of prefabricated degree of installation method batch production of integrated air-line system of the present embodiment is higher, because This, the installation of integrated air-line system is relatively fewer by material, environment and technology restriction, it is to avoid because of insufficient space between airduct Cause the problem of airduct of centre is difficult to install, the installation quality of airduct can be improved, making material is saved, avoid job site The various wastings of resources and the generation of rubbish, be conducive to green construction.
As preferably embodiment, in order to preferably fix airduct unit, described integrated airduct in installation process In the installation method of system, in the 4th step, first, hanger 6 is set by the both sides of airduct unit 2, the airduct unit 2 is hanged Hang on the hook 7 set in building structure 9.
As preferably embodiment, in order that integrated air-line system is in installation process, the position of hanger 6 and hook 7 Putting mutually to correspond to, and more preferable supported collection is into air-line system, in the installation method of described integrated air-line system, in the 1st step, First, modeled by BIM, determine the length of each airduct unit 2, the position being arranged on airduct unit 2 of hanger 6 and Hook 7 is arranged on the position in building structure 9.
It is described in order to ensure that integrated airduct module does not sustain damage in installation process as preferably embodiment In the installation method of integrated air-line system, in the 1st step, after some integrated airduct modules are formed, in the outer of integrated airduct module Enclose setting protecting frame 10;In 3rd step, lifted by integrated airduct module to installation site, remove protecting frame 10.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (10)

1. a kind of integrated air-line system, including some integrated airduct modules, it is characterised in that the integrated airduct module is included altogether With support (1) and some airduct units (2), airduct fixing device (3), Yi Jizhi are arranged at intervals on the shared support (1) Frame fixing device (4), the airduct unit (2) is fixed on the shared support (1) side by side by the airduct fixing device (3) On, the two ends of the airduct unit (2) set attachment means (5), and the shared support (1) passes through the bracket fixing device (4) it is fixed in building structure (9), adjacent integrated airduct module is connected by the attachment means (5) of correspondence airduct unit (2) Connect.
2. integrated air-line system as claimed in claim 1, it is characterised in that the airduct fixing device (3) includes U-shaped plate (3a), the fixed plate (3b) and anchor ear bar (3c) for being arranged on U-shaped plate (3a) two ends, the two ends of the anchor ear bar (3c) It is bolted on U-shaped plate (3a), the airduct unit (2) is fixed on the U-shaped plate (3a) by anchor ear bar (3c), The airduct fixing device (3) is fixed on the shared support (1) by fixed plate (3b), the U-shaped plate (3b), Yi Jisuo State the part setting rubber blanket that anchor ear bar (3c) is contacted with the airduct unit (2).
3. integrated air-line system as claimed in claim 1, it is characterised in that the both sides of the airduct unit (2) set hanger (6), the hanger (6) is suspended on the hook (7) set in building structure (9).
4. integrated air-line system as claimed in claim 1, it is characterised in that also including floor stand (8), the floor stand (8) it is sheathed on the airduct unit (2) outside, the floor stand (8) is fixed on floor.
5. integrated air-line system as claimed in claim 1, it is characterised in that the quantity of the shared support (1) is at least 2.
6. integrated air-line system as claimed in claim 1, it is characterised in that also including protecting frame (10), the integrated airduct mould It is internal that block is arranged on the protecting frame (10).
7. the installation method of the integrated air-line system in a kind of claim 1-6 described in any one, it is characterised in that including such as Lower step:
Some airduct units (2) are fixed on described share by the 1st step side by side by the airduct fixing device (3) in the factory On support (1), some integrated airduct modules are formed;
2nd step, integrated airduct module is transported to job site, and integrated airduct module is checked, confirms pipe group specification, auxiliary Accessory, heat-insulating property meet installation requirement;
3rd step, is lifted integrated airduct module to installation site using mobile platform haul method;
4th step, installation is fixed on by spaced bracket fixing device (4) on shared support (1) by integrated airduct module Position, the attachment means (5) set by airduct unit (2) end connect adjacent integrated airduct module;
5th step, repeats the 3rd step and the 4th step, until integrated airduct module is fully completed and is fixedly connected, forms integrated airduct system System;
6th step, is rinsed and seal tightness test to integrated air-line system, to being sealed at the opening of each airduct unit (2), Integrated air-line system connects ground lead.
8. the installation method of integrated air-line system as claimed in claim 7, it is characterised in that in the 4th step, first, pass through wind The both sides of pipe unit (2) set hanger (6), and the airduct unit (2) is suspended on to the hook (7) set in building structure (9) On.
9. the installation method of integrated air-line system as claimed in claim 8, it is characterised in that in the 1st step, first, pass through BIM Modeling, determines the length of each airduct unit (2), the position being arranged on airduct unit (2) of hanger (6) and hook (7) Position in building structure (9).
10. the installation method of integrated air-line system as claimed in claim 7, it is characterised in that in the 1st step, some being formed After integrated airduct module, protecting frame (10) is set in the periphery of integrated airduct module;In 3rd step, hung by integrated airduct module It is filled to after installation site, removes protecting frame (10).
CN201710446483.1A 2017-06-14 2017-06-14 A kind of integrated air-line system and its installation method Pending CN107143989A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710446483.1A CN107143989A (en) 2017-06-14 2017-06-14 A kind of integrated air-line system and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710446483.1A CN107143989A (en) 2017-06-14 2017-06-14 A kind of integrated air-line system and its installation method

Publications (1)

Publication Number Publication Date
CN107143989A true CN107143989A (en) 2017-09-08

Family

ID=59781547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710446483.1A Pending CN107143989A (en) 2017-06-14 2017-06-14 A kind of integrated air-line system and its installation method

Country Status (1)

Country Link
CN (1) CN107143989A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107662881A (en) * 2017-10-17 2018-02-06 上海市安装工程集团有限公司 Integral riser erecting device and its installation method in a kind of high stove pipe well
CN111022758A (en) * 2019-12-03 2020-04-17 中国五冶集团有限公司 Air duct installation method
CN113483153A (en) * 2021-07-01 2021-10-08 上海海直建设工程有限公司 Air pipe structure for air conditioner installation engineering and installation method thereof
CN118111100A (en) * 2024-04-29 2024-05-31 中建安装集团有限公司 Modularized efficient low-carbon construction method for fireproof heat-preservation air duct

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201457040U (en) * 2009-07-09 2010-05-12 重庆小康汽车产业(集团)有限公司 Air bottle mounting structure of double-fuel pickup
CN201778965U (en) * 2010-07-26 2011-03-30 北京创和世纪通讯技术有限公司 Single-pipe-tower base station fixture
CN104806822A (en) * 2015-04-16 2015-07-29 上海市安装工程集团有限公司 Combined type stand pipe and modularized installation method thereof
CN206109444U (en) * 2016-08-24 2017-04-19 安徽马钢重型机械制造有限公司 Single -row formula hot -blast furnace hot -air pipes displacement control system of blast furnace
CN106568147A (en) * 2016-08-31 2017-04-19 大连都市发展设计有限公司 Novel structure and installation process for air pipe below girderless floor
CN207196844U (en) * 2017-06-14 2018-04-06 上海市安装工程集团有限公司 A kind of integrated air-line system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201457040U (en) * 2009-07-09 2010-05-12 重庆小康汽车产业(集团)有限公司 Air bottle mounting structure of double-fuel pickup
CN201778965U (en) * 2010-07-26 2011-03-30 北京创和世纪通讯技术有限公司 Single-pipe-tower base station fixture
CN104806822A (en) * 2015-04-16 2015-07-29 上海市安装工程集团有限公司 Combined type stand pipe and modularized installation method thereof
CN206109444U (en) * 2016-08-24 2017-04-19 安徽马钢重型机械制造有限公司 Single -row formula hot -blast furnace hot -air pipes displacement control system of blast furnace
CN106568147A (en) * 2016-08-31 2017-04-19 大连都市发展设计有限公司 Novel structure and installation process for air pipe below girderless floor
CN207196844U (en) * 2017-06-14 2018-04-06 上海市安装工程集团有限公司 A kind of integrated air-line system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107662881A (en) * 2017-10-17 2018-02-06 上海市安装工程集团有限公司 Integral riser erecting device and its installation method in a kind of high stove pipe well
CN111022758A (en) * 2019-12-03 2020-04-17 中国五冶集团有限公司 Air duct installation method
CN113483153A (en) * 2021-07-01 2021-10-08 上海海直建设工程有限公司 Air pipe structure for air conditioner installation engineering and installation method thereof
CN118111100A (en) * 2024-04-29 2024-05-31 中建安装集团有限公司 Modularized efficient low-carbon construction method for fireproof heat-preservation air duct

Similar Documents

Publication Publication Date Title
CN107143989A (en) A kind of integrated air-line system and its installation method
CN104806822B (en) The modularity installation method of integral riser
CN106838465A (en) The existing pipe excavation protection construction method of underground pipe gallery
CN102864915B (en) Construction method for venue large space double-helix air pipes
CN109440985A (en) Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method
CN204111216U (en) A kind of tower crane attachment structure of building operation
CN206495234U (en) The existing pipe excavation protection constructing device of underground pipe gallery
CN111188440A (en) ETFE membrane structure curtain wall installation and construction method
CN107476439A (en) A kind of retractable flexible encapsulated net canopy of new large span
CN211735095U (en) A concrete curing means for hanging basket cantilever construction
CN207196844U (en) A kind of integrated air-line system
CN204474271U (en) A kind of high wind resistance nacelle device
CN109162466A (en) Room level units formula curtain wall installing structure and method
CN207196845U (en) A kind of integrated airduct module
CN202834602U (en) Mounting structure of ball machine on bracket
CN205367457U (en) Cast member installs special hoist
CN106481014B (en) Using the mineral wool abatvoix furred ceiling and its construction method of no sunpender keel installation
CN108675105A (en) A kind of condenser hanging apparatus and its construction technology
CN209038861U (en) A kind of pipe crawling device gondola
CN206985650U (en) A kind of power equipment installs hanging basket
CN221119150U (en) Self-clamping type vertical shaft construction combined operation hanging frame
CN205481241U (en) Device is joined in marriage to dry process floor heating pipe collection
CN207200181U (en) A kind of fire-type crane span structure
CN218509086U (en) High-altitude anti-falling structure
CN207097584U (en) A kind of noise reduction heat-dissipating voltage transformer case easy to remove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170908

WD01 Invention patent application deemed withdrawn after publication