CN204111216U - A kind of tower crane attachment structure of building operation - Google Patents
A kind of tower crane attachment structure of building operation Download PDFInfo
- Publication number
- CN204111216U CN204111216U CN201420518253.3U CN201420518253U CN204111216U CN 204111216 U CN204111216 U CN 204111216U CN 201420518253 U CN201420518253 U CN 201420518253U CN 204111216 U CN204111216 U CN 204111216U
- Authority
- CN
- China
- Prior art keywords
- draw ring
- set collar
- frame
- tower crane
- fixed leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 230000007812 deficiency Effects 0.000 abstract description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 7
- 229910052742 iron Inorganic materials 0.000 description 4
- 239000006173 Good's buffer Substances 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 150000002505 iron Chemical class 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model belongs to building operation technical field of tools, be specifically related to a kind of tower crane attachment structure of building operation, comprise attachment frame and fixed leg, attachment frame comprises the upper ledge and lower frame that are parallel to each other, the corner of upper ledge and lower frame is equipped with column, the upper surface of upper ledge corner is provided with draw ring, the lower surface of lower frame corner is provided with lower draw ring, fixed leg overcoat has set collar, be fixedly connected with by single pipe link between set collar and fixed leg, upper draw ring with between set collar, lower draw ring is all connected by steel rope with between set collar.The technical matters that the utility model effectively solves in prior art that the height deficiency of adhering to frame causes that tower crane whole is unstable, attaching structure itself and tower-body standard section are easily out of shape etc.To have a good application prospect in building operation technical field of tools.
Description
Technical field
The utility model belongs to building operation technical field of tools, is specifically related to a kind of tower crane attachment structure of building operation.
Background technology
During building operation, when tower crane use highly exceedes unattached height, need to arrange attachment device, the frame attachment pull bar of design is fixed on building, and it can increase the firmness of tower crane, unlikely because excessive height, in lifting process, safety misadventure occurs.General attachment device is the attached wall pin of steel structure, but during the attached wall pin of fabrication and installation steel structure, the distance of tower crane and surrounding existing structure and the impact of angle can be subject to, many times can because of the restriction of the Anchored Bar length and angle that are subject to attached wall pin, can not realize installing, cannot tower crane attachment be realized.And many times, on standard knot, first insert steel pipe composition " well " cabinet frame, hang with iron wire colligation fixing, then attachment frame is placed on " well " cabinet frame; Or directly use iron wire colligation on attachment frame, be suspended on standard knot, the mode of attachment frame is hung in this iron wire colligation, and under cover iron wire corrosion disconnects, and adheres to lower slide of frame, the power transmission of attachment system is obstructed, the potential safety hazard of complete machine unstability.
The attachment frame of prior art generally only has a frame, highly lower, be equivalent to only have a upper ledge in the utility model or a lower frame, fixing Area comparison is contacted narrow when being arranged on tower-body standard section outer hoop, be easy to the distortion causing attaching structure itself and tower-body standard section, attachment frame of the present utility model is due to by upper and lower two frames, and centre is provided with column to be connected, make the attachment frame height formed from upper ledge upper surface to lower frame lower surface, compared with prior art greatly increase, make in tower crane whole more stable, and attaching structure itself and tower-body standard section are also not easy distortion.And, attachment frame is connected on fixed leg by steel rope, particularly set collar is connected with fixed leg only by single pipe link, steel rope can connect 0 ~ 360 ° of angle, when mounted, the position of fixed leg is selected can be more free, is not easy by the distance of surrounding existing structure and the impact of angle, fixed leg can arbitrarily be fixed on building built around especially, meets various mounting condition.
As preferably, described set collar at least two, described upper draw ring and lower draw ring are all connected on each set collar by steel rope.Set collar is fixed on the differing heights of fixed leg, and draw ring is all coupled up and down, and whole tower crane can be made more steady, and the distortion that simultaneously can produce vibrations or displacement have good buffer action, and wind loading rating and shock resistance improve all greatly.
As preferably, the height h of described column is 50 ~ 150mm.The aspect ratio prior art of attachment frame increases greatly, makes in tower crane whole more stable, and attaching structure itself is also not easy distortion.
The utility model discloses a kind of tower crane attachment structure of building operation, wherein adhere to frame to be made up of upper and lower frames, and connected by column, the aspect ratio prior art of the attachment frame of formation increases greatly, make in tower crane whole more stable, and attaching structure itself is also not easy distortion.The corner of upper and lower frames is equipped with draw ring, and steel rope connects the set collar on draw ring and fixed leg, thus is fixed tower crane by fixed leg.And set collar is looped around outside fixed leg, be fixed on fixed leg by single pipe link, when tower crane attachment is installed, the position of fixed leg is selected can be freer, be not easy by the distance of surrounding existing structure and the impact of angle, steel rope can connect 0 ~ 360 ° of angle, meets various mounting condition.To have a good application prospect in building operation technical field of tools.
Summary of the invention
The purpose of this utility model is for the problems referred to above, a kind of tower crane attachment structure of building operation is provided, the aspect ratio prior art of attachment frame increases greatly, makes in tower crane whole more stable, and attaching structure itself and tower-body standard section are also not easy distortion.Attachment frame is connected on fixed leg by steel rope, and when mounted, the position of fixed leg is selected can be more free, and be not easy by the distance of surrounding existing structure and the impact of angle, steel rope can connect 0 ~ 360 ° of angle, meets various mounting condition.The technical matters that the height deficiency of adhering to frame in effective solution prior art causes that tower crane whole is unstable, attaching structure itself and tower-body standard section are easily out of shape etc.
For achieving the above object, the technical solution adopted in the utility model is: a kind of tower crane attachment structure of building operation, comprise attachment frame and fixed leg, described attachment frame comprises the upper ledge and lower frame that are parallel to each other, the corner of described upper ledge and lower frame is equipped with column, the upper end of described column is fixedly connected with the lower surface of described upper ledge corner, the lower end of described column is fixedly connected with the upper surface of described lower frame corner, the upper surface of described upper ledge corner is provided with draw ring, the lower surface of described lower frame corner is provided with lower draw ring, described fixed leg overcoat has set collar, be fixedly connected with by single pipe link between described set collar and fixed leg, between described upper draw ring and set collar, described lower draw ring is all connected by steel rope with between set collar.
Accompanying drawing explanation
Fig. 1 is the structural representation of the tower crane attachment constructive embodiment 1 of a kind of building operation of the utility model.
Fig. 2 is the annexation enlarged drawing of the utility model embodiment 1.
Fig. 3 is the structural representation of the tower crane attachment constructive embodiment 2 of a kind of building operation of the utility model.
In figure: 1-fixed leg; 11-set collar; 12-pipe link; 2-upper ledge; The upper draw ring of 21-; 3-lower frame; Draw ring under 31-; 4-column; 5-steel rope.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the utility model is further described in detail.
Embodiment 1
As Fig. 1, shown in 2, a kind of tower crane attachment structure of building operation, comprise attachment frame and fixed leg 1, described attachment frame comprises the upper ledge 2 and lower frame 3 that are parallel to each other, the corner of described upper ledge 2 and lower frame 3 is equipped with column 4, the upper end of described column 4 is fixedly connected with the lower surface of described upper ledge 2 four jiaos, the lower end of described column 4 is fixedly connected with the upper surface of described lower frame 3 four jiaos, the upper surface of described upper ledge 2 four jiaos is provided with draw ring 21, the lower surface of described lower frame 3 four jiaos is provided with lower draw ring 31, described fixed leg 1 overcoat has set collar 11, be fixedly connected with by single pipe link 12 between described set collar 11 and fixed leg 1, between described upper draw ring 21 and set collar 11, described lower draw ring 31 is all connected by steel rope 5 with between set collar 11.
The height h of described column 4 is 50 ~ 150mm.
Embodiment 2
As shown in Figure 3, a kind of tower crane attachment structure of building operation, its structure and embodiment 1 basic simlarity, difference is: described set collar 11 at least two, and described upper draw ring 21 and lower draw ring 31 are all connected on each set collar 11 by steel rope 5.
Below be illustrated the utility model by way of example, but the utility model is not limited to above-mentioned specific embodiment, all any improvement of doing based on the utility model or modification all belong to the protection domain of the utility model claim.
Claims (3)
1. the tower crane attachment structure of a building operation, it is characterized in that: comprise attachment frame and fixed leg (1), described attachment frame comprises the upper ledge (2) and lower frame (3) that are parallel to each other, the corner of described upper ledge (2) and lower frame (3) is equipped with column (4), the upper end of described column (4) is fixedly connected with the lower surface of described upper ledge (2) corner, the lower end of described column (4) is fixedly connected with the upper surface of described lower frame (3) corner, the upper surface of described upper ledge (2) corner is provided with draw ring (21), the lower surface of described lower frame (3) corner is provided with lower draw ring (31), described fixed leg (1) overcoat has set collar (11), be fixedly connected with by single pipe link (12) between described set collar (11) and fixed leg (1), between described upper draw ring (21) and set collar (11), described lower draw ring (31) is all connected by steel rope (5) with between set collar (11).
2. the tower crane attachment structure of a kind of building operation according to claim 1, it is characterized in that: described set collar (11) at least two, described upper draw ring (21) and lower draw ring (31) are all connected on each set collar (11) by steel rope (5).
3. the tower crane attachment structure of a kind of building operation according to claim 1, is characterized in that: the height h of described column (4) is 50 ~ 150mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420518253.3U CN204111216U (en) | 2014-09-10 | 2014-09-10 | A kind of tower crane attachment structure of building operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420518253.3U CN204111216U (en) | 2014-09-10 | 2014-09-10 | A kind of tower crane attachment structure of building operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204111216U true CN204111216U (en) | 2015-01-21 |
Family
ID=52328553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420518253.3U Expired - Fee Related CN204111216U (en) | 2014-09-10 | 2014-09-10 | A kind of tower crane attachment structure of building operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204111216U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105565181A (en) * | 2015-12-22 | 2016-05-11 | 上海庞源机械租赁有限公司 | Soft-attaching wall-attached frame for tower cranes |
CN105752864A (en) * | 2016-04-14 | 2016-07-13 | 成都市第二建筑工程公司 | Tower crane attachment joint and construction method thereof |
CN107055415A (en) * | 2017-06-21 | 2017-08-18 | 山东电力基本建设总公司 | Cooling tower Hydraulic Lifting-up Level Bridge attachment device |
CN107814322A (en) * | 2016-09-23 | 2018-03-20 | 成都九十度工业产品设计有限公司 | A kind of application method of the normal structure of heaving line protector |
CN111056451A (en) * | 2019-12-30 | 2020-04-24 | 北京城乡中昊建设有限责任公司 | Tower crane fixing device |
-
2014
- 2014-09-10 CN CN201420518253.3U patent/CN204111216U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105565181A (en) * | 2015-12-22 | 2016-05-11 | 上海庞源机械租赁有限公司 | Soft-attaching wall-attached frame for tower cranes |
CN105752864A (en) * | 2016-04-14 | 2016-07-13 | 成都市第二建筑工程公司 | Tower crane attachment joint and construction method thereof |
CN105752864B (en) * | 2016-04-14 | 2017-11-03 | 成都建筑工程集团总公司 | Derrick crane adheres to node and its construction method |
CN107814322A (en) * | 2016-09-23 | 2018-03-20 | 成都九十度工业产品设计有限公司 | A kind of application method of the normal structure of heaving line protector |
CN107055415A (en) * | 2017-06-21 | 2017-08-18 | 山东电力基本建设总公司 | Cooling tower Hydraulic Lifting-up Level Bridge attachment device |
CN111056451A (en) * | 2019-12-30 | 2020-04-24 | 北京城乡中昊建设有限责任公司 | Tower crane fixing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204111216U (en) | A kind of tower crane attachment structure of building operation | |
CN106006498A (en) | Reverse wall straddling type basket hanging mechanism | |
CN204001938U (en) | Built on stilts span wire suspension protector | |
CN204886004U (en) | Type of easily hanging work platform that passes a bridge | |
CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
CN202022671U (en) | Soft attaching structure of tower crane | |
CN204111235U (en) | A kind of voltage transformer and JP cabinet dismounting special purpose device | |
CN207499592U (en) | A kind of construction place bounding wall guardrail structure | |
CN202848994U (en) | Lifting rod depending on traction of steel wire rope to rise and fall | |
CN213015326U (en) | Hanging flower basket for construction safe in utilization | |
CN205447177U (en) | Equipment for power transmission and distribution rack | |
CN204297994U (en) | Escalator hoisting main movable stand | |
CN207151128U (en) | Guardrail before a kind of garden supervisor | |
CN202609889U (en) | Movable lifting head for steel wire rope | |
CN202808121U (en) | Machine-room-less rope hitch plate assembly | |
CN202657877U (en) | Circuit equipment construction lifting frame | |
CN205892680U (en) | Anti - formula hanging flower basket of sitting on fence hangs mechanism | |
CN201704037U (en) | Adjustable hanging basket suspension mechanism | |
CN206727573U (en) | A kind of cable wiring structure of staged bridge joint | |
CN203653070U (en) | Centre sill hanging tool of railway vehicle | |
CN204001673U (en) | Expanded metal lath fastening devices | |
CN203783162U (en) | Glass curtain wall lifting bracket | |
CN203883432U (en) | Elevating support for ground wire | |
CN202934212U (en) | Safe and energy-saving welding machine frame | |
CN204012367U (en) | Substation grounding angle steel construction protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150121 |