CN205481241U - Device is joined in marriage to dry process floor heating pipe collection - Google Patents

Device is joined in marriage to dry process floor heating pipe collection Download PDF

Info

Publication number
CN205481241U
CN205481241U CN201521127053.6U CN201521127053U CN205481241U CN 205481241 U CN205481241 U CN 205481241U CN 201521127053 U CN201521127053 U CN 201521127053U CN 205481241 U CN205481241 U CN 205481241U
Authority
CN
China
Prior art keywords
water
valve
knockout drum
floor heating
water knockout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521127053.6U
Other languages
Chinese (zh)
Inventor
杨培娜
张鹏
贾胜伟
龚小东
涂晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FIFTH CONSTRUCTION Co ZHONGTIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
FIFTH CONSTRUCTION Co ZHONGTIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FIFTH CONSTRUCTION Co ZHONGTIAN CONSTRUCTION GROUP CO Ltd filed Critical FIFTH CONSTRUCTION Co ZHONGTIAN CONSTRUCTION GROUP CO Ltd
Priority to CN201521127053.6U priority Critical patent/CN205481241U/en
Application granted granted Critical
Publication of CN205481241U publication Critical patent/CN205481241U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model relates to a warm up and lay technical field, specifically disclose a device is joined in marriage to dry process floor heating pipe collection, for a special case, water knockout drum and water collector are installed to special incasement, water supply main valve, filter, confession way branch valve are installed in the same direction as water flow direction on the water knockout drum in proper order to water knockout drum and confession water piping connection, return circuit branch valve, return water main valve are installed along going out a water direction in proper order to water collector and time water piping connection, water knockout drum and water collector end all are equipped with the wash -out valve, the wash -out valve upper end all is connected with discharge valve, water supply pipe is provided with hot metering device on the road, be connected with floor heating pipe on supplying way branch's valve and return circuit branch valve, the cover is equipped with the ripple sleeve pipe on the pipeline of the department of bending, and the pipeline of the department of bending uses the foam to glue with the space on ground and packs. The utility model has the advantages that, the construction method is simple, and the efficiency of construction is high, saves the time limit for a project, and construction quality is controllable, and is energy -concerving and environment -protective, maintenance, transformation convenience.

Description

Dry method floor heating pipeline collection is equipped to be put
Technical field
This utility model relates to ground heater laying technical field, particularly relates to that a kind of dry method floor heating pipeline collection is equipped to be put.
Background technology
The raising required living environment along with development and the people of building material technology, ground spoke heating exists Northern heating area house is popularized.But spoke heat construction needs to pour the microlith of 40-50mm traditionally Concrete cover, not only increases load of floor, reduces indoor pure space height, and, wet trade work Sequence is complicated, and the duration is longer, adds the risk of cross-contamination in fitting-out work.After pea gravel concreten protective layer Phase curing requirements is strict, and protective layer desciccation crack becomes the most insoluble common quality defect of projects.Tradition Wet method floor heating construction head room is limited, long construction period, construction quality are difficult to ensure that.
Utility model content
The purpose of this utility model is to provide that a kind of dry method floor heating pipeline collection is equipped to be put, and construction method is simple, executes Work efficiency rate is high, saves the duration, and construction quality is controlled, energy-conserving and environment-protective, keeps in repair, transforms conveniently.
To achieve these goals, this utility model have employed following technical scheme: dry method floor heating pipeline collection It is equipped with and puts, be a dedicated box, water knockout drum and water collector are installed in described dedicated box;Described water knockout drum with Feed pipe connects, and on water knockout drum, Parallel to the flow direction is sequentially installed with water supply main valve, filter, supplies road branch valve;
Described water collector is connected with return pipe, is sequentially installed with branch of a circuit valve, backwater main valve along water outlet direction;
Described water knockout drum and water collector end are respectively arranged with drain valve, and described drain valve upper end is respectively connected with air bleeding valve;
Feed pipe road is provided with heat metering device;
There is floor heating pipeline for connecting in road branch valve and branch of a circuit valve, the pipeline of bending part is arranged with ripple Sleeve pipe, the pipeline of bending part uses foamed glue to fill with the space on ground.
More optimizedly, when mounted horizontally, water knockout drum is arranged on, and water collector is arranged on down, and centre-to-centre spacing is 200mm, water collector 8 centre-to-centre spacing ground is not less than 300mm;When installed vertically, water knockout drum, water collector Lower end is not less than 150mm far from ground.
More optimizedly, between feed pipe and return pipe, it is provided with bypass deferent, bypass deferent is provided with valve Door.
The beneficial effects of the utility model are: after using said apparatus, have the advantage that
Efficiency of construction is high, saves the duration: install in saving quick, and tube pitch is unified to be determined, reduces difficulty of construction, This engineering method eliminates indoor wet trade link, can save the engineering time of more than 50%,.
Energy-conserving and environment-protective: the construction of dry method floor heating eliminates the operation that pea gravel concreten protective layer pours, and saves A large amount of construction materials and maintenance water.Heat transfer rate exceedes 2 times of tradition floor heating, the highest energy-conservation up to 40%, Respond national energy-saving and reduce discharging the call of green construction.
Maintenance, transformation are convenient: can keep in repair as long as raising timber floor, reequiping during finishing, also allow for tearing open and move to Other places secondary utilizes, and does not waste original material, reduces cost.
Using foamed glue to fill space, water knockout drum position, foamed glue has preferable hardness, insulation effect after drying Fruit is good.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment technical scheme, institute in embodiment being described below The accompanying drawing used is needed to be briefly described, it should be apparent that, the accompanying drawing in describing below is only this practicality Novel in order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below by p- In embodiment or description of the prior art, the required accompanying drawing used is briefly described, skill common for this area From the point of view of art personnel, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing.
Fig. 1 is structural representation of the present utility model;
Fig. 2 position side schematic view of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, to the technical side in this utility model embodiment Case is clearly and completely described, it is clear that described embodiment is only that this utility model part is real Execute example rather than whole embodiments.Based on the embodiment in this utility model, ordinary skill people The every other embodiment that member is obtained under not making creative work premise, broadly falls into this utility model The scope of protection.
Dry method floor heating pipeline collection as shown in Fig. 1~2 is equipped to be put, and is a dedicated box, peace in described dedicated box Equipped with water knockout drum 4 and water collector 8;Described water knockout drum 4 is connected with feed pipe 1, the side of stream downstream on water knockout drum 4 To being sequentially installed with water supply main valve 2, filter 3, supplying road branch valve 5;Described water collector 8 and return pipe 11 Connect, be sequentially installed with branch of a circuit valve 9, backwater main valve 10 along water outlet direction;Described water knockout drum 4 and collection Hydrophone 8 end is respectively arranged with drain valve 7, and described drain valve 7 upper end is respectively connected with air bleeding valve 6;At feed pipe 1 Heat metering device it is provided with on road;Floor heating pipeline is had for connecting on road branch valve 5 and branch of a circuit valve 9, Being arranged with corrugated bushing 14 on the pipeline of bending part, the pipeline of bending part uses foamed glue to fill out with the space on ground Fill.
When mounted horizontally, water knockout drum 4 is arranged on, and water collector 8 is arranged on down, and centre-to-centre spacing is 200mm, Water collector 8 centre-to-centre spacing ground is not less than 300mm;When installed vertically, water knockout drum 4, water collector 8 lower end Away from ground not less than 150mm.
Between feed pipe 1 and return pipe 11, it is provided with bypass deferent 12, bypass deferent 12 is provided with valve 13.
Enforcement step:
1, collection should carry out the water pressure test before being equipped with and putting installation.
2, the heat pipe that adds of each loop is installed one by one, after all loops add heat pipe installation, will add heat pipe with Water knockout drum 4 connects.Put (water knockout drum 4, water collector 8 etc.) fixed collection is equipped, wall can be fixed on Or in dedicated box.When mounted horizontally, being typically arranged on by water knockout drum 4, water collector 8 is arranged on down, Centre-to-centre spacing is preferably 200mm, and water collector 8 centre-to-centre spacing ground should be not less than 300mm;When installed vertically, divide, Water collector 8 lower end should be not less than 150mm far from ground.
3, the equipped installation site put of collection should first be determined before installing.Put the collection hanging wall installation is equipped, permissible Messenger wire obtains collecting equipped and puts centrage, then that retaining element is mounted to a wall;Pedestal mounted collection is equipped with Putting, the most longitudinal and transverse direction is ejected it and is installed centrage, can equipped for collection putting be placed on according to this centrage Installation site;Put in place by equipped for collection, after levelling, centering, fix temporarily.
4, water supply before water knockout drum 4 connects on pipeline, Parallel to the flow direction should install valve, filter 3, Valve and tapping pipe;In backwater connecting tube after water collector 8, tapping pipe should be installed, and install balance additional Valve or other can turn off regulation valve;To there being the system of heat death theory requirement, heat metering device should be set.
5, between the water inlet manifold and total outlet pipe of water collector 8 of water knockout drum 4, by-pass is preferably set, On bypass deferent, valve should be set.
6, on water knockout drum 4, water collector 8, branch road valve, manually or automatically exhaust apparatus all should be set.
7, using foamed glue to fill space, water knockout drum 4 position, foamed glue has preferable hardness after drying, protects Temp effect is good.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, All within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, all Within protection domain of the present utility model should be included in.

Claims (3)

1. dry method floor heating pipeline collection is equipped puts, it is characterised in that: it is a dedicated box, peace in described dedicated box Equipped with water knockout drum (4) and water collector (8);
Described water knockout drum (4) is connected with feed pipe (1), and the upper Parallel to the flow direction of water knockout drum (4) is installed successively There are water supply main valve (2), filter (3), supply road branch valve (5);
Described water collector (8) is connected with return pipe (11), is sequentially installed with branch of a circuit valve along water outlet direction (9), backwater main valve (10);
Described water knockout drum (4) and water collector (8) end are respectively arranged with drain valve (7), described drain valve (7) Upper end is respectively connected with air bleeding valve (6);
Feed pipe (1) road is provided with heat metering device;
Floor heating pipeline is had, on the pipeline of bending part for the upper connection in road branch valve (5) and branch of a circuit valve (9) Being arranged with corrugated bushing (14), the pipeline of bending part uses foamed glue to fill with the space on ground.
Dry method floor heating pipeline collection the most according to claim 1 is equipped to be put, it is characterised in that: when level is pacified During dress, water knockout drum (4) is arranged on, and water collector (8) is arranged on down, and centre-to-centre spacing is 200mm, catchments Device (8) centre-to-centre spacing ground is not less than 300mm;When installed vertically, water knockout drum (4), water collector (8) Lower end is not less than 150mm far from ground.
Dry method floor heating pipeline collection the most according to claim 1 is equipped to be put, it is characterised in that: at feed pipe (1) and it is provided with bypass deferent (12) between return pipe (11), bypass deferent (12) is provided with valve Door (13).
CN201521127053.6U 2015-12-29 2015-12-29 Device is joined in marriage to dry process floor heating pipe collection Expired - Fee Related CN205481241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521127053.6U CN205481241U (en) 2015-12-29 2015-12-29 Device is joined in marriage to dry process floor heating pipe collection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521127053.6U CN205481241U (en) 2015-12-29 2015-12-29 Device is joined in marriage to dry process floor heating pipe collection

Publications (1)

Publication Number Publication Date
CN205481241U true CN205481241U (en) 2016-08-17

Family

ID=56661999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521127053.6U Expired - Fee Related CN205481241U (en) 2015-12-29 2015-12-29 Device is joined in marriage to dry process floor heating pipe collection

Country Status (1)

Country Link
CN (1) CN205481241U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113685878A (en) * 2021-09-05 2021-11-23 中建八局第四建设有限公司 Construction method for heating pipeline at water distributing and collecting device part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113685878A (en) * 2021-09-05 2021-11-23 中建八局第四建设有限公司 Construction method for heating pipeline at water distributing and collecting device part

Similar Documents

Publication Publication Date Title
CN106402987B (en) Indoor floor heating construction method
CN208074267U (en) A kind of hanging bracing means of Urban Underground pipe gallery excavation pit gut line
CN103591628A (en) Floor radiant heating construction method
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN103437556A (en) Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering
CN205783241U (en) A kind of thermodynamic heating system
CN205481241U (en) Device is joined in marriage to dry process floor heating pipe collection
CN206145767U (en) Take underfloor heating system of monitor control device
CN107143989A (en) A kind of integrated air-line system and its installation method
CN104296222B (en) Floor heating laying process
CN206233500U (en) Heat-preserving wall balustrade exterior panelling mounting structure
CN103362257A (en) Construction process of concealed roofing exhaust hole
CN203346950U (en) Hidden laying structure for temporary water supply pipes of high-rise building
CN212327756U (en) Dust device for construction site
CN105508729A (en) Dry-method floor heating pipeline laying process
CN208633453U (en) A kind of packet standpipe
CN208586798U (en) A kind of wind resistance lifts metal Roof construction system
CN207196844U (en) A kind of integrated air-line system
CN105890180A (en) Electric water heater with solar photovoltaic power supply
CN206245606U (en) A kind of EPS composite heat-insulation roofs
CN115419205B (en) BIM technology-based building decoration suspended ceiling and installation method thereof
CN207038287U (en) A kind of exciting transformer water-tight device
CN203334685U (en) Concrete curing device
CN205677644U (en) The outdoor anti-freezing system of hydraulic support
CN210976436U (en) Wall light steel dry hanging base layer frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20161229