CN206495234U - The existing pipe excavation protection constructing device of underground pipe gallery - Google Patents

The existing pipe excavation protection constructing device of underground pipe gallery Download PDF

Info

Publication number
CN206495234U
CN206495234U CN201720171546.2U CN201720171546U CN206495234U CN 206495234 U CN206495234 U CN 206495234U CN 201720171546 U CN201720171546 U CN 201720171546U CN 206495234 U CN206495234 U CN 206495234U
Authority
CN
China
Prior art keywords
steel wire
supporting
rope
constructing device
main rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720171546.2U
Other languages
Chinese (zh)
Inventor
何俨
柴占全
张元洪
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201720171546.2U priority Critical patent/CN206495234U/en
Application granted granted Critical
Publication of CN206495234U publication Critical patent/CN206495234U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of existing pipe excavation protection constructing device of underground pipe gallery, including two supporting and mounting brackets being relatively fixed on the basis of the concrete bearing of foundation ditch both sides, the main rope for the adjustable degree of tautness being connected in two supporting and mounting brackets, suspension apparatus on the main rope and located at concrete bearing basis corresponding to the counter weight construction at the supporting and mounting bracket position, the suspension apparatus includes multiple Suspensions on the main rope along the main rope length direction interval, each Suspension includes time steel wire rope and the suspension ring for being used to be located on pipeline located at described steel wire rope lower end.One first flower basket bolt is provided with each supporting and mounting bracket, the two ends of the main rope are connected with the first flower basket bolt in supporting and mounting bracket respectively, to adjust the degree of tautness of the main rope by first flower basket bolt at two ends.The above-mentioned existing pipe excavation protection constructing device of underground pipe gallery is applied to the protection of the underground utilities such as heating power, combustion gas, feedwater, draining.

Description

The existing pipe excavation protection constructing device of underground pipe gallery
Technical field
The utility model is related to the existing pipe excavation protection constructing device of underground pipe gallery when a kind of foundation ditch groove is excavated.
Background technology
When carrying out underground pipe gallery foundation ditch groove earth excavation, existing pipeline can be run into(Such as diameter 50cm heating power Pipeline), the pipeline is located at directly over piping lane, carries out moving to change that more time need to be delayed, the duration does not allow, and expense is larger, to protect The normal construction of card Pipe rack must take rational safeguard measure to carry out pipeline protection, be set using in the side slope of piping lane both sides Concrete weight coating basis is put, pre-buried suspension hook is suspended in midair by steel wire rope to two heat distribution pipelines, to protect lower pipeline, pipe The well rear monitoring for regularly carrying out pipeline of road suspension protection, if deforming, is reinforced, it is ensured that thermal pipe using fastening bolt The position in road is not moved, so as to ensure the normal construction of bottom Pipe rack, this method be also applied for it is other such as:Feedwater, row The light current pipeline such as water, combustion gas, electric power, telecommunications, movement, UNICOM.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is:There is provided one kind can be effective Ground ensures that the underground that is all kinds of important but can not moving the pipeline changed run into during foundation ditch groove is excavated or basement construction is crossed is comprehensive Close the existing pipe excavation protection constructing device of piping lane.
In order to solve the above technical problems, the technical scheme that the utility model is used is:A kind of underground integrated pipe is provided Corridor existing pipe excavation protection constructing device, including two supports being relatively fixed on the basis of the concrete bearing of foundation ditch both sides are solid Determine frame, the main rope for the adjustable degree of tautness being connected in two supporting and mounting brackets, the suspention dress on the main rope Put and located at concrete bearing basis corresponding to the counter weight construction at the supporting and mounting bracket position, the suspension apparatus Including multiple Suspensions along the main rope length direction interval on the main rope, each Suspension includes Secondary steel wire rope and the suspension ring for being used to be located on pipeline located at described steel wire rope lower end.
As optimization, one first flower basket bolt, the two ends of the main rope are provided with each supporting and mounting bracket It is connected respectively with the first flower basket bolt in the supporting and mounting bracket, to adjust described by first flower basket bolt at two ends The degree of tautness of main rope.
As optimization, the counter weight construction is embedded in the concrete bearing basis corresponding to the supporting and mounting bracket in advance At position, the counter weight construction includes transverse steel mesh sheet and vertically the reinforcing bar drag hook in the transverse steel mesh sheet, The reinforcing bar drag hook is connected with the lower end of corresponding first flower basket bolt.
As optimization, each Suspension also includes the use being connected between the main rope and described steel wire rope In the second flower basket bolt for adjusting its length.
As optimization, the suspension ring are formed by the lower end coiling of described steel wire rope.
As optimization, fastening rope card in three roads is provided with described steel wire rope lap position.
As optimization, described steel wire rope is located at middle fastening rope and blocked and one section between the fastening rope card on side Leave surplus capacity.
As optimization, the interface of described steel wire rope and pipeline is provided with steel plate cushion block.
The existing pipe excavation protection constructing device of this underground pipe gallery has advantages below:
1st, according to pipeline weight size, steel wire rope, flower basket bolt, support frame, suspension hook, counterweight size are calculated, during calculating Reserved safety coefficient can preferably ensure the stability of pipeline;2nd, moved and changed relative to pipeline first using this method, it is cost-effective; 3rd, pipe strengthening protection is carried out using the device, excavates and be supported in pipeline bottom without half, it is to avoid bottom operation Potential safety hazard;4th, lifting pipeline is carried out in advance, the set-up time is shorter, on the duration substantially without influence;5th, the device be applied to heating power, The protection of all kinds of underground utilities such as combustion gas, feedwater, draining, communication, electric power, it is widely applicable.
Brief description of the drawings
Fig. 1 is that the structure of the existing pipe excavation protection embodiment of constructing device one of the utility model underground pipe gallery is shown It is intended to.
Fig. 2 is the structural representation of Suspension in Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
1 and Fig. 2 is referred to, the existing pipe excavation protection constructing device of underground pipe gallery of the present utility model includes relative Two supporting and mounting brackets 11 that are fixed on the concrete bearing basis 100 of foundation ditch both sides, it is connected in two supporting and mounting brackets 11 The main rope 12 of adjustable degree of tautness, the suspension apparatus 13 on the main rope 12 and held located at the concrete Weight basis 100 is corresponding to the counter weight construction 14 at the position of supporting and mounting bracket 11.
In order that the length direction of the main rope 12 it is consistent with the length direction of the pipeline to be suspended 101 in foundation ditch or Approximate consistent, two supporting and mounting brackets 11 should be located on concrete bearing basis 100 at corresponding to the two ends of pipeline 101 to be suspended.
The supporting and mounting bracket 11 is tripod, with being embedded in the concrete bearing basis 100 corresponding at position Counter weight construction 14 is connected.One first flower basket bolt 111 is provided with each supporting and mounting bracket 11, the main rope 12 Two ends are connected with the first flower basket bolt 111 in the supporting and mounting bracket 11 respectively, to pass through first gaily decorated basket spiral shell at two ends Bolt 111 adjusts the degree of tautness of the main rope 12.
The counter weight construction 14 is embedded in the position that the supporting and mounting bracket 11 is corresponded in the concrete bearing basis 100 in advance Place is put, the counter weight construction 14 includes transverse steel mesh sheet 141 and the vertically reinforcing bar in the transverse steel mesh sheet 141 Drag hook 142, the reinforcing bar drag hook 142 is connected with the lower end of corresponding first flower basket bolt 111, also the bottom with supporting and mounting bracket 11 End is connected, for fixing supporting and mounting bracket 11, prevents that supporting and mounting bracket 11 from turning on one's side.
The suspension apparatus 13 is included along the length direction interval of main rope 12 on the main rope 12 Multiple Suspensions, each Suspension include time steel wire rope 131, located at described lower end of steel wire rope 131 be used for be located on pipe Suspension ring 132 on road 101 and it is connected to being used between the main rope 12 and described steel wire rope 131 and adjusts its length The second flower basket bolt 133.
In the present embodiment, the suspension ring 132 are formed by the lower end coiling of described steel wire rope 131.In described steel wire rope Three roads fastening rope card 134 is provided with 131 lap positions, described steel wire rope 131 is located at middle fastening rope card 134 with being located at One section between the fastening rope card 134 on side is left surplus capacity.In this way, can be hung according to the diameter of pipeline 101 to adjust The elasticity of ring 132, can also detect whether time suspension ring 132 of the coiling of steel wire rope 131 overlap firmly by surplus capacity, prevent Because overlap it is insecure caused by pipeline 101 drop the problems such as.In certain embodiments, can be only in centre fastening rope card 134 One section between a fastening rope card 134 on side is left surplus capacity.
In order to increase the contact surface of suspension ring 132 and pipeline 101, set in the interface of described steel wire rope 131 and pipeline 101 It is equipped with steel plate cushion block 135.So, pipeline 101 can be protected, the suspension ring 132 for preventing time pipeline 101 from being made by steel wire rope Damage.
The existing pipe excavation protection constructing device of underground pipe gallery of the present utility model, can effectively be ensured in foundation ditch groove Excavate or basement construction cross during run into all kinds of important but the pipeline changed can not be moved, such as:Heat distribution pipeline, gas pipeline, The buried pipelines such as feedwater, drainage pipeline, high-tension electricity, communication cable.
Specific operation process is as follows:
In foundation ditch groove earth excavation, first by earth excavation to pipeline bottom absolute altitude, excavated by manual work, which is removed, to be needed to lift by crane fixed position The cubic metre of earth and stone;Increase lifting surface area using steel plate cushion block 135, backing plate overcoat steel wire rope carries out pipeline 101 and hangs drawing;Steel wire rope is fastened Block the fastening of three roads, the 3rd road reserves surplus capacity to prevent from drawing button and check fastening rope 134 clamping levels of card;Utilize the first gaily decorated basket spiral shell Bolt 111 connects main rope 12;Main rope 12 carries out oblique pull by supporting and mounting bracket 11 and pre-buried drag hook;It is attached after drag hook to match somebody with somebody Weight, it is ensured that lineoutofservice signal pull, which is met, to be required to prevent the excessive rollover of pulling force simultaneously;The existing pipe excavation protection of underground pipe gallery is applied Frock puts progress examination drawing after device is lifted, and tension is adjusted with the flower basket bolt of main rope 12 and secondary steel wire rope 131, Bottom earth excavation is carried out after tension;Inspect periodically the absolute altitude of pipeline 101 and how much fastening rope blocks 134 surplus capacities, optionally carry out Regulation, it is ensured that pipeline safety.The method for carrying out pipeline lifting reinforcing using the device is applied to most underground utilities, and this is outstanding Hang protection device and determined according to pipeline weight time steel wire rope 131, the diameter of main rope 12, flower basket bolt model specification, Support tripod from channel-section steel specification, suspension hook size, counterweight foundation arrangement of reinforcement and counterweight number, it is adaptable to the lifting of all kinds of pipelines Protection, it is safe and stable, moved compared to changing for pipeline is carried out, cost is low, and favourable to the duration.
This suspension protective device, pipeline weight is communicated up by primary and secondary steel wire rope 131, with concrete weight coating basis In gusseted rack position formation active force and reaction force, power is transmitted with configuration eventually through suspension hook;Pass through steel plate Cushion block 135 separates steel wire rope with pipeline, increases lifting surface area, prevents steel wire rope from hurting pipeline;Steel wire rope restraint location is adopted Fixed with three roads fastening rope card 134, prevent steel wire stripped thread;Surplus capacity is reserved between 3rd fastening rope card 134, to be fastened Rope 134 tightness inspections of card, prevent steel wire iope slippage, are welded at the top of supporting and mounting bracket with round steel pipe with supporting and mounting bracket, Steel wire rope lifting can avoid preventing from, because of preponderance, steel wire rope being hurt on round steel pipe top;In the welding of the round steel pipe left and right sides Fixed strip, prevents steel wire iope slippage is deflected away from from coming off.If there are many pipelines to need lifting, triangular support bracket quantity can be increased, one by one Correspondence carries out oblique pull, can preferably ensure the stability of triangular support bracket
The existing pipe excavation protection constructing device of this underground pipe gallery has advantages below:
1st, according to pipeline weight size, steel wire rope, flower basket bolt, support frame, suspension hook, counterweight size are calculated, during calculating Reserved safety coefficient can preferably ensure the stability of pipeline;
2nd, moved and changed relative to pipeline first using this method, it is cost-effective;
3rd, pipe strengthening protection is carried out using the device, excavates and be supported in pipeline bottom without half, it is to avoid under The potential safety hazard of portion's operation;
4th, lifting pipeline is carried out in advance, the set-up time is shorter, on the duration substantially without influence;
5th, the device is applied to the protection of all kinds of underground utilities such as heating power, combustion gas, feedwater, draining, communication, electric power, is applicable It is wide.
Embodiment of the present utility model is these are only, the scope of the claims of the present utility model, every profit is not thereby limited The equivalent structure or equivalent flow conversion made with the utility model specification and accompanying drawing content, or directly or indirectly it is used in it The technical field of his correlation, is similarly included in scope of patent protection of the present utility model.

Claims (8)

1. a kind of existing pipe excavation protection constructing device of underground pipe gallery, it is characterised in that:Including being relatively fixed to foundation ditch Two supporting and mounting brackets, the main steel for the adjustable degree of tautness being connected in two supporting and mounting brackets on the basis of the concrete bearing of both sides Cord, the suspension apparatus on the main rope and located at the concrete bearing basis corresponding to it is described support fix Counter weight construction at rack position, the suspension apparatus includes being located at the main rope along the main rope length direction interval On multiple Suspensions, each Suspension include time steel wire rope and located at described steel wire rope lower end be used for be located on pipe Suspension ring on road.
2. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 1, it is characterised in that:Each Be provided with one first flower basket bolt in supporting and mounting bracket, the two ends of the main rope respectively with located at the supporting and mounting bracket On the connection of the first flower basket bolt, to pass through the degree of tautness that first flower basket bolt at two ends adjusts the main rope.
3. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 2, it is characterised in that:It is described to match somebody with somebody Weight structure is embedded in the concrete bearing basis at corresponding to the position of the supporting and mounting bracket in advance, and the counter weight construction includes Transverse steel mesh sheet and vertically the reinforcing bar drag hook in the transverse steel mesh sheet, the reinforcing bar drag hook and corresponding first The lower end connection of flower basket bolt.
4. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 1, it is characterised in that:It is described every One Suspension also includes being connected to second gaily decorated basket for adjusting its length between the main rope and described steel wire rope Bolt.
5. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 1, it is characterised in that:It is described to hang Ring is formed by the lower end coiling of described steel wire rope.
6. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 5, it is characterised in that:Described Fastening rope card in three roads is provided with secondary steel wire rope lap position.
7. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 6, it is characterised in that:Described time Steel wire rope is located at middle fastening rope card and one section between the fastening rope card on side leaves surplus capacity.
8. the existing pipe excavation protection constructing device of underground pipe gallery as claimed in claim 5, it is characterised in that:Described The interface of secondary steel wire rope and pipeline is provided with steel plate cushion block.
CN201720171546.2U 2017-02-24 2017-02-24 The existing pipe excavation protection constructing device of underground pipe gallery Active CN206495234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720171546.2U CN206495234U (en) 2017-02-24 2017-02-24 The existing pipe excavation protection constructing device of underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720171546.2U CN206495234U (en) 2017-02-24 2017-02-24 The existing pipe excavation protection constructing device of underground pipe gallery

Publications (1)

Publication Number Publication Date
CN206495234U true CN206495234U (en) 2017-09-15

Family

ID=59806651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720171546.2U Active CN206495234U (en) 2017-02-24 2017-02-24 The existing pipe excavation protection constructing device of underground pipe gallery

Country Status (1)

Country Link
CN (1) CN206495234U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555152A (en) * 2017-09-25 2019-04-02 中石化重型起重运输工程有限责任公司 The Equipment Foundations of hanging device and the guard method of underground installation
CN109914480A (en) * 2019-04-15 2019-06-21 贵州理工学院 A kind of structural system for solving underground structure and conflicting with municipal pipeline
CN111509649A (en) * 2019-01-30 2020-08-07 大唐东营发电有限公司 Temporary debugging power supply configuration scheme
CN114576431A (en) * 2021-12-27 2022-06-03 华北冶建工程建设有限公司 Flexible natural gas pipeline reinforcing method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555152A (en) * 2017-09-25 2019-04-02 中石化重型起重运输工程有限责任公司 The Equipment Foundations of hanging device and the guard method of underground installation
CN109555152B (en) * 2017-09-25 2021-05-07 中石化重型起重运输工程有限责任公司 Method for protecting equipment foundation and underground facility of hoisting equipment
CN111509649A (en) * 2019-01-30 2020-08-07 大唐东营发电有限公司 Temporary debugging power supply configuration scheme
CN109914480A (en) * 2019-04-15 2019-06-21 贵州理工学院 A kind of structural system for solving underground structure and conflicting with municipal pipeline
CN114576431A (en) * 2021-12-27 2022-06-03 华北冶建工程建设有限公司 Flexible natural gas pipeline reinforcing method

Similar Documents

Publication Publication Date Title
CN206495234U (en) The existing pipe excavation protection constructing device of underground pipe gallery
CN106838465A (en) The existing pipe excavation protection construction method of underground pipe gallery
CN101476293B (en) Non-stand construction method for large bridge arch rib
CN206669113U (en) A kind of suspension protection structure being used in foundation pit construction
CN107089584B (en) A kind of jacket lifting technology for binding
CN204782016U (en) Hoist and mount of curtain wall glass plate and conveyor
CN105546278A (en) Method for protecting underground pipeline during pipe ditch excavation
CN213461075U (en) Protection device for underground original pipeline
CN212052333U (en) Suspension bridge catwalk surface course installing the system
CN209227564U (en) A kind of slope surface prefabricated section placing device
CN206562753U (en) Adjustable steel wire rope builder's jack constructing device
CN202500096U (en) Rain water box culvert crossing underground pipeline protection device
CN205369182U (en) A fill water energy absorber that is used for geomembrane storehouse basin prevention of seepage system
CN112095619A (en) Protection device for underground original pipeline and construction method thereof
CN208986479U (en) A kind of safe and efficient formula electricity comb line hanger
CN108988193A (en) A kind of safe and efficient formula electricity comb line hanger and application method
CN207229910U (en) A kind of backfill pipeline sink preventing apparatus
CN201358125Y (en) Concrete pre-embedded welding hook gate rail
CN205560001U (en) A device is laid to pipe cable for cut -and -fill mining
CN217328773U (en) Flexible vertical fixing device for water hose of submersible pump
CN204986006U (en) Aerial cableway of big pipe diameter piping erection of complicated topography in mountain area is exclusively used in
CN212222248U (en) Riser hoisting device
CN218118897U (en) Heating power pipeline suspends protection architecture in midair
CN109428309B (en) Temporary power utilization system for foundation pit and construction method thereof
CN113175017B (en) Construction process for sinking pipe of large-depth underwater water supply pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant