CN107125049A - Vernalization hardening frame - Google Patents

Vernalization hardening frame Download PDF

Info

Publication number
CN107125049A
CN107125049A CN201710405885.7A CN201710405885A CN107125049A CN 107125049 A CN107125049 A CN 107125049A CN 201710405885 A CN201710405885 A CN 201710405885A CN 107125049 A CN107125049 A CN 107125049A
Authority
CN
China
Prior art keywords
vernalization
bottom wall
side wall
hardening
hardening frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710405885.7A
Other languages
Chinese (zh)
Inventor
卓杰强
刘春宇
赵慧
杨琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Qianhai Hongjia Technology Co Ltd
Original Assignee
Shenzhen Qianhai Hongjia Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Qianhai Hongjia Technology Co Ltd filed Critical Shenzhen Qianhai Hongjia Technology Co Ltd
Priority to CN201710405885.7A priority Critical patent/CN107125049A/en
Priority to PCT/CN2017/093449 priority patent/WO2018218751A1/en
Publication of CN107125049A publication Critical patent/CN107125049A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C1/00Apparatus, or methods of use thereof, for testing or treating seed, roots, or the like, prior to sowing or planting
    • A01C1/02Germinating apparatus; Determining germination capacity of seeds or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Physiology (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention provides a kind of vernalization hardening frame, framework is surrounded by bottom wall and side wall, hole tray can be directly placed in framework, vernalization hardening frame can be stacked together, germinating cabinet's vernalization is delivered to, vernalization hardening frame is moved to seedling rearing room nursery again after the completion of vernalization, whole process eliminates the input of vernalization frame and seedling bed, cost has been saved, and has been occupied little space;By opening up groove respectively on the first side wall and second sidewall set along bottom wall length direction, reduce the material usage of vernalization hardening frame itself, production cost is reduced, while groove is easy to germination and growing state of the producers to vernalization hardening inframe crops to be observed;It is connected by setting with bottom wall and perpendicular to the guardrail of bottom wall, it is ensured that vernalization hardening frame is in transportation, and its internal hole tray placed is not fallen out away, it is to avoid cause economic loss;Reinforcement in bottom wall mounting groove is converged on the column structure of bottom wall central, increases the bulk strength of vernalization hardening frame.

Description

Vernalization hardening frame
Technical field
The present invention relates to agricultural equipment technical field, specially a kind of vernalization hardening frame.
Background technology
At present, the vernalization and nursery of crops are carried out in different greenhouses in soilless culture, for the ease of beating Reason and the mobile hole tray for carrying crops, can be using nursery frame as utensil, and for carrying hole tray, but existing nursery frame is present More defect, the long side surface framework of nursery frame is enclosed construction, and its top is provided with crossbeam, considerably increases material usage, Add the cost of nursery frame;The side feed opening of nursery frame is standard-sized sheet, in transportation, is easily caused the cave of nursery inframe Disk drops at opening;The bottom reinforcement of nursery frame is meticulous simultaneously, and is not connected as a single entity in centre so that nursery frame is overall Intensity it is smaller, it is fragile.
The content of the invention
It is contemplated that at least solving one of technical problem present in prior art or correlation technique.
Therefore, it is an object of the present invention to proposing a kind of vernalization hardening frame.
In view of this, according to one object of the present invention there is provided a kind of vernalization hardening frame, including:Bottom wall, bottom wall is square Shape;Side wall, side wall and bottom wall are perpendicular;Side wall includes the first side wall and second sidewall and the edge set along bottom wall length direction The 3rd side wall that bottom wall width direction is set;Wherein, the top of the first side wall and second sidewall opens up fluted respectively, the 3rd side The top of wall offers first window, and the first side wall deviates from the vertical edge of the 3rd side wall, second sidewall away from the perpendicular of the 3rd side wall The skirt of straight flange and bottom wall is into the second window;The bottom of second window is provided with guardrail, and guardrail is connected and vertical with bottom wall In bottom wall;The height of guardrail is 10mm to 20mm.
The vernalization hardening frame that the present invention is provided, framework is surrounded by bottom wall and side wall, and hole tray can be directly placed at this framework It is interior, then vernalization hardening frame is stacked together, germinating cabinet is delivered to and carries out vernalization, urging together will be stacked after the completion of vernalization again Bud hardening frame is moved to seedling rearing room and carries out nursery, and whole process eliminates the input of vernalization frame and seedling bed, saved cost, and Occupy little space;Bottom wall is the rectangle of rule, contributes to stacking and putting for vernalization hardening frame, and can be more fully using urging The inner space of bud hardening frame;By opening up the first groove on the first side wall set along bottom wall length direction, along bottom wall The second groove is opened up in the second sidewall that length direction is set, the material usage of vernalization hardening frame itself is reduced, reduces life Cost is produced, while groove is easy to germination and growing state of the producers to vernalization hardening inframe crops to be observed.3rd The top of side wall offers first window and the first side wall deviates from the vertical edge of the 3rd side wall, second sidewall and deviates from the 3rd side wall Vertical edge and bottom wall skirt into the second window, it is ensured that producers can be in diverse location, from different perspectives more The comprehensively germination of observation vernalization hardening inframe crops and growing state, and be easy to daily arrange.The bottom of second window is set Guardrail is equipped with, guardrail is connected with bottom wall and perpendicular to bottom wall, it is ensured that vernalization hardening frame is in transportation, its internal placement Hole tray do not fall out away, it is to avoid cause economic loss.The height of guardrail be 10mm to 20mm, vernalization hardening frame is effectively ensured Interior hole tray is not fallen out away, while saving material, reduces production cost.
In addition, according in the above-mentioned technical proposal of the invention provided, can also have following additional technical feature:
In any of the above-described technical scheme, it is preferable that the top of the 3rd side wall and the top of the second window are provided with horizontal stroke In being generally aligned in the same plane at the top of beam, the top of crossbeam and the top of the first side wall, second sidewall.
In the technical scheme, first crossbeam is provided with the top of the 3rd side wall, the top of the second window is provided with second Crossbeam, facilitates producers to take vernalization hardening frame;The top of crossbeam is located at the top of the first side wall, the top of second sidewall In same plane, it is ensured that vernalization hardening frame upper surface it is smooth, be easy to stack multiple vernalization hardening frames together, it is ensured that Integrally-built stability.
In any of the above-described technical scheme, it is preferable that multiple through holes are provided with bottom wall and side wall, multiple through holes are in bottom wall It is uniformly distributed with the wall of side.
In the technical scheme, multiple through holes are provided with bottom wall and side wall, multiple through holes are uniform on bottom wall and side wall Distribution, on the one hand, alleviate the overall weight of vernalization hardening frame;On the other hand so that the bulk strength increase of vernalization hardening frame, Avoid due to, without corresponding engraved structure, being damaged on plastic products after cracking, crackle extremely easily extends so that Multiple through holes on the overall fracture of plastic products, vernalization hardening frame can effectively prevent the extension of crackle, further increase whole Body intensity.
In any of the above-described technical scheme, it is preferable that groove is U-shaped.
In the technical scheme, groove is U-shaped, is both easy to shaping, while facilitating agriculture of the user to vernalization hardening inframe again Crop is observed.
In any of the above-described technical scheme, it is preferable that prolong the extension extended with side wall opposite direction, extension and bottom wall Lower surface surround mounting groove;The center of bottom wall sets the column structure of the opening direction protrusion of oriented mounting groove, column knot Structure is contour with extension.
In the technical scheme, prolong the extension extended with side wall opposite direction, the lower surface of extension and bottom wall is surrounded Mounting groove so that bottom wall is not directly contacted with ground, or when vernalization hardening frame is stacked together, mutual bottom not phase mutual connection Touch, leave space, it is ensured that vernalization hardening frame bottom is ventilative, permeable, contributes to the growth of vernalization hardening inframe crops;Install The setting of groove additionally aids provides installing space for subsequent installation strengthening part.The center of bottom wall sets opening for oriented mounting groove The column structure of mouth direction protrusion, enhances framework overall intensity and bearing capacity;Column structure is contour with extension, protects The smooth of vernalization hardening frame bottom has been demonstrate,proved, has been easy to vernalization hardening frame to be stacked.
In any of the above-described technical scheme, it is preferable that the lower surface of bottom wall is provided with reinforcement;Reinforcement includes being located at bottom Oblique reinforcement on the diagonal of wall and the cross reinforcing on the two opposite side lines of centres of bottom wall and longitudinally reinforced Muscle;Cross reinforcing, waling and oblique reinforcement are converged on column structure, form M shape structure.
In the technical scheme, reinforcement is set in the lower surface of bottom wall, the intensity of vernalization hardening frame is improved, not rapid wear It is bad;Oblique reinforcement on the diagonal of bottom wall and the cross reinforcing on the two opposite side lines of centres of bottom wall and Waling is converged on column structure, is formed M shape structure, each reinforcement is linked together by column structure, enter One step improves the intensity of vernalization hardening frame.
In any of the above-described technical scheme, it is preferable that extension includes the first extension set along bottom wall length direction And the second extension set along bottom wall width direction;First extension is provided with dress with the apex that the second extension intersects Interpolating unit.
In the technical scheme, the first extension and the second extension can surround mounting groove, the first extension and The intersecting apex of two extensions is provided with the portion of plugging, and is easy to vernalization hardening frame to stack together.
In any of the above-described technical scheme, it is preferable that the apex that the first side wall, second sidewall intersect with crossbeam respectively is set It is equipped with the insertion section being adapted with the portion of plugging;Portion is plugged vertically to be located along the same line with insertion section.
In the technical scheme, the apex that the first side wall, second sidewall intersect with crossbeam respectively is provided with and plugged portion The insertion section being adapted, and plug portion and be vertically located along the same line with insertion section, it is ensured that vernalization hardening frame can It is engaged, is successfully stacked together with insertion section by plugging portion, and the vernalization hardening frame stacked together is overall more flat Surely, it is not susceptible to tilt.
In any of the above-described technical scheme, it is preferable that the portion of plugging is the consent being recessed straight down;Insertion section for it is vertical to Upper raised support plug.
In the technical scheme, the portion of plugging is the consent being recessed straight down, and insertion section is support raised straight up Plug, this is simple in construction, is easy to shaping, and the cooperation of consent and support plug, more solid and reliable.
In any of the above-described technical scheme, it is preferable that offer multiple hollow holes on extension, multiple hollow holes are along level Direction equidistantly distributed.
Multiple hollow holes are offered in the technical scheme, on extension, and multiple hollow holes are equidistant in the horizontal direction Distribution, not only increases integrally-built intensity, and make the profile of vernalization hardening frame more attractive in appearance.
To sum up, framework is surrounded by bottom wall and side wall, hole tray can be directly placed in this framework, then by vernalization hardening frame Stack together, deliver to germinating cabinet and carry out vernalization, the vernalization hardening frame stacked together is moved to nursery again after the completion of vernalization Room carries out nursery, and whole process eliminates the input of vernalization frame and seedling bed, saved cost, and occupy little space;By Groove is opened up respectively on the first side wall and second sidewall set along bottom wall length direction, reduces the material of vernalization hardening frame itself Expect consumption, reduce production cost, while groove is easy to producers to the germination of vernalization hardening inframe crops and growth feelings Condition is observed.Further, the top of the 3rd side wall offers first window and the first side wall away from the perpendicular of the 3rd side wall Straight flange, second sidewall deviate from the vertical edge of the 3rd side wall and the skirt of bottom wall into the second window, it is ensured that producers can In diverse location, germination and the growing state of vernalization hardening inframe crops are observed more fully hereinafter from different perspectives, and be easy to It is daily to arrange.The bottom of second window is provided with guardrail, and guardrail is connected with bottom wall and perpendicular to bottom wall, it is ensured that vernalization hardening Frame is in transportation, and its internal hole tray placed is not fallen out away, it is to avoid cause economic loss.Set in the mounting groove of bottom There is the M shape reinforcement on the column structure for converging in the protrusion on bottom wall, further increase the intensity of vernalization hardening frame. The top of 3rd side wall and the top of the second window are provided with crossbeam, facilitate producers to take vernalization hardening frame;First side The apex that wall, second sidewall intersect with crossbeam respectively is provided with the insertion section being adapted with the portion of plugging, and plugs portion and insertion Portion is vertically located along the same line, it is ensured that vernalization hardening frame can be engaged by plugging portion with insertion section, smoothly Ground is stacked together, and the vernalization hardening frame stacked together is overall more steady, is not susceptible to tilt.
The additional aspect and advantage of the present invention will become obvious in following description section, or pass through the practice of the present invention Recognize.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become from description of the accompanying drawings below to embodiment is combined Substantially and be readily appreciated that, wherein:
Fig. 1 is that vernalization hardening frame stacks schematic diagram in one embodiment of the present of invention;
Fig. 2 is the side view of vernalization hardening frame in one embodiment of the present of invention;
Fig. 3 is the top view of vernalization hardening frame in one embodiment of the present of invention;
Fig. 4 is the upward view of vernalization hardening frame in one embodiment of the present of invention;
Wherein, corresponding relations of the Fig. 1 into Fig. 4 between reference and component names is:
10 bottom walls, 12 column structures, 14 reinforcements, 142 oblique reinforcements, 144 cross reinforcings, 146 walings, The side of 16 bottom walls, 22 the first side walls, 222 first grooves, the vertical edge of 224 the first side walls, 24 second sidewalls, 242 second grooves, The vertical edge of 244 second sidewalls, 26 the 3rd side walls, 262 first windows, 264 first crossbeams, 28 second windows, 282 guardrails, 284 Second cross beam, 30 extensions, 32 first extensions, 34 second extensions, 36 hollow holes, 40 plug portion, 50 insertion sections.
Embodiment
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting, the implementation of the application Feature in example and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also Implemented with being different from other modes described here using other, therefore, protection scope of the present invention is not by described below Specific embodiment limitation.
Vernalization hardening frame described according to some embodiments of the invention is described referring to Fig. 1 to Fig. 4.
As depicted in figs. 1 and 2, embodiments of the invention propose a kind of vernalization hardening frame, including:Bottom wall 10, bottom wall 10 For rectangle;Side wall, side wall and bottom wall 10 are perpendicular;Side wall includes the first side wall 22 and second set along the length direction of bottom wall 10 Side wall 24 and the 3rd side wall 26 set along the width of bottom wall 10;Wherein, the top of the first side wall 22 and second sidewall 24 Open up fluted respectively, the top of the 3rd side wall offers first window, and the vertical edge 224 of the first side wall (carry on the back by the first side wall 22 From the vertical edge of the 3rd side wall 26), the vertical edge 244 of second sidewall (second sidewall 24 deviates from the vertical edge of the 3rd side wall 26) with And the side 16 of bottom wall surrounds the second window 28;The bottom of second window is provided with guardrail, guardrail be connected with bottom wall and perpendicular to Bottom wall;The height of guardrail is 10mm to 20mm.Fig. 1 shows that multiple vernalization hardening frames stack structure together.
The vernalization hardening frame that the present invention is provided, framework is surrounded by bottom wall 10 and side wall, and hole tray can be directly placed at this frame In vivo, then vernalization hardening frame is stacked together, delivers to germinating cabinet and carry out vernalization, will be stacked together again after the completion of vernalization Vernalization hardening frame is moved to seedling rearing room and carries out nursery, and whole process eliminates the input of vernalization frame and seedling bed, saved cost, And occupy little space;Bottom wall 10 is the rectangle of rule, contributes to stacking and putting for vernalization hardening frame, and can be more fully sharp With the inner space of vernalization hardening frame;By opening up the first groove on the first side wall 22 set along the length direction of bottom wall 10 222, the second groove 242 is opened up in the second sidewall 24 set along the length direction of bottom wall 10, vernalization hardening frame itself is reduced Material usage, production cost is reduced, while groove is easy to germination and life of the producers to vernalization hardening inframe crops Long situation is observed.The top of 3rd side wall 26 offers the vertical edge 224, second of first window 262 and the first side wall The vertical edge 244 of side wall and the side 16 of bottom wall surround the second window 28, it is ensured that producers can be in diverse location, never Observe germination and the growing state of vernalization hardening inframe crops more fully hereinafter with angle, and be easy to daily arrange.Second window The bottom of mouth 28 is provided with guardrail 282, and guardrail 282 is connected with bottom wall 10 and perpendicular to bottom wall 10, it is ensured that vernalization hardening frame In transportation, its internal hole tray placed is not fallen out away, it is to avoid cause economic loss.The height of guardrail 282 is 10mm to 20mm, the hole tray that vernalization hardening inframe is effectively ensured is not fallen out away, while saving material, is reduced and is produced into This.
As depicted in figs. 1 and 2, in one embodiment of the present of invention, it is preferable that the top of the 3rd side wall 26 and the second window 28 top is provided with crossbeam, and the top of crossbeam and the top of the top of the first side wall 22, second sidewall 24 are put down positioned at same In face.
In this embodiment, the top of the 3rd side wall 26 is provided with first crossbeam 264, and the top of the second window 28 is provided with Second cross beam 284, facilitates producers to take vernalization hardening frame;The top of crossbeam and the top of the first side wall 22, second sidewall In 24 top is generally aligned in the same plane, it is ensured that vernalization hardening frame upper surface it is smooth, be easy to stack multiple vernalization hardening frames Together, it is ensured that integrally-built stability.
As depicted in figs. 1 and 2, in one embodiment of the present of invention, it is preferable that be provided with bottom wall 10 and side wall multiple logical Hole, multiple through holes are uniformly distributed on bottom wall 10 and side wall.
In this embodiment, multiple through holes are provided with bottom wall 10 and side wall, multiple through holes are equal on bottom wall 10 and side wall Even distribution, on the one hand, alleviate the overall weight of vernalization hardening frame;On the other hand so that the bulk strength of vernalization hardening frame increases Plus, it is to avoid due to, without corresponding engraved structure, being damaged on plastic products after cracking, crackle extremely easily extends, So that multiple through holes on the overall fracture of plastic products, vernalization hardening frame can effectively prevent the extension of crackle, further improve Bulk strength.
As depicted in figs. 1 and 2, in one embodiment of the present of invention, it is preferable that groove is U-shaped.
In this embodiment, groove is U-shaped, is both easy to shaping, while facilitating farming of the user to vernalization hardening inframe again Thing is observed.
As depicted in figs. 1 and 2, in one embodiment of the present of invention, it is preferable that prolong the extension extended with side wall opposite direction Portion 30, the lower surface of extension 30 and bottom wall 10 surrounds mounting groove;The center of bottom wall 10 sets the openings of oriented mounting groove To the column structure 12 of protrusion, column structure 12 and extension 30 are contour.
In this embodiment, the extension 30 extended with side wall opposite direction, the lower surface of extension 30 and bottom wall 10 are prolonged Surround mounting groove so that bottom wall 10 is not directly contacted with ground, or when vernalization hardening frame is stacked together, mutual bottom not phase Mutually contact, leaves space, it is ensured that vernalization hardening frame bottom is ventilative, permeable, contributes to the growth of vernalization hardening inframe crops; The setting of mounting groove additionally aids provides installing space for subsequent installation strengthening part.The center of bottom wall 10 sets oriented install The column structure 12 of the opening direction protrusion of groove, enhances framework overall intensity and bearing capacity;Column structure 12 is with prolonging Extending portion 30 is contour, it is ensured that vernalization hardening frame bottom it is smooth, be easy to vernalization hardening frame to be stacked.
As shown in Figure 2 and Figure 4, in one embodiment of the present of invention, it is preferable that the lower surface of bottom wall 10 is provided with reinforcement 14;Reinforcement 14 includes the oblique reinforcement 142 on the diagonal of bottom wall 10 and the two opposite side centers positioned at bottom wall 10 Cross reinforcing 144 and waling 146 on line;Cross reinforcing 144, waling 146 and oblique reinforcement Muscle 142 is converged on column structure 12, forms M shape structure.
In this embodiment, reinforcement 14 is set in the lower surface of bottom wall 10, improves the intensity of vernalization hardening frame, be difficult Damage;Oblique reinforcement 142 on the diagonal of bottom wall 10 and the horizontal stroke on the two opposite side lines of centres of bottom wall 10 Converged in reinforcement 144 and waling 146 on column structure 12, form M shape structure, pass through each reinforcement 14 Column structure 12 links together, and further increases the intensity of vernalization hardening frame.
As shown in Figure 2 and Figure 4, in one embodiment of the present of invention, it is preferable that extension 30 is included along the length side of bottom wall 10 The second extension 34 set to the first extension 32 of setting and along the width of bottom wall 10;First extension 32 and second The intersecting apex of extension 34 is provided with the portion of plugging 40.
In this embodiment, the first extension 32 and the second extension 34 can surround mounting groove, the first extension 32 The apex intersected with the second extension 34 is provided with the portion of plugging 40, is easy to vernalization hardening frame to stack together.
As shown in Figures 2 and 3, in one embodiment of the present of invention, it is preferable that the first side wall 22, second sidewall 24 are distinguished The apex intersected with crossbeam is provided with plugging the insertion section 50 that portion 40 is adapted;Portion 40 and insertion section 50 are plugged along vertical side To being located along the same line.
In this embodiment, the apex that the first side wall 22, second sidewall 24 intersect with crossbeam respectively is provided with and plugged The insertion section 50 that portion 40 is adapted, and plug portion 40 and be vertically located along the same line with insertion section 50, it is ensured that vernalization Hardening frame can be engaged by plugging portion 40 with insertion section 50, successfully be stacked together, and stack vernalization refining together Seedling frame is overall more steady, is not susceptible to tilt.
As depicted in figs. 1 and 2, in one embodiment of the present of invention, it is preferable that it is the plug being recessed straight down to plug portion 40 Hole;Insertion section 50 is support plug raised straight up.
In this embodiment, it is the consent being recessed straight down to plug portion 40, and insertion section 50 is branch raised straight up Support plug, this is simple in construction, is easy to shaping, and the cooperation of consent and support plug, more solid and reliable.
As depicted in figs. 1 and 2, in one embodiment of the present of invention, it is preferable that multiple hollow holes are offered on extension 30 36, multiple hollow holes 36 equidistantly distributed in the horizontal direction.
In this embodiment, multiple hollow holes 36 are offered on extension 30, and multiple hollow holes 36 are in the horizontal direction etc. Spacing is distributed, and not only increases integrally-built intensity, and make the profile of vernalization hardening frame more attractive in appearance.
To sum up, framework is surrounded by bottom wall 10 and side wall, hole tray can be directly placed in this framework, then by vernalization hardening Frame is stacked together, is delivered to germinating cabinet and is carried out vernalization, is again moved to the vernalization hardening frame stacked together after the completion of vernalization and educates Seedling room carries out nursery, and whole process eliminates the input of vernalization frame and seedling bed, saved cost, and occupy little space;Pass through Groove is opened up respectively on the first side wall 22 and second sidewall 24 set along the length direction of bottom wall 10, reduces vernalization hardening frame The material usage of itself, reduces production cost, while groove is easy to germination of the producers to vernalization hardening inframe crops It is observed with growing state.Further, the top of the 3rd side wall 26 offers the perpendicular of first window 262 and the first side wall The side 16 of straight flange 224, the vertical edge 244 of second sidewall and bottom wall surrounds the second window 28, it is ensured that producers can be Diverse location, observes germination and the growing state of vernalization hardening inframe crops more fully hereinafter from different perspectives, and is easy to day Often arrange.The bottom of second window 28 is provided with guardrail 282, and guardrail 282 is connected with bottom wall 10 and perpendicular to bottom wall 10, it is ensured that Vernalization hardening frame is in transportation, and its internal hole tray placed is not fallen out away, it is to avoid cause economic loss.Pacify bottom The M shape reinforcement 14 on the column structure 12 for converging in the protrusion on bottom wall 10 is provided with tankage, further increases and urges The intensity of bud hardening frame.The top of 3rd side wall 26 and the top of the second window 28 are provided with crossbeam, facilitate producers to take Take vernalization hardening frame;The apex that the first side wall 22, second sidewall 24 intersect with crossbeam respectively is provided with and plugged portion 40 and mutually fits The insertion section 50 matched somebody with somebody, and plug portion 40 and be vertically located along the same line with insertion section 50, it is ensured that vernalization hardening frame energy It is enough to be engaged by plugging portion 40 with insertion section 50, successfully stack together, and the vernalization hardening frame stacked together is overall It is more steady, it is not susceptible to tilt.
In the present invention, term " multiple " then refers to two or more, unless otherwise clear and definite restriction.Term " peace The term such as dress ", " connected ", " connection ", " fixation " all should be interpreted broadly, for example, " connection " can be fixedly connected, can also It is to be detachably connected, or is integrally connected;" connected " can be joined directly together, and can also be indirectly connected to by intermediary.It is right For one of ordinary skill in the art, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that combining the embodiment or specific features, structure, material or the feature of example description is contained at least one reality of the invention Apply in example or example.In this manual, identical embodiment or reality are not necessarily referring to the schematic representation of above-mentioned term Example.Moreover, description specific features, structure, material or feature can in any one or more embodiments or example with Suitable mode is combined.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of vernalization hardening frame, it is characterised in that including:
Bottom wall, the bottom wall is rectangle;
Side wall, the side wall and the bottom wall are perpendicular;
The side wall includes the first side wall set along the bottom wall length direction and second sidewall and along the bottom wall width The 3rd side wall that direction is set;
Wherein, the top of the first side wall and the second sidewall opens up fluted respectively, and the top of the 3rd side wall is opened Provided with first window, the first side wall deviates from the vertical edge of the 3rd side wall, the second sidewall and deviates from the 3rd side The skirt of the vertical edge of wall and the bottom wall is into the second window;
The bottom of second window is provided with guardrail, and the guardrail is connected with the bottom wall and perpendicular to the bottom wall;
The height of the guardrail is 10mm to 20mm.
2. vernalization hardening frame according to claim 1, it is characterised in that
The top of the 3rd side wall and the top of second window are provided with crossbeam, the top of the crossbeam and described the In being generally aligned in the same plane at the top of the top of side wall, the second sidewall.
3. vernalization hardening frame according to claim 1 or 2, it is characterised in that
Multiple through holes are provided with the bottom wall and the side wall, multiple through holes are uniform on the bottom wall and the side wall Distribution.
4. vernalization hardening frame according to claim 1 or 2, it is characterised in that
The groove is U-shaped.
5. vernalization hardening frame according to claim 1, it is characterised in that also include:
Prolong the extension extended with side wall opposite direction, the lower surface of the extension and the bottom wall surrounds mounting groove;
The center of the bottom wall sets the column structure of the opening direction protrusion of the oriented mounting groove, the column structure with The extension is contour.
6. vernalization hardening frame according to claim 5, it is characterised in that
The lower surface of the bottom wall is provided with reinforcement;
The reinforcement includes the oblique reinforcement on the diagonal of the bottom wall and two opposite side positioned at the bottom wall Cross reinforcing and waling on the line of centres;
The cross reinforcing, the waling and the oblique reinforcement are converged on the column structure, are formed M shape structure.
7. the vernalization hardening frame according to claim 5 or 6, it is characterised in that
The extension includes the first extension set along the bottom wall length direction and set along the bottom wall width direction The second extension put;
The apex that first extension intersects with second extension is provided with the portion of plugging.
8. vernalization hardening frame according to claim 7, it is characterised in that
The apex that the first side wall, the second sidewall intersect with the crossbeam respectively is provided with mutually fits with the portion of plugging The insertion section matched somebody with somebody;
The portion that plugs vertically is located along the same line with the insertion section.
9. vernalization hardening frame according to claim 8, it is characterised in that
The portion of plugging is the consent being recessed straight down;
The insertion section is support plug raised straight up.
10. the vernalization hardening frame according to claim 5 or 6, it is characterised in that
Offer multiple hollow holes on the extension, multiple hollow holes equidistantly distributed in the horizontal direction.
CN201710405885.7A 2017-05-31 2017-05-31 Vernalization hardening frame Pending CN107125049A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710405885.7A CN107125049A (en) 2017-05-31 2017-05-31 Vernalization hardening frame
PCT/CN2017/093449 WO2018218751A1 (en) 2017-05-31 2017-07-19 Germination-accelerating and seedling-hardening box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710405885.7A CN107125049A (en) 2017-05-31 2017-05-31 Vernalization hardening frame

Publications (1)

Publication Number Publication Date
CN107125049A true CN107125049A (en) 2017-09-05

Family

ID=59734299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710405885.7A Pending CN107125049A (en) 2017-05-31 2017-05-31 Vernalization hardening frame

Country Status (2)

Country Link
CN (1) CN107125049A (en)
WO (1) WO2018218751A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111034548A (en) * 2019-12-24 2020-04-21 安徽咱家田生态农业有限公司 Method for cultivating snakegourd seedlings by utilizing snakegourd seeds

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201163905Y (en) * 2007-08-15 2008-12-17 北京农学院 Tridimensional seedling disk
CN202697355U (en) * 2012-07-29 2013-01-30 贵州省烟草公司黔西南州公司 Pneumatic lifting tobacco seedling hardening-off system
CN203603434U (en) * 2013-11-13 2014-05-21 哈尔滨建成集团有限公司 Movable type long cylinder inner cavity packing work operating platform
CN203801390U (en) * 2014-05-16 2014-09-03 台州市绿沃川农场(普通合伙) Seedling frame for large-scale vegetable planting
CN204132062U (en) * 2014-08-13 2015-02-04 吴世坤 Intake type rice shoot dish
CN204180496U (en) * 2014-10-24 2015-03-04 李润溪 Automation Pregermination and seedling breeding all-in-one
CN205071759U (en) * 2015-09-23 2016-03-09 上海乾满实业有限公司 Plant society flowerpot
CN205389694U (en) * 2016-03-14 2016-07-27 杭州宅耕农业科技有限公司 Cabinet and combination formula of growing seedlings cabinet of growing seedlings
CN205491703U (en) * 2016-03-11 2016-08-24 云南省农业科学院热带亚热带经济作物研究所 Hydroponic device that vernalization of butter fruit was used
CN205667171U (en) * 2016-06-07 2016-11-02 云南农业大学 A kind of bletilla seedling equipment
CN106613475A (en) * 2016-11-03 2017-05-10 明光市大全甜叶菊专业合作社 Stevia rebaudiana seedling growing pot

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11113410A (en) * 1997-10-20 1999-04-27 Kaneko Agricult Mach Co Ltd Seedling box
CN203072489U (en) * 2013-02-26 2013-07-24 叶少杰 Novel tea seedling raising tray
CN203233799U (en) * 2013-05-22 2013-10-16 福建省荆龙生物科技有限公司 Frame-shaped anoectochilus formosanus planting device
CN204837269U (en) * 2015-07-22 2015-12-09 广西壮族自治区农业科学院农业资源与环境研究所 Basket of growing seedlings

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201163905Y (en) * 2007-08-15 2008-12-17 北京农学院 Tridimensional seedling disk
CN202697355U (en) * 2012-07-29 2013-01-30 贵州省烟草公司黔西南州公司 Pneumatic lifting tobacco seedling hardening-off system
CN203603434U (en) * 2013-11-13 2014-05-21 哈尔滨建成集团有限公司 Movable type long cylinder inner cavity packing work operating platform
CN203801390U (en) * 2014-05-16 2014-09-03 台州市绿沃川农场(普通合伙) Seedling frame for large-scale vegetable planting
CN204132062U (en) * 2014-08-13 2015-02-04 吴世坤 Intake type rice shoot dish
CN204180496U (en) * 2014-10-24 2015-03-04 李润溪 Automation Pregermination and seedling breeding all-in-one
CN205071759U (en) * 2015-09-23 2016-03-09 上海乾满实业有限公司 Plant society flowerpot
CN205491703U (en) * 2016-03-11 2016-08-24 云南省农业科学院热带亚热带经济作物研究所 Hydroponic device that vernalization of butter fruit was used
CN205389694U (en) * 2016-03-14 2016-07-27 杭州宅耕农业科技有限公司 Cabinet and combination formula of growing seedlings cabinet of growing seedlings
CN205667171U (en) * 2016-06-07 2016-11-02 云南农业大学 A kind of bletilla seedling equipment
CN106613475A (en) * 2016-11-03 2017-05-10 明光市大全甜叶菊专业合作社 Stevia rebaudiana seedling growing pot

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111034548A (en) * 2019-12-24 2020-04-21 安徽咱家田生态农业有限公司 Method for cultivating snakegourd seedlings by utilizing snakegourd seeds

Also Published As

Publication number Publication date
WO2018218751A1 (en) 2018-12-06

Similar Documents

Publication Publication Date Title
CA2848885C (en) Plant propagation container, a tray and a greenhouse for the container, and a method for propagating growth of seedlings
US20140366444A1 (en) Propagation container for plants and propagation plate having several such propagation containers
US9462756B2 (en) Modular device for raising seedling
CN101248739B (en) Grid type bowl blanket-shaped seedling rice seedling raising disk
CN107125049A (en) Vernalization hardening frame
CN201282675Y (en) Upper alms bowl lower blanket type alms bowl-shaped blanket-liked seedling-cultivation plate and alms bowl-shaped blanket-liked seedling
CN201015322Y (en) Combined tray for plant growth
CN2914645Y (en) A seedling-growing tray provided a groove
CN104705137B (en) Rice seedling raising method for mechanical transplanting
CN206923366U (en) A kind of agricultural planting seedling cultivation box
KR20100042615A (en) Receptacles for raising seeding
CN205584871U (en) Basin is planted to many specifications of balcony garden draw -in groove formula
CN204518621U (en) Certain kind of berries class crop-planting case
CN209089516U (en) A kind of strawberry seedling culture hole plate
CN203446282U (en) Rice seedling cultivation disk
CN205454918U (en) Seedling sprout cultivation dish
CN206923350U (en) Plant cup and its planting unit
CN202104077U (en) Novel pot-mat seedling raising disk
CN201178608Y (en) Grid-type earthen bowl-shaped blanket shaped rice seedling raising disk
CN105830800A (en) Bowl-blanket type hybrid rice seedling nursing tray
CN207476161U (en) The card punch of corn seed sowing
KR100841897B1 (en) Box for seedling culture
CN206533872U (en) A kind of seedling bed for recycling nutrient solution
CN208821299U (en) A kind of raising tray
CN205962020U (en) Bulk that band shift moved chassis technological device of growing seedlings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 518052 Guangdong city of Shenzhen province Qianhai Shenzhen Hong Kong cooperation zone before Bay Road No. 1 building 201 room A (located in Shenzhen Qianhai business secretary Co. Ltd.)

Applicant after: Shenzhen Chun Mu source Holdings Limited

Address before: 518052 Guangdong city of Shenzhen province Qianhai Shenzhen Hong Kong cooperation zone before Bay Road No. 1 building 201 room A

Applicant before: Shenzhen Qianhai Hong Jia Technology Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905

RJ01 Rejection of invention patent application after publication