CN107093017B - The business datum acquisition methods and its device and system of power-off event - Google Patents
The business datum acquisition methods and its device and system of power-off event Download PDFInfo
- Publication number
- CN107093017B CN107093017B CN201710249228.8A CN201710249228A CN107093017B CN 107093017 B CN107093017 B CN 107093017B CN 201710249228 A CN201710249228 A CN 201710249228A CN 107093017 B CN107093017 B CN 107093017B
- Authority
- CN
- China
- Prior art keywords
- scheduled outage
- outage
- application
- scheduled
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The present invention proposes a kind of business datum acquisition methods of power-off event,Device,System,The scheduled outage application is obtained to the terminal logged in Permission Levels for the account of power supply station administrative staff,Whether the scheduled outage coverage for judging the scheduled outage application by the terminal exceedes default power failure coverage,Whether the history scheduled outage number of the power failure responsible consumer of the scheduled outage application exceedes default frequency of power cut,Amount when whether amount exceedes default during the influence of the scheduled outage application,Whether the scheduled outage circuit of the scheduled outage application, which possesses, turns condition of power supply,And confirm the liability cause of the scheduled outage application,If the scheduled outage application meets electricity cut-off standard,Illustrate that the scheduled outage application possesses normalization,Judge that scheduled outage application meets power failure planning standard by first terminal,So that the plan application auditing flow automation that has a power failure,The auditing flow of power failure plan application can be accelerated.
Description
Technical field
The present invention relates to power domain, more particularly to the business datum acquisition methods and its device of a kind of power-off event and it is
System.
Background technology
Power industry is one of standard for weighing a national economic development degree, and electric power system is supplied electricity consumption user
, need to be according to instructions from the higher level, in certain period, to the power failure that acted out one's plan in given area, with the supply line to the region when electric
Carry out the work such as overhauling, need to be obtained during scheduled outage the business datum of scheduled outage event, such as scheduled outage circuit
And scheduled outage duration etc..
The year or monthly plan power failure Shen that the business datum of scheduled outage event is formulated from upstream electric power system side at present
Middle it please obtain, in the operating process that actual executive plan has a power failure application, staff is not strict to scheduled outage circuit
In accordance with scheduled outage application come perform stop telegram in reply operation, such as scheduled outage application indicate stop send a telegram in reply the time be respectively 8 points of morning
To 8 points at night, if service work is fulfiled ahead of schedule, staff may at night 6 points just scheduled outage circuit is sent a telegram in reply, therefore directly
The business datum of the scheduled outage event obtained in the annual or monthly power failure plan application formulated from upstream electric power system side is true
Reality is not high.
The content of the invention
Based on this, the present invention proposes business datum acquisition methods, the device and system of a kind of power-off event, it is possible to increase
The authenticity in the business datum source of power-off event.
A kind of business datum acquisition methods of power-off event, comprise the following steps:
Scheduled outage application is obtained for the first terminal that the account of power supply station administrative staff logs in by Permission Levels, is passed through
The first terminal judges whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and
Judge whether the history scheduled outage number of the power failure responsible consumer of the scheduled outage application exceedes default frequency of power cut and sentence
Whether amount exceedes amount when presetting and judges the plan of the scheduled outage application during influence of the disconnected scheduled outage application
Whether dead line, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application;
If the scheduled outage coverage of the scheduled outage application is not less than default power failure coverage, and the meter
The history scheduled outage number of the power failure responsible consumer for the application that has a power failure is drawn not less than default frequency of power cut, and the scheduled outage
During the influence of application amount not less than it is default when amount, and the scheduled outage circuit of the scheduled outage application do not possess turn supply
Electric condition, perform the scheduled outage application;
Power failure when performing the scheduled outage application and telegram in reply operational order are obtained, is operated according to the power failure and telegram in reply
Instruction control front end integrates the business datum that power failure application system obtains scheduled outage event from second terminal;The business datum
The business datum of corresponding scheduled outage event during to perform the scheduled outage application;The second terminal is that Permission Levels are
Management stops the terminal that the account of dispatcher logs in of sending a telegram in reply;
The business datum of power-off event corresponding to the scheduled outage application is integrated into power failure application system by front end
Service interface is sent to information service platform.
A kind of business datum acquisition device of power-off event, including:
Scheduled outage application acquisition module, for by Permission Levels for power supply station administrative staff account log in first
Terminal obtains scheduled outage application, and the scheduled outage coverage for judging the scheduled outage application by the first terminal is
It is no to exceed default power failure coverage, and judge the history scheduled outage number of the power failure responsible consumer of the scheduled outage application
Whether exceed default frequency of power cut, and judge amount when whether amount exceedes default during the influence of the scheduled outage application, and
Judge whether the scheduled outage circuit of the scheduled outage application possesses and turn condition of power supply, and confirm the scheduled outage application
Liability cause;
The execution module of scheduled outage application first, if the scheduled outage coverage for the scheduled outage application does not surpass
Cross default power failure coverage, and the history scheduled outage number of the power failure responsible consumer of the scheduled outage application not less than
Default frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when amount, and the plan stops
The scheduled outage circuit of electricity application, which does not possess, turns condition of power supply, performs the scheduled outage application;
Scheduled outage event acquisition module, power failure and telegram in reply operation when performing the scheduled outage application for obtaining refer to
Order, integrate power failure application system according to the power failure and telegram in reply operational order control front end and obtain scheduled outage thing from second terminal
The business datum of part;The business number of corresponding scheduled outage event when the business datum is performs the scheduled outage application
According to;The second terminal is that Permission Levels are that management stops the terminal that the account of dispatcher logs in of sending a telegram in reply;
Scheduled outage event uploading module, for the business datum of power-off event corresponding to the scheduled outage application to be led to
The service interface for crossing front end synthesis power failure application system is sent to information service platform.
A kind of business datum of power-off event obtains system, including:
The first terminal that Permission Levels log in for the account of power supply station administrative staff, for scheduled outage application, passes through institute
State first terminal and judge whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and sentence
Whether the history scheduled outage number of the power failure responsible consumer of the disconnected scheduled outage application exceedes default frequency of power cut, and judges
Amount when whether amount exceedes default during the influence of the scheduled outage application, and judge that the plan of the scheduled outage application stops
Whether electric line, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application;
Scheduled outage application performs equipment, if the scheduled outage coverage for the scheduled outage application is not less than pre-
If power failure coverage, and the history scheduled outage number of the power failure responsible consumer of the scheduled outage application is not less than default
Frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when amount, and the scheduled outage Shen
Scheduled outage circuit please, which does not possess, turns condition of power supply, and performing equipment by the scheduled outage application performs the scheduled outage
Application;
Front end integrates power failure application system, for obtaining power failure and the telegram in reply operational order of scheduled outage application, from authority
The second terminal that rank stops the account login of telegram in reply dispatcher for management obtains scheduled outage corresponding to the scheduled outage application
The business datum of event;The business datum of power-off event corresponding to the scheduled outage application is uploaded to information service platform.
The business datum acquisition methods and apparatus and system of above-mentioned power-off event, the scheduled outage application is obtained to power
The terminal that rank logs in for the account of power supply station administrative staff is limited, is stepped on by the Permission Levels for the account of power supply station administrative staff
The terminal of record judges whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and judges
Whether the history scheduled outage number of the power failure responsible consumer of the scheduled outage application exceedes default frequency of power cut, and judges institute
Amount when whether amount exceedes default when stating the influence of scheduled outage application, and judge the scheduled outage of the scheduled outage application
Whether circuit, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application, if the scheduled outage application
Scheduled outage coverage is not less than default power failure coverage, and the power failure responsible consumer of the scheduled outage application is gone through
History scheduled outage number not less than default frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when
Amount, and the scheduled outage circuit of the scheduled outage application does not possess and turns condition of power supply, performs the scheduled outage application,
Illustrate that the scheduled outage application meets power failure planning standard, it is normative and rigorous to illustrate that the scheduled outage application possesses
Property, whether obtain and judge scheduled outage application by the first terminal for the account login that Permission Levels are power supply station administrative staff
Meet power failure planning standard so that the automation of power failure plan application auditing flow, the auditing flow that power failure plan application can be accelerated;
Then the scheduled outage application is performed, after performing the scheduled outage application, power failure application system is integrated from power by front end
The terminal that limit rank stops the account login of telegram in reply dispatcher for management obtains power-off event corresponding to the scheduled outage application
Business datum, i.e., the scheduled outage application can be obtained by front end synthesis power failure application system and actually approved to execute
When, the business datum of power-off event corresponding to the scheduled outage application, illustrate that the business datum of the scheduled outage event is come
The data obtained in real time during the executive plan power failure application of source, possess authenticity and accuracy;Finally by the scheduled outage Shen
Please corresponding to the business datum of power-off event the communication interface of power failure application system is integrated by front end be uploaded to information service and put down
Platform so that the business datum of power-off event can be integrated into information service platform corresponding to the scheduled outage application, convenient
The business datum of power-off event is quickly called corresponding to the scheduled outage application.
Brief description of the drawings
Fig. 1 is a kind of schematic flow sheet of the business datum acquisition methods of power-off event of the present invention;
Fig. 2 is the schematic flow sheet of the business datum acquisition methods of the power-off event in one embodiment;
Fig. 3 be one embodiment in scheduled outage business datum and fault outage business datum circulation signal
Figure;
Fig. 4 is a kind of structural representation of the business datum acquisition device of power-off event of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Referring to Fig. 1, Fig. 1 is a kind of schematic flow sheet of the business datum acquisition methods of power-off event of the present invention.
The business datum acquisition methods of the power-off event of present embodiment, it may include following steps:
S11:Scheduled outage application is obtained for the first terminal that the account of power supply station administrative staff logs in by Permission Levels,
Judge whether the scheduled outage coverage of the scheduled outage application exceedes default have a power failure and influence model by the first terminal
Enclose, and judge whether the history scheduled outage number of the power failure responsible consumer of the scheduled outage application exceedes default power failure time
Number, and judge amount when whether amount exceedes default during the influence of the scheduled outage application, and judge the scheduled outage Shen
Whether scheduled outage circuit please, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application;
S12:If the scheduled outage coverage of the scheduled outage application is not less than default power failure coverage, and institute
The history scheduled outage number of the power failure responsible consumer of scheduled outage application is stated not less than default frequency of power cut, and the plan
Have a power failure application influence when amount not less than it is default when amount, and the scheduled outage circuit of the scheduled outage application does not possess
Turn condition of power supply, perform the scheduled outage application;
S13:Power failure when performing the scheduled outage application and telegram in reply operational order are obtained, according to the power failure and telegram in reply
Operational order control front end integrates the business datum that power failure application system obtains scheduled outage event from second terminal;The business
The business datum of corresponding scheduled outage event when data is perform the scheduled outage application;The second terminal is authority level
It Wei not manage and stop the terminal that the account of dispatcher logs in of sending a telegram in reply;
S14:The business datum of power-off event corresponding to the scheduled outage application is integrated into the application system that has a power failure by front end
The service interface of system is sent to information service platform.
The business datum acquisition methods of the power-off event of present embodiment, the scheduled outage application is obtained to authority level
Not Wei power supply station administrative staff account log in terminal, by the Permission Levels for power supply station administrative staff account log in
Terminal judges whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and described in judgement
Whether the history scheduled outage number of the power failure responsible consumer of scheduled outage application exceedes default frequency of power cut and judges the meter
Whether amount exceedes amount when presetting and judges the scheduled outage circuit of the scheduled outage application when drawing the influence for the application that has a power failure
Whether possess and turn condition of power supply, if the scheduled outage coverage of the scheduled outage application influences model not less than default have a power failure
Enclose, and the history scheduled outage number of the power failure responsible consumer of the scheduled outage application is not less than default frequency of power cut, and
And during the influence of the scheduled outage application amount not less than it is default when amount, and the scheduled outage of the scheduled outage application
Circuit, which does not possess, turns condition of power supply, performs the scheduled outage application, illustrates that the scheduled outage application meets power failure plan mark
Standard, illustrate that the scheduled outage application possesses normalization, first logged in by Permission Levels for the account of power supply station administrative staff
Terminal obtains and judged that scheduled outage application meets power failure planning standard so that the plan application auditing flow automation that has a power failure,
The auditing flow of power failure plan application can be accelerated;Then the scheduled outage application is performed, after performing the scheduled outage application,
Described in the terminal acquisition for stopping the account login of telegram in reply dispatcher for management from Permission Levels by front end synthesis power failure application system
The business datum of power-off event corresponding to scheduled outage application, i.e., it can be obtained by front end synthesis power failure application system described
When actually approving to execute, the business datum of power-off event, illustrates institute corresponding to the scheduled outage application for scheduled outage application
The data obtained in real time during the business datum source executive plan power failure application for stating scheduled outage event, possess authenticity;Finally
The business datum of power-off event corresponding to the scheduled outage application is integrated to the communication interface of power failure application system by front end
It is uploaded to information service platform so that the business datum of power-off event can be integrated into letter corresponding to the scheduled outage application
Service platform is ceased, facilitates the business datum of power-off event corresponding to the scheduled outage application to be quickly called.
In present embodiment, the history frequency of power cut that power failure responsible consumer number can be set is no more than 2 times, if scheduled outage Shen
Please possess and turn condition of power supply, power supply can be turned by turning power supply or automatic switch remote signalling control by hand, liability cause can be maintenance, work
The reasons such as journey, it can determine whether the scheduled outage application whether as can not be caused by Resistance factor (such as by because maintenance must be planned to stop
Electricity), the default frequency of power cut that the dead line of the scheduled outage application can be set is annual no more than 3 times.
Wherein, for step S14, the business datum of power-off event corresponding to the scheduled outage application takes available for information
Business platform, which is sent to power supply reliability system, to be used to calculate power supply reliability index, if reliability index is less than preset value, can be obtained
The reason for taking reduction reliability, improves electric power system, improves power supply reliability.
Wherein, for step S11, scheduled outage can for certain circuit need to be overhauled for electric power system and what need to be carried out stops
Electricity work, the circuit that need to carry out scheduled outage is scheduled outage circuit.Amount can be to preset customer interrupted during default influence
Number and the critical value of the product of power failure duration, such as amount is less than 1.5 ten thousand hours during default power failure.Default frequency of power cut can be pre-
The scheduled outage number critical value of certain circuit first set, for example, in one month, the frequency of power cut of a scheduled outage route
It must not exceed 3 times.Described information service platform can be information integrated platform (SOA), when applying for executive plan power failure, generation
Business datum it is more, by described information integrated platform (SOA), business datum can be managed collectively, facilitate subsequent calls.Front end
Integrated system can be for the subsystem of production management system, examination & approval and execution available for scheduled outage.
The scheduled outage application can be power supply station administrative staff it is determined that want executive plan power failure before, to outage management
The scheduled outage information of system application, it may include dead line, stop send a telegram in reply time, customer interrupted etc..For example, the first terminal
The scheduled outage application obtained has a power failure according to the standing plans of annual power failure plan itemizing for Outage Management Systems and applied;
Or, the scheduled outage application that the first terminal obtains is that the account that Permission Levels are power failure planning personnel logs in
The Contingency plans that terminal is formulated, which have a power failure, applies.Wherein, the standing plans of annual power failure plan itemizing, which have a power failure, applies, can be by described
Annual plan, which has a power failure, applies for the monthly power failure plan application of decomposition, or stops to resolve into monthly plan by annual plan power failure application
After electricity application, monthly plan has a power failure all scheduled outage applications that application is decomposed, and the present invention also can to obtain this solid according to being actually needed
Power failure of working out a scheme is applied, is not limited to above several ways.
For step S12, referring to Fig. 2, in one embodiment, if judging the scheduled outage by the first terminal
The scheduled outage coverage of application is not less than default power failure coverage, and the important use of power failure of the scheduled outage application
The history scheduled outage number at family not less than default frequency of power cut, and during the influence of the scheduled outage application amount not less than
Amount when default, and after the scheduled outage circuit of the scheduled outage application does not possess and turns condition of power supply, including following step
Suddenly:
S121:The first control instruction is obtained, control authority rank is the 3rd of the account login of distribution departmental manager
Terminal obtains the scheduled outage application from the first terminal, if the scheduled outage application includes more than two scheduled outages
Circuit, more than two scheduled outage circuits for judging the scheduled outage application by the third terminal whether there is identical
Dead line section, and by the third terminal rejudge the scheduled outage application scheduled outage circuit whether need turn
Power supply, and judge the scheduled outage application scheduled outage circuit can livewire work, and judge the scheduled outage application
Scheduled outage circuit whether need to carry out repair based on condition of component, and judge the scheduled outage application power failure duration whether exceed it is pre-
If power failure duration, in the city plan dead line for judging the scheduled outage application, whether city customer interrupted is more than 200
Family, in rural planning dead line, whether rural area customer interrupted is more than 500 families;
S122:If identical dead line section be present in more than two scheduled outage circuits of the scheduled outage application,
The identical power failure section is extracted by the third terminal, the scheduled outage application needs to turn power supply, if the plan
The scheduled outage circuit applied have a power failure without livewire work, if the scheduled outage circuit of the scheduled outage application needs to carry out shape
State overhaul, if the power failure duration of the scheduled outage application not less than default power failure duration, if the city of the scheduled outage application
In city's scheduled outage circuit, city customer interrupted is not less than 200 families, and in rural planning dead line, rural area customer interrupted does not surpass
500 families are crossed, perform the scheduled outage application;Wherein, when performing the scheduled outage application, needs are carried out to turn power supply
Scheduled outage circuit, which performs, turns powered operation, and the identical dead line section is performed and once stops telegram in reply operation.
The present embodiment, if the scheduled outage application obtained includes more than two scheduled outage circuits, such as 3 scheduled outages
Circuit, A scheduled outages circuit are counted in scheduled outage on January 1 in 17 year, B scheduled outages circuit in scheduled outage on January 5 in 17 year and C
Dead line is drawn in scheduled outage on January 8, such as the 2nd line of the 1st line scan pickup coil side of A scheduled outage circuits and B scheduled outage circuits
3rd part of path of section and C scheduled outage circuits is the same line section, i.e., this 3 part of paths overlap, then will overlap
Circuit segment information (including user profile, feeder line information and transformer information etc.) extract, perform have a power failure plan Shen
Please when, once plan is only performed to the part of path of the coincidence and stops telegram in reply operation, the part of path of the coincidence can be avoided in one month
Repeatedly stop sending a telegram in reply, and more than default frequency of power cut.
In one embodiment, if if more than two plans for judging the scheduled outage application by the third terminal stop
There is identical dead line section in electric line, then extract the identical power failure section, the plan by the third terminal
The application that has a power failure needs to turn power supply, if the scheduled outage circuit of the scheduled outage application without livewire work, if the plan stops
The scheduled outage circuit of electricity application needs to carry out repair based on condition of component, if the power failure duration of the scheduled outage application stops not less than default
Electric duration, if in the city plan dead line of the scheduled outage application, city customer interrupted is not less than 200 families, rural area meter
Draw in dead line, rural area customer interrupted after performing the scheduled outage application, comprises the following steps not less than 500 families:
The second control instruction is obtained, is sales department administrative staff's according to the second control instruction control authority rank
The 4th terminal that account logs in obtains the scheduled outage application from the third terminal, by described in the 4th terminal judgement
Whether the customer interrupted of scheduled outage application includes default responsible consumer;If the customer interrupted of the scheduled outage application includes pre-
If responsible consumer, then when performing the scheduled outage application, the power failure period of the default responsible consumer is arranged on described
In the permission time of default responsible consumer.
The default responsible consumer can be the user that can only have a power failure in specific time period, such as go to work on factory, daytime, it is impossible to stop
Electricity, it can only have a power failure at night, then the period that has a power failure is arranged on the evening of factory's permission.
Some responsible consumers can influence normal workflow such as school, ordnance factory when having a power failure, and cause greater loss,
Therefore these users are usually to protect power supply user, that is, keep the user of power supply, it is impossible to have a power failure, in one embodiment, pass through authority level
Not Wei sales department administrative staff account log in the 4th terminal judge whether the customer interrupted in scheduled outage application includes
Power supply user is protected, if not including, illustrates that the scheduled outage application possesses reasonability.If judged by the 4th terminal
Customer interrupted in scheduled outage application, which includes, protects power supply user, then guarantor's power supply user can be extracted by the 4th terminal
Information, is uploaded to the front end integrated system of electric power system, and corresponding measure is taken by front end integrated system
Ensure, when stopping telegram in reply operation corresponding to the execution scheduled outage application, to ensure the power supply for protecting the user that powers.Or if
Judge that the customer interrupted in the scheduled outage application includes and protect power supply user, then reacquired by the first terminal a
Scheduled outage application.By Permission Levels the scheduled outage is audited for the 4th terminal that the account of sales department administrative staff logs in
Whether application meets scheduled outage index so that the automation of power failure plan application auditing flow, can accelerate power failure plan application
Auditing flow.
In one embodiment, if if including default weight by the customer interrupted of the 4th terminal scheduled outage application
After wanting user, comprise the following steps:
The 3rd control instruction is obtained, is that office of city equipment portion reliability is special according to the 3rd control instruction control authority rank
The 7th terminal for blaming the account login of keeper obtains the scheduled outage application from the 4th terminal, by the described 7th eventually
End judges whether the liability cause of the scheduled outage application is to preset reasonable liability cause, and confirms the scheduled outage application
Power failure equipments and its technical reason;
It is dispatcher by Permission Levels if the liability cause of the scheduled outage application is to preset reasonable liability cause
The 8th terminal that the account of specific responsibility logs in obtains the scheduled outage application from the 7th terminal, is sentenced by the 8th terminal
It is disconnected whether to turn power supply plan to needing the scheduled outage circuit for turning power supply to formulate, judge the power off time of the scheduled outage application
Whether in default power off time, judge whether the load for needing to turn the scheduled outage circuit of power supply exceedes default load;
If having formulated to the scheduled outage circuit for needing to turn power supply and turning power supply plan, during the power failure of the scheduled outage application
Between in default power off time, it is necessary to turn the load of the scheduled outage circuit of power supply not less than default load, then perform described in
Scheduled outage application, and turn powered operation to needing the scheduled outage circuit for turning power supply to perform according to power supply plan is turned.
In the present embodiment, judge whether the liability cause of the scheduled outage application is reasonable by the 7th terminal, example
If maintenance and engineering construction be reasonable liability cause, a load for the scheduled outage circuit that the 8th terminal judges to need to turn to power is
It is no to exceed default load, Load flow calculation can be carried out to turning supply line, be calculated whether its load exceedes default load.
In one embodiment, if it is default to judge that the customer interrupted of the scheduled outage application includes by the 4th terminal
After responsible consumer, comprise the following steps:
The 3rd control instruction is obtained, is that office of city equipment portion reliability is special according to the 3rd control instruction control authority rank
The 7th terminal for blaming the account login of keeper obtains the scheduled outage application from the 4th terminal, by the described 7th eventually
End judges whether the customer interrupted of the scheduled outage application includes the powered user of more than 10KV voltages;
If the customer interrupted of the scheduled outage application does not include the powered user of more than 10KV voltages, the plan is performed
Have a power failure application.
The scheduled outage application is typically entered to the powered user of below 10KV voltages, such as Middle Voltage, low-voltage customer
Row scheduled outage, if by the 7th terminal judge the scheduled outage application customer interrupted include more than 10KV voltages by
The user of electricity, can reacquire scheduled outage application, or when performing the scheduled outage application, to more than 10KV voltages by electricity
User perform protect powered operation.The 7th logged in by the account that Permission Levels are office of city equipment portion reliability specific responsibility keeper is whole
Hold to judge whether the customer interrupted of the scheduled outage application meets power failure planning standard so that the plan application examination & verification that has a power failure is flowed
Process automation, the auditing flow that power failure plan application can be accelerated.
In one embodiment, the business datum acquisition methods of the power-off event are further comprising the steps of:
Obtain and barrier is reported by the fault trip impaired report information of feeder-terminal-unit monitoring, the user of marketing customer service system collection
The inspection fault message that information and Permission Levels obtain for the 5th terminal that the account of patrol officer logs in;
The fault trip impaired report information, user's impaired report information and the inspection fault message are carried out being generated as failure
Work order information;
By Permission Levels the fault ticket information is obtained for the 6th terminal that the account of breakdown repair personnel logs in;Its
In, the fault ticket information includes failure liability cause and fault outage coverage;
Break down the fault outage route of power failure according to the fault ticket acquisition of information;
When isolating to the fault outage route, if the fault outage route, which possesses, turns condition of power supply, perform
Turn powered operation;
The telegram in reply operational order to the fault outage route is obtained, is grasped according to the telegram in reply of the fault outage route
Work, which instructs, controls front end fault outage application system whole to manage the second of the account login for stopping telegram in reply dispatcher from Permission Levels
End obtains the business datum of the fault outage event;
The business datum of the fault ticket information and fault outage event is uploaded to the letter by communication interface
Cease service platform;
The business datum of the scheduled outage event and the industry of fault outage event are obtained from described information service platform
Business data;
Electric power system is calculated according to the business datum of the business datum of the scheduled outage event and fault outage event
Power supply reliability.
Fault outage circuit can be to have actually occurred failure to need to carry out the circuit of breakdown repair, in power failure of breaking down
Before, fault outage circuit is unknown, in this implementation, can by feeder-terminal-unit monitor fault trip impaired report information,
The user's impaired report information and Permission Levels of marketing customer service system collection are patrolled for what the terminal that the account of patrol officer logs in obtained
Inspection fault message is obtained from hardware end, user side and inspection side come the fault outage route for the power failure that determines to break down
Failure impaired report information determines fault outage route, possesses authenticity.Then by the fault ticket information and fault outage
The business datum of event is uploaded to described information service platform by communication interface, when calculating the power supply reliability of electric power system,
The business datum of the scheduled outage event and the business number of fault outage event that will be obtained from described information service platform
According to being counted as data source, the accuracy and authenticity for the power supply reliability for calculating electric power system are improved.
In the present embodiment, the feeder-terminal-unit can be that feeder automation switchs, automatic by feeder line during fault trip
Switching monitoring automatically generates 10KV fault trips report barrier work order, obtains fault trip impaired report information;Customer service system of marketing collection
During user's impaired report information, barrier phone can be reported by the client that the customer service terminal of marketing system 99598 is connected to, obtain user and report barrier letter
Breath;When Permission Levels obtain inspection impaired report information for the 5th terminal that the account of patrol officer logs in, it is outer that station can be made a report on by teams and groups
During failure, patrol officer make an inspection tour maintenance process in, it may be found that fault upload to the 5th terminal, pass through the 5th terminal
Obtain the inspection impaired report information.
Wherein, the fault trip impaired report information, user's impaired report information and the inspection fault message are generated
It may include for the step of fault ticket information:
If the fault trip impaired report information is identical with user's impaired report information and the inspection fault message, by preceding
Production management system is held to obtain and by the fault trip impaired report information, user's impaired report information or the inspection fault message
It is generated as the fault ticket information;
If the fault trip impaired report information, user's impaired report information and the inspection fault message have what part repeated
Impaired report information, then by the fault trip impaired report information, user's impaired report information and described patrolled by front end production management system
Inspection fault message merges into fault ticket information.
The failure impaired report information obtained when three of the above source is completely the same, then the failure in any one source may be selected
Impaired report information generates the fault ticket, if the consistent information in part be present in the failure impaired report information that three of the above source obtains,
The failure impaired report information in three kinds of sources is then subjected to integration and merges into the fault ticket information, improves fault outage Route Generation
Efficiency.
In one embodiment, according to the business datum of the scheduled outage event and the business datum of fault outage event
Before the power supply reliability for calculating electric power system, comprise the following steps:
First is sent to information service platform obtain instruction according to the scheduled outage application;
According to described first obtain instruction control described information service platform by the electronic handoff procedure of infrastructure project,
The electronic handoff procedure of the electronic handoff procedure of industry expansion engineering, the electronic handoff procedure and repair of technology innovation project
Obtain the basic data of the scheduled outage circuit of the scheduled outage application;The basic data of the scheduled outage circuit includes meter
Draw substation information, feeder line information, transformer information, scheduled outage user profile and family on dead line and become relation letter
Breath;The business datum of the scheduled outage event includes the basic data of the scheduled outage circuit;
Second is sent to information service platform obtain instruction according to the fault outage route;
Instruction control described information service platform is obtained according to described second to transfer by the electronization of the infrastructure project
Flow, industry expand the electronic handoff procedure of engineering, the electronic of electronic handoff procedure or repair of technology innovation project is transferred
Flow obtains the basic data of fault outage circuit, and the basic data of the faulty line includes the power transformation on fault outage circuit
Stand information, feeder line information, transformer information, fault outage user profile and family becomes relation information;The fault outage event
Business datum include the basic data of the fault outage circuit.
In the present embodiment, the business datum of the scheduled outage event includes the basic data of scheduled outage circuit, such as
Substation information, feeder line information, transformer information, scheduled outage user profile, family on scheduled outage circuit become relation information,
The business datum of the fault outage event includes the basic data of fault outage circuit, such as the power transformation on fault outage circuit
Stand information, feeder line information, transformer information, fault outage user profile, family become relation information, pass through the electronization of infrastructure project
Handover Interface, industry expand the electronic Handover Interface of engineering, technology innovation project electronic Handover Interface and repair electronics
Change Handover Interface and obtain the basic data on the scheduled outage route and the basic data on fault outage route, in raising
The accuracy and authenticity and rate of data acquisition of basic data acquisition are stated, above basic data is passed through into corresponding electronics
Change the integrated preservation of Handover Interface to described information service platform, improve the integration of above basic data, be powered reliably
Property when calculating, it is convenient to call.
In one embodiment, the business datum of the scheduled outage event includes the service data of scheduled outage event, institute
When stating the power failure of the dead line, scheduled outage circuit of the service data including scheduled outage circuit of scheduled outage event and starting
Between, scheduled outage circuit have a power failure the end time, the execution state of scheduled outage circuit, the total user of the power failure of scheduled outage circuit
Number, the power failure responsible consumer number of scheduled outage circuit, the total power off time of the user of scheduled outage circuit, the shadow of scheduled outage circuit
Turn power supply information, the power failure plan execution information of scheduled outage circuit, the scheduled outage circuit of amount, scheduled outage circuit when ringing
Loss load, the loss electricity of scheduled outage circuit, the power failure property of scheduled outage circuit, the technology of scheduled outage circuit it is former
Cause, the liability cause of scheduled outage circuit, the responsible department of scheduled outage circuit, scheduled outage circuit power failure equipments code,
The interruption duration of scheduled outage circuit, the equivalent interruption duration of scheduled outage circuit, the middle pressure of scheduled outage circuit
Bore number of users, scheduled outage circuit middle pressure bore when amount, the power failure Middle Voltage number of scheduled outage circuit, scheduled outage
Power failure low-voltage customer number, the regionalism of scheduled outage circuit and the department of affiliated unit of scheduled outage circuit of circuit;
The business datum of the fault outage event includes the service data of fault outage event, the fault outage event
Service data include the dead line of fault outage circuit, the power failure time started of fault outage circuit, fault outage circuit
Have a power failure the end time, the execution state of fault outage circuit, the total number of users of the power failure of fault outage circuit, fault outage circuit
Power failure responsible consumer number, the total power off time of the user of fault outage circuit, fault outage circuit influence when amount, failure stop
Electric line turn power supply information, whether major network failure cause, the telegram in reply execution information of fault outage circuit, fault outage circuit
It is former to lose load, the loss electricity of fault outage circuit, the power failure property of fault outage circuit, the technology of fault outage circuit
Cause, the power failure equipments code of the liability cause of fault outage circuit, fault outage circuit, fault outage circuit responsible department,
The interruption duration of fault outage circuit, the equivalent interruption duration of fault outage circuit, the middle pressure of fault outage circuit
Bore number of users, fault outage circuit middle pressure bore when amount, power failure Middle Voltage number, the fault outage of fault outage circuit
Power failure low-voltage customer number, the regionalism of fault outage circuit and the department of affiliated unit of fault outage circuit of circuit.
Fig. 3 is the circulation signal of the business datum of scheduled outage and the business datum of fault outage in one embodiment
Figure.
Terminal referred to above can be to possess data processing function intelligent terminal, such as PC, smart mobile phone.
A kind of embodiment of the acquisition device of the business datum of power-off event of the invention set forth below.
Referring to Fig. 4, Fig. 4 is a kind of structural representation of the business datum acquisition device of power-off event of the present invention.
The business datum acquisition device of the power-off event of present embodiment, it may include:
Scheduled outage application acquisition module 10, scheduled outage application acquisition module, for being power supply station by Permission Levels
The first terminal that the account of administrative staff logs in obtains scheduled outage application, judges the scheduled outage by the first terminal
Whether the scheduled outage coverage of application exceedes default power failure coverage, and judges the power failure weight of the scheduled outage application
Want whether the history scheduled outage number of user exceedes default frequency of power cut and judge family during the influence of the scheduled outage application
Amount and judge whether the scheduled outage circuit of the scheduled outage application possesses when whether number exceedes default and turn condition of power supply,
And confirm the liability cause of the scheduled outage application;
The first execution module of scheduled outage application 20, if the scheduled outage coverage for the scheduled outage application is not
History scheduled outage number more than default power failure coverage, and the power failure responsible consumer of the scheduled outage application does not surpass
Cross default frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when amount, and the plan
The scheduled outage circuit applied that has a power failure, which does not possess, turns condition of power supply, performs the scheduled outage application;
Scheduled outage event acquisition module 30, power failure and telegram in reply operation when performing the scheduled outage application for obtaining
Instruction, integrate power failure application system according to the power failure and telegram in reply operational order control front end and obtain scheduled outage from second terminal
The business datum of event;The business number of corresponding scheduled outage event when the business datum is performs the scheduled outage application
According to;The second terminal is that Permission Levels are that management stops the terminal that the account of dispatcher logs in of sending a telegram in reply;
Scheduled outage event uploading module 40, for by the business datum of power-off event corresponding to the scheduled outage application
The service interface that power failure application system is integrated by front end is sent to information service platform.
Present embodiment, the scheduled outage application is obtained to Permission Levels by scheduled outage application acquisition module 10
The terminal logged in for the account of power supply station administrative staff, the end logged in by the Permission Levels for the account of power supply station administrative staff
End judges whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and judges the meter
Whether the history scheduled outage number for drawing the power failure responsible consumer for the application that has a power failure exceedes default frequency of power cut, and judges the plan
Have a power failure application influence when amount amount when whether exceeding default, and judge that the scheduled outage circuit of the scheduled outage application is
It is no possess turn condition of power supply, if the scheduled outage coverage of the scheduled outage application not less than default power failure coverage,
And the history scheduled outage number of the power failure responsible consumer of the scheduled outage application is not less than default frequency of power cut, and institute
When stating the influence of scheduled outage application amount not less than it is default when amount, and the scheduled outage circuit of the scheduled outage application
Do not possess and turn condition of power supply, and confirm the liability cause of the scheduled outage application, perform the scheduled outage application, illustrate institute
State scheduled outage application and meet power failure planning standard, illustrate that the scheduled outage application possesses normalization, then perform the meter
The application that has a power failure is drawn, after performing the scheduled outage application, being had a power failure by scheduled outage event acquisition module 30 by front end synthesis should
Obtained with system from the terminal that Permission Levels are the account login that management stops telegram in reply dispatcher corresponding to the scheduled outage application
The business datum of power-off event, i.e., the scheduled outage application can be obtained in reality by integrating power failure application system by the front end
When approving to execute, the business datum of power-off event corresponding to the scheduled outage application, illustrate the industry of the scheduled outage event
The data obtained in real time during the executive plan power failure application of business data source, possess authenticity;By scheduled outage event uploading module
40, the communication that the business datum of power-off event corresponding to the scheduled outage application is integrated to power failure application system by front end connects
Mouth is uploaded to information service platform so that the business datum of power-off event can be integrated into corresponding to the scheduled outage application
Information service platform, the business datum of power-off event corresponding to the scheduled outage application is facilitated quickly to be called.
The business datum acquisition device of the power-off event of the present invention and a pair of the business datum acquisition methods 1 of power-off event
Should, the technical characteristic and its advantage illustrated in the embodiment of the business datum acquisition methods of above-mentioned power-off event is applied to
In the embodiment of the business datum acquisition device of the power-off event, hereby give notice that.
In one optional embodiment, a kind of business datum of power-off event obtains system, including:
The first terminal that Permission Levels log in for the account of power supply station administrative staff, for scheduled outage application, passes through institute
State first terminal and judge whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and sentence
Whether the history scheduled outage number of the power failure responsible consumer of the disconnected scheduled outage application exceedes default frequency of power cut, and judges
Amount when whether amount exceedes default during the influence of the scheduled outage application, and judge that the plan of the scheduled outage application stops
Whether electric line, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application;
Scheduled outage application performs equipment, if the scheduled outage coverage for the scheduled outage application is not less than pre-
If power failure coverage, and the history scheduled outage number of the power failure responsible consumer of the scheduled outage application is not less than default
Frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when amount, and the scheduled outage Shen
Scheduled outage circuit please, which does not possess, turns condition of power supply, and performing equipment by the scheduled outage application performs the scheduled outage
Application;
Front end integrates power failure application system, for obtaining power failure and the telegram in reply operational order of scheduled outage application, from authority
The second terminal that rank stops the account login of telegram in reply dispatcher for management obtains scheduled outage corresponding to the scheduled outage application
The business datum of event;The business datum of power-off event corresponding to the scheduled outage application is uploaded to information service platform.
Present embodiment, the first terminal that Permission Levels are logged in for the account of power supply station administrative staff is by the scheduled outage
Application obtains the terminal logged in Permission Levels for the account of power supply station administrative staff, is managed by the Permission Levels for power supply station
The terminal that the account of personnel logs in judges amount when whether amount exceedes default have a power failure during the power failure of the scheduled outage application, sentences
Whether the scheduled outage coverage of the disconnected scheduled outage application exceedes default power failure coverage, and judges that the plan stops
Whether the history scheduled outage number of the power failure responsible consumer of electricity application exceedes default frequency of power cut, and judges the scheduled outage
Amount when whether amount exceedes default during the influence of application, and judge whether the scheduled outage circuit of the scheduled outage application has
It is standby to turn condition of power supply, and confirm the liability cause of the scheduled outage application, if the scheduled outage shadow of the scheduled outage application
Scope is rung not less than default power failure coverage, and the history scheduled outage of the power failure responsible consumer of the scheduled outage application
Number not less than default frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when amount, and
The scheduled outage circuit of the scheduled outage application, which does not possess, turns condition of power supply, performs the scheduled outage application, described in explanation
Scheduled outage application meets power failure planning standard, illustrates that the scheduled outage application possesses normalization, then scheduled outage application
Perform equipment and perform the scheduled outage application, after performing the scheduled outage application, front end integrates power failure application system from power
The terminal that limit rank stops the account login of telegram in reply dispatcher for management obtains power-off event corresponding to the scheduled outage application
Business datum, i.e., the scheduled outage application can be obtained by front end synthesis power failure application system and actually approved to execute
When, the business datum of power-off event corresponding to the scheduled outage application, illustrate that the business datum of the scheduled outage event is come
The data obtained in real time during the executive plan power failure application of source, possess authenticity;Front end integrates power failure application system by the plan
The business datum of power-off event corresponding to application that has a power failure is uploaded to information service platform so that corresponding to the scheduled outage application
The business datum of power-off event can be integrated into information service platform, facilitate power-off event corresponding to the scheduled outage application
Business datum be quickly called.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply each technical characteristic in example be possible to combination be all described, as long as but lance is not present in the combination of these technical characteristics
Shield, all should be the scope that this specification is recorded.
Embodiment described above only expresses several embodiments of the present invention, and its description is more specific and detailed, but not
Therefore the limitation to the scope of the claims of the present invention can be interpreted as.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. the business datum acquisition methods of a kind of power-off event, it is characterised in that comprise the following steps:
Scheduled outage application is obtained for the first terminal that the account of power supply station administrative staff logs in by Permission Levels, by described
First terminal judges whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and judges
Whether the history scheduled outage number of the power failure responsible consumer of the scheduled outage application exceedes default frequency of power cut, and judges institute
Amount when whether amount exceedes default when stating the influence of scheduled outage application, and judge the scheduled outage of the scheduled outage application
Whether circuit, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application;
If the scheduled outage coverage of the scheduled outage application is not less than default power failure coverage, and the plan stops
The history scheduled outage number of the power failure responsible consumer of electricity application is not less than default frequency of power cut, and the scheduled outage application
Influence when amount not less than it is default when amount, and the scheduled outage circuit of the scheduled outage application do not possess turn power supply a bar
Part, perform the scheduled outage application;
Power failure when performing the scheduled outage application and telegram in reply operational order are obtained, according to the power failure and telegram in reply operational order
Front end is controlled to integrate the business datum that power failure application system obtains scheduled outage event from second terminal;The business datum is to hold
The business datum of corresponding scheduled outage event during the row scheduled outage application;The second terminal is that Permission Levels are management
Stop the terminal that the account of dispatcher logs in of sending a telegram in reply;
The business datum of power-off event corresponding to the scheduled outage application is integrated to the service of power failure application system by front end
Interface is sent to information service platform;
Wherein, the business datum acquisition methods of the power-off event, it is further comprising the steps of:
Obtain fault trip impaired report information, the user's impaired report information of marketing customer service system collection by feeder-terminal-unit monitoring
And the inspection fault message that Permission Levels obtain for the 5th terminal that the account of patrol officer logs in;
The fault trip impaired report information, user's impaired report information and the inspection fault message are generated as fault ticket letter
Breath;
By Permission Levels the fault ticket information is obtained for the 6th terminal that the account of breakdown repair personnel logs in;Wherein,
The fault ticket information includes failure liability cause and fault outage coverage;
Break down the fault outage route of power failure according to the fault ticket acquisition of information;
When isolating to the fault outage route, if the fault outage route, which possesses, turns condition of power supply, perform and turn to supply
It is electrically operated;
The telegram in reply operational order to the fault outage route is obtained, is referred to according to the operation of the telegram in reply of the fault outage route
Order controls front end fault outage application system to be obtained from the second terminal that Permission Levels are the account login that management stops telegram in reply dispatcher
Take the business datum of fault outage event;
The business datum of the fault ticket information and fault outage event is uploaded into described information by communication interface to take
Business platform;
The business datum of the scheduled outage event and the business number of fault outage event are obtained from described information service platform
According to;
The confession of electric power system is calculated according to the business datum of the business datum of the scheduled outage event and fault outage event
Electric reliability.
2. according to the method for claim 1, it is characterised in that if judging the scheduled outage Shen by the first terminal
Scheduled outage coverage please is not less than default power failure coverage, and the power failure responsible consumer of the scheduled outage application
History scheduled outage number not less than default frequency of power cut, and during the influence of the scheduled outage application amount not less than pre-
If when amount, and after the scheduled outage circuit of the scheduled outage application does not possess and turns condition of power supply, comprise the following steps:
The first control instruction is obtained, according to the account that the first control instruction control authority rank is distribution departmental manager
The third terminal of login obtains the scheduled outage application from the first terminal, if the scheduled outage application include two with
Upper scheduled outage circuit, by the third terminal judge the scheduled outage application more than two scheduled outage circuits whether
Identical dead line section be present;And the scheduled outage circuit of the scheduled outage application is rejudged by the third terminal
Whether need to turn power supply, and judge the scheduled outage application scheduled outage circuit can livewire work, and judge the meter
Draw whether the scheduled outage circuit for the application that has a power failure needs to carry out repair based on condition of component, and judge the power failure duration of the scheduled outage application
Whether exceed and preset power failure duration, in the city plan dead line for judging the scheduled outage application, city customer interrupted is
It is no more than 200 families, in rural planning dead line, whether rural area customer interrupted more than 500 families;
If more than two scheduled outage circuits of the scheduled outage application have identical dead line section, pass through described
Three terminals extract the identical power failure section, if the scheduled outage application needs to turn power supply, if the scheduled outage application
Scheduled outage circuit without livewire work, if the scheduled outage circuit of the scheduled outage application needs to carry out repair based on condition of component,
If the power failure duration of the scheduled outage application is not less than default power failure duration, if the city plan of the scheduled outage application stops
In electric line, city customer interrupted is not less than 200 families, in rural planning dead line, rural area customer interrupted not less than 500 families,
Perform the scheduled outage application;Wherein, when performing the scheduled outage application, needs turn with the scheduled outage of power supply
Circuit, which performs, turns powered operation, and the identical dead line section is performed and once stops telegram in reply operation.
3. according to the method for claim 2, it is characterised in that if if judging the scheduled outage by the third terminal
Be present identical dead line section in more than two scheduled outage circuits of application, then extracted by the third terminal described identical
Power failure section, the scheduled outage application needs to turn power supply, if the scheduled outage circuit of the scheduled outage application is without band
Electric operation, if the scheduled outage circuit of the scheduled outage application needs to carry out repair based on condition of component, if the scheduled outage application
Power failure duration is not less than default power failure duration, if in the city plan dead line of the scheduled outage application, city, which has a power failure, to be used
Family in rural planning dead line, after rural area customer interrupted is not less than 500 families, comprises the following steps not less than 200 families:
The second control instruction is obtained, according to the account that the second control instruction control authority rank is sales department administrative staff
The 4th terminal logged in obtains the scheduled outage application from the third terminal, judges the plan by the 4th terminal
Whether the customer interrupted applied that has a power failure includes default responsible consumer;If the customer interrupted of the scheduled outage application includes default weight
User is wanted, then when performing the scheduled outage application, the power failure period of the default responsible consumer is arranged on described default
In the permission time of responsible consumer.
4. according to the method for claim 1, it is characterised in that according to the business datum of the scheduled outage event and event
The step of before the power supply reliability of the business datum calculating electric power system of barrier power-off event, includes:
First is sent to information service platform obtain instruction according to the scheduled outage application;
Electronic handoff procedure, the industry expansion that instruction controls described information service platform by infrastructure project are obtained according to described first
The electronic handoff procedure of engineering, the electronic handoff procedure of the electronic handoff procedure and repair of technology innovation project obtain
The basic data of the scheduled outage circuit of the scheduled outage application;The basic data of the scheduled outage circuit is stopped including plan
Substation information, feeder line information, transformer information, scheduled outage user profile and family in electric line become relation information;Institute
Stating the business datum of scheduled outage event includes the basic data of the scheduled outage circuit;According to the fault outage route to
Information service platform sends second and obtains instruction;
According to described second obtain instruction control described information service platform by the electronic Handover Interface of the infrastructure project,
The electronic Handover Interface of industry expansion engineering, the electronic Handover Interface of the electronic Handover Interface or repair of technology innovation project obtain
The basic data of fault outage circuit is taken, the basic data of the fault outage circuit includes the transformer station on fault outage circuit
Information, feeder line information, transformer information, fault outage user profile and family become relation information;The fault outage event
Business datum includes the basic data of the fault outage circuit.
5. the method according to claim 1 or 4, it is characterised in that
The business datum of the scheduled outage event includes the service data of scheduled outage event, the fortune of the scheduled outage event
Row data include the dead line of scheduled outage circuit, the power failure time started of scheduled outage circuit, scheduled outage circuit stop
Electric end time, the execution state of scheduled outage circuit, the total number of users of power failure of scheduled outage circuit, scheduled outage circuit stop
Electric responsible consumer number, the total power off time of the user of scheduled outage circuit, scheduled outage circuit influence when amount, scheduled outage line
Road turns power supply information, the power failure plan execution information of scheduled outage circuit, the loss load of scheduled outage circuit, scheduled outage
The loss electricity of circuit, the power failure property of scheduled outage circuit, the technical reason of scheduled outage circuit, the duty of scheduled outage circuit
The power failure of power failure equipments code, scheduled outage circuit of reason, the responsible department of scheduled outage circuit, scheduled outage circuit is appointed to hold
Continuous time, the equivalent interruption duration of scheduled outage circuit, middle pressure bore number of users, the scheduled outage line of scheduled outage circuit
Amount during the middle pressure bore on road, the power failure Middle Voltage number of scheduled outage circuit, scheduled outage circuit power failure low-voltage customer number,
The regionalism of scheduled outage circuit and the department of affiliated unit of scheduled outage circuit;
The business datum of the fault outage event includes the service data of fault outage event, the fortune of the fault outage event
Row data include the dead line of fault outage circuit, the power failure time started of fault outage circuit, fault outage circuit stop
Electric end time, the execution state of fault outage circuit, the total number of users of power failure of fault outage circuit, fault outage circuit stop
Electric responsible consumer number, the total power off time of the user of fault outage circuit, fault outage circuit influence when amount, fault outage line
Road turn power supply information, whether major network failure cause, the loss of the telegram in reply execution information, fault outage circuit of fault outage circuit
Load, the loss electricity of fault outage circuit, the power failure property of fault outage circuit, the technical reason of fault outage circuit, event
The liability cause of barrier dead line, the power failure equipments code of fault outage circuit, the responsible department of fault outage circuit, failure are stopped
The interruption duration of electric line, the equivalent interruption duration of fault outage circuit, the middle pressure bore of fault outage circuit are used
Amount, fault outage circuit middle pressure bore when amount, the power failure Middle Voltage number of fault outage circuit, fault outage circuit
The department of affiliated unit of power failure low-voltage customer number, the regionalism of fault outage circuit and fault outage circuit.
6. according to the method for claim 1, it is characterised in that
The scheduled outage application that the first terminal obtains is Outage Management Systems consolidating according to annual power failure plan itemizing
Power failure of working out a scheme is applied;
Or, the scheduled outage application that the first terminal obtains is that the account that Permission Levels are power failure planning personnel is stepped on
The Contingency plans that the terminal of record is formulated, which have a power failure, applies.
7. according to the method for claim 3, it is characterised in that if judging the scheduled outage Shen by the 4th terminal
After customer interrupted please includes default responsible consumer, comprise the following steps:
The 3rd control instruction is obtained, is office of city equipment portion reliability specific responsibility pipe according to the 3rd control instruction control authority rank
The 7th terminal that the account of reason person logs in obtains the scheduled outage application from the 4th terminal, is sentenced by the 7th terminal
Whether the liability cause of the disconnected scheduled outage application is to preset reasonable liability cause, and confirms stopping for the scheduled outage application
Electric equipment and its technical reason;
If the liability cause of the scheduled outage application is to preset reasonable liability cause, specialized in by Permission Levels for dispatcher
The 8th terminal that logs in of account obtain the scheduled outage application from the 7th terminal, judged by the 8th terminal be
It is no to need turn power supply a scheduled outage circuit formulate turns power supply plan, judge the scheduled outage application power off time whether
In default power off time, judge whether the load for needing to turn the scheduled outage circuit of power supply exceedes default load;
If turn power supply plan to needing the scheduled outage circuit for turning power supply to formulate, at the power off time of the scheduled outage application
In in default power off time, it is necessary to which the load for turning the scheduled outage circuit of power supply then performs the plan not less than default load
Have a power failure application, and turns powered operation to needing the scheduled outage circuit for turning power supply to perform according to power supply plan is turned.
A kind of 8. business datum acquisition device of power-off event, it is characterised in that including:
Scheduled outage application acquisition module, for the first terminal logged in by Permission Levels for the account of power supply station administrative staff
Scheduled outage application is obtained, whether the scheduled outage coverage for judging the scheduled outage application by the first terminal surpasses
Cross default power failure coverage, and judge the power failure responsible consumer of the scheduled outage application history scheduled outage number whether
More than default frequency of power cut, and judge amount when whether amount exceedes default during the influence of the scheduled outage application, and judge
Whether the scheduled outage circuit of the scheduled outage application, which possesses, turns condition of power supply, and confirms the responsibility of the scheduled outage application
Reason;
The execution module of scheduled outage application first, if the scheduled outage coverage for the scheduled outage application is not less than pre-
If power failure coverage, and the history scheduled outage number of the power failure responsible consumer of the scheduled outage application is not less than default
Frequency of power cut, and during the influence of the scheduled outage application amount not less than it is default when amount, and the scheduled outage Shen
Scheduled outage circuit please, which does not possess, turns condition of power supply, performs the scheduled outage application;
Scheduled outage event acquisition module, power failure and telegram in reply operational order when performing the scheduled outage application for obtaining,
Integrate power failure application system according to the power failure and telegram in reply operational order control front end and obtain scheduled outage event from second terminal
Business datum;The business datum of corresponding scheduled outage event when the business datum is performs the scheduled outage application;
The second terminal is that Permission Levels are that management stops the terminal that the account of dispatcher logs in of sending a telegram in reply;
Scheduled outage event uploading module, it is preceding for the business datum of power-off event corresponding to the scheduled outage application to be passed through
The service interface of the comprehensive power failure application system in end is sent to information service platform;
Wherein, the business datum acquisition device of the power-off event, in addition to power supply reliability computing module, the power supply are reliable
Property computing module is used for:
Obtain fault trip impaired report information, the user's impaired report information of marketing customer service system collection by feeder-terminal-unit monitoring
And the inspection fault message that Permission Levels obtain for the 5th terminal that the account of patrol officer logs in;
The fault trip impaired report information, user's impaired report information and the inspection fault message are generated as fault ticket letter
Breath;
By Permission Levels the fault ticket information is obtained for the 6th terminal that the account of breakdown repair personnel logs in;Wherein,
The fault ticket information includes failure liability cause and fault outage coverage;
Break down the fault outage route of power failure according to the fault ticket acquisition of information;
When isolating to the fault outage route, if the fault outage route, which possesses, turns condition of power supply, perform and turn to supply
It is electrically operated;
The telegram in reply operational order to the fault outage route is obtained, is referred to according to the operation of the telegram in reply of the fault outage route
Order controls front end fault outage application system to be obtained from the second terminal that Permission Levels are the account login that management stops telegram in reply dispatcher
Take the business datum of fault outage event;
The business datum of the fault ticket information and fault outage event is uploaded into described information by communication interface to take
Business platform;
The business datum of the scheduled outage event and the business number of fault outage event are obtained from described information service platform
According to;
The confession of electric power system is calculated according to the business datum of the business datum of the scheduled outage event and fault outage event
Electric reliability.
9. a kind of business datum of power-off event obtains system, it is characterised in that including:
The first terminal that Permission Levels log in for the account of power supply station administrative staff, for scheduled outage application, pass through described the
One terminal judges whether the scheduled outage coverage of the scheduled outage application exceedes default power failure coverage, and judges institute
Whether the history scheduled outage number for stating the power failure responsible consumer of scheduled outage application exceedes default frequency of power cut, and described in judgement
Amount when whether amount exceedes default during the influence of scheduled outage application, and judge the scheduled outage line of the scheduled outage application
Whether road, which possesses, turns condition of power supply, and confirms the liability cause of the scheduled outage application;
Scheduled outage application performs equipment, if the scheduled outage coverage for the scheduled outage application is stopped not less than default
Electric coverage, and the history scheduled outage number of the power failure responsible consumer of the scheduled outage application is not less than default power failure
Number, and during the influence of the scheduled outage application amount not less than it is default when amount, and the scheduled outage application
Scheduled outage circuit, which does not possess, turns condition of power supply, and performing equipment by the scheduled outage application performs the scheduled outage Shen
Please;
Front end integrates power failure application system, for obtaining power failure and the telegram in reply operational order of scheduled outage application, from Permission Levels
The second terminal for stopping the account login of telegram in reply dispatcher for management obtains scheduled outage event corresponding to the scheduled outage application
Business datum;The business datum of power-off event corresponding to the scheduled outage application is uploaded to information service platform;
Wherein, the business datum of the power-off event obtains system, in addition to power supply reliability computing device, and the power supply is reliable
Property computing device is used for:
Obtain fault trip impaired report information, the user's impaired report information of marketing customer service system collection by feeder-terminal-unit monitoring
And the inspection fault message that Permission Levels obtain for the 5th terminal that the account of patrol officer logs in;
The fault trip impaired report information, user's impaired report information and the inspection fault message are generated as fault ticket letter
Breath;
By Permission Levels the fault ticket information is obtained for the 6th terminal that the account of breakdown repair personnel logs in;Wherein,
The fault ticket information includes failure liability cause and fault outage coverage;
Break down the fault outage route of power failure according to the fault ticket acquisition of information;
When isolating to the fault outage route, if the fault outage route, which possesses, turns condition of power supply, perform and turn to supply
It is electrically operated;
The telegram in reply operational order to the fault outage route is obtained, is referred to according to the operation of the telegram in reply of the fault outage route
Order controls front end fault outage application system to be obtained from the second terminal that Permission Levels are the account login that management stops telegram in reply dispatcher
Take the business datum of fault outage event;
The business datum of the fault ticket information and fault outage event is uploaded into described information by communication interface to take
Business platform;
The business datum of the scheduled outage event and the business number of fault outage event are obtained from described information service platform
According to;
The confession of electric power system is calculated according to the business datum of the business datum of the scheduled outage event and fault outage event
Electric reliability.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710249228.8A CN107093017B (en) | 2017-04-17 | 2017-04-17 | The business datum acquisition methods and its device and system of power-off event |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710249228.8A CN107093017B (en) | 2017-04-17 | 2017-04-17 | The business datum acquisition methods and its device and system of power-off event |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107093017A CN107093017A (en) | 2017-08-25 |
CN107093017B true CN107093017B (en) | 2018-02-09 |
Family
ID=59637926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710249228.8A Expired - Fee Related CN107093017B (en) | 2017-04-17 | 2017-04-17 | The business datum acquisition methods and its device and system of power-off event |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107093017B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110210738B (en) * | 2019-05-22 | 2023-04-07 | 深圳供电局有限公司 | Power supply reliability analysis method and system |
CN110263078B (en) * | 2019-08-14 | 2019-11-29 | 广东电网有限责任公司佛山供电局 | A kind of distribution line heavy-overload Intelligent statistical method |
CN112865227A (en) * | 2021-01-08 | 2021-05-28 | 时域网络科技(深圳)有限责任公司 | Power supply method and device, storage medium and power supply equipment |
CN113780886B (en) * | 2021-09-27 | 2023-05-26 | 国网湖南省电力有限公司 | Power grid pre-calculation type power outage overhaul plan making method and system |
CN116451909B (en) * | 2023-06-14 | 2023-08-22 | 广东电网有限责任公司梅州供电局 | Power failure application form processing method and device, electronic equipment and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012244333A1 (en) * | 2011-11-02 | 2013-05-16 | Unison Networks Limited | Improvements in smart distribution transformer systems |
DE102012104162A1 (en) * | 2012-05-02 | 2013-11-07 | Stadt Aachen Gebäudemanagement | Method and system for monitoring energy or water consumption |
CN105470928A (en) * | 2015-09-21 | 2016-04-06 | 国电南瑞科技股份有限公司 | Zoned and layered load transferring method based on urban power transmission network fault recovery |
CN105870917A (en) * | 2016-04-19 | 2016-08-17 | 梅照付 | Electric power grid supply system |
CN106329500A (en) * | 2016-10-27 | 2017-01-11 | 珠海许继电气有限公司 | Method for treatment on distribution wire fault |
CN106355357A (en) * | 2016-10-12 | 2017-01-25 | 深圳供电局有限公司 | Power distribution network fault processing method and information processing system |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102208048A (en) * | 2011-03-15 | 2011-10-05 | 福建省电力有限公司 | Technology support system of marketing and distribution integration power supply service and method thereof |
CN103489062B (en) * | 2013-09-04 | 2017-09-05 | 广东电网公司佛山供电局 | Scheduled outage method and device based on CIM |
CN103761625A (en) * | 2014-02-13 | 2014-04-30 | 国家电网公司 | Outage management system based on information exchange bus and data processing method thereof |
MX364764B (en) * | 2014-05-28 | 2019-05-06 | Siemens Schweiz Ag | System and method for fault analysis and prioritization. |
CN104881729A (en) * | 2015-04-23 | 2015-09-02 | 中国南方电网有限责任公司 | Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system |
CN105184442A (en) * | 2015-07-23 | 2015-12-23 | 国网青海省电力公司西宁供电公司 | Power distribution network dispatching management statistical analysis system |
CN105260843A (en) * | 2015-10-16 | 2016-01-20 | 国网甘肃省电力公司天水供电公司 | Power supply stoppage information analyzing system |
CN106251052A (en) * | 2016-07-25 | 2016-12-21 | 国网安徽省电力公司宿州供电公司 | The county's grid power blackout management and control of a kind of ground and analysis decision plateform system |
-
2017
- 2017-04-17 CN CN201710249228.8A patent/CN107093017B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012244333A1 (en) * | 2011-11-02 | 2013-05-16 | Unison Networks Limited | Improvements in smart distribution transformer systems |
DE102012104162A1 (en) * | 2012-05-02 | 2013-11-07 | Stadt Aachen Gebäudemanagement | Method and system for monitoring energy or water consumption |
CN105470928A (en) * | 2015-09-21 | 2016-04-06 | 国电南瑞科技股份有限公司 | Zoned and layered load transferring method based on urban power transmission network fault recovery |
CN105870917A (en) * | 2016-04-19 | 2016-08-17 | 梅照付 | Electric power grid supply system |
CN106355357A (en) * | 2016-10-12 | 2017-01-25 | 深圳供电局有限公司 | Power distribution network fault processing method and information processing system |
CN106329500A (en) * | 2016-10-27 | 2017-01-11 | 珠海许继电气有限公司 | Method for treatment on distribution wire fault |
Also Published As
Publication number | Publication date |
---|---|
CN107093017A (en) | 2017-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107093017B (en) | The business datum acquisition methods and its device and system of power-off event | |
CN107167704B (en) | Power distribution network fault diagnosis system and method based on CIM model | |
CN105184442A (en) | Power distribution network dispatching management statistical analysis system | |
CN104539051B (en) | A kind of secondary equipment of intelligent converting station online evaluation system | |
CN105427039A (en) | Efficient processing method of distribution network repair work orders based on responsibility areas | |
KR101278309B1 (en) | Outage schedule management apparatus and method in ems | |
CN102005736A (en) | On-line monitoring method of state of relay protection equipment | |
Davis et al. | The future of distribution system resiliency | |
CN106651643A (en) | Power security management and control method for whole process based on distribution and adjustment | |
CN105119237B (en) | The method that relay protection operation is checked | |
CN102737287A (en) | Regional power grid on-line power supply risk assessment system | |
CN107657391A (en) | A kind of dispatching of power netwoks monitoring defect management and assessment system | |
CN105207358B (en) | The quality of power supply monitors platform on-line | |
CN104836329B (en) | Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation | |
CN105932770A (en) | Intelligent electric meter box | |
CN106487004B (en) | One electrical secondary system of intelligent substation runs hidden danger Intelligent drainage checking method | |
CN105404962A (en) | Modification strategy of electric power system relay protection device and generation system thereof | |
CN112633618B (en) | Reliability evaluation method and device for medium-voltage distribution network | |
dos Santos et al. | Reliability and availability analysis methodology for power system protection schemes | |
CN205643673U (en) | Metering device scraps alarm device based on measurement instrument follow -up of quality evaluation system | |
CN114971588A (en) | Work order automatic auditing and transmitting method and related device | |
CN113902317A (en) | Power distribution network line operation risk analysis system and method | |
CN113128719A (en) | Power line repair management method | |
Liu et al. | Risk assessment of power system security based on component importance and operation state | |
McBee et al. | Identifying DA allocation by minimizing the overall cost of customer minutes interrupted |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180209 Termination date: 20210417 |
|
CF01 | Termination of patent right due to non-payment of annual fee |