CN107090933A - A kind of vaulted installation of ceiling method of steel skeleton - Google Patents

A kind of vaulted installation of ceiling method of steel skeleton Download PDF

Info

Publication number
CN107090933A
CN107090933A CN201710445597.4A CN201710445597A CN107090933A CN 107090933 A CN107090933 A CN 107090933A CN 201710445597 A CN201710445597 A CN 201710445597A CN 107090933 A CN107090933 A CN 107090933A
Authority
CN
China
Prior art keywords
dome
main joist
vaulted
installation
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710445597.4A
Other languages
Chinese (zh)
Inventor
裴旭
王肖
赵宇阔
张振禹
冒培成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201710445597.4A priority Critical patent/CN107090933A/en
Publication of CN107090933A publication Critical patent/CN107090933A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of vaulted installation of ceiling method of steel skeleton, comprise the following steps:First:Centered on the center of circle at vault bottom, grid is set up according to setting spacing, coordinate of the lattice point relative to the center of circle and the distance apart from the center of circle of grid is calculated;Second:Using any diameter at vault bottom as base, according to the sagitta of dome, dome section circular arc is determined;3rd:According to the lattice point of grid apart from the distance in the center of circle, vertical distance of the lattice point apart from dome is calculated;4th:Three-dimensional coordinate of the suspension centre on dome relative to the center of circle is calculated apart from the vertical distance of dome according to the coordinate and lattice point of lattice point, and be labeled in the correspondence position of dome, the installation accuracy of dome is improved, while improving the rigidity of dome, durability, stability.

Description

A kind of vaulted installation of ceiling method of steel skeleton
Technical field
The present invention relates to technical field of buildings, a kind of vaulted installation of ceiling method of steel skeleton is related specifically to.
Background technology
In top-grade building decorative ornament engineering, preferable decorative effect, some works are realized frequently with vaulted curved surface furred ceiling Journey can also carry out flawless finish processing, including air brushing, the wallpaper even technique such as goldleaf in dome surface layer (such as plasterboard), and this is right The construction quality of vaulted furred ceiling proposes higher requirement, is difficult to repair if going wrong, and causes huge loss.
Large area dome in top-grade building decorative engineering, should not only have round and smooth curved surface, should also have preferably whole Body rigidity, stability, durability.
The content of the invention
The purpose of the present invention aims to provide good a kind of good rigidity, stability, good endurance, high-precision steel skeleton is vaulted hangs Push up installation method.
The vaulted installation of ceiling method of steel skeleton that the present invention is provided, comprises the following steps:
First:Centered on the center of circle at vault bottom, grid is set up according to setting spacing, the lattice point of grid is calculated relative to circle The coordinate of the heart and the distance apart from the center of circle;
Second:Using any diameter at vault bottom as base, according to the sagitta of dome, dome section circular arc is determined;
3rd:According to the lattice point of grid apart from the distance in the center of circle, vertical distance of the lattice point apart from dome is calculated;
4th:According to the coordinate and lattice point of lattice point apart from the vertical distance of dome calculate suspension centre on dome relative to The three-dimensional coordinate in the center of circle, and be labeled in the correspondence position of dome;
5th:Three-dimensional coordinate according to the suspension centre on dome relative to the center of circle is cut to suspension rod, main joist and false keel respectively It is cut into type;
6th:Suspension rod is fixed on floor slab bottoms, main joist is welded on boom foot, the fixed joint dragon between main joist Bone, plasterboard is fixed in the bottom surface of main joist and false keel, and surface layer is formed in gypsum board surface Puttying, and surface layer is carried out in surface layer Construction.
It is preferred that, the difference of the height of floor and the height of dome is less than the Cutting Length of suspension rod.
It is preferred that, a vertical center line is drawn on the stationary plane of suspension rod and main joist, in center line and main joist bottom surface Point of intersection draw a horizontal linear, when main joist is welded on suspension rod, the intersection point of vertical center line and horizontal linear and master Align keel bottom surface.
It is preferred that, suspension rod is set to angle steel suspension rod.
It is preferred that, corner brace is fixed to floor slab bottoms, angle steel suspension rod and corner brace are welded and fixed.
It is preferred that, main joist is set to steel side and leads to main joist.
It is preferred that, false keel is set to light steel paired joist, and false keel is fixed with main joist by turning tail screw.
It is preferred that, when fixing plasterboard in the bottom surface of main joist and false keel, plasterboard is first fixed in the middle of dome, then Plasterboard is fixed by row to both sides successively.
It is preferred that, white glue with vinyl is filled out in the seam crossing of plasterboard, bandage or brown paper are pasted into seam crossing by white glue with vinyl, After Puttying again after white glue with vinyl drying.
The vaulted installation of ceiling method of steel skeleton that the present invention is provided, by main joist, false keel, suspension rod advance meter Calculate, main joist, false keel, suspension rod are processed according to the data for calculating acquisition, the installation accuracy of dome is improved, carries simultaneously The high rigidity of dome, durability, stability.
The main view of the specific embodiment for the vault type furred ceiling that Fig. 1 obtains for the vaulted installation of ceiling method of steel skeleton that invention is provided Figure;
Fig. 2 is the upward view of Fig. 1 vault type furred ceiling;
The installation steps of plasterboard in the vaulted installation of ceiling method of steel skeleton that Fig. 3-5 provides for invention;
The flow chart for the vaulted installation of ceiling method of steel skeleton that Fig. 6 provides for invention.
Embodiment
The core of the present invention is there is provided the vaulted installation of ceiling method of steel skeleton, by main joist, false keel, suspension rod Precalculate, main joist, false keel, suspension rod be processed according to the data for calculating acquisition, the installation accuracy of dome is improved, The rigidity, durability, stability of dome are improved simultaneously.
In order that those skilled in the art more fully understands technical scheme, with reference to specific embodiment pair The present invention is described in further detail.
With reference to Fig. 1-2,6, the vaulted installation of ceiling method of steel skeleton disclosed by the invention comprises the following steps:
First:Centered on the center of circle at vault bottom, grid is set up according to setting spacing, the lattice point of grid is calculated relative to circle The coordinate of the heart and the distance apart from the center of circle;
Second:Using any diameter at vault bottom as base, according to the sagitta of dome, dome section circular arc is determined;
3rd:According to the lattice point of grid apart from the distance in the center of circle, vertical distance of the lattice point apart from dome is calculated;
4th:According to the coordinate and lattice point of lattice point apart from the vertical distance of dome calculate suspension centre on dome relative to The three-dimensional coordinate in the center of circle, and be labeled in the correspondence position of dome;
5th:Three-dimensional coordinate according to the suspension centre on dome relative to the center of circle is cut to suspension rod, main joist and false keel respectively It is cut into type;
6th:Suspension rod is fixed on floor slab bottoms, main joist is welded on boom foot, the fixed joint dragon between main joist Bone, plasterboard is fixed in the bottom surface of main joist and false keel, and surface layer is formed in gypsum board surface Puttying, and surface layer is carried out in surface layer Construction.
In an embodiment of the present invention, by being precalculated to main joist, false keel, suspension rod, obtained according to calculating Data are processed to main joist, false keel, suspension rod, improve the installation accuracy of dome, while improving the rigid, resistance to of dome Long property, stability, dome can accurately measure curved surface each point to the height of vault baseplane by a series of rigorous complete methods, Accurate data is provided for the surveying setting-out of vaulted furred ceiling, positioning shaping.The measuring method is simple and practical, by CAD mapping softwares It can be rapidly completed, in particular cases even complete all to calculate using ruler, compasses Freehandhand-drawing, led to by angle steel suspension rod and steel side Be welded and fixed to form overall steel skeleton, it is ensured that the integral rigidity and stability of vaulted ceiling structure.
Further, the difference of the height of floor and the height of dome is less than the Cutting Length of suspension rod.
In an embodiment of the present invention, determine that every angle steel suspension rod processing length need to consider following factor:Furred ceiling design mark Height, angle steel suspension rod end at each suspension centre of curved surface that high, live structure roof absolute altitude, Part I are measured relative to vault baseplane Head arrives mounting distance, structure roof construction error of dome curved surface surface layer etc..With reference to factors above, it can be stayed during processing angle steel suspension rod Go out certain surplus, redundance is cut off after suspended ceiling framework completes to install further according to being actually needed, it is to avoid suspension rod occur Too short situation, improves the efficiency of assembling, meanwhile, it is easy to the fixation of suspension rod and main joist.
Further, a vertical center line is drawn on the stationary plane of suspension rod and main joist, in center line and main joist bottom The point of intersection in face draws a horizontal linear, when main joist is welded on suspension rod, the intersection point of vertical center line and horizontal linear with Align main joist bottom surface.
In an embodiment of the present invention, select certain to arrange angle steel suspension rod and carry out main joist installation, steel side is led into main joist first Middle part welded with the angle steel suspension rod in the middle of the row, the side of ensuring leads to the level of main joist base and cross hairs mark during welding Straight line is concordant, and its two ends is naturally drooped using the elasticity and gravity of its material itself, and whole keel are in natural curve.By main dragon Bone midpoint is completed after welding with middle angle steel, then prolongs cross hairs mark position progress of two edge directions successively with other angle steel suspension rods It can artificially apply stress in welding, installation process to be adjusted the degree of crook of main joist, make main joist base and each angle steel The intersection point alignment of the cross mark line of suspension rod, it is ensured that the installation accuracy of main joist, and then ensure the whole structure of dome curved surface.
Further, suspension rod is set to angle steel suspension rod.
In an embodiment of the present invention, suspension rod is set to angle steel suspension rod, using the rigidity reinforced of angle steel to main joist of suspended ceiling Support, for offsetting mount stress of the main joist by curved generation.
Further, corner brace is fixed to floor slab bottoms, angle steel suspension rod and corner brace is welded and fixed.
Further, main joist is set to the logical main joist in steel side.
In an embodiment of the present invention, main joist is set to the logical main joist in steel side, the material stiffness and bullet for utilizing steel side to lead to Property deformability realize dome skeleton moulding, and weld to form rigidly connected overall skeleton by itself and angle steel suspension rod, improve The intensity and reliability of vaulted furred ceiling.
Further, false keel is set to light steel paired joist, and false keel is fixed with main joist by turning tail screw.
In an embodiment of the present invention, the density of false keel can be changed for different processing requests, that is, adjusted Spacing between false keel, false keel is closeer, and reliability is higher, and structural strength is bigger, can lift construction quality.
Further, when fixing plasterboard in the bottom surface of main joist and false keel, plasterboard is first fixed in the middle of dome, so Plasterboard is fixed by row to both sides successively afterwards.
With reference to Fig. 3-5, further, white glue with vinyl is filled out in the seam crossing of plasterboard, bandage or brown paper are passed through into white glue with vinyl Seam crossing is pasted, after Puttying again after white glue with vinyl drying.
In an embodiment of the present invention, surface layer uses double-deck plasterboard to increase surface thickness, and then improves surface layer intensity And entire firmness.First row plasterboard first is installed in the middle part of vaulted furred ceiling, is then installed by row to both sides successively.Plasterboard Facing joint takes crack resistence measure, can mix 108 glue using filleting gypsum and fill up plasterboard seam, then bandage or brown paper are led to Cross white glue with vinyl and paste seam crossing, it is to be dried after Puttying again, prevent plasterboard from ftractureing, the installation for solving vaulted furred ceiling easily goes out The problem of existing cumulative errors.Surface layer needs to carry out the surface constructions such as emulsion paint, air brushing, wallpaper or goldleaf according to design, improves Construction quality.
Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said The bright method and its core concept for being only intended to help to understand the present invention.It should be pointed out that for the ordinary skill of the art For personnel, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these improvement Also fallen into modification in the protection domain of the claims in the present invention.

Claims (9)

1. a kind of vaulted installation of ceiling method of steel skeleton, it is characterised in that comprise the following steps:
First:Centered on the center of circle at vault bottom, grid is set up according to setting spacing, the lattice point of the grid is calculated relative to institute State the coordinate and the distance apart from the center of circle in the center of circle;
Second:Using any diameter at vault bottom as base, according to the sagitta of dome, the dome section circular arc is determined;
3rd:According to the lattice point of the grid apart from the distance in the center of circle, the lattice point is calculated apart from the perpendicular of the dome Straight distance;
4th:Hanging on dome is calculated apart from the vertical distance of the dome according to the coordinate of the lattice point and the lattice point The three-dimensional coordinate relative to the center of circle is put, and is labeled in the correspondence position of the dome;
5th:Three-dimensional coordinate according to the suspension centre on the dome relative to the center of circle is respectively to suspension rod, main joist and pair dragon Bone excision forming;
6th:The suspension rod is fixed on floor slab bottoms, the main joist is welded on the boom foot, in the main joist Between fix the false keel, main joist and false keel bottom surface fix plasterboard, gypsum board surface Puttying formed face Layer, surface construction is carried out in the surface layer.
2. the vaulted installation of ceiling method of steel skeleton according to claim 1, it is characterised in that the height of floor and dome The difference of height is less than the Cutting Length of the suspension rod.
3. the vaulted installation of ceiling method of steel skeleton according to claim 2, it is characterised in that in the suspension rod and the master A vertical center line is drawn on the stationary plane of keel, the point of intersection in the center line Yu the main joist bottom surface draws a level Straight line, when the main joist is welded on the suspension rod, the intersection point of the vertical center line and the horizontal linear with it is described Align main joist bottom surface.
4. the vaulted installation of ceiling method of steel skeleton according to claim 1, it is characterised in that the suspension rod is set to angle steel Suspension rod.
5. the vaulted installation of ceiling method of steel skeleton according to claim 4, it is characterised in that corner brace is fixed to floor bottom Portion, the angle steel suspension rod is welded and fixed with corner brace.
6. the vaulted installation of ceiling method of steel skeleton according to claim 1, it is characterised in that the main joist is set to steel The logical main joist in side.
7. the vaulted installation of ceiling method of steel skeleton according to claim 1, it is characterised in that the false keel is set to gently Steel paired joist, the false keel is fixed with the main joist by turning tail screw.
8. the vaulted installation of ceiling method of steel skeleton according to claim 1, it is characterised in that in main joist and false keel When plasterboard is fixed in bottom surface, plasterboard is first fixed in the middle of dome, then plasterboard is fixed by row to both sides successively.
9. the vaulted installation of ceiling method of steel skeleton according to claim 1, it is characterised in that filled out in the seam crossing of plasterboard White glue with vinyl, seam crossing is pasted by bandage or brown paper by white glue with vinyl, after Puttying again after white glue with vinyl drying.
CN201710445597.4A 2017-06-13 2017-06-13 A kind of vaulted installation of ceiling method of steel skeleton Pending CN107090933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710445597.4A CN107090933A (en) 2017-06-13 2017-06-13 A kind of vaulted installation of ceiling method of steel skeleton

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710445597.4A CN107090933A (en) 2017-06-13 2017-06-13 A kind of vaulted installation of ceiling method of steel skeleton

Publications (1)

Publication Number Publication Date
CN107090933A true CN107090933A (en) 2017-08-25

Family

ID=59639499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710445597.4A Pending CN107090933A (en) 2017-06-13 2017-06-13 A kind of vaulted installation of ceiling method of steel skeleton

Country Status (1)

Country Link
CN (1) CN107090933A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6912488B1 (en) * 1998-09-18 2005-06-28 Nasser Saebi Method of constructing curved structures as part of a habitable building
US7389612B1 (en) * 2001-08-09 2008-06-24 Fischbeck Richard D Geodesic structure
CN103615046A (en) * 2013-12-11 2014-03-05 中国建筑装饰集团有限公司 Hyperbolic circular arc wood dome and construction and installation method thereof
CN204940649U (en) * 2015-07-31 2016-01-06 深圳市富山厚土建材有限公司 A kind of module unit type dome assembly
CN105421643A (en) * 2015-12-22 2016-03-23 中国建筑第六工程局有限公司 Arched curved-surface suspended ceiling and manufacturing method thereof
CN205688579U (en) * 2016-05-25 2016-11-16 青岛海川建设集团有限公司 A kind of big dome structure of superelevation
CN106223523A (en) * 2016-08-16 2016-12-14 深圳海外装饰工程有限公司 One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall
CN106437170A (en) * 2016-04-17 2017-02-22 北京工业大学 Installation method for annular cross cable system supporting dome structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6912488B1 (en) * 1998-09-18 2005-06-28 Nasser Saebi Method of constructing curved structures as part of a habitable building
US7389612B1 (en) * 2001-08-09 2008-06-24 Fischbeck Richard D Geodesic structure
CN103615046A (en) * 2013-12-11 2014-03-05 中国建筑装饰集团有限公司 Hyperbolic circular arc wood dome and construction and installation method thereof
CN204940649U (en) * 2015-07-31 2016-01-06 深圳市富山厚土建材有限公司 A kind of module unit type dome assembly
CN105421643A (en) * 2015-12-22 2016-03-23 中国建筑第六工程局有限公司 Arched curved-surface suspended ceiling and manufacturing method thereof
CN106437170A (en) * 2016-04-17 2017-02-22 北京工业大学 Installation method for annular cross cable system supporting dome structure
CN205688579U (en) * 2016-05-25 2016-11-16 青岛海川建设集团有限公司 A kind of big dome structure of superelevation
CN106223523A (en) * 2016-08-16 2016-12-14 深圳海外装饰工程有限公司 One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
武利平: "铁路客站高大空间装饰吊顶施工技术研究", 《建筑技术》 *
谢尊渊 主编: "《建筑施工》", 31 August 1998, 中国建筑工业出版社 *

Similar Documents

Publication Publication Date Title
CN105113671B (en) A kind of large-scale conchoidal Double curved arc curtain wall construction method
CN106836806B (en) Method and device for constructing special-shaped concrete structure by using BIM technology and precision control method and device in process of constructing special-shaped concrete structure by using BIM technology
CN106320707B (en) A kind of full projection line-putting method
CN102635209B (en) Cornice steel skeleton and bracket steel skeleton for large-span big roof of pseudo-classic architecture and construction method of cornice steel skeleton and bracket steel skeleton
CN103114732B (en) Cast steel penetration pipe node space positioning method
CN104612307A (en) Suspended ceiling system and construction method thereof
CN110990913B (en) Side span shape finding method adopting horizontal plane internal force control
CN205156916U (en) Detection apparatus for be used for constructional steel form setting straightness that hangs down
CN110409841B (en) Construction method of hyperbolic pipe truss structure
CN104834797B (en) A kind of pseudo-classic architecture concrete wing angle is based on CAD and construction method
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN107090933A (en) A kind of vaulted installation of ceiling method of steel skeleton
CN107724574B (en) All-transparent louver glass double skin aspiratory curtain wall equivalent space construction technology
CN108915136A (en) A kind of construction method of open stone curtain wall
CN111979913A (en) Cable-stayed bridge cable-beam anchoring structure and control method of anchor pipe angle
CN105064643B (en) The cladding accurate installation method of building stones hanging part for board of R types
Chuang et al. Design and modelling of Heinz Isler’s Sicli shell
CN111894223B (en) Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon
CN115434471A (en) Light steel keel gypsum board suspended ceiling construction method
CN210067164U (en) Novel curved surface high-crack-resistance GRC decoration dry-hanging curtain wall plate framework
CN206931294U (en) The device of Complex Different Shape concrete structure precision controlling
CN101666145B (en) Method for upward hanging projecting eave stones
CN112797949A (en) Shield tunneling machine starting attitude manual measurement method
CN105672657B (en) A kind of ceiling method
CN213143530U (en) Ultrathin cement fiberboard curtain wall mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170825