CN106223523A - One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall - Google Patents

One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall Download PDF

Info

Publication number
CN106223523A
CN106223523A CN201610671877.2A CN201610671877A CN106223523A CN 106223523 A CN106223523 A CN 106223523A CN 201610671877 A CN201610671877 A CN 201610671877A CN 106223523 A CN106223523 A CN 106223523A
Authority
CN
China
Prior art keywords
baiye
plasterboard
dome
hall
moulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610671877.2A
Other languages
Chinese (zh)
Inventor
陈汉成
陈智坚
孙嘉伟
陈泓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Overseas Decoration Engineering Co Ltd
Original Assignee
Shenzhen Overseas Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Overseas Decoration Engineering Co Ltd filed Critical Shenzhen Overseas Decoration Engineering Co Ltd
Priority to CN201610671877.2A priority Critical patent/CN106223523A/en
Publication of CN106223523A publication Critical patent/CN106223523A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • E04B7/105Grid-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/061Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members supporting construction for curved ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/34Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles
    • E04B9/345Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of non-parallel slats, e.g. grids

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention discloses one and pray hanging type plasterboard BAIYE moulding construction method under the dome of hall, comprise the following steps: (1) three-dimensional modeling and find out plasterboard BAIYE moulding control point;(2) the multiple chi in three-dimensional data scene;(3) on-the-spot unwrapping wire and location;(4) BAIYE skeleton is made;(5) plasterboard is installed.The construction method of the present invention is simple, modularity is installed, moulding is unique, the design on roof, hall is adopted an original approach, natural light can be entered the room by direct irradiation, is the perfect adaptation of tradition and engineering, have employed hanging type plasterboard BAIYE moulding inside dome, projection between the inner pillar of the Room is enhanced each other's beauty with the light praying roof, hall, defines the dynamic effect of light and shade.

Description

One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall
Technical field
The present invention relates to the realm of building construction, under specifically one prays hall dome, the BAIYE moulding of hanging type plasterboard is executed Work method.
Background technology
Indoor design is the character of use according to building, local environment and respective standard, use material technology means and Architectural design principle, function of creation grace reasonable, comfortable, meets people's material and the indoor environment of cultural life needs.This Spatial environments both had use value, and meets corresponding functional requirement, also reflects historical context, architectural style, environment simultaneously The Nervous and Mental Factors such as atmosphere.
Summary of the invention
It is an object of the invention to provide one and pray hanging type plasterboard BAIYE moulding construction method under the dome of hall.
For achieving the above object, the present invention provides following technical scheme:
One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall, comprises the following steps:
(1) three-dimensional modeling and find out plasterboard BAIYE moulding control point: on-the-spot dome is measured and data collection, so Afterwards measurement data input computer carry out three-dimensional modeling, further according to design drawing calculate plasterboard BAIYE skeleton moulding size and Installation site control point;
(2) the multiple chi in three-dimensional data scene: scene is carried out multiple according to computer three-dimensional model molded dimension and control point data Chi is measured, and checks its error, and checking that data again input computer and adjust, repeatedly checks until data are accurate;
(3) on-the-spot unwrapping wire and location: according to the final control point data calculated, carry out unwrapping wire at the scene, makees to face with angle steel Time control point scale, then bracing wire angle cleat control point forms dome BAIYE three-dimensional modeling netting twine;
(4) make BAIYE skeleton: the size calculated according to computer three-dimensional model, use square tube, angle steel at the scene or outside the venue Making BAIYE steel skeleton semi-finished product, and carry out model section installation according to unwrapping wire control point, skeleton is temporarily fixed in structure, and examines Look into its size and have zero deflection;Should adjust in time if any deviation, large area carcasing after determining model section zero deflection, can be carried out And install, fix the most by column after bolt location to be checked is errorless during installation, pacify on surface immediately after steel skeleton is fixing The fixing lightgage steel joist of dress;
(5) plasterboard is installed: lightgage steel joist i.e. carries out plasterboard facing installation after installing leveling.
As the further scheme of the present invention: what in step (4), skeleton was temporarily fixed in structure concretely comprises the following steps: pass through 4 corner braces of skeleton are bolted on the U-shaped steel of steel construction.
As the present invention further scheme: total is with the system form of multiple stealthy cross couplings, by bent steel Profile material forms, and on three axis, the short bracket of adjustable steel profile uses hollow rectangle square tube to form with band iron, is fixed on vault On the main steel construction on top.
As the present invention further scheme: the section bar spandrel girder of described U-shaped steel is tightened on the short bracket of steel profile, use Screw is fixed in side.
As the present invention further scheme: load-bearing frame uses 3-D solid structure, panel material uses and meets standard The bilayer thickness of DIN EN520 is the plasterboard of 12.5mm, is tightened on load-bearing frame.
Compared with prior art, the invention has the beneficial effects as follows: the construction method of the present invention is simple, modularity is installed, and makes Type is unique, and the design on roof, hall is adopted an original approach, and natural light can be entered the room by direct irradiation, is the perfect adaptation of tradition and engineering, Have employed hanging type plasterboard BAIYE moulding inside dome, the projection between the inner pillar of the Room and the light praying roof, hall hand over phase Shine, define the dynamic effect of light and shade.
Accompanying drawing explanation
Fig. 1 is for praying under the dome of hall dome three-dimensional model diagram in hanging type plasterboard BAIYE moulding construction method.
Fig. 2 is to pray under the dome of hall the knot of the short bracket of adjustable steel section bar in hanging type plasterboard BAIYE moulding construction method Structure schematic diagram.
Fig. 3 is to pray the structural representation of three-dimensional load-bearing frame in hanging type plasterboard BAIYE moulding construction method under the dome of hall Figure.
Fig. 4 is to pray under the dome of hall the A-A sectional view of Fig. 3 in hanging type plasterboard BAIYE moulding construction method.
Fig. 5 is to pray under the dome of hall the structural representation of plasterboard in hanging type plasterboard BAIYE moulding construction method.
Fig. 6 is for praying under the dome of hall in hanging type plasterboard BAIYE moulding construction method hanging type plasterboard hundred under dome Leaf window modeling effect figure.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Referring to Fig. 1~6, in the embodiment of the present invention, one is prayed hanging type plasterboard BAIYE moulding under the dome of hall and is executed Work method, comprises the following steps:
(1) three-dimensional modeling and find out plasterboard BAIYE moulding control point: on-the-spot dome is measured and data collection, so Afterwards measurement data input computer is carried out three-dimensional modeling, as it is shown in figure 1, then calculate plasterboard BAIYE bone according to design drawing Frame molded dimension and installation site control point;
(2) the multiple chi in three-dimensional data scene: scene is carried out multiple according to computer three-dimensional model molded dimension and control point data Chi is measured, and checks its error, and checking that data again input computer and adjust, repeatedly checks until data are accurate;
(3) on-the-spot unwrapping wire and location: according to the final control point data calculated, carry out unwrapping wire at the scene, makees to face with angle steel Time control point scale, then bracing wire angle cleat control point forms dome BAIYE three-dimensional modeling netting twine;
(4) make BAIYE skeleton: the size calculated according to computer three-dimensional model, use square tube, angle steel at the scene or outside the venue Making BAIYE steel skeleton semi-finished product, and carry out model section installation according to unwrapping wire control point, skeleton should be temporarily fixed in structure (logical 4 corner braces crossing skeleton are bolted on the U-shaped steel of steel construction), and check that its size has zero deflection;If any deviation should and Time adjust, large area carcasing and installation can be carried out after determining model section zero deflection, during installation, bolt must not screw on, to be checked Position errorless after fix the most by column, fixing lightgage steel joist is installed on surface after steel skeleton is fixing immediately;
(5) plasterboard is installed: lightgage steel joist can carry out plasterboard facing installation after installing leveling.
The design on the roof, hall of the present invention is adopted an original approach, and natural light can be entered the room by direct irradiation, dome design be tradition with The perfect adaptation of engineering, allows people enter selfless thought and mental realm, have employed hanging type plasterboard BAIYE inside dome Moulding, the projection between the inner pillar of the Room is enhanced each other's beauty with the light praying roof, hall, defines the dynamic effect of light and shade, as Shown in Fig. 6.
Total, with the system form of multiple stealthy cross couplings, is made up of curved plates section bar, adjustable on three axis The short bracket of steel profile use hollow rectangle square tube and band iron to form, be fixed on the main steel construction of dome, such as Fig. 2 institute Show.U-shaped steel profile spandrel girder is tightened on the short bracket of steel profile, fixes in side with screw.The load-bearing frame of plank uses three-dimensional Stereochemical structure, as shown in Figure 3-4, panel material uses the Gypsum Fibrosum that bilayer thickness is 12.5mm meeting standard DIN EN 520 Plate, is tightened on load-bearing frame, as shown in Figure 5.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of the spirit or essential attributes of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter From the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all by fall in the implication of equivalency and scope of claim Change is included in the present invention.Should not be considered as limiting involved claim by any reference in claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment May be appreciated other embodiments.

Claims (5)

1. pray hanging type plasterboard BAIYE moulding construction method under the dome of hall for one kind, it is characterised in that comprise the following steps:
(1) three-dimensional modeling and find out plasterboard BAIYE moulding control point: on-the-spot dome is measured and data collection, then Measurement data input computer carries out three-dimensional modeling, calculates plasterboard BAIYE skeleton moulding size and installation further according to design drawing Position control point;
(2) the multiple chi in three-dimensional data scene: scene carried out multiple chi survey according to computer three-dimensional model molded dimension and control point data Amount, checks its error, and checking that data again input computer and adjust, repeatedly checks until data are accurate;
(3) on-the-spot unwrapping wire and location: according to the final control point data calculated, carry out unwrapping wire at the scene, makees interim control with angle steel System point scale, then bracing wire angle cleat control point formation dome BAIYE three-dimensional modeling netting twine;
(4) make BAIYE skeleton: the size calculated according to computer three-dimensional model, make at the scene or outside the venue of square tube, angle steel BAIYE steel skeleton semi-finished product, and carry out model section installation according to unwrapping wire control point, skeleton is temporarily fixed in structure, and checks it Size has zero deflection;Should adjust in time if any deviation, large area carcasing and peace after determining model section zero deflection, can be carried out Dress, fixes after during installation, bolt location to be checked is errorless the most by column, installs solid after steel skeleton is fixing immediately on surface Determine lightgage steel joist;
(5) plasterboard is installed: lightgage steel joist i.e. carries out plasterboard facing installation after installing leveling.
The most according to claim 1 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists In, what in step (4), skeleton was temporarily fixed in structure concretely comprises the following steps: be bolted to steel by the 4 of skeleton corner braces On the U-shaped steel of structure.
The most according to claim 1 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists In, total, with the system form of multiple stealthy cross couplings, is made up of curved plates section bar, adjustable die on three axis The short bracket of material uses hollow rectangle square tube to form with band iron, is fixed on the main steel construction of dome.
The most according to claim 2 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists In, the section bar spandrel girder of described U-shaped steel is tightened on the short bracket of steel profile, fixes in side with screw.
The most according to claim 1 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists In, load-bearing frame uses 3-D solid structure, and panel material uses the bilayer thickness meeting standard DIN EN 520 to be 12.5mm's Plasterboard, is tightened on load-bearing frame.
CN201610671877.2A 2016-08-16 2016-08-16 One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall Pending CN106223523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610671877.2A CN106223523A (en) 2016-08-16 2016-08-16 One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610671877.2A CN106223523A (en) 2016-08-16 2016-08-16 One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall

Publications (1)

Publication Number Publication Date
CN106223523A true CN106223523A (en) 2016-12-14

Family

ID=57548240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610671877.2A Pending CN106223523A (en) 2016-08-16 2016-08-16 One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall

Country Status (1)

Country Link
CN (1) CN106223523A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090933A (en) * 2017-06-13 2017-08-25 中国建筑第六工程局有限公司 A kind of vaulted installation of ceiling method of steel skeleton
CN107165323A (en) * 2017-05-31 2017-09-15 苏州金螳螂建筑装饰股份有限公司 A kind of dynamic scale moulding anti-deformation design structure of Buddhism dome and its construction method
CN112031251A (en) * 2020-08-24 2020-12-04 苏州金螳螂建筑装饰股份有限公司 Adjustable arc aluminum square tube design ceiling structure and installation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782825A (en) * 1993-06-30 1995-03-28 Seiwa Gikou:Kk Method for constructing ceiling
CN104612306A (en) * 2014-12-20 2015-05-13 山西省第五建筑工程公司 Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN104912340A (en) * 2015-06-09 2015-09-16 华鼎建筑装饰工程有限公司 Construction method for double-curve triangular aluminum plate unit type hanging ceiling
CN105133840A (en) * 2015-05-28 2015-12-09 南京长岛建设工程有限公司 Construction method for hyperboloid furred ceiling
CN105421643A (en) * 2015-12-22 2016-03-23 中国建筑第六工程局有限公司 Arched curved-surface suspended ceiling and manufacturing method thereof
CN105421773A (en) * 2015-10-30 2016-03-23 深圳市亚泰国际建设股份有限公司 Construction method for light steel skeleton special-shaped model suspended ceiling
CN105588549A (en) * 2015-12-17 2016-05-18 浙江亚厦装饰股份有限公司 Hyperbolic-veneer installing, positioning and acceptance checking method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782825A (en) * 1993-06-30 1995-03-28 Seiwa Gikou:Kk Method for constructing ceiling
CN104612306A (en) * 2014-12-20 2015-05-13 山西省第五建筑工程公司 Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN105133840A (en) * 2015-05-28 2015-12-09 南京长岛建设工程有限公司 Construction method for hyperboloid furred ceiling
CN104912340A (en) * 2015-06-09 2015-09-16 华鼎建筑装饰工程有限公司 Construction method for double-curve triangular aluminum plate unit type hanging ceiling
CN105421773A (en) * 2015-10-30 2016-03-23 深圳市亚泰国际建设股份有限公司 Construction method for light steel skeleton special-shaped model suspended ceiling
CN105588549A (en) * 2015-12-17 2016-05-18 浙江亚厦装饰股份有限公司 Hyperbolic-veneer installing, positioning and acceptance checking method
CN105421643A (en) * 2015-12-22 2016-03-23 中国建筑第六工程局有限公司 Arched curved-surface suspended ceiling and manufacturing method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165323A (en) * 2017-05-31 2017-09-15 苏州金螳螂建筑装饰股份有限公司 A kind of dynamic scale moulding anti-deformation design structure of Buddhism dome and its construction method
CN107090933A (en) * 2017-06-13 2017-08-25 中国建筑第六工程局有限公司 A kind of vaulted installation of ceiling method of steel skeleton
CN112031251A (en) * 2020-08-24 2020-12-04 苏州金螳螂建筑装饰股份有限公司 Adjustable arc aluminum square tube design ceiling structure and installation method

Similar Documents

Publication Publication Date Title
Yu et al. Rigidity of corrugated plate sidewalls and its effect on the modular structural design
Vicente et al. Performance of masonry enclosure walls: lessons learned from recent earthquakes
Veljkovic et al. Light steel framing for residential buildings
CN107977487A (en) A kind of assembly concrete architectural design method based on BIM technology
CN106989211A (en) Assembled architecture pipeline hanger system installation method based on BIM
Soni et al. Structural analysis of multistory building of different shear walls location and heights
CN106223523A (en) One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall
Kuzman et al. A new era for multi-storey timber buildings in Europe
Boake Diagrids, the New Stablity System: Combining Architecture with Engineering
Gibb et al. Glossary of terms
Wu et al. Novel Precast Concrete Structure Systems
Korol et al. Constructive systems, load-bearing and enclosing structures of high-rise buildings
CN107605076A (en) A kind of curtain wall construction method
Martelli et al. The exoskeleton technology as a solution to seismic adjustment of existing buildings
Wakchaure et al. Effect of torsion consideration in analysis of multi storey frame
JP2014525001A (en) Insulation wall parts
Puppio et al. Parametric analysis on external dissipative link system for seismic protection of low rise RC buildings
Ilgın A study on tall buildings and aerodynamic modifications against wind excitation
Shrestha Comparison Between Common Seismic Codes Used in Nepal and Eurocode 8: Study Case Analysis of RC Building
Naqash A note on the structural assessment of perforated panels used in façade
US20200002934A1 (en) Super shear panels
Loka Design of a two apartment house
REDDY PLAN, ANALYSIS AND DESIGN OF STEEL INTENSIVE ARCHERY ACADEMY WITH HOSTEL
Marriage Experimental construction in a timber house
Tuca et al. Life-cycle assessment of a steel framed family house

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161214