CN106223523A - One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall - Google Patents
One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall Download PDFInfo
- Publication number
- CN106223523A CN106223523A CN201610671877.2A CN201610671877A CN106223523A CN 106223523 A CN106223523 A CN 106223523A CN 201610671877 A CN201610671877 A CN 201610671877A CN 106223523 A CN106223523 A CN 106223523A
- Authority
- CN
- China
- Prior art keywords
- baiye
- plasterboard
- dome
- hall
- moulding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000465 moulding Methods 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 241001201614 Prays Species 0.000 title description 4
- 238000013461 design Methods 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 37
- 239000010959 steel Substances 0.000 claims description 37
- 238000009434 installation Methods 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000006880 cross-coupling reaction Methods 0.000 claims description 3
- 238000013480 data collection Methods 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 239000011265 semifinished product Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 230000006978 adaptation Effects 0.000 abstract description 3
- 238000013459 approach Methods 0.000 abstract description 3
- 230000003796 beauty Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003340 mental effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- OSGAYBCDTDRGGQ-UHFFFAOYSA-L calcium sulfate Chemical compound [Ca+2].[O-]S([O-])(=O)=O OSGAYBCDTDRGGQ-UHFFFAOYSA-L 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/08—Vaulted roofs
- E04B7/10—Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
- E04B7/105—Grid-like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/061—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members supporting construction for curved ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/34—Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles
- E04B9/345—Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of non-parallel slats, e.g. grids
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The invention discloses one and pray hanging type plasterboard BAIYE moulding construction method under the dome of hall, comprise the following steps: (1) three-dimensional modeling and find out plasterboard BAIYE moulding control point;(2) the multiple chi in three-dimensional data scene;(3) on-the-spot unwrapping wire and location;(4) BAIYE skeleton is made;(5) plasterboard is installed.The construction method of the present invention is simple, modularity is installed, moulding is unique, the design on roof, hall is adopted an original approach, natural light can be entered the room by direct irradiation, is the perfect adaptation of tradition and engineering, have employed hanging type plasterboard BAIYE moulding inside dome, projection between the inner pillar of the Room is enhanced each other's beauty with the light praying roof, hall, defines the dynamic effect of light and shade.
Description
Technical field
The present invention relates to the realm of building construction, under specifically one prays hall dome, the BAIYE moulding of hanging type plasterboard is executed
Work method.
Background technology
Indoor design is the character of use according to building, local environment and respective standard, use material technology means and
Architectural design principle, function of creation grace reasonable, comfortable, meets people's material and the indoor environment of cultural life needs.This
Spatial environments both had use value, and meets corresponding functional requirement, also reflects historical context, architectural style, environment simultaneously
The Nervous and Mental Factors such as atmosphere.
Summary of the invention
It is an object of the invention to provide one and pray hanging type plasterboard BAIYE moulding construction method under the dome of hall.
For achieving the above object, the present invention provides following technical scheme:
One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall, comprises the following steps:
(1) three-dimensional modeling and find out plasterboard BAIYE moulding control point: on-the-spot dome is measured and data collection, so
Afterwards measurement data input computer carry out three-dimensional modeling, further according to design drawing calculate plasterboard BAIYE skeleton moulding size and
Installation site control point;
(2) the multiple chi in three-dimensional data scene: scene is carried out multiple according to computer three-dimensional model molded dimension and control point data
Chi is measured, and checks its error, and checking that data again input computer and adjust, repeatedly checks until data are accurate;
(3) on-the-spot unwrapping wire and location: according to the final control point data calculated, carry out unwrapping wire at the scene, makees to face with angle steel
Time control point scale, then bracing wire angle cleat control point forms dome BAIYE three-dimensional modeling netting twine;
(4) make BAIYE skeleton: the size calculated according to computer three-dimensional model, use square tube, angle steel at the scene or outside the venue
Making BAIYE steel skeleton semi-finished product, and carry out model section installation according to unwrapping wire control point, skeleton is temporarily fixed in structure, and examines
Look into its size and have zero deflection;Should adjust in time if any deviation, large area carcasing after determining model section zero deflection, can be carried out
And install, fix the most by column after bolt location to be checked is errorless during installation, pacify on surface immediately after steel skeleton is fixing
The fixing lightgage steel joist of dress;
(5) plasterboard is installed: lightgage steel joist i.e. carries out plasterboard facing installation after installing leveling.
As the further scheme of the present invention: what in step (4), skeleton was temporarily fixed in structure concretely comprises the following steps: pass through
4 corner braces of skeleton are bolted on the U-shaped steel of steel construction.
As the present invention further scheme: total is with the system form of multiple stealthy cross couplings, by bent steel
Profile material forms, and on three axis, the short bracket of adjustable steel profile uses hollow rectangle square tube to form with band iron, is fixed on vault
On the main steel construction on top.
As the present invention further scheme: the section bar spandrel girder of described U-shaped steel is tightened on the short bracket of steel profile, use
Screw is fixed in side.
As the present invention further scheme: load-bearing frame uses 3-D solid structure, panel material uses and meets standard
The bilayer thickness of DIN EN520 is the plasterboard of 12.5mm, is tightened on load-bearing frame.
Compared with prior art, the invention has the beneficial effects as follows: the construction method of the present invention is simple, modularity is installed, and makes
Type is unique, and the design on roof, hall is adopted an original approach, and natural light can be entered the room by direct irradiation, is the perfect adaptation of tradition and engineering,
Have employed hanging type plasterboard BAIYE moulding inside dome, the projection between the inner pillar of the Room and the light praying roof, hall hand over phase
Shine, define the dynamic effect of light and shade.
Accompanying drawing explanation
Fig. 1 is for praying under the dome of hall dome three-dimensional model diagram in hanging type plasterboard BAIYE moulding construction method.
Fig. 2 is to pray under the dome of hall the knot of the short bracket of adjustable steel section bar in hanging type plasterboard BAIYE moulding construction method
Structure schematic diagram.
Fig. 3 is to pray the structural representation of three-dimensional load-bearing frame in hanging type plasterboard BAIYE moulding construction method under the dome of hall
Figure.
Fig. 4 is to pray under the dome of hall the A-A sectional view of Fig. 3 in hanging type plasterboard BAIYE moulding construction method.
Fig. 5 is to pray under the dome of hall the structural representation of plasterboard in hanging type plasterboard BAIYE moulding construction method.
Fig. 6 is for praying under the dome of hall in hanging type plasterboard BAIYE moulding construction method hanging type plasterboard hundred under dome
Leaf window modeling effect figure.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise
Embodiment, broadly falls into the scope of protection of the invention.
Referring to Fig. 1~6, in the embodiment of the present invention, one is prayed hanging type plasterboard BAIYE moulding under the dome of hall and is executed
Work method, comprises the following steps:
(1) three-dimensional modeling and find out plasterboard BAIYE moulding control point: on-the-spot dome is measured and data collection, so
Afterwards measurement data input computer is carried out three-dimensional modeling, as it is shown in figure 1, then calculate plasterboard BAIYE bone according to design drawing
Frame molded dimension and installation site control point;
(2) the multiple chi in three-dimensional data scene: scene is carried out multiple according to computer three-dimensional model molded dimension and control point data
Chi is measured, and checks its error, and checking that data again input computer and adjust, repeatedly checks until data are accurate;
(3) on-the-spot unwrapping wire and location: according to the final control point data calculated, carry out unwrapping wire at the scene, makees to face with angle steel
Time control point scale, then bracing wire angle cleat control point forms dome BAIYE three-dimensional modeling netting twine;
(4) make BAIYE skeleton: the size calculated according to computer three-dimensional model, use square tube, angle steel at the scene or outside the venue
Making BAIYE steel skeleton semi-finished product, and carry out model section installation according to unwrapping wire control point, skeleton should be temporarily fixed in structure (logical
4 corner braces crossing skeleton are bolted on the U-shaped steel of steel construction), and check that its size has zero deflection;If any deviation should and
Time adjust, large area carcasing and installation can be carried out after determining model section zero deflection, during installation, bolt must not screw on, to be checked
Position errorless after fix the most by column, fixing lightgage steel joist is installed on surface after steel skeleton is fixing immediately;
(5) plasterboard is installed: lightgage steel joist can carry out plasterboard facing installation after installing leveling.
The design on the roof, hall of the present invention is adopted an original approach, and natural light can be entered the room by direct irradiation, dome design be tradition with
The perfect adaptation of engineering, allows people enter selfless thought and mental realm, have employed hanging type plasterboard BAIYE inside dome
Moulding, the projection between the inner pillar of the Room is enhanced each other's beauty with the light praying roof, hall, defines the dynamic effect of light and shade, as
Shown in Fig. 6.
Total, with the system form of multiple stealthy cross couplings, is made up of curved plates section bar, adjustable on three axis
The short bracket of steel profile use hollow rectangle square tube and band iron to form, be fixed on the main steel construction of dome, such as Fig. 2 institute
Show.U-shaped steel profile spandrel girder is tightened on the short bracket of steel profile, fixes in side with screw.The load-bearing frame of plank uses three-dimensional
Stereochemical structure, as shown in Figure 3-4, panel material uses the Gypsum Fibrosum that bilayer thickness is 12.5mm meeting standard DIN EN 520
Plate, is tightened on load-bearing frame, as shown in Figure 5.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of the spirit or essential attributes of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter
From the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all by fall in the implication of equivalency and scope of claim
Change is included in the present invention.Should not be considered as limiting involved claim by any reference in claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps
Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should
Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment
May be appreciated other embodiments.
Claims (5)
1. pray hanging type plasterboard BAIYE moulding construction method under the dome of hall for one kind, it is characterised in that comprise the following steps:
(1) three-dimensional modeling and find out plasterboard BAIYE moulding control point: on-the-spot dome is measured and data collection, then
Measurement data input computer carries out three-dimensional modeling, calculates plasterboard BAIYE skeleton moulding size and installation further according to design drawing
Position control point;
(2) the multiple chi in three-dimensional data scene: scene carried out multiple chi survey according to computer three-dimensional model molded dimension and control point data
Amount, checks its error, and checking that data again input computer and adjust, repeatedly checks until data are accurate;
(3) on-the-spot unwrapping wire and location: according to the final control point data calculated, carry out unwrapping wire at the scene, makees interim control with angle steel
System point scale, then bracing wire angle cleat control point formation dome BAIYE three-dimensional modeling netting twine;
(4) make BAIYE skeleton: the size calculated according to computer three-dimensional model, make at the scene or outside the venue of square tube, angle steel
BAIYE steel skeleton semi-finished product, and carry out model section installation according to unwrapping wire control point, skeleton is temporarily fixed in structure, and checks it
Size has zero deflection;Should adjust in time if any deviation, large area carcasing and peace after determining model section zero deflection, can be carried out
Dress, fixes after during installation, bolt location to be checked is errorless the most by column, installs solid after steel skeleton is fixing immediately on surface
Determine lightgage steel joist;
(5) plasterboard is installed: lightgage steel joist i.e. carries out plasterboard facing installation after installing leveling.
The most according to claim 1 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists
In, what in step (4), skeleton was temporarily fixed in structure concretely comprises the following steps: be bolted to steel by the 4 of skeleton corner braces
On the U-shaped steel of structure.
The most according to claim 1 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists
In, total, with the system form of multiple stealthy cross couplings, is made up of curved plates section bar, adjustable die on three axis
The short bracket of material uses hollow rectangle square tube to form with band iron, is fixed on the main steel construction of dome.
The most according to claim 2 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists
In, the section bar spandrel girder of described U-shaped steel is tightened on the short bracket of steel profile, fixes in side with screw.
The most according to claim 1 praying hanging type plasterboard BAIYE moulding construction method under the dome of hall, its feature exists
In, load-bearing frame uses 3-D solid structure, and panel material uses the bilayer thickness meeting standard DIN EN 520 to be 12.5mm's
Plasterboard, is tightened on load-bearing frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610671877.2A CN106223523A (en) | 2016-08-16 | 2016-08-16 | One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610671877.2A CN106223523A (en) | 2016-08-16 | 2016-08-16 | One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106223523A true CN106223523A (en) | 2016-12-14 |
Family
ID=57548240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610671877.2A Pending CN106223523A (en) | 2016-08-16 | 2016-08-16 | One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223523A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090933A (en) * | 2017-06-13 | 2017-08-25 | 中国建筑第六工程局有限公司 | A kind of vaulted installation of ceiling method of steel skeleton |
CN107165323A (en) * | 2017-05-31 | 2017-09-15 | 苏州金螳螂建筑装饰股份有限公司 | A kind of dynamic scale moulding anti-deformation design structure of Buddhism dome and its construction method |
CN112031251A (en) * | 2020-08-24 | 2020-12-04 | 苏州金螳螂建筑装饰股份有限公司 | Adjustable arc aluminum square tube design ceiling structure and installation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0782825A (en) * | 1993-06-30 | 1995-03-28 | Seiwa Gikou:Kk | Method for constructing ceiling |
CN104612306A (en) * | 2014-12-20 | 2015-05-13 | 山西省第五建筑工程公司 | Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling |
CN104912340A (en) * | 2015-06-09 | 2015-09-16 | 华鼎建筑装饰工程有限公司 | Construction method for double-curve triangular aluminum plate unit type hanging ceiling |
CN105133840A (en) * | 2015-05-28 | 2015-12-09 | 南京长岛建设工程有限公司 | Construction method for hyperboloid furred ceiling |
CN105421643A (en) * | 2015-12-22 | 2016-03-23 | 中国建筑第六工程局有限公司 | Arched curved-surface suspended ceiling and manufacturing method thereof |
CN105421773A (en) * | 2015-10-30 | 2016-03-23 | 深圳市亚泰国际建设股份有限公司 | Construction method for light steel skeleton special-shaped model suspended ceiling |
CN105588549A (en) * | 2015-12-17 | 2016-05-18 | 浙江亚厦装饰股份有限公司 | Hyperbolic-veneer installing, positioning and acceptance checking method |
-
2016
- 2016-08-16 CN CN201610671877.2A patent/CN106223523A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0782825A (en) * | 1993-06-30 | 1995-03-28 | Seiwa Gikou:Kk | Method for constructing ceiling |
CN104612306A (en) * | 2014-12-20 | 2015-05-13 | 山西省第五建筑工程公司 | Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling |
CN105133840A (en) * | 2015-05-28 | 2015-12-09 | 南京长岛建设工程有限公司 | Construction method for hyperboloid furred ceiling |
CN104912340A (en) * | 2015-06-09 | 2015-09-16 | 华鼎建筑装饰工程有限公司 | Construction method for double-curve triangular aluminum plate unit type hanging ceiling |
CN105421773A (en) * | 2015-10-30 | 2016-03-23 | 深圳市亚泰国际建设股份有限公司 | Construction method for light steel skeleton special-shaped model suspended ceiling |
CN105588549A (en) * | 2015-12-17 | 2016-05-18 | 浙江亚厦装饰股份有限公司 | Hyperbolic-veneer installing, positioning and acceptance checking method |
CN105421643A (en) * | 2015-12-22 | 2016-03-23 | 中国建筑第六工程局有限公司 | Arched curved-surface suspended ceiling and manufacturing method thereof |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165323A (en) * | 2017-05-31 | 2017-09-15 | 苏州金螳螂建筑装饰股份有限公司 | A kind of dynamic scale moulding anti-deformation design structure of Buddhism dome and its construction method |
CN107090933A (en) * | 2017-06-13 | 2017-08-25 | 中国建筑第六工程局有限公司 | A kind of vaulted installation of ceiling method of steel skeleton |
CN112031251A (en) * | 2020-08-24 | 2020-12-04 | 苏州金螳螂建筑装饰股份有限公司 | Adjustable arc aluminum square tube design ceiling structure and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yu et al. | Rigidity of corrugated plate sidewalls and its effect on the modular structural design | |
Vicente et al. | Performance of masonry enclosure walls: lessons learned from recent earthquakes | |
Veljkovic et al. | Light steel framing for residential buildings | |
CN107977487A (en) | A kind of assembly concrete architectural design method based on BIM technology | |
CN106989211A (en) | Assembled architecture pipeline hanger system installation method based on BIM | |
Soni et al. | Structural analysis of multistory building of different shear walls location and heights | |
CN106223523A (en) | One prays hanging type plasterboard BAIYE moulding construction method under the dome of hall | |
Kuzman et al. | A new era for multi-storey timber buildings in Europe | |
Boake | Diagrids, the New Stablity System: Combining Architecture with Engineering | |
Gibb et al. | Glossary of terms | |
Wu et al. | Novel Precast Concrete Structure Systems | |
Korol et al. | Constructive systems, load-bearing and enclosing structures of high-rise buildings | |
CN107605076A (en) | A kind of curtain wall construction method | |
Martelli et al. | The exoskeleton technology as a solution to seismic adjustment of existing buildings | |
Wakchaure et al. | Effect of torsion consideration in analysis of multi storey frame | |
JP2014525001A (en) | Insulation wall parts | |
Puppio et al. | Parametric analysis on external dissipative link system for seismic protection of low rise RC buildings | |
Ilgın | A study on tall buildings and aerodynamic modifications against wind excitation | |
Shrestha | Comparison Between Common Seismic Codes Used in Nepal and Eurocode 8: Study Case Analysis of RC Building | |
Naqash | A note on the structural assessment of perforated panels used in façade | |
US20200002934A1 (en) | Super shear panels | |
Loka | Design of a two apartment house | |
REDDY | PLAN, ANALYSIS AND DESIGN OF STEEL INTENSIVE ARCHERY ACADEMY WITH HOSTEL | |
Marriage | Experimental construction in a timber house | |
Tuca et al. | Life-cycle assessment of a steel framed family house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161214 |
|
WD01 | Invention patent application deemed withdrawn after publication |