CN107083745A - The arrangement for adjusting height and its application method of a kind of falsework - Google Patents

The arrangement for adjusting height and its application method of a kind of falsework Download PDF

Info

Publication number
CN107083745A
CN107083745A CN201710191456.4A CN201710191456A CN107083745A CN 107083745 A CN107083745 A CN 107083745A CN 201710191456 A CN201710191456 A CN 201710191456A CN 107083745 A CN107083745 A CN 107083745A
Authority
CN
China
Prior art keywords
adjusting
adjusting rod
falsework
arrangement
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710191456.4A
Other languages
Chinese (zh)
Other versions
CN107083745B (en
Inventor
苏昱晟
李鑫奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201710191456.4A priority Critical patent/CN107083745B/en
Publication of CN107083745A publication Critical patent/CN107083745A/en
Application granted granted Critical
Publication of CN107083745B publication Critical patent/CN107083745B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The arrangement for adjusting height and its application method of a kind of falsework of the present invention, are related to municipal technical field of bridge construction.It includes being oppositely arranged and being connected to a pair of adjusting parts of falsework crossbeam;Adjusting part includes a L bracket, and the horizontal part of L bracket is fixed in crossbeam, and its vertical portion is away from crossbeam;Hanging piece includes hanging piece main body and regulating bolt provided with U-shaped neck and connecting portion, and U-shaped neck is snapped in L bracket vertical portion, and its top is threadedly coupled with regulating bolt, and bottom and the L bracket vertical portion of regulating bolt offset;And be arranged between a pair of hanging pieces and the bolted adjusting rod of connecting portion.Application method:It is simultaneously fixed in falsework crossbeam by assembled height adjusting means in advance, and slinging beam is installed on column;The main regulation of absolute altitude is carried out to adjusting rod and hanging piece is anchored on;The absolute altitude needed for bridge construction is fine-tuning to by regulating bolt;The horizontal member of bridge is erected on adjusting rod, arrangement for adjusting height is removed.

Description

The arrangement for adjusting height and its application method of a kind of falsework
Technical field
The present invention relates to municipal technical field of bridge construction, the arrangement for adjusting height of more particularly to a kind of falsework and its Application method.
Background technology
Falsework is typically made up of components such as column, crossbeams, and it is widely used in municipal bridge construction, can be as existing Pour main load-carrying construction of beam, Coping Construction etc..
Because the top rake of bridge changes, the scaffolding height of each falsework is all inconsistent in construction, and falsework Scaffolding height is limited by column specification and crossbeam specification, it is difficult to the disposable absolute altitude set up required for construction.Such as Fig. 1 and Shown in Fig. 2, at present, the adjusting method of falsework scaffolding height is as follows:When setting up falsework 10, using " just it is low not The principle of height ", the i.e. scaffolding height of falsework 10 are less than the absolute altitude needed for construction;Then, in the crossbeam 12 of falsework 10 Upper welding steel buttress 14 or absolute altitude of the billet 13 to be adjusted to needed for construction of jumping a queue;Finally, when bridge falls frame, steel branch is cut off Pier 14.It can be seen that, the construction method needs to aid in falsework 10 to reach regulation height by welding and cutting off steel buttress 14 Purpose, not only degree of regulation is poor, and work high above the ground work amount in job site is big, need to expend substantial amounts of artificial.
The content of the invention
For the adjusting method of existing falsework height, degree of regulation is poor, and job site work high above the ground work amount Big the problem of, it is an object of the invention to provide a kind of arrangement for adjusting height of falsework and its application method, with reference to regulation The absolute altitude main regulation of bar and the fine setting of regulating bolt, and then the accurate absolute altitude for adjusting falsework, and without overhead welding operation, Ensure construction safety and improve efficiency of construction.
The technical solution adopted for the present invention to solve the technical problems is:A kind of arrangement for adjusting height bag of falsework Include:It is oppositely arranged and is connected to a pair of adjusting parts of the crossbeam of falsework;The adjusting part includes a L bracket, institute The horizontal part for stating L bracket is fixed in the crossbeam, and the vertical portion of the L bracket is away from the crossbeam;A pair of hanging pieces, it is described Hanging piece includes the hanging piece main body provided with U-shaped neck and connecting portion, and a regulating bolt, and the U-shaped neck is snapped in the L-shaped branch The vertical portion of frame, the top of the U-shaped neck is threadedly coupled provided with bolt hole and with the regulating bolt, the regulating bolt Top of the bottom then with the vertical portion of the L bracket offsets;And the adjusting rod between hanging piece described in a pair is arranged at, it is described Vertically arranged some bolts hole on adjusting rod, and the adjusting rod and the connecting portion bolt connection of the hanging piece main body.
It is preferred that, the connecting portion of the hanging piece main body is the L-shaped steel member in a cross section, and one of the connecting portion is straight Side and the U-shaped neck bolt connection, another straight flange of the connecting portion are connected with the adjusting rod by split bolt.
It is preferred that, the connecting portion of the hanging piece main body is steel member of the cross section in I shapes, the connecting portion and the U Shape neck is vertical and fixes as one, on the connecting portion vertically arranged some bolts hole and with the adjusting rod bolt connection.
It is preferred that, the adjusting rod is made up of the steel with square-section.
It is preferred that, the adjusting rod is made up of square tube.
In addition, present invention also offers a kind of application method of the arrangement for adjusting height of falsework, step is as follows:
First, assembled height adjusting means and L bracket is fixed on the crossbeam of falsework in advance, lifts by crane the crossbeam And the arrangement for adjusting height, by the crossbeam on the column of the falsework;
2nd, mobile adjusting rod carries out the main regulation of absolute altitude, makes the adjusting rod and the bolt on the connecting portion of hanging piece main body Hole is alignd, and the adjusting rod is anchored on into the hanging piece main body by split bolt;
3rd, the height of the adjusting rod is finely adjusted by adjusting regulating bolt, the adjusting rod is adjusted to bridge Absolute altitude needed for construction;
4th, the horizontal member of bridge is erected on the adjusting rod, when bridge falls frame, adjusts the regulating bolt, make The horizontal member for obtaining the arrangement for adjusting height and the bridge departs from, and then removes the arrangement for adjusting height.
Effect of the invention is that:
First, the arrangement for adjusting height of falsework of the invention, including the L-shaped branch being installed on the crossbeam of falsework Frame, is snapped in the hanging piece in L bracket, and with the bolted adjusting rod of hanging piece, vertically arranged some spiral shells on adjusting rod Keyhole is easy to its absolute altitude of flexible modulation, further, is threadedly coupled by tightening (or unscrewing) with the U-shaped neck of hanging piece main body Regulating bolt, is finely adjusted with realizing to the relative position between crossbeam and adjusting rod, so that falsework accurately be adjusted To the absolute altitude needed for bridge construction.The present invention arrangement for adjusting height combination adjusting rod absolute altitude main regulation and regulating bolt it is micro- Adjust, and then the absolute altitude of accurate adjustment falsework, and without overhead welding operation, when bridge falls frame, also eliminate on-site cutting The work such as steel branch upsetting, have ensured construction safety and have improved efficiency of construction.
2nd, the application method of the arrangement for adjusting height of falsework of the invention, is in advance adjusted the height being completed The L bracket of device is welded on the crossbeam of falsework, arrangement for adjusting height is lifted with crossbeam and is arranged on interim On the column of support, the absolute altitude of the Level Change falsework for the adjusting rod being connected to by adjustment bolt on hanging piece is especially weighed Want, the regulating bolt being also threadedly coupled by tightening (or unscrewing) with hanging piece is finely adjusted to the absolute altitude of falsework, from And falsework is accurately adjusted to the absolute altitude needed for bridge construction, moreover, avoiding overhead welding operation, improve construction Efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of existing falsework;
Fig. 2 is the partial enlarged drawing of part A in Fig. 1;
Fig. 3 is the structural representation of the arrangement for adjusting height of the falsework of one embodiment of the invention;
Fig. 4 is Fig. 3 B-B profiles;
Fig. 5 and Fig. 6 adjusts height simultaneously for the arrangement for adjusting height of the falsework of one embodiment of the invention using adjusting rod Fixed schematic diagram;
Fig. 7 utilizes the regulation spiral shell being threadedly coupled on hanging piece for the arrangement for adjusting height of the falsework of one embodiment of the invention Bolt carries out the schematic diagram of height fine adjusting function.
Fig. 8 is the schematic diagram for the horizontal member that bridge is installed using the arrangement for adjusting height of one embodiment of the invention;
Label is as follows in figure:
Falsework 10;Column 11;Crossbeam 12;Billet 13;Arrangement for adjusting height 30;The horizontal member 20 of bridge;L-shaped Support 31;Hanging piece 32;U-shaped neck 32a;Connecting portion 32b;Regulating bolt 32c;Adjusting rod 33;Split bolt 34.
Embodiment
Below in conjunction with the drawings and specific embodiments to a kind of arrangement for adjusting height of falsework proposed by the present invention and its Application method is described in further detail.According to following explanation and claims, advantages and features of the invention will be more clear Chu.The technology contents and feature of the present invention by cited embodiment combination accompanying drawing, will be described in detail below.It need to illustrate in addition That accompanying drawing is using very simplified form and uses non-accurately ratio, only to it is convenient, lucidly aid in illustrating this hair The purpose of bright embodiment.
It refer to Fig. 1 and Fig. 2, the falsework 10 of the present embodiment includes some columns 11, be set up on column 11 and simultaneously Two crossbeams 12 set are arranged, billet 13 is set between crossbeam 12 and column 11.The arrangement for adjusting height 30 of the present invention is installed In on two crossbeams 12, and the height of falsework 10 is adjusted to using arrangement for adjusting height 30 height needed for bridge construction Degree, then, installs the horizontal member 20 of bridge on two crossbeams 12.Crossbeam 12 in the present embodiment by taking I-steel as an example, when So, it is not limited to this, a kind of arrangement for adjusting height of falsework of the present invention is illustrated with reference to Fig. 3 to Fig. 8, it includes It is oppositely arranged and is connected to a pair of adjusting parts of the crossbeam 12 of falsework 10;The adjusting part includes a L bracket 31, L The horizontal part of shape support 31 is fixed in the wing plate of crossbeam 12, and wing plate edge is stretched out in the vertical portion of L bracket 31;A pair of hanging pieces 32, The hanging piece 32 includes the hanging piece main body provided with U-shaped neck 32a and connecting portion 32b, and a regulating bolt 32c, U-shaped neck 32a The vertical portion of L bracket 31 is snapped in, U-shaped neck 32a top is threadedly coupled provided with bolt hole and with regulating bolt 32c, Top of the regulating bolt 32c bottom then with the vertical portion of L bracket 31 offsets;And it is arranged at the tune between a pair of hanging pieces 32 The vertically arranged some bolts hole of correspondence, adjusting rod 33 and connecting portion on the connecting portion 32b of pole 33, adjusting rod 33 and hanging piece main body 32b bolt connections.
The arrangement for adjusting height of the falsework of the present invention, including the L-shaped branch being installed on the crossbeam 12 of falsework 10 Frame 31, is snapped in the hanging piece 32 in L bracket 31, and with the bolted adjusting rod of hanging piece 32 33, it is vertical on adjusting rod 33 Some bolts hole set are easy to its absolute altitude of flexible modulation, further, by the U-shaped card for tightening (or unscrewing) and hanging piece main body The regulating bolt 32c of groove 32a threaded connections, is finely adjusted with realizing to the relative position between crossbeam 12 and adjusting rod 33, from And falsework 10 is accurately adjusted to the absolute altitude needed for bridge construction.The arrangement for adjusting height 30 of the present invention combines adjusting rod 33 absolute altitude main regulation and regulating bolt 32c fine setting, and then the accurate absolute altitude for adjusting falsework 10, and without overhead welding Operation, when bridge falls frame, also eliminates the work such as on-site cutting steel branch upsetting, has ensured construction safety and improved efficiency of construction.
Please continue to refer to Fig. 3 and Fig. 4, the connecting portion 32b of hanging piece main body is the L-shaped steel member in a cross section, connecting portion A 32b straight flange and U-shaped neck 32a bolt connections, connecting portion 32b another straight flange and adjusting rod 33 pass through split bolt 34 Connection.The connecting portion 32b of L-shaped respectively with U-shaped neck 32a and the bolt connection of adjusting rod 33, be easy to the flexible modulation mark of adjusting rod 33 Height, and convenient disassembly, are utilized with the turnover repeatedly beneficial to each part.
As another embodiment, the connecting portion 32b of hanging piece main body is in the steel member of I shapes for a cross section, and with U-shaped neck 32a is vertical and fixes as one, on connecting portion 32b vertically arranged some bolts hole and with the bolt connection of adjusting rod 33.Connecting portion 32b fixes as one with U-shaped neck 32a, remains able to realize being stably connected with for hanging piece 32 and adjusting rod 33, and simplification finishes Structure.
The steel that above-mentioned adjusting rod 33 can have square-section by channel-section steel, square tube etc. are made, and are vertically set on adjusting rod 33 Some bolts hole are put, the main regulation in absolute altitude direction, easy to operate, flexible adjustment can be carried out using bolt hole.The present embodiment is preferred Square tube, square tube material is more convenient for processing bolt hole, and convenient material drawing.
Illustrate the application method of the arrangement for adjusting height of the falsework of the present invention, specific steps with reference to Fig. 3 to Fig. 8 It is as follows:
First, as shown in figure 3, assembled height adjusting means 30 and L bracket 31 is welded in into the one of falsework 10 in advance To on crossbeam 12, slinging beam 12 and arrangement for adjusting height 30, on the column 11 that crossbeam 12 is arranged on to falsework 10;
2nd, as shown in figure 5, moving up and down the main regulation that adjusting rod 33 carries out absolute altitude, adjusting rod 33 and hanging piece main body are made Bolt hole alignment on connecting portion 32b, as shown in fig. 6, adjusting rod 33 is anchored on into hanging piece main body by split bolt 34;
3rd, as shown in fig. 7, being finely adjusted by tightening or unscrewing regulating bolt 32c to the height of adjusting rod 33, it will adjust Bar 33 is adjusted to the absolute altitude needed for bridge construction;
4th, as shown in figure 8, the horizontal member 20 of bridge is erected on adjusting rod 33, when bridge falls frame, adjustment regulation spiral shell Bolt 32c so that the horizontal member 20 of arrangement for adjusting height 30 and bridge departs from, then, removes arrangement for adjusting height 30.
The application method of the arrangement for adjusting height of the falsework of the present invention, in advance by the arrangement for adjusting height being completed 30 L bracket 31 is welded on the crossbeam 12 of falsework 10, arrangement for adjusting height 30 is lifted and is pacified with crossbeam 12 On the column 11 of falsework 10, the Level Change for the adjusting rod 33 being connected to by adjustment bolt on hanging piece 32 is propped up temporarily The absolute altitude of frame 10, it is of particular importance that also by tightening regulating bolt 32c that (or unscrewing) be threadedly coupled with hanging piece 32 to interim The absolute altitude of support 10 is finely adjusted, so that falsework 10 is accurately adjusted to the absolute altitude needed for bridge construction, and, it is to avoid Overhead welding operation, improves efficiency of construction.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (6)

1. a kind of arrangement for adjusting height of falsework, it is characterised in that including:
It is oppositely arranged and is connected to a pair of adjusting parts of the crossbeam of falsework;
The adjusting part includes a L bracket, and the horizontal part of the L bracket is fixed in the crossbeam, the L bracket Vertical portion is away from the crossbeam;
A pair of hanging pieces, the hanging piece includes the hanging piece main body provided with U-shaped neck and connecting portion, and a regulating bolt, the U-shaped card Groove is snapped in the vertical portion of the L bracket, and the top of the U-shaped neck connects provided with bolt hole and with the regulating bolt screw thread Connect, the top of the bottom of the regulating bolt then with the vertical portion of the L bracket offsets;
And vertically arranged some bolts hole on the adjusting rod between hanging piece described in a pair, the adjusting rod are arranged at, and it is described Adjusting rod and the connecting portion bolt connection of the hanging piece main body.
2. arrangement for adjusting height according to claim 1, it is characterised in that:The connecting portion of the hanging piece main body is one transversal The L-shaped steel member in face, a straight flange of the connecting portion and the U-shaped neck bolt connection, the connecting portion it is another straight Side is connected with the adjusting rod by split bolt.
3. arrangement for adjusting height according to claim 1, it is characterised in that:The connecting portion of the hanging piece main body is one transversal Face is in the steel member of I shapes, and the connecting portion is vertical with the U-shaped neck and fixes as one, vertically arranged on the connecting portion Some bolts hole and with the adjusting rod bolt connection.
4. the arrangement for adjusting height according to any one of claims 1 to 3, it is characterised in that:The adjusting rod is by with square The steel of tee section are made.
5. arrangement for adjusting height according to claim 4, it is characterised in that:The adjusting rod is made up of square tube.
6. the application method of the arrangement for adjusting height of falsework as described in any one of claim 1 to 5, step is as follows:
First, assembled height adjusting means and L bracket is fixed on the crossbeam of falsework in advance, lifts by crane the crossbeam and institute Arrangement for adjusting height is stated, on the column that the crossbeam is arranged on to the falsework;
2nd, mobile adjusting rod carries out the main regulation of absolute altitude, makes the adjusting rod and the bolt hole pair on the connecting portion of hanging piece main body Together, the adjusting rod is anchored on by the hanging piece main body by split bolt;
3rd, the height of the adjusting rod is finely adjusted by adjusting regulating bolt, the adjusting rod is adjusted to bridge construction Required absolute altitude;
4th, the horizontal member of bridge is erected on the adjusting rod, when bridge falls frame, adjusts the regulating bolt so that institute The horizontal member for stating arrangement for adjusting height and the bridge departs from, and then removes the arrangement for adjusting height.
CN201710191456.4A 2017-03-28 2017-03-28 A kind of height adjustment device and its application method of falsework Active CN107083745B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710191456.4A CN107083745B (en) 2017-03-28 2017-03-28 A kind of height adjustment device and its application method of falsework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710191456.4A CN107083745B (en) 2017-03-28 2017-03-28 A kind of height adjustment device and its application method of falsework

Publications (2)

Publication Number Publication Date
CN107083745A true CN107083745A (en) 2017-08-22
CN107083745B CN107083745B (en) 2018-10-09

Family

ID=59615078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710191456.4A Active CN107083745B (en) 2017-03-28 2017-03-28 A kind of height adjustment device and its application method of falsework

Country Status (1)

Country Link
CN (1) CN107083745B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201358579Y (en) * 2009-01-06 2009-12-09 广州市市政集团有限公司 Adjustable support bracket device
CN202157271U (en) * 2011-05-31 2012-03-07 无锡澳玛高铁科技有限公司 Auxiliary landing leg structure of bridge erecting machine
CN202954302U (en) * 2012-12-06 2013-05-29 中国十九冶集团有限公司 Bed-jig elevation adjusting device
JP2014020137A (en) * 2012-07-19 2014-02-03 Oriental Shiraishi Corp Precast floor slab and erection method of precast floor slab
CN203905472U (en) * 2014-06-23 2014-10-29 贵州平川塑业建材科技有限公司 Adjustable stand column support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201358579Y (en) * 2009-01-06 2009-12-09 广州市市政集团有限公司 Adjustable support bracket device
CN202157271U (en) * 2011-05-31 2012-03-07 无锡澳玛高铁科技有限公司 Auxiliary landing leg structure of bridge erecting machine
JP2014020137A (en) * 2012-07-19 2014-02-03 Oriental Shiraishi Corp Precast floor slab and erection method of precast floor slab
CN202954302U (en) * 2012-12-06 2013-05-29 中国十九冶集团有限公司 Bed-jig elevation adjusting device
CN203905472U (en) * 2014-06-23 2014-10-29 贵州平川塑业建材科技有限公司 Adjustable stand column support

Also Published As

Publication number Publication date
CN107083745B (en) 2018-10-09

Similar Documents

Publication Publication Date Title
CN105926958B (en) A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column
CN107761570B (en) A kind of accurate positioning hanger for longspan steel truss girder
CN104278843B (en) The deviation correcting device of a kind of steel structure girder lifting docking and using method
CN203247565U (en) Auxiliary riveting stud second-phase embedding part mounting device for vertical ship lift
CN208055878U (en) A kind of Pass line adjustment and stripper apparatus for bent cap cast-in-place support
CN110205933A (en) A kind of arch rib of long-span steel arch bridge assembly falsework
CN108005392A (en) A kind of assembly concrete shear wall accurate positioning device and its installation method
CN206408969U (en) A kind of support meanss for being used to adjust bent cap vertical and horizontal gradient
CN107083745A (en) The arrangement for adjusting height and its application method of a kind of falsework
CN205804189U (en) A kind of High-speed Railway Bridges beam support installs equipment
CN106041825B (en) A kind of sedan-chair frame adjusts frock
CN209538044U (en) A kind of arch rib of long-span steel arch bridge assembly falsework
CN209384578U (en) A kind of hoistway with steel structure
CN208748518U (en) A kind of formwork for placing support device
CN208649894U (en) A kind of steel anchor beam and steel corbel unit spelling moulding bed
CN103343639A (en) Efficiently-adjusting module sliding system
CN107938841A (en) A kind of positioning adjusting of steel column pairing and method of temporarily fixing
CN215104767U (en) Adjustable anti-deformation bed-jig
CN209349757U (en) Wielding neck means for correcting
CN209352470U (en) A kind of swing arm tower crane perpendicularity regulating device
CN208009910U (en) A kind of assembly concrete shear wall accurate positioning device
CN207260607U (en) A kind of accumulation slippage construction equal proportion plays fall girder apparatus
CN108116618A (en) One erecting device for being used for ventilation terminal
CN206970160U (en) Pipe riser
CN208777634U (en) A kind of adjustable elevator shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant