CN207260607U - A kind of accumulation slippage construction equal proportion plays fall girder apparatus - Google Patents

A kind of accumulation slippage construction equal proportion plays fall girder apparatus Download PDF

Info

Publication number
CN207260607U
CN207260607U CN201721196593.9U CN201721196593U CN207260607U CN 207260607 U CN207260607 U CN 207260607U CN 201721196593 U CN201721196593 U CN 201721196593U CN 207260607 U CN207260607 U CN 207260607U
Authority
CN
China
Prior art keywords
steel truss
equal proportion
section
counter
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721196593.9U
Other languages
Chinese (zh)
Inventor
方继
黄会泽
郑海堂
帖磊
曹晗
丁仕洪
刘果
蔡振兴
邹孔庆
陈国权
吴晓锋
马建廷
付明珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steel Structure Construction Co Ltd of CTCE Group
Original Assignee
Steel Structure Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steel Structure Construction Co Ltd of CTCE Group filed Critical Steel Structure Construction Co Ltd of CTCE Group
Priority to CN201721196593.9U priority Critical patent/CN207260607U/en
Application granted granted Critical
Publication of CN207260607U publication Critical patent/CN207260607U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of accumulation slippage construction equal proportion to play fall girder apparatus, including adjusting section, fixed section, lateral support, self-locking jack, counter-force seat, monitor reflection plaster, formed according to steel truss, adjusting section corresponds respectively to be arranged on fixed section, and the upper end of fixed section is equipped with connecting cross beam anyhow, connected and fixed by lateral support respectively between fixed section and connecting cross beam, linear be placed in of steel truss is adjusted in section, intersection between and is supported by one-to-one counter-force seat transition respectively, counter-force seat controls steel truss linear by dismountable self-locking jack equal proportion top lifting respectively.The utility model its simple in structure, making, simple installation, coordinated by self-locking jack and displacement monitoring, it can realize large span steel truss alignment control, reduce the workload of segmentation installation and pre- arch camber, integrally-built alignment control is improved, it is convenient for disassembly and assembly, it is reusable, reduce and manufacture cost, improve installation efficiency.

Description

A kind of accumulation slippage construction equal proportion plays fall girder apparatus
Technical field:
Technical field of building construction is the utility model is related to, a kind of accumulation slippage construction equal proportion is related generally to and rises and falls beam dress Put.
Background technology:
Vertically and horizontally plane steel truss is a kind of common architecture structure form to large span, is widely used in venue, train Stand, the volumed space building field such as airport.
Vertically and horizontally plane steel truss due to the features such as member dead weight is big, joint form is complicated, easily causes steel truss to large span Integral linear deviation.Existing correction control method is usually that segmentation arch camber installation or the pre- arch camber in high-altitude are in bulk.But due to operation Face limits, and welding deformation influences, and controls linear deviation difficulty big.Pre- arch camber required precision height is installed in segmentation, high-altitude is risen in advance It is big to encircle weld industry difficulty in bulk, overall control effect is extremely difficult to expected requirement.
Utility model content:
The defects of the utility model aim is exactly to make up prior art, there is provided a kind of accumulation slippage construction equal proportion rises Fall girder apparatus, by effective combination of self-locking jack and displacement monitoring, can adjust the structural linetype of large span steel truss, from And realize integrally-built alignment control, improve large-span steel installation accuracy.
The utility model is achieved through the following technical solutions:
A kind of accumulation slippage construction equal proportion plays fall girder apparatus, it is characterised in that:Including adjusting section(1), fixed section(2)、 Lateral support(3), self-locking jack(4), counter-force seat(5), monitoring reflection plaster(6), according to steel truss(7)Composition, the adjusting section (1)Correspond respectively and be arranged on fixed section(2)On, and fixed section(2)Upper end be equipped with connecting cross beam anyhow, it is described solid Determine section(2)Pass through lateral support respectively between connecting cross beam(3)Connection is fixed, the steel truss(7)It is linear to be placed in adjusting Section(2)On, and between intersection pass through one-to-one counter-force seat respectively(5)Transition supports, the counter-force seat(5)Lead to respectively Cross dismountable self-locking jack(4)Equal proportion top lifting controls steel truss(7)It is linear.
The self-locking jack(4)With steel truss(7)Vertical angle be not greater than 0.1 °.
The monitoring reflection plaster(6)Positioned at counter-force seat(5)The steel truss of top(7)On rod piece, steel truss is monitored in real time (7)Vertical displacement.
The more self-locking jacks(4)Synchronous unloading.
The adjusting section(1)With fixed section(2)Between using assembled connect.
The utility model has the advantages that:
1st, fixed section combines integral, simple in structure, making, simple installation by high-strength bolt with adjusting section.
2nd, coordinated by self-locking jack and displacement monitoring, it is possible to achieve large span steel truss alignment control, reduces segmentation Installation and the workload of pre- arch camber, improve integrally-built alignment control.
3rd, each component can give full play to effectiveness, and leg portion uses assembled, convenient for disassembly and assembly, reusable, drop It is low to manufacture cost, improve installation efficiency.
Brief description of the drawings:
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the partial structurtes enlarged drawing of the utility model.
Embodiment:
Referring to attached drawing.
A kind of accumulation slippage construction equal proportion plays fall girder apparatus, it is characterised in that:Including adjusting section 1, fixed section 2, lateral Support 3, self-locking jack 4, counter-force seat 5, monitoring reflection plaster 6, form according to steel truss 7, and the adjusting section 1 corresponds respectively to be set Put on fixed section 2, and the upper end of fixed section 2 is equipped with connecting cross beam anyhow, divides between the fixed section 2 and connecting cross beam Do not connected and fixed by lateral support 3, the steel truss 7 is linear to be placed in and adjusts in section 2, and between intersection pass through respectively One-to-one 5 transition support of counter-force seat, the counter-force seat 5 pass through dismountable 4 equal proportion top lifting control of self-locking jack respectively Steel truss 7 processed is linear.
The vertical angle of the self-locking jack 4 and steel truss 7 is not greater than 0.1 °.
The monitoring reflection plaster 6 is located on 7 rod piece of steel truss of the top of counter-force seat 5, monitors 7 vertical position of steel truss in real time Move.
The synchronous unloading of the more self-locking jacks 4.
Connected between the adjusting section 1 and fixed section 2 using assembled.

Claims (5)

1. a kind of accumulation slippage construction equal proportion plays fall girder apparatus, it is characterised in that:Including adjusting section(1), fixed section(2), side To support(3), self-locking jack(4), counter-force seat(5), monitoring reflection plaster(6), according to steel truss(7)Composition, the adjusting section(1) Correspond respectively and be arranged on fixed section(2)On, and fixed section(2)Upper end be equipped with connecting cross beam anyhow, the fixation Section(2)Pass through lateral support respectively between connecting cross beam(3)Connection is fixed, the steel truss(7)It is linear to be placed in adjusting section (2)On, and between intersection pass through one-to-one counter-force seat respectively(5)Transition supports, the counter-force seat(5)Pass through respectively Dismountable self-locking jack(4)Equal proportion top lifting controls steel truss(7)It is linear.
2. accumulation slippage construction equal proportion according to claim 1 plays fall girder apparatus, it is characterised in that:The self-locking thousand Jin top(4)With steel truss(7)Vertical angle be not greater than 0.1 °.
3. accumulation slippage construction equal proportion according to claim 1 plays fall girder apparatus, it is characterised in that:The monitoring is anti- Light pastes(6)Positioned at counter-force seat(5)The steel truss of top(7)On rod piece, steel truss is monitored in real time(7)Vertical displacement.
4. accumulation slippage construction equal proportion according to claim 1 plays fall girder apparatus, it is characterised in that:Described more are certainly Lock jack(4)Synchronous unloading.
5. accumulation slippage construction equal proportion according to claim 1 plays fall girder apparatus, it is characterised in that:The adjusting section (1)With fixed section(2)Between using assembled connect.
CN201721196593.9U 2017-09-14 2017-09-14 A kind of accumulation slippage construction equal proportion plays fall girder apparatus Expired - Fee Related CN207260607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721196593.9U CN207260607U (en) 2017-09-14 2017-09-14 A kind of accumulation slippage construction equal proportion plays fall girder apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721196593.9U CN207260607U (en) 2017-09-14 2017-09-14 A kind of accumulation slippage construction equal proportion plays fall girder apparatus

Publications (1)

Publication Number Publication Date
CN207260607U true CN207260607U (en) 2018-04-20

Family

ID=61921919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721196593.9U Expired - Fee Related CN207260607U (en) 2017-09-14 2017-09-14 A kind of accumulation slippage construction equal proportion plays fall girder apparatus

Country Status (1)

Country Link
CN (1) CN207260607U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532969A (en) * 2018-05-31 2018-09-14 重庆建工集团股份有限公司 A kind of the type steel support device and its construction method of loading hole built-in fitting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532969A (en) * 2018-05-31 2018-09-14 重庆建工集团股份有限公司 A kind of the type steel support device and its construction method of loading hole built-in fitting

Similar Documents

Publication Publication Date Title
CN107355037B (en) Self-supporting steel truss floor slab supporting system of assembled steel structure building and construction method
CN103046754A (en) Construction method for abutting high-altitude long-span roof pipe trusses by adjustable temporary support
CN104631838A (en) Method for installing abnormal-shaped extremely-large overhung steel truss under process monitoring construction
CN102912972B (en) Multifunctional lifting steel platform switching jig and construction method
CN105971294A (en) Stereoscopic supporting scaffold composed of universal standard joints and mounting method
CN104563494A (en) Transformation supporting system for socket disc-lock steel tube support and construction method
CN103334527A (en) Steel structure cast-in-site floor arching construction method
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN204843369U (en) Steel case roof beam steel structure welding anti -deformation platform device
CN106351462A (en) Temporary steel pipe supported prestressed reinforcement structure and construction method thereof
CN208251619U (en) A kind of assembling truss floor support plate support
CN207260607U (en) A kind of accumulation slippage construction equal proportion plays fall girder apparatus
CN205777401U (en) A kind of moulding bed universal standard saves
CN102691412A (en) Prefabricated frame structure connection supporting template with adjustable vertical height
CN203513056U (en) Retractable staircase lower truss
CN106996197A (en) The correcting device and its application method misplaced for steel construction vertical member counterpart
CN209741895U (en) Connection structure of assembled elevator steel construction and base
CN202913677U (en) Multifunctional conversion scaffold capable of lifting steel platform
CN203429556U (en) System for quickly installing and positioning cable saddle
CN213359489U (en) Adjustable reinforcing device for supporting construction elevator on basement roof
CN104018655A (en) Component-based single supporting frame
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN211395376U (en) Auxiliary positioning device for mounting arch rib of arch bridge with extra-large steel box girder
CN211142847U (en) Telescopic steel box girder top push axis displacement deviation correcting device
CN103556577B (en) Elevation adjusting device for steel truss and method for adjusting elevation of steel truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180420

CF01 Termination of patent right due to non-payment of annual fee