CN107060173A - Early form removal construction method in clear-water concrete wafer board structure hole - Google Patents
Early form removal construction method in clear-water concrete wafer board structure hole Download PDFInfo
- Publication number
- CN107060173A CN107060173A CN201710462023.8A CN201710462023A CN107060173A CN 107060173 A CN107060173 A CN 107060173A CN 201710462023 A CN201710462023 A CN 201710462023A CN 107060173 A CN107060173 A CN 107060173A
- Authority
- CN
- China
- Prior art keywords
- cast
- plate
- wafer board
- hole
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses early form removal construction method in a kind of clear-water concrete wafer board structure hole, after the completion of the lifting of wafer board unit plate, cast-in-site stripe is left between two pieces of prefabricated wafer boards, cast-in-site stripe is provided with wafer board preformed hole, and its specification and arrangement are consistent with prefabricated board;After prefabricated wafer board lifting is completed, reinforcing bar in colligation preformed groove props up cast-in-place reserved plate hole internal model, then pours cast-in-site stripe concrete, and hole inner template is removed after waiting concrete to have some strength.Easy construction of the present invention, construction quality are good.
Description
Technical field
The present invention relates to early form removal construction method in a kind of clear-water concrete wafer board structure hole.
Background technology
Wafer board refers to Large area reinforced concrete structure floor plates with holes, is constructed as high-level cleaning shop return air,
Required with meeting the clean of general electronic workshop, putting into very big factory building in photoelectricity, electronic chip etc. can be applied.Generally
In the case of wafer board be with FRP(Fiber glass epoxy)Do bucket mould in plate bed die and hole and pour to smash and form, the bucket template after the completion of pouring
Do not removed as bed die and casement.
Some plant designings need to be used clear-water concrete structure, not adopted during construction due to technique or fire-fighting requirements, wafer board
Expoxy glass steel form is used, or uses FRP templates and needs to remove.FRP(Fiber glass epoxy)Template strength is not high, constructs thickness
It is thin, should not form removal be used in turn.Clear-water concrete waffle plate bed die uses multi-plywood template under normal circumstances, and hole internal model is adopted
Use steel form.And when adopt use steel form in hole when, how to accomplish quickly to remove, both constructing operation is convenient, casement improved again
Speed is used in turn, the construction quality, construction speed, cost-effective key of wafer board structure construction is to ensure that.
The content of the invention
It is an object of the invention to provide in the good clear-water concrete wafer board structure hole of a kind of easy construction, construction quality
Early form removal construction method.
The present invention technical solution be:
Early form removal construction method in a kind of clear-water concrete wafer board structure hole, it is characterized in that:Comprise the following steps:
1)After the completion of the lifting of wafer board unit plate, cast-in-site stripe is left between two pieces of prefabricated wafer boards, cast-in-site stripe is provided with China
Husband's plate preformed hole, its specification and arrangement are consistent with prefabricated board;
2)After prefabricated wafer board lifting is completed, reinforcing bar in colligation preformed groove props up cast-in-place reserved plate hole internal model, then poured cast-in-place
Band concrete, hole inner template is removed after waiting concrete to have some strength;
The cast-in-place reserved plate hole internal model is assembled by 3 arc formworks per mold ring by structure steel fabrication, wherein:2
Piece arc length 474mm, 1 arc length 100mm;If the annular transverse flange plate of twice up and down, each piece of arc formwork both sides set vertical method
Pass through vertical flanged plate bolt connection between blue plate edge sealing, three pieces of arc formworks;Upper cover plate external diameter is bigger than aperture by design requirement
30mm, edges of boards Xian is bolted into 45o chamferings, lamina tecti with lower part steel mould tool;Two square tube horizontal strokes are welded on upper cover plate
Beam, for adjusting mould installion absolute altitude and levelness;
3)1 piece of 3 arc formwork outer surface arc length 100mm, wedge shaped shape, its interior annular transverse flange plate arc length
125mm, vertical flanged plate, into 27.09o angles, is easy to die during form removal to be dismantled into drum with arc radial line.
45o chamfering of upper cover plate side Xian into 15*15mm.
Easy construction of the present invention, construction quality are good.Whole mould is divided into three compositions, and wherein width is less a piece of in water
The wedge shaped shape of flat cutting faces, is easy to be tightened with bolt by vertical flanged plate between assembly and disassembly, three dies, just piece is closed
Smoothly;
First tear the smaller die blade of width after the completion of concreting open, because the die blade horizontal profile designs and produces wedgewise block, tear open
After the connecting bolt that vertical flanged plate is released when unloading, by die blade into hole direction gently prize it is i.e. dismountable, when die blade is torn open
After removing, another two panels mould 1 can be easy to remove.
Three bucket wall moulds are fixed on entirety by lamina tecti, both met the requirement of design aperture chamfered edge, three moulds can be fixed again
Tool prevents deformation;
The two horizontal square tubes welded on lamina tecti, can adjust the top mark height and sag of mould, it is possible to pass through the fixed party
Pipe is to prevent die shift.
Whole mould is molded using welding for steel structure, and bolt is assembled, firm to be unlikely to deform, repeat turnover it is up to a hundred it is secondary need not
Trimming;
Mold outer surface is handled by polishing, and concrete surface can reach the perception requirement of clear-water concrete after form removal.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the cast-in-place reserved plate hole internal model of the present invention.
Fig. 2 is Fig. 1 top view.
Fig. 3 is wedge shape die blade structural map.
Embodiment
Early form removal construction method, comprises the following steps in a kind of clear-water concrete wafer board structure hole:
1)After the completion of the lifting of wafer board unit plate, cast-in-site stripe is left between two pieces of prefabricated wafer boards, cast-in-site stripe is provided with China
Husband's plate preformed hole, its specification and arrangement are consistent with prefabricated board;
2)After prefabricated wafer board lifting is completed, reinforcing bar in colligation preformed groove props up cast-in-place reserved plate hole internal model, then poured cast-in-place
Band concrete, hole inner template is removed after waiting concrete to have some strength;
The cast-in-place reserved plate hole internal model is assembled by 3 arc formworks per mold ring by structure steel fabrication, wherein:
Wherein 21,2 arc length are 474mm, another 13 arc length 100mm;If the annular transverse flange plate of twice, each piece of arc formwork up and down
Both sides are set passes through vertical flanged plate bolt connection between vertical flanged plate edge sealing, three pieces of arc formworks;Upper cover plate external diameter is by design
It is required that 30mm bigger than aperture, edges of boards Xian is bolted into 45o chamferings, lamina tecti with lower part steel mould tool;Welded on upper cover plate
Two square tube beams 4,5 are connect, for adjusting mould installion absolute altitude and levelness;
3)1 piece of 3 arc formwork outer surface arc length 100mm, wedge shaped shape, its interior annular transverse flange plate arc length
125mm, vertical flanged plate, into 27.09o angles, is easy to die during form removal to be dismantled into drum with arc radial line.
45o chamfering of upper cover plate side Xian into 15*15mm.
Claims (2)
1. early form removal construction method in a kind of clear-water concrete wafer board structure hole, it is characterized in that:Comprise the following steps:
1)After the completion of the lifting of wafer board unit plate, cast-in-site stripe is left between two pieces of prefabricated wafer boards, cast-in-site stripe is provided with China
Husband's plate preformed hole, its specification and arrangement are consistent with prefabricated board;
2)After prefabricated wafer board lifting is completed, reinforcing bar in colligation preformed groove props up cast-in-place reserved plate hole internal model, then poured cast-in-place
Band concrete, hole inner template is removed after waiting concrete to have some strength;
The cast-in-place reserved plate hole internal model is assembled by 3 arc formworks per mold ring by structure steel fabrication, wherein:2
Piece arc length 474mm, 1 arc length 100mm;If the annular transverse flange plate of twice up and down, each piece of arc formwork both sides set vertical method
Pass through vertical flanged plate bolt connection between blue plate edge sealing, three pieces of arc formworks;Upper cover plate external diameter is bigger than aperture by design requirement
30mm, edges of boards Xian is bolted into 45o chamferings, lamina tecti with lower part steel mould tool;Two square tube horizontal strokes are welded on upper cover plate
Beam, for adjusting mould installion absolute altitude and levelness;
3)1 piece of 3 arc formwork outer surface arc length 100mm, wedge shaped shape, its interior annular transverse flange plate arc length
125mm, vertical flanged plate, into 27.09o angles, is easy to die during form removal to be dismantled into drum with arc radial line.
2. early form removal construction method in clear-water concrete wafer board structure hole according to claim 1, it is characterized in that:Upper lid
45o chamfering of edges of boards Xian into 15*15mm.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710462023.8A CN107060173B (en) | 2017-06-19 | 2017-06-19 | Early demoulding construction method in clear-water concrete wafer board structure hole |
CN201811265091.6A CN109208799B (en) | 2017-06-19 | 2017-06-19 | Construction method for early formwork removal in structure hole of waffle slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710462023.8A CN107060173B (en) | 2017-06-19 | 2017-06-19 | Early demoulding construction method in clear-water concrete wafer board structure hole |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811265091.6A Division CN109208799B (en) | 2017-06-19 | 2017-06-19 | Construction method for early formwork removal in structure hole of waffle slab |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107060173A true CN107060173A (en) | 2017-08-18 |
CN107060173B CN107060173B (en) | 2018-12-11 |
Family
ID=59594186
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710462023.8A Active CN107060173B (en) | 2017-06-19 | 2017-06-19 | Early demoulding construction method in clear-water concrete wafer board structure hole |
CN201811265091.6A Active CN109208799B (en) | 2017-06-19 | 2017-06-19 | Construction method for early formwork removal in structure hole of waffle slab |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811265091.6A Active CN109208799B (en) | 2017-06-19 | 2017-06-19 | Construction method for early formwork removal in structure hole of waffle slab |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107060173B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112092154A (en) * | 2019-06-17 | 2020-12-18 | 陕西晟泰源水泥制品有限公司 | Prefabricated inspection well preformed hole forming device and forming method |
CN112681382B (en) * | 2021-01-13 | 2022-04-12 | 郑州美东工程科技有限公司 | Template connection assembly for working well construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU727665B3 (en) * | 1999-07-19 | 2000-12-21 | Sydney Waffle Pods Pty Limited | A void former for a waffle slab foundation |
GB2367311A (en) * | 2000-09-27 | 2002-04-03 | Runborn Pretech Engineering Co | Floor comprising square waffle slabs supported at each corner by a pillar |
CN103225397A (en) * | 2013-04-08 | 2013-07-31 | 中国葛洲坝集团股份有限公司 | Integral assembling and disassembling template and method for round well pipe concrete lining |
US20160115698A1 (en) * | 2013-06-05 | 2016-04-28 | Fabio Parodi | Method and apparatus for forming a formwork for a concrete slab |
CN205857715U (en) * | 2016-07-14 | 2017-01-04 | 中国建筑第二工程局有限公司 | Easy-to-detach type waffle slab cover plate and waffle slab structure |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203834627U (en) * | 2014-03-28 | 2014-09-17 | 中国一冶集团有限公司 | Novel combined steel die plate for shaping water drainage well bore |
CN206957201U (en) * | 2017-06-19 | 2018-02-02 | 南通建工集团股份有限公司 | Early form removal in clear-water concrete wafer board structure hole |
-
2017
- 2017-06-19 CN CN201710462023.8A patent/CN107060173B/en active Active
- 2017-06-19 CN CN201811265091.6A patent/CN109208799B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU727665B3 (en) * | 1999-07-19 | 2000-12-21 | Sydney Waffle Pods Pty Limited | A void former for a waffle slab foundation |
GB2367311A (en) * | 2000-09-27 | 2002-04-03 | Runborn Pretech Engineering Co | Floor comprising square waffle slabs supported at each corner by a pillar |
CN103225397A (en) * | 2013-04-08 | 2013-07-31 | 中国葛洲坝集团股份有限公司 | Integral assembling and disassembling template and method for round well pipe concrete lining |
US20160115698A1 (en) * | 2013-06-05 | 2016-04-28 | Fabio Parodi | Method and apparatus for forming a formwork for a concrete slab |
CN205857715U (en) * | 2016-07-14 | 2017-01-04 | 中国建筑第二工程局有限公司 | Easy-to-detach type waffle slab cover plate and waffle slab structure |
Also Published As
Publication number | Publication date |
---|---|
CN109208799B (en) | 2020-05-19 |
CN107060173B (en) | 2018-12-11 |
CN109208799A (en) | 2019-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107130791A (en) | Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction | |
CN111946050A (en) | Aluminum alloy formwork construction method applied to assembly type engineering | |
CN203712840U (en) | Small box girder concrete pouring mold | |
CN105952148A (en) | Easy-to-demount inner aluminum form support system for narrow deformation joint and construction method | |
CN106638697A (en) | Method for rapidly constructing light formwork of reinforced-concrete-cast-in-place circular draining inspection well | |
CN107143076A (en) | A kind of Prefabricated stacking floor with side flanging and its construction method for being used to drop plate region | |
CN107060173A (en) | Early form removal construction method in clear-water concrete wafer board structure hole | |
CN106285002A (en) | Cast-in-place walls difference of height tool-type hoisting die construction method | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN206957201U (en) | Early form removal in clear-water concrete wafer board structure hole | |
KR20090123388A (en) | Mold for manufacturing pc beam | |
CN210216896U (en) | Prefabricated plate skeleton and prefabricated plate | |
CN112411798A (en) | Synchronous construction method for prefabricated guide wall and main structure of toilet | |
CN112523393A (en) | Circular concrete column and masonry filler wall constructional column connecting section and construction method | |
CN202064636U (en) | Closed stair formwork erecting device | |
CN104153386B (en) | Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof | |
CN215969285U (en) | Mould for manufacturing concrete fence plate | |
CN207244961U (en) | A kind of Prefabricated stacking floor with side flanging for being used to drop plate region | |
CN215889453U (en) | Temporary support for two sides of post-cast strip of building floor | |
CN109914571B (en) | Basement drainage ditch formwork system, pouring system and construction method | |
CN209798958U (en) | Pouring system for drainage ditch of bottom plate post-cast strip and shaping hanging die for drainage ditch | |
CN214739890U (en) | Steel form for concrete constructional column construction | |
CN114481873A (en) | Rainwater square culvert engineering template segmented assembling and integral sliding construction method | |
CN210738077U (en) | Waterproof reverse-edge aluminum alloy hanging die | |
CN210551989U (en) | A mould for making roofing parapet flashing prefab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |