CN107060083A - Cylinder with large diameter spells mould construction method with girder connection - Google Patents

Cylinder with large diameter spells mould construction method with girder connection Download PDF

Info

Publication number
CN107060083A
CN107060083A CN201710425863.7A CN201710425863A CN107060083A CN 107060083 A CN107060083 A CN 107060083A CN 201710425863 A CN201710425863 A CN 201710425863A CN 107060083 A CN107060083 A CN 107060083A
Authority
CN
China
Prior art keywords
column
girder
cylinder
template
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710425863.7A
Other languages
Chinese (zh)
Other versions
CN107060083B (en
Inventor
刁晓翔
孟令军
方喆
刁宁
扈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN201710425863.7A priority Critical patent/CN107060083B/en
Publication of CN107060083A publication Critical patent/CN107060083A/en
Application granted granted Critical
Publication of CN107060083B publication Critical patent/CN107060083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/021Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/028Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for columns' capital
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Mould construction method is spelled the invention discloses cylinder with large diameter and girder connection, is comprised the following steps:Prepare column-form;Colligation cylinder with large diameter intersects the beam steel of front and rear two girders and two secondary beams in left and right with cylinder reinforcing bar at girder connection and with cylinder, then cylindrical steel template is installed outside cylinder reinforcing bar respectively, rectangle beam forms is respectively mounted outside the beam steel at girder and secondary beam position;Sponge strip is set in the top surface of column-form and bottom surface difference border, the iron sheet liner that column-form lower end is stretched out is downwardly into both cylindrical steel template endoporus and is brought into close contact;Height is respectively mounted on position on column-form top surface and between girder and secondary beam arc formwork and being respectively mounted beam bottom arc formwork between two secondary beam bottoms and column-form top surface between girder height identical beam.It ensure that the tightness of template using this method, it is to avoid occur situations such as spillage.

Description

Cylinder with large diameter spells mould construction method with girder connection
Technical field
The present invention relates to bean column node formwork construction method, more particularly to cylinder with large diameter is with spelling mould construction party at girder connection Method.
Background technology
In cylinder construction, column template installs often construction Difficulties, and particularly with major diameter, (body diameter is typically larger than In 2.1 meters) formwork erection of cylinder, in post and top plate girder connection position, formwork difficulty is larger, is generally integrally added using plank sheathing Work is installed, and the template of whole is processed into circle, due to there is stress in template, is installed and is easily become in casting process Shape, is unfavorable for process control.
The content of the invention
It is an object of the invention to overcome the shortcomings of prior art, there is provided a kind of Stability Analysis of Structures and workable big Diameter cylinder spells mould construction method with girder connection.
To reach above-mentioned purpose, the present invention uses following technical proposals:
The cylinder with large diameter of the present invention spells mould construction method with girder connection, comprises the following steps:
(1) column-form is prepared, described column-form is spliced to form by many wide battens of 5cm-8cm, in described circle The thick iron sheet liners of 2mm-3mm are fixed with the inwall of column template, described iron sheet liner upper end is alignd with column-form, lower end Column-form 5cm-8cm is stretched out, cuff has spaced annular wooden splint, cylinder above and below multiple tracks on described column-form The internal diameter of template is consistent with large-diameter circular column internal diameter;
(2) colligation cylinder with large diameter intersects front and rear two girders and a left side with cylinder reinforcing bar at girder connection and with cylinder The beam steel of right two secondary beams, then installs cylindrical steel template, the beam at girder and secondary beam position outside cylinder reinforcing bar respectively It is respectively mounted rectangle beam forms outside reinforcing bar, the end template of the rectangle beam forms of the top mark height of described cylindrical steel template in girder Absolute altitude;The end template of four rectangle beam forms and column-form intersection to be installed are shaped as and the radius such as column-form Circular arc;
(3) sponge strip, the iron sheet that column-form lower end is stretched out are set in the top surface of column-form and bottom surface difference border Liner is downwardly into both cylindrical steel template endoporus and is brought into close contact, and then adjusts column-form and causes column-form bottom surface to compress circle Post punching block plate top surface, and column-form is fixed, the top surface absolute altitude of described column-form is consistent with girder bottom elevation;
(4) height and girder height phase are respectively mounted on the position on column-form top surface and between girder and secondary beam The radius such as arc formwork and column-form between arc formwork between same beam, described beam;And in two secondary beam bottoms and cylinder Height is respectively mounted between template top surface and is equal to girder and time elevation difference beam, chord length is equal to time beam width and radius and column-form phase Same beam bottom arc formwork;Arc formwork and two pieces of beam bottom arc formworks are by the wide wood of several 5cm-8cm between beam described in four pieces Bar splicing constitutes and the thick iron sheet liners of 2mm-3mm is lined with each piece of arc formwork inwall;
(5) U.S. line paper is used by all piece positions stick carbon fiber.
The beneficial effects of the invention are as follows:
Column-form and arc formwork are made using batten splicing, radian is more prone to control, is conveniently adjusted, and processing letter Just.Iron sheet liner ensure that the flatness and perception effect of periphery concrete, and iron sheet liner insertion cylindrical steel template is made Steel form and plank sheathing splice the more clear and more coherent nature in position, are completely embedded.Added on the outside of column-form using annular wooden splint Gu, it is ensured that the fastness of column-form.Border sets sponge strip and pastes U.S. line paper in edge joint position above and below column-form, It ensure that the tightness of template, it is to avoid occur situations such as spillage.
Brief description of the drawings
Fig. 1 is cylinder with large diameter of the present invention and the column-form floor map in girder connection spelling mould construction method;
Fig. 2 is cylinder with large diameter of the present invention and the column-form elevational schematic view in girder connection spelling mould construction method;
Fig. 3 is cylinder with large diameter of the present invention and the bean column node stereogram in girder connection spelling mould construction method.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Cylinder with large diameter of the present invention as shown in drawings spells mould construction method with girder connection, comprises the following steps:
(1) column-form 1 is prepared, described column-form 1 is spliced to form by many wide battens of 5cm-8cm, described 1 pair of the thick iron sheet liners 2 of 2mm-3mm, described iron sheet liner upper end and column-form are fixed with the inwall of column-form 1 Together, column-form 5cm-8cm is stretched out in lower end, and cuff has spaced annular wood above and below multiple tracks on described column-form 1 Clamping plate 3, the internal diameter of column-form 1 is consistent with large-diameter circular column internal diameter;
(2) colligation cylinder with large diameter with cylinder reinforcing bar at girder connection and with cylinder intersect front and rear two girders 6 and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at girder 6 and the position of secondary beam 7 Beam steel outside be respectively mounted rectangle beam forms, the top mark height of described cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The end template of four rectangle beam forms is shaped as and column-form 1 with the intersection of column-form 1 to be installed Deng the circular arc of radius;
(3) sponge strip is set in the top surface of column-form 1 and bottom surface difference border, the iron that the lower end of column-form 1 is stretched out Intracutaneous lining is downwardly into both cylindrical steel template endoporus and is brought into close contact, and then adjusts column-form and the bottom surface of column-form 1 is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by existing structures such as steel pipe, flitch and ties, it is ensured that When pouring post concrete column-form will not occurred level displacement, top surface absolute altitude and the beam bottom of girder 6 of described column-form 1 are marked It is high consistent;
(4) height and girder height are respectively mounted on the position on the top surface of column-form 1 and between girder and secondary beam Arc formwork 4 and the grade radius of column-form 1 between arc formwork 4 between identical beam, described beam;And two secondary beam bottoms with Height is respectively mounted between the top surface of column-form 1 and is equal to girder and time elevation difference beam, chord length is equal to the width of secondary beam 7 and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The wide batten splicings of 5cm-8cm constitute and the thick iron sheet liners 2 of 2mm-3mm are lined with each piece of arc formwork inwall;
(5) U.S. line paper is used by all piece positions stick carbon fiber.
Embodiment 1
(1) column-form 1 is prepared, described column-form 1 is spliced to form by many wide battens of 5cm, in described cylinder The thick iron sheet liners 2 of 3mm are fixed with the inwall of template 1, described iron sheet liner upper end is alignd with column-form 1, and lower end is stretched Go out column-form 5cm, cuff has spaced annular wooden splint 3, column-form above and below multiple tracks on described column-form 1 1 internal diameter is consistent with large-diameter circular column internal diameter;
(2) colligation cylinder with large diameter with cylinder reinforcing bar at girder connection and with cylinder intersect front and rear two girders 6 and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at girder 6 and the position of secondary beam 7 Beam steel outside be respectively mounted rectangle beam forms, the top mark height of described cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The end template of four rectangle beam forms is shaped as and column-form 1 with the intersection of column-form 1 to be installed Deng the circular arc of radius;
(3) sponge strip is set in the top surface of column-form 1 and bottom surface difference border, the iron that the lower end of column-form 1 is stretched out Intracutaneous lining is downwardly into both cylindrical steel template endoporus and is brought into close contact, and then adjusts column-form and the bottom surface of column-form 1 is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by steel pipe, flitch and tie, it is ensured that when pouring post concrete Column-form will not occurred level displacement, the top surface absolute altitude of described column-form 1 is consistent with the bottom elevation of girder 6;
(4) height and girder height are respectively mounted on the position on the top surface of column-form 1 and between girder and secondary beam Arc formwork 4 and the grade radius of column-form 1 between arc formwork 4 between identical beam, described beam;And two secondary beam bottoms with Height is respectively mounted between the top surface of column-form 1 and is equal to girder and time elevation difference beam, chord length is equal to the width of secondary beam 7 and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The wide batten splicings of 5cm constitute and the thick iron sheet liners 2 of 3mm are lined with each piece of arc formwork inwall;
(5) arc formwork, column-form and beam bottom arc mould between column-form and cylindrical steel template, column-form and beam Plate and beam bottom arc formwork and the piece position of secondary beam bottom are pasted with U.S. line paper reinforcement respectively.
After testing:Using template at the cylinder with large diameter bean column node of this method construction and installation, installation site is accurate, piece Tightly, appearance is good after Stability Analysis of Structures, concreting.
Embodiment 2
(1) column-form 1 is prepared, described column-form 1 is spliced to form by many wide battens of 7cm, in described cylinder The thick iron sheet liners 2 of 2mm are fixed with the inwall of template 1, described iron sheet liner upper end is alignd with column-form 1, and lower end is stretched Go out column-form 8cm, cuff has spaced annular wooden splint 3, column-form above and below multiple tracks on described column-form 1 1 internal diameter is consistent with large-diameter circular column internal diameter;
(2) colligation cylinder with large diameter with cylinder reinforcing bar at girder connection and with cylinder intersect front and rear two girders 6 and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at girder 6 and the position of secondary beam 7 Beam steel outside be respectively mounted rectangle beam forms, the top mark height of described cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The end template of four rectangle beam forms is shaped as and column-form 1 with the intersection of column-form 1 to be installed Deng the circular arc of radius;
(3) sponge strip is set in the top surface of column-form 1 and bottom surface difference border, the iron that the lower end of column-form 1 is stretched out Intracutaneous lining is downwardly into both cylindrical steel template endoporus and is brought into close contact, and then adjusts column-form and the bottom surface of column-form 1 is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by steel pipe, flitch and tie, it is ensured that when pouring post concrete Column-form will not occurred level displacement, the top surface absolute altitude of described column-form 1 is consistent with the bottom elevation of girder 6;
(4) height and girder height are respectively mounted on the position on the top surface of column-form 1 and between girder and secondary beam Arc formwork 4 and the grade radius of column-form 1 between arc formwork 4 between identical beam, described beam;And two secondary beam bottoms with Height is respectively mounted between the top surface of column-form 1 and is equal to girder and time elevation difference beam, chord length is equal to the width of secondary beam 7 and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The wide batten splicings of 7cm constitute and the thick iron sheet liners 2 of 2mm are lined with each piece of arc formwork inwall;
(5) arc formwork, column-form and beam bottom arc mould between column-form and cylindrical steel template, column-form and beam Plate and beam bottom arc formwork and the piece position of secondary beam bottom are pasted with U.S. line paper reinforcement respectively.
After testing:Using template at the cylinder with large diameter bean column node of this method construction and installation, installation site is accurate, piece Tightly, appearance is good after Stability Analysis of Structures, concreting.
Embodiment 3
(1) column-form 1 is prepared, described column-form 1 is spliced to form by many wide battens of 8cm, in described cylinder The thick iron sheet liners 2 of 2mm are fixed with the inwall of template 1, described iron sheet liner upper end is alignd with column-form 1, and lower end is stretched Go out column-form 7cm, cuff has spaced annular wooden splint 3, column-form above and below multiple tracks on described column-form 1 1 internal diameter is consistent with large-diameter circular column internal diameter;
(2) colligation cylinder with large diameter with cylinder reinforcing bar at girder connection and with cylinder intersect front and rear two girders 6 and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at girder 6 and the position of secondary beam 7 Beam steel outside be respectively mounted rectangle beam forms, the top mark height of described cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The end template of four rectangle beam forms is shaped as and column-form 1 with the intersection of column-form 1 to be installed Deng the circular arc of radius;
(3) sponge strip is set in the top surface of column-form 1 and bottom surface difference border, the iron that the lower end of column-form 1 is stretched out Intracutaneous lining is downwardly into both cylindrical steel template endoporus and is brought into close contact, and then adjusts column-form and the bottom surface of column-form 1 is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by steel pipe, flitch and tie, it is ensured that when pouring post concrete Column-form will not occurred level displacement, the top surface absolute altitude of described column-form 1 is consistent with the bottom elevation of girder 6;
(4) height and girder height are respectively mounted on the position on the top surface of column-form 1 and between girder and secondary beam Arc formwork 4 and the grade radius of column-form 1 between arc formwork 4 between identical beam, described beam;And two secondary beam bottoms with Height is respectively mounted between the top surface of column-form 1 and is equal to girder and time elevation difference beam, chord length is equal to the width of secondary beam 7 and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The wide batten splicings of 8cm constitute and the thick iron sheet liners 2 of 2mm are lined with each piece of arc formwork inwall;
(5) arc formwork, column-form and beam bottom arc mould between column-form and cylindrical steel template, column-form and beam Plate and beam bottom arc formwork and the piece position of secondary beam bottom are pasted with U.S. line paper reinforcement respectively.
After testing:Using template at the cylinder with large diameter bean column node of this method construction and installation, installation site is accurate, piece Tightly, appearance is good after Stability Analysis of Structures, concreting.

Claims (1)

1. cylinder with large diameter spells mould construction method with girder connection, it is characterised in that comprise the following steps:
(1) column-form is prepared, described column-form is spliced to form by many wide battens of 5cm-8cm, in described cylinder mold The thick iron sheet liners of 2mm-3mm are fixed with the inwall of plate, described iron sheet liner upper end is alignd with column-form, and lower end is stretched out Column-form 5cm-8cm, cuff has spaced annular wooden splint, column-form above and below multiple tracks on described column-form Internal diameter it is consistent with large-diameter circular column internal diameter;
(2) colligation cylinder with large diameter intersects front and rear two girders and left and right two with cylinder reinforcing bar at girder connection and with cylinder The beam steel of root secondary beam, then installs cylindrical steel template outside cylinder reinforcing bar respectively, the beam steel at girder and secondary beam position It is outer to be respectively mounted rectangle beam forms, the end template mark of the rectangle beam forms of the top mark height of described cylindrical steel template in girder It is high;The circle being shaped as with the radius such as column-form of the end template of four rectangle beam forms and column-form intersection to be installed Arc;
(3) sponge strip, the iron sheet liner that column-form lower end is stretched out are set in the top surface of column-form and bottom surface difference border It is downwardly into both cylindrical steel template endoporus to be brought into close contact, then adjusts column-form and cause column-form bottom surface to compress cylindrical steel Template top surface, and column-form is fixed, the top surface absolute altitude of described column-form is consistent with girder bottom elevation;
(4) height and girder height identical are respectively mounted on the position on column-form top surface and between girder and secondary beam The radius such as arc formwork and column-form between arc formwork between beam, described beam;And in two secondary beam bottoms and column-form Height is respectively mounted between top surface and is equal to girder and time elevation difference beam, chord length is equal to time beam width and radius and column-form identical Beam bottom arc formwork;Arc formwork and two pieces of beam bottom arc formworks are spelled by the wide battens of several 5cm-8cm between beam described in four pieces Connect and constitute and be lined with each piece of arc formwork inwall the thick iron sheet liners of 2mm-3mm;
(5) U.S. line paper is used by all piece positions stick carbon fiber.
CN201710425863.7A 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method Active CN107060083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710425863.7A CN107060083B (en) 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710425863.7A CN107060083B (en) 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method

Publications (2)

Publication Number Publication Date
CN107060083A true CN107060083A (en) 2017-08-18
CN107060083B CN107060083B (en) 2019-03-12

Family

ID=59617328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710425863.7A Active CN107060083B (en) 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method

Country Status (1)

Country Link
CN (1) CN107060083B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979139A (en) * 2018-09-25 2018-12-11 中国五冶集团有限公司 Formwork structure for cylinder beam and Vierendeel girder node construction
CN108979140A (en) * 2018-09-25 2018-12-11 中国五冶集团有限公司 A kind of formwork structure and the annular fastening device for the fastening of arc column mould
CN111910916A (en) * 2020-07-02 2020-11-10 中铁十六局集团城市建设发展有限公司 Construction method for beam column joint connection

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203373966U (en) * 2013-06-28 2014-01-01 中国新兴建设开发总公司 Forming timber formwork of concrete cylinder and beam column joints
CN103485538A (en) * 2013-09-17 2014-01-01 天津住宅集团建设工程总承包有限公司 Construction method of energy-saving insulation waterproof wood-trussed roof system
CN204024046U (en) * 2014-07-23 2014-12-17 中建三局集团有限公司 A kind of asymmetric cylinder and beam tubular joint formwork erection system
CN204531397U (en) * 2015-02-02 2015-08-05 中国建筑第八工程局有限公司 Bean column node typified form
CN204662958U (en) * 2015-03-16 2015-09-23 中国建筑第八工程局有限公司 Cylinder column cap formwork structure
CN204850442U (en) * 2015-07-30 2015-12-09 重庆大学 A arc formwork for special -shaped beam column node

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203373966U (en) * 2013-06-28 2014-01-01 中国新兴建设开发总公司 Forming timber formwork of concrete cylinder and beam column joints
CN103485538A (en) * 2013-09-17 2014-01-01 天津住宅集团建设工程总承包有限公司 Construction method of energy-saving insulation waterproof wood-trussed roof system
CN204024046U (en) * 2014-07-23 2014-12-17 中建三局集团有限公司 A kind of asymmetric cylinder and beam tubular joint formwork erection system
CN204531397U (en) * 2015-02-02 2015-08-05 中国建筑第八工程局有限公司 Bean column node typified form
CN204662958U (en) * 2015-03-16 2015-09-23 中国建筑第八工程局有限公司 Cylinder column cap formwork structure
CN204850442U (en) * 2015-07-30 2015-12-09 重庆大学 A arc formwork for special -shaped beam column node

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979139A (en) * 2018-09-25 2018-12-11 中国五冶集团有限公司 Formwork structure for cylinder beam and Vierendeel girder node construction
CN108979140A (en) * 2018-09-25 2018-12-11 中国五冶集团有限公司 A kind of formwork structure and the annular fastening device for the fastening of arc column mould
CN108979139B (en) * 2018-09-25 2023-08-22 中国五冶集团有限公司 Template structure for construction of cylindrical beam and frame beam joint
CN108979140B (en) * 2018-09-25 2023-12-15 中国五冶集团有限公司 Template structure and annular fastening device for fastening arc-shaped column die
CN111910916A (en) * 2020-07-02 2020-11-10 中铁十六局集团城市建设发展有限公司 Construction method for beam column joint connection

Also Published As

Publication number Publication date
CN107060083B (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN206722404U (en) Horizontal reinforcing apparatus of narrow end wall unilateral formwork
CN107060083A (en) Cylinder with large diameter spells mould construction method with girder connection
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN103147763A (en) Tunnel inverted arch end combined steel mould
CN102155025A (en) Late poured band type assembled pipe jacking working open caisson
CN207794327U (en) A kind of precast assembly structure of Subway Station Platform plate
CN103243911A (en) Integral setting and one-step in-position construction method for steel sleeves of inner pipelines of vertical shaft of building
CN108222347A (en) A kind of big module welding overlapping beam slab of the assembled with plane girder temporary support
CN103437791A (en) Installation method of buried waterstop at tip of tunnel lining trolley
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN110700570A (en) Construction method of cast-in-place concrete curved surface inclined cylinder structure
CN108360723A (en) A kind of half welding overlapping contignation of the big module of the assembled with space truss temporary support
CN108457187A (en) A kind of pre-assembled suitable for large span combination beam is folded to spell technique
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN207749409U (en) Detachable assembling type reinforced concrete bridge pier cushion cap connection structure
CN207004011U (en) Cylinder with large diameter spells mould constructing structure with girder connection
CN208734075U (en) A kind of steel structure concrete platform template installs structure
CN206736881U (en) Shallow sea region measurement control point platform
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN206189607U (en) Rag bolt location structure
CN109868923A (en) One kind, which dissipates, spells plank sheathing exposed concrete construction method
CN108979137A (en) The assembling and disassembling construction method of Round Concrete column composite wooden template
CN208396295U (en) A kind of open-cut station construction stair formwork erecting structure
CN108316327A (en) A kind of open caisson template and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant