CN107060083B - Cylinder with large diameter and girder connection spell mould construction method - Google Patents

Cylinder with large diameter and girder connection spell mould construction method Download PDF

Info

Publication number
CN107060083B
CN107060083B CN201710425863.7A CN201710425863A CN107060083B CN 107060083 B CN107060083 B CN 107060083B CN 201710425863 A CN201710425863 A CN 201710425863A CN 107060083 B CN107060083 B CN 107060083B
Authority
CN
China
Prior art keywords
column
girder
cylinder
template
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710425863.7A
Other languages
Chinese (zh)
Other versions
CN107060083A (en
Inventor
刁晓翔
孟令军
方喆
刁宁
扈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN201710425863.7A priority Critical patent/CN107060083B/en
Publication of CN107060083A publication Critical patent/CN107060083A/en
Application granted granted Critical
Publication of CN107060083B publication Critical patent/CN107060083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/021Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/028Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for columns' capital
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Abstract

The invention discloses cylinder with large diameter and girder connection to spell mould construction method, comprising the following steps: prepares column-form;Bind the beam steel of cylinder with large diameter with two secondary beams of cylinder reinforcing bar at girder connection and the girder of the front and back intersected with cylinder two and left and right, then cylindrical steel template is installed outside cylinder reinforcing bar respectively, rectangle beam forms is installed respectively outside the beam steel at girder and secondary beam position;Sponge strip is set in the top and bottom of column-form difference border, the iron sheet liner that column-form lower end is stretched out is downwardly into both cylindrical steel template inner holes and is fitted closely;Arc formwork between mounting height and the identical beam of girder height is distinguished on position on column-form top surface and between girder and secondary beam and mounting rail bottom arc formwork is distinguished between two secondary beam bottoms and column-form top surface.The tightness that ensure that template using this method, situations such as avoiding spillage generation.

Description

Cylinder with large diameter and girder connection spell mould construction method
Technical field
The present invention relates to spell mould construction party at bean column node formwork construction method more particularly to cylinder with large diameter and girder connection Method.
Background technique
Cylinder construction in, column template installs often construction Difficulties, particularly with major diameter (body diameter be typically larger than etc. In 2.1 meters) formwork erection of cylinder, in column and top plate girder connection position, formwork difficulty is larger, generallys use plank sheathing and integrally adds Work is installed, and whole template is processed into circle, due to, there are stress, installing in template and being easy to happen change in casting process Shape is unfavorable for process control.
Summary of the invention
It is an object of the invention to overcome the shortcomings of prior art, the big of a kind of stable structure and strong operability is provided Diameter cylinder and girder connection spell mould construction method.
In order to achieve the above objectives, the present invention adopts the following technical solutions:
Cylinder with large diameter and girder connection of the invention spells mould construction method, comprising the following steps:
(1) column-form is prepared, the column-form is spliced to form by more 5cm-8cm wide battens, in the circle The iron sheet liner of 2mm-3mm thickness is fixed on the inner wall of column template, the iron sheet liner upper end is aligned with column-form, lower end Column-form 5cm-8cm is stretched out, cuff has the spaced annular wooden splint of multiple tracks or more, cylinder on the column-form The internal diameter of template is consistent with large-diameter circular column internal diameter;
(2) cylinder with large diameter and cylinder reinforcing bar at girder connection and the girder of the front and back intersected with cylinder two and a left side are bound The beam steel of right two secondary beams, then installs cylindrical steel template outside cylinder reinforcing bar respectively, the beam at girder and secondary beam position Rectangle beam forms is installed respectively, the top mark height of the cylindrical steel template is in the end template of the rectangle beam forms of girder outside reinforcing bar Absolute altitude;The shape of the end template of four rectangle beam forms and column-form intersection to be installed is and the radiuses such as column-form It is arc-shaped;
(3) sponge strip, the iron sheet that column-form lower end is stretched out are set in the top and bottom of column-form difference border Liner is downwardly into both cylindrical steel template inner holes and fits closely, and then adjusts column-form and column-form bottom surface is made to compress circle Column punching block plate top surface, and column-form is fixed, the top surface absolute altitude of the column-form is consistent with girder bottom elevation;
(4) mounting height and girder height phase are distinguished on the position on column-form top surface and between girder and secondary beam With beam between arc formwork, the radiuses such as arc formwork and column-form between the beam;And in two secondary beam bottoms and cylinder Mounting height is distinguished between template top surface and is equal to girder and time elevation difference beam, and chord length is equal to time beam width and radius and column-form phase Same beam bottom arc formwork;Arc formwork and two pieces of beam bottom arc formworks are by several 5cm-8cm wide wood between beam described in four pieces Item splicing forms and is lined with the iron sheet liner of 2mm-3mm thickness on each piece of arc formwork inner wall;
(5) use U.S. line paper by all piece positions stick carbon fiber.
The beneficial effects of the present invention are:
Production column-form is spliced using batten and arc formwork, radian are more easier to control, be conveniently adjusted, and processes letter Just.Iron sheet liner ensure that the flatness and perception effect of periphery concrete, and iron sheet liner insertion cylindrical steel template is made The more clear and more coherent nature of steel form and plank sheathing splicing position is completely embedded.Added on the outside of column-form using annular wooden splint Gu ensure that the fastness of column-form.Border is arranged sponge strip and pastes U.S. line paper in edge joint position above and below column-form, The tightness that ensure that template, situations such as avoiding spillage generation.
Detailed description of the invention
Fig. 1 is the column-form floor map in cylinder with large diameter of the present invention and girder connection spelling mould construction method;
Fig. 2 is the column-form elevational schematic view in cylinder with large diameter of the present invention and girder connection spelling mould construction method;
Fig. 3 is the bean column node perspective view in cylinder with large diameter of the present invention and girder connection spelling mould construction method.
Specific embodiment
The present invention is described in detail in the following with reference to the drawings and specific embodiments.
Cylinder with large diameter of the present invention and girder connection as shown in drawings spell mould construction method, comprising the following steps:
(1) column-form 1 is prepared, the column-form 1 is spliced to form by more 5cm-8cm wide battens, described The iron sheet liner 2 of 2mm-3mm thickness is fixed on the inner wall of column-form 1, the iron sheet liner upper end and column-form 1 are right Together, column-form 5cm-8cm is stretched out in lower end, and cuff has the spaced annular wood of multiple tracks or more on the column-form 1 The internal diameter of clamping plate 3, column-form 1 is consistent with large-diameter circular column internal diameter;
(2) binding cylinder with large diameter and cylinder reinforcing bar at girder connection and the girder 6 of the front and back intersected with cylinder two and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at 7 position of girder 6 and secondary beam Beam steel outside rectangle beam forms is installed respectively, the top mark height of the cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The shape of the end template of four rectangle beam forms and 1 intersection of column-form to be installed is and column-form 1 Wait the arc-shaped of radiuses;
(3) sponge strip is set in the top and bottom of column-form 1 difference border, the iron that 1 lower end of column-form is stretched out Intradermal lining is downwardly into both cylindrical steel template inner holes and fits closely, and then adjusts column-form and 1 bottom surface of column-form is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by existing structures such as steel pipe, flitch and ties, it is ensured that Horizontal displacement, the top surface absolute altitude and 6 beam bottom mark of girder of the column-form 1 will not occur for column-form when pouring column concrete It is high consistent;
(4) mounting height and girder height are distinguished on the position on 1 top surface of column-form and between girder and secondary beam Arc formwork 4 between identical beam, arc formwork 4 and the equal radiuses of column-form 1 between the beam;And two secondary beam bottoms with Mounting height is distinguished between 1 top surface of column-form and is equal to girder and time elevation difference beam, and chord length is equal to 7 width of secondary beam and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The splicing of 5cm-8cm wide batten forms and is lined with the iron sheet liner 2 of 2mm-3mm thickness on each piece of arc formwork inner wall;
(5) use U.S. line paper by all piece positions stick carbon fiber.
Embodiment 1
(1) column-form 1 is prepared, the column-form 1 is spliced to form by more 5cm wide battens, in the cylinder The iron sheet liner 2 of 3mm thickness is fixed on the inner wall of template 1, the iron sheet liner upper end is aligned with column-form 1, and lower end is stretched Column-form 5cm out, cuff has the spaced annular wooden splint 3 of multiple tracks or more, column-form on the column-form 1 1 internal diameter is consistent with large-diameter circular column internal diameter;
(2) binding cylinder with large diameter and cylinder reinforcing bar at girder connection and the girder 6 of the front and back intersected with cylinder two and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at 7 position of girder 6 and secondary beam Beam steel outside rectangle beam forms is installed respectively, the top mark height of the cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The shape of the end template of four rectangle beam forms and 1 intersection of column-form to be installed is and column-form 1 Wait the arc-shaped of radiuses;
(3) sponge strip is set in the top and bottom of column-form 1 difference border, the iron that 1 lower end of column-form is stretched out Intradermal lining is downwardly into both cylindrical steel template inner holes and fits closely, and then adjusts column-form and 1 bottom surface of column-form is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by steel pipe, flitch and tie, it is ensured that when pouring column concrete Horizontal displacement will not occur for column-form, and the top surface absolute altitude of the column-form 1 is consistent with 6 bottom elevation of girder;
(4) mounting height and girder height are distinguished on the position on 1 top surface of column-form and between girder and secondary beam Arc formwork 4 between identical beam, arc formwork 4 and the equal radiuses of column-form 1 between the beam;And two secondary beam bottoms with Mounting height is distinguished between 1 top surface of column-form and is equal to girder and time elevation difference beam, and chord length is equal to 7 width of secondary beam and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The splicing of 5cm wide batten forms and is lined with the iron sheet liner 2 of 3mm thickness on each piece of arc formwork inner wall;
(5) arc formwork, column-form and beam bottom arc mould between column-form and cylindrical steel template, column-form and beam The piece position of plate and beam bottom arc formwork and secondary beam bottom is pasted with U.S. line paper reinforcement respectively.
Through detecting: using template at the cylinder with large diameter bean column node of this method construction and installation, installation site is accurate, piece Tightly, stable structure, appearance is good after concreting.
Embodiment 2
(1) column-form 1 is prepared, the column-form 1 is spliced to form by more 7cm wide battens, in the cylinder The iron sheet liner 2 of 2mm thickness is fixed on the inner wall of template 1, the iron sheet liner upper end is aligned with column-form 1, and lower end is stretched Column-form 8cm out, cuff has the spaced annular wooden splint 3 of multiple tracks or more, column-form on the column-form 1 1 internal diameter is consistent with large-diameter circular column internal diameter;
(2) binding cylinder with large diameter and cylinder reinforcing bar at girder connection and the girder 6 of the front and back intersected with cylinder two and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at 7 position of girder 6 and secondary beam Beam steel outside rectangle beam forms is installed respectively, the top mark height of the cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The shape of the end template of four rectangle beam forms and 1 intersection of column-form to be installed is and column-form 1 Wait the arc-shaped of radiuses;
(3) sponge strip is set in the top and bottom of column-form 1 difference border, the iron that 1 lower end of column-form is stretched out Intradermal lining is downwardly into both cylindrical steel template inner holes and fits closely, and then adjusts column-form and 1 bottom surface of column-form is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by steel pipe, flitch and tie, it is ensured that when pouring column concrete Horizontal displacement will not occur for column-form, and the top surface absolute altitude of the column-form 1 is consistent with 6 bottom elevation of girder;
(4) mounting height and girder height are distinguished on the position on 1 top surface of column-form and between girder and secondary beam Arc formwork 4 between identical beam, arc formwork 4 and the equal radiuses of column-form 1 between the beam;And two secondary beam bottoms with Mounting height is distinguished between 1 top surface of column-form and is equal to girder and time elevation difference beam, and chord length is equal to 7 width of secondary beam and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The splicing of 7cm wide batten forms and is lined with the iron sheet liner 2 of 2mm thickness on each piece of arc formwork inner wall;
(5) arc formwork, column-form and beam bottom arc mould between column-form and cylindrical steel template, column-form and beam The piece position of plate and beam bottom arc formwork and secondary beam bottom is pasted with U.S. line paper reinforcement respectively.
Through detecting: using template at the cylinder with large diameter bean column node of this method construction and installation, installation site is accurate, piece Tightly, stable structure, appearance is good after concreting.
Embodiment 3
(1) column-form 1 is prepared, the column-form 1 is spliced to form by more 8cm wide battens, in the cylinder The iron sheet liner 2 of 2mm thickness is fixed on the inner wall of template 1, the iron sheet liner upper end is aligned with column-form 1, and lower end is stretched Column-form 7cm out, cuff has the spaced annular wooden splint 3 of multiple tracks or more, column-form on the column-form 1 1 internal diameter is consistent with large-diameter circular column internal diameter;
(2) binding cylinder with large diameter and cylinder reinforcing bar at girder connection and the girder 6 of the front and back intersected with cylinder two and The beam steel of two secondary beams 7 in left and right, then installs cylindrical steel template outside cylinder reinforcing bar respectively, at 7 position of girder 6 and secondary beam Beam steel outside rectangle beam forms is installed respectively, the top mark height of the cylindrical steel template is in the rectangle beam forms of girder 6 End template absolute altitude;The shape of the end template of four rectangle beam forms and 1 intersection of column-form to be installed is and column-form 1 Wait the arc-shaped of radiuses;
(3) sponge strip is set in the top and bottom of column-form 1 difference border, the iron that 1 lower end of column-form is stretched out Intradermal lining is downwardly into both cylindrical steel template inner holes and fits closely, and then adjusts column-form and 1 bottom surface of column-form is pressed Tight cylinder steel mould plate top surface, and column-form 1 is fixed by steel pipe, flitch and tie, it is ensured that when pouring column concrete Horizontal displacement will not occur for column-form, and the top surface absolute altitude of the column-form 1 is consistent with 6 bottom elevation of girder;
(4) mounting height and girder height are distinguished on the position on 1 top surface of column-form and between girder and secondary beam Arc formwork 4 between identical beam, arc formwork 4 and the equal radiuses of column-form 1 between the beam;And two secondary beam bottoms with Mounting height is distinguished between 1 top surface of column-form and is equal to girder and time elevation difference beam, and chord length is equal to 7 width of secondary beam and radius and cylinder The identical beam bottom arc formwork 5 of template 1;Arc formwork 4 and two pieces of beam bottom arc formworks 5 are by several between beam described in four pieces The splicing of 8cm wide batten forms and is lined with the iron sheet liner 2 of 2mm thickness on each piece of arc formwork inner wall;
(5) arc formwork, column-form and beam bottom arc mould between column-form and cylindrical steel template, column-form and beam The piece position of plate and beam bottom arc formwork and secondary beam bottom is pasted with U.S. line paper reinforcement respectively.
Through detecting: using template at the cylinder with large diameter bean column node of this method construction and installation, installation site is accurate, piece Tightly, stable structure, appearance is good after concreting.

Claims (1)

1. cylinder with large diameter and girder connection spell mould construction method, it is characterised in that the following steps are included:
(1) column-form is prepared, the column-form is spliced to form by more 5cm-8cm wide battens, in the cylinder mold The iron sheet liner of 2mm-3mm thickness is fixed on the inner wall of plate, the iron sheet liner upper end is aligned with column-form, and lower end is stretched out Column-form 5cm-8cm, cuff has the spaced annular wooden splint of multiple tracks or more, column-form on the column-form Internal diameter it is consistent with large-diameter circular column internal diameter;
(2) cylinder with large diameter and cylinder reinforcing bar at girder connection and the girder of the front and back intersected with cylinder two and left and right two are bound Then the beam steel of root secondary beam installs cylindrical steel template outside cylinder reinforcing bar respectively, the beam steel at girder and secondary beam position Outer to install rectangle beam forms respectively, the top mark height of the cylindrical steel template is in the end template mark of the rectangle beam forms of girder It is high;The shape of the end template of four rectangle beam forms and column-form intersection to be installed is the circle with radiuses such as column-forms Arc;
(3) sponge strip, the iron sheet liner that column-form lower end is stretched out are set in the top and bottom of column-form difference border It is downwardly into both cylindrical steel template inner holes to fit closely, then adjusts column-form and column-form bottom surface is made to compress cylindrical steel Template top surface, and column-form is fixed, the top surface absolute altitude of the column-form is consistent with girder bottom elevation;
(4) it is identical with girder height that mounting height is distinguished on the position on column-form top surface and between girder and secondary beam Arc formwork between beam, the radiuses such as arc formwork and column-form between the beam;And in two secondary beam bottoms and column-form Mounting height is distinguished between top surface and is equal to girder and time elevation difference beam, and chord length is equal to time beam width and radius is identical with column-form Beam bottom arc formwork;Arc formwork and two pieces of beam bottom arc formworks are spelled by several 5cm-8cm wide battens between beam described in four pieces Connect the iron sheet liner for forming and being lined on each piece of arc formwork inner wall 2mm-3mm thickness;
(5) use U.S. line paper by all piece positions stick carbon fiber.
CN201710425863.7A 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method Active CN107060083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710425863.7A CN107060083B (en) 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710425863.7A CN107060083B (en) 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method

Publications (2)

Publication Number Publication Date
CN107060083A CN107060083A (en) 2017-08-18
CN107060083B true CN107060083B (en) 2019-03-12

Family

ID=59617328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710425863.7A Active CN107060083B (en) 2017-06-08 2017-06-08 Cylinder with large diameter and girder connection spell mould construction method

Country Status (1)

Country Link
CN (1) CN107060083B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979139B (en) * 2018-09-25 2023-08-22 中国五冶集团有限公司 Template structure for construction of cylindrical beam and frame beam joint
CN108979140B (en) * 2018-09-25 2023-12-15 中国五冶集团有限公司 Template structure and annular fastening device for fastening arc-shaped column die
CN111910916A (en) * 2020-07-02 2020-11-10 中铁十六局集团城市建设发展有限公司 Construction method for beam column joint connection

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203373966U (en) * 2013-06-28 2014-01-01 中国新兴建设开发总公司 Forming timber formwork of concrete cylinder and beam column joints
CN103485538A (en) * 2013-09-17 2014-01-01 天津住宅集团建设工程总承包有限公司 Construction method of energy-saving insulation waterproof wood-trussed roof system
CN204024046U (en) * 2014-07-23 2014-12-17 中建三局集团有限公司 A kind of asymmetric cylinder and beam tubular joint formwork erection system
CN204531397U (en) * 2015-02-02 2015-08-05 中国建筑第八工程局有限公司 Bean column node typified form
CN204662958U (en) * 2015-03-16 2015-09-23 中国建筑第八工程局有限公司 Cylinder column cap formwork structure
CN204850442U (en) * 2015-07-30 2015-12-09 重庆大学 A arc formwork for special -shaped beam column node

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203373966U (en) * 2013-06-28 2014-01-01 中国新兴建设开发总公司 Forming timber formwork of concrete cylinder and beam column joints
CN103485538A (en) * 2013-09-17 2014-01-01 天津住宅集团建设工程总承包有限公司 Construction method of energy-saving insulation waterproof wood-trussed roof system
CN204024046U (en) * 2014-07-23 2014-12-17 中建三局集团有限公司 A kind of asymmetric cylinder and beam tubular joint formwork erection system
CN204531397U (en) * 2015-02-02 2015-08-05 中国建筑第八工程局有限公司 Bean column node typified form
CN204662958U (en) * 2015-03-16 2015-09-23 中国建筑第八工程局有限公司 Cylinder column cap formwork structure
CN204850442U (en) * 2015-07-30 2015-12-09 重庆大学 A arc formwork for special -shaped beam column node

Also Published As

Publication number Publication date
CN107060083A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN107060083B (en) Cylinder with large diameter and girder connection spell mould construction method
CN103147763B (en) A kind of tunnel invert termination combined steel
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN106703306B (en) Precast concrete parapet component and connection structure thereof
CN206722404U (en) A kind of narrow end wall single side formwork horizontal reinforcing device
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN205894668U (en) Superimposed sheet is pour and is used mould
CN208981528U (en) Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure
CN109403466A (en) A kind of construction method of eminence reinforced concrete hanging beam diaphragm structure built-in fitting
CN209227594U (en) A kind of aluminum wood gang form applied to pipe gallery construction
CN111101645A (en) Self-in-place reinforced precast concrete wallboard, connecting structure and construction method
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN207004011U (en) Cylinder with large diameter spells mould constructing structure with girder connection
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN109868923A (en) One kind, which dissipates, spells plank sheathing exposed concrete construction method
CN109778910A (en) The superimposed sheet for overlapping prefabricated piping lane reinforces mounting device and its method
CN215563552U (en) Vertical joint construction of prefabricated wallboard based on ultra high performance concrete form
CN201090027Y (en) Simple hanging ring aerial steel tube branching membrane
CN209397938U (en) One kind reinforcing tooling for Double-side laminated co-clip heart heat-preservation shear wall wall root
CN106400687A (en) Positioning assisting assembly jig for pier column reinforcing rib
CN207392744U (en) Prefabricated concrete structure primary-secondary beam connecting integration support system
CN108266036B (en) Construction method of concrete silo roof plate structure
CN112726919A (en) BIM-based assembled integral frame structure composite beam and composite slab design and construction method
CN214089762U (en) Slit gate pier construction complete device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant