CN103147763B - A kind of tunnel invert termination combined steel - Google Patents
A kind of tunnel invert termination combined steel Download PDFInfo
- Publication number
- CN103147763B CN103147763B CN201310001280.3A CN201310001280A CN103147763B CN 103147763 B CN103147763 B CN 103147763B CN 201310001280 A CN201310001280 A CN 201310001280A CN 103147763 B CN103147763 B CN 103147763B
- Authority
- CN
- China
- Prior art keywords
- lower bolster
- cope match
- plate pattern
- waterstop
- inverted arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to a kind of tunnel invert termination combined steel, belong to constructing tunnel apparatus field.Mainly comprise cope match-plate pattern, lower bolster and connecting bolt, linked together by connecting bolt between cope match-plate pattern and lower bolster, in bury waterstop and be sandwiched between cope match-plate pattern and lower bolster.Middle buried water stop horizontal positioned of the present invention, half is fixed in bolster flange crack, second half is directly imbedded this section two and serves as a contrast in inverted arch concrete, unaffected in work progress, ensure that the precision that waterstop is located, thus ensure that the guarded drainage effect of inverted arch, simultaneously, by composite assembly, steel form is formed a whole, replace traditional lumps of wood to support scattered assembling construction, manually high in conjunction with mechanical assembled efficiency, human assistance machinery, change the drawback that mechanical assistance is in the past artificial, labour intensity is low, and speed of application is fast.
Description
Technical field
The present invention relates to a kind of tunnel invert termination combined steel, belong to constructing tunnel apparatus field.
Background technology
In construction of tunnel, two lining concrete are as the permanent supporting of the rigidity of " New Austrian Tunneling Method ", vital effect is had to tunnel operation security, tunnel double-lining construction is mostly 8 ~ 12m mono-circulation, arrange hoop middle-set-type waterstop at every circulating connection constuction joint place, the installation quality of this waterstop is to the waterproof important in inhibiting in whole piece tunnel.
Inverted arch in tunnel engineering two serves as a contrast concrete when performing, and the general wooden form that adopts is termination mould construction, working procedure comprise blanking, assembled, in bury that waterstop bending is fixed, reinforced, concreting, dismounting, operation is numerous and diverse, and circulation timei is long, and reinforcing supports many, globality is poor, and easily rise mould.Especially bury waterstop during bending method is fixing, very easily occur that waterstop length of embedment is dark or shallow, position in or outward, angular slope etc., especially at both sides bending position of punching, radius is less, in bury waterstop should double 90-degree bent, curve small radius arc again, produce fold, concrete enters, size and the position that cannot ensure to bury in termination waterstop are accurately located, thus the waterproof quality of inverted arch termination constuction joint cannot be ensured, and wooden form loss is very big, construction cost is high.
Summary of the invention
The present invention, in order to overcome above-mentioned defect, proposes a kind of tunnel invert termination combined steel, mainly comprises: cope match-plate pattern, lower bolster and connecting bolt.Adopt bolt to be linked together by bolster, in bury waterstop and be sandwiched between bolster, every block template also connects into an entirety by side flange bolt.By this template system, achieve in good inverted arch termination constuction joint and bury the fixing of waterstop, thus ensure that excellent waterproof effect.
Technical scheme of the present invention is as follows:
A kind of tunnel invert termination combined steel, be is characterized in that: mainly comprise cope match-plate pattern, lower bolster and connecting bolt, linked together between cope match-plate pattern and lower bolster by connecting bolt, in bury waterstop and be sandwiched between cope match-plate pattern and lower bolster template.
Described lower bolster is the fan-shaped template by design inverted arch section sectional making, lower bolster bottom surface, end face and both sides are provided with steel plate flange, the curved plate flange of lower bolster bottom surface, end face is convenient to bury waterstop in horizontal, flat folder, vertical ribbing between the steel plate flange of lower bolster bottom surface, end face, and lower bolster both sides steel plate flange is convenient to be connected between template.
Described lower bolster bottom part ring is provided with reinforcing bar locating hole to by reinforcement placement form.
Described lower bolster height gets the half that design two serves as a contrast inverted arch thickness.
Described cope match-plate pattern, make according to lower bolster fragment size length, bottom cope match-plate pattern, curved plate flange is identical with lower bolster top steel plate flange arc, is convenient to bury waterstop in flat folder.
Described cope match-plate pattern height is filled apical side height according to inverted arch and is made.
Described cope match-plate pattern both sides are fixed by draw-in groove with longitudinal inverted arch sidewall template.
Bottom described cope match-plate pattern, steel plate flange is corresponding with lower bolster top steel plate flange punches, and is convenient to connecting bolt and passes to connect cope match-plate pattern and lower bolster.
Waterstop horizontal positioned is buried in described, half is fixed in upper and lower template steel plate banjo clip seam, and second half directly imbeds in two lining inverted arch concrete, unaffected in work progress, ensure that the precision that waterstop is located, thus ensure that the guarded drainage effect of inverted arch.
Described lower bolster bottom outside is provided with outer subsides waterstop.
Beneficial effect
The invention has the advantages that: first, middle buried water stop horizontal positioned, half is fixed in bolster flange crack, second half is directly imbedded this section two and serves as a contrast in inverted arch concrete, unaffected in work progress, ensure that the precision that waterstop is located, thus ensure that the guarded drainage effect of inverted arch; The second, formed a whole by steel form by composite assembly, replace traditional lumps of wood to support scattered assembling construction, manually high in conjunction with mechanical assembled efficiency, human assistance machinery, change the drawback that mechanical assistance is in the past artificial, labour intensity is low, and speed of application is fast.
Accompanying drawing explanation
Fig. 1: template assembly figure of the present invention;
Fig. 2: single form elevation;
Fig. 3: single form lateral view;
In figure: 1-sidewall template; 2-cope match-plate pattern; 3-lower bolster; 4-reinforcing bar locating hole; Waterstop is buried in 5-; 6-pastes waterstop 7-connecting bolt outward.
Detailed description of the invention
As Figure 1-3, tunnel invert termination of the present invention combined steel, mainly comprises: cope match-plate pattern, lower bolster and connecting bolt.Adopt bolt to be linked together by bolster, in bury waterstop and be sandwiched between bolster, every block template also connects into an entirety by side flange bolt.By this template system, achieve in good inverted arch termination constuction joint and bury the fixing of waterstop, thus ensure that excellent waterproof effect.
Technical scheme of the present invention is as follows:
A kind of tunnel invert termination combined steel, is mainly comprised cope match-plate pattern 2, lower bolster 3 and connecting bolt 7, is linked together between cope match-plate pattern 2 and lower bolster 3 by connecting bolt 7, in bury waterstop 5 and be sandwiched between cope match-plate pattern 2 and lower bolster 3 template.Wherein, lower bolster 3 is the fan-shaped templates by design inverted arch section sectional making, lower bolster 3 bottom surface, end face and both sides are provided with steel plate flange, the curved plate flange of lower bolster 3 bottom surface, end face is convenient to bury waterstop 5 in horizontal, flat folder, vertical ribbing between the steel plate flange of lower bolster 3 bottom surface, end face, and lower bolster 3 both sides steel plate flange is convenient to be connected between template.Lower bolster 3 bottom part ring is provided with reinforcing bar locating hole 4 to by reinforcement placement form, lower bolster 3 highly gets the half that design two serves as a contrast inverted arch thickness, cope match-plate pattern 2, make according to lower bolster 3 fragment size length, bottom cope match-plate pattern 2, curved plate flange is identical with lower bolster 3 top steel plate flange arc, is convenient to bury waterstop 5 in flat folder.Cope match-plate pattern 2 height is filled apical side height according to inverted arch and is made, and cope match-plate pattern 2 both sides are fixed by draw-in groove with longitudinal inverted arch sidewall template 1.Bottom cope match-plate pattern 2, steel plate flange is corresponding with lower bolster 3 top steel plate flange punches, and is convenient to connecting bolt 7 and passes to connect cope match-plate pattern 2 and lower bolster 3.
In bury waterstop 5 horizontal positioned, half is fixed in upper and lower template steel plate banjo clip seam, second half directly imbeds in two lining inverted arch concrete, unaffected in work progress, ensure that the precision that waterstop is located, thus ensure that the guarded drainage effect of inverted arch, and lower bolster 3 bottom outside is also provided with outer subsides waterstop 6.
The mounting method of combinations thereof punching block is:
1, after inverted arch has just propped up, according to the position measurement setting-out of design and construction seam;
2, face elevation is just propped up in repetition measurement constuction joint position, cuts and owes to dig, and mortar is repaired and backbreak, and measuring height of section error must not exceed ± 2cm;
3, lay inverted arch and connect abutment wall geotextiles, splash guard, erection loop is to, longitudinal drainage pipe;
4, constuction joint position graticule, the back of the body of laying placed in the middle pastes waterstop;
5, surveying and locating goes out tunnel center line, with for standard is pasted on waterstop at the back of the body, lower bolster 3 is installed, lateral support makes it firm, and the bolt of every section of bed die connects;
6, on lower bolster 3, laying buries waterstop 5 in installing;
7, template 2 is installed in segmentation, and note its midline position of adjustment, upper and lower mould connecting bolt 7 connects, and bury waterstop 5 position fastening bolt 7 in adjustment, cope match-plate pattern 2 adopts lateral support to reinforce;
8, the longitudinal inverted arch sidewall template 1 in both sides is installed;
9, build inverted arch two and serve as a contrast concrete;
10, after inverted arch two serves as a contrast concrete final set, mounting center ditch template;
11, build inverted arch to fill.
Be more than an exemplary embodiments of the present invention, enforcement of the present invention is not limited thereto.
Claims (8)
1. a tunnel invert termination combined steel, it is characterized in that: mainly comprise cope match-plate pattern (2), lower bolster (3) and connecting bolt (7), linked together by connecting bolt (7) between cope match-plate pattern (2) and lower bolster (3), in bury waterstop (5) and be sandwiched between cope match-plate pattern (2) and lower bolster (3) template; Described lower bolster (3) is the fan-shaped template by design inverted arch section sectional making, lower bolster (3) bottom surface, end face and both sides are provided with steel plate flange, the curved plate flange of lower bolster (3) bottom surface, end face is convenient to bury waterstop (5) in horizontal, flat folder, vertical ribbing between the steel plate flange of lower bolster (3) bottom surface, end face, and lower bolster (3) both sides steel plate flange is convenient to be connected between template; Described lower bolster (3) bottom part ring is provided with reinforcing bar locating hole (4) to by reinforcement placement form.
2. a kind of tunnel invert termination according to claim 1 combined steel, is characterized in that: described lower bolster (3) highly gets the half that design two serves as a contrast inverted arch thickness.
3. according to the arbitrary described a kind of tunnel invert termination combined steel of claim 1-2, it is characterized in that: described cope match-plate pattern (2), make according to lower bolster (3) fragment size length, cope match-plate pattern (2) bottom curved plate flange is identical with lower bolster (3) top steel plate flange arc, is convenient to bury waterstop (5) in flat folder.
4. a kind of tunnel invert termination according to claim 3 combined steel, is characterized in that: described cope match-plate pattern (2) height is filled apical side height according to inverted arch and made.
5. a kind of tunnel invert termination according to claim 4 combined steel, is characterized in that: described cope match-plate pattern (2) both sides are fixed by draw-in groove with longitudinal inverted arch sidewall template (1).
6. a kind of tunnel invert termination according to claim 5 combined steel, it is characterized in that: bottom described cope match-plate pattern (2), steel plate flange is corresponding with lower bolster (3) top steel plate flange punches, be convenient to connecting bolt (7) and pass to connect cope match-plate pattern (2) and lower bolster (3).
7. a kind of tunnel invert termination according to claim 3 combined steel, it is characterized in that: in described, bury waterstop (5) horizontal positioned, half is fixed in cope match-plate pattern (2) bottom steel plate flange and lower bolster (3) top steel plate flange crack, and second half is directly imbedded in two lining inverted arch concrete.
8. a kind of tunnel invert termination according to claim 1 combined steel, is characterized in that: described lower bolster (3) bottom outside is provided with outer subsides waterstop (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310001280.3A CN103147763B (en) | 2013-01-04 | 2013-01-04 | A kind of tunnel invert termination combined steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310001280.3A CN103147763B (en) | 2013-01-04 | 2013-01-04 | A kind of tunnel invert termination combined steel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103147763A CN103147763A (en) | 2013-06-12 |
CN103147763B true CN103147763B (en) | 2015-09-09 |
Family
ID=48546046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310001280.3A Active CN103147763B (en) | 2013-01-04 | 2013-01-04 | A kind of tunnel invert termination combined steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103147763B (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437791B (en) * | 2013-09-13 | 2016-02-17 | 中铁隧道集团二处有限公司 | The mounting method of buried water stop in a kind of tunnel lining trolley termination |
CN103643971B (en) * | 2013-12-06 | 2016-01-20 | 中铁二十三局集团有限公司 | Tunnel invert sizing end mould rapid constructing method |
CN103670452B (en) * | 2013-12-23 | 2016-05-25 | 中铁五局(集团)有限公司 | A kind of for accurately mounting structure and the method for location of tunnel arch wall lining cutting buried water stop |
CN103982199B (en) * | 2014-05-16 | 2016-03-30 | 山东省交通规划设计院 | Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking |
CN105134253B (en) * | 2015-07-09 | 2017-12-01 | 中铁十二局集团有限公司 | Tunnel inverted arch composite entity template and pouring construction method |
CN106089248B (en) * | 2016-07-22 | 2018-07-17 | 中铁十九局集团第七工程有限公司 | The construction method of tunnel inverted arch drain hole |
CN106437763A (en) * | 2016-08-26 | 2017-02-22 | 中铁十局集团第四工程有限公司 | Inverted arch steel end die and construction method thereof |
CN106884664B (en) * | 2017-02-27 | 2020-02-21 | 中铁十九局集团有限公司 | Tunnel inverted arch template and tunnel inverted arch filling rapid construction method |
CN111441798A (en) * | 2019-06-22 | 2020-07-24 | 李光见 | Construction technology design for section plug of tunnel secondary lining trolley |
CN110529149A (en) * | 2019-08-14 | 2019-12-03 | 保利长大工程有限公司 | Inverted arch layered pouring combined steel formwork |
CN111155563A (en) * | 2020-01-21 | 2020-05-15 | 中铁隧道集团二处有限公司 | Water stopping device and mounting method thereof |
CN113107538A (en) * | 2021-04-26 | 2021-07-13 | 甘肃省公路交通建设集团有限公司北仙项目管理分公司 | Assembled inverted arch curved surface attaching template for highway tunnel |
CN114075984A (en) * | 2021-11-01 | 2022-02-22 | 中建五局土木工程有限公司 | Positioning end template of tunnel inverted arch end exposed steel bar and construction method |
CN114251106B (en) * | 2021-12-09 | 2023-11-03 | 中交第二航务工程局有限公司 | Integral inverted arch end steel mould convenient to assemble and disassemble and construction method |
CN115075098A (en) * | 2022-05-25 | 2022-09-20 | 中交二航局广西建设工程有限公司 | End head device for tunnel composite pavement construction and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201650310U (en) * | 2010-04-30 | 2010-11-24 | 中铁十一局集团有限公司 | Medium-bury type water stop mounting structure used in tunnel |
CN101967985A (en) * | 2010-09-08 | 2011-02-09 | 中铁隧道集团三处有限公司 | Self-propelled inverted arch template construction method |
CN202250110U (en) * | 2011-10-24 | 2012-05-30 | 中铁十七局集团第四工程有限公司 | Buried waterstop fixing device in secondary tunnel liner |
CN202417532U (en) * | 2011-12-20 | 2012-09-05 | 中国建筑第五工程局有限公司 | Waterstop mounting module |
CN102748038A (en) * | 2012-07-11 | 2012-10-24 | 上海盾构设计试验研究中心有限公司 | Full-recovery shield tunnel enter and exit water stop device |
CN202578719U (en) * | 2012-05-18 | 2012-12-05 | 中铁十二局集团第七工程有限公司 | Steel-edged water-stop fixing device |
CN202628115U (en) * | 2012-04-20 | 2012-12-26 | 中交第一公路工程局有限公司 | Integral-type inverted-arch template device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202510132U (en) * | 2012-04-12 | 2012-10-31 | 中铁十二局集团有限公司 | High-speed railway tunnel invert form |
-
2013
- 2013-01-04 CN CN201310001280.3A patent/CN103147763B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201650310U (en) * | 2010-04-30 | 2010-11-24 | 中铁十一局集团有限公司 | Medium-bury type water stop mounting structure used in tunnel |
CN101967985A (en) * | 2010-09-08 | 2011-02-09 | 中铁隧道集团三处有限公司 | Self-propelled inverted arch template construction method |
CN202250110U (en) * | 2011-10-24 | 2012-05-30 | 中铁十七局集团第四工程有限公司 | Buried waterstop fixing device in secondary tunnel liner |
CN202417532U (en) * | 2011-12-20 | 2012-09-05 | 中国建筑第五工程局有限公司 | Waterstop mounting module |
CN202628115U (en) * | 2012-04-20 | 2012-12-26 | 中交第一公路工程局有限公司 | Integral-type inverted-arch template device |
CN202578719U (en) * | 2012-05-18 | 2012-12-05 | 中铁十二局集团第七工程有限公司 | Steel-edged water-stop fixing device |
CN102748038A (en) * | 2012-07-11 | 2012-10-24 | 上海盾构设计试验研究中心有限公司 | Full-recovery shield tunnel enter and exit water stop device |
Also Published As
Publication number | Publication date |
---|---|
CN103147763A (en) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147763B (en) | A kind of tunnel invert termination combined steel | |
CN108104825B (en) | A kind of shield tunnel tunnel bottom backfills assembly construction method | |
CN102155025B (en) | Late poured band type assembled pipe jacking working open caisson | |
CN103643971B (en) | Tunnel invert sizing end mould rapid constructing method | |
CN202559384U (en) | Prefabricated assembled pipe-jacking working well | |
CN103147764B (en) | Sizing end mould plate for second lining of tunnel arch wall | |
CN102644296A (en) | Prefabricate assembly type pipe jacking working well | |
CN103437791A (en) | Installation method of buried waterstop at tip of tunnel lining trolley | |
CN102518300B (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
CN202031108U (en) | Post-poured band type fabricated pipe-jacking working well | |
CN103352578B (en) | A kind of construction method of carbon fiber cloth steel member composite reinforcement beam | |
CN107355008B (en) | Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure | |
CN218236612U (en) | Reinforced concrete pipeline repairing device | |
CN107060083B (en) | Cylinder with large diameter and girder connection spell mould construction method | |
CN204212442U (en) | A kind of hi-Fix guiding device | |
CN105220809A (en) | The syndeton of a kind of arch top board and bracket stake and construction method thereof | |
CN204436457U (en) | The prefabricated evacuation platform of a kind of shield structure running tunnel | |
CN202247907U (en) | Supporting structure of urban track traffic super-large section cut-and-cover section tunnel | |
CN204825945U (en) | A fixture for fixing buried bolt in advance | |
CN208668462U (en) | A kind of pipe gallery supporting structure | |
CN102605945B (en) | Manufacturing method of big wood formwork | |
CN206189456U (en) | Three cabin piping lanes | |
CN104653222A (en) | Prefabricated evacuation platform for shield interval tunnel | |
CN104314318A (en) | High-precision positioning guide device and use method thereof | |
CN202510132U (en) | High-speed railway tunnel invert form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |