CN107059909A - A kind of bridge foundation and substructure construction method - Google Patents

A kind of bridge foundation and substructure construction method Download PDF

Info

Publication number
CN107059909A
CN107059909A CN201710450754.0A CN201710450754A CN107059909A CN 107059909 A CN107059909 A CN 107059909A CN 201710450754 A CN201710450754 A CN 201710450754A CN 107059909 A CN107059909 A CN 107059909A
Authority
CN
China
Prior art keywords
reinforcing bar
cushion cap
pier shaft
cut
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710450754.0A
Other languages
Chinese (zh)
Inventor
李克智
李检平
苗金丽
肖宝海
陈朋
安海平
刘军锋
许可
南宁涛
叶虎
李彦军
胡志安
邢磊
吴庆革
王海龙
张赫然
韩兴明
王东
祝贺兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201710450754.0A priority Critical patent/CN107059909A/en
Publication of CN107059909A publication Critical patent/CN107059909A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

A kind of bridge foundation and substructure construction method.It includes making drilled pile;Twice annular is carried out to cover to reinforcement using cutting machine in the designed elevation position of stake top and reinforcing bar apical position to cut, and reinforcing bar is completely exfoliated with concrete;Cushion cap steel reinforcement cage is made, then sizing steel mold is fixed at the top of cushion cap steel reinforcement cage;Pier shaft mask reinforcing bar is set, cushion cap is made;Ring cutting is carried out in sizing steel mold inside edge, dabbing processing is then carried out;The steps such as pier shaft are made.Effect of the present invention:Bicyclic cutting process ensure that the height and protective layer for going deep into cushion cap part pile foundation at stake top, so as to ensure that the integrality of pile foundation.It is bicyclic cut after first expose reinforcing bar, it is ensured that reinforcing bar is not damaged when stake top is cut, the anchor connection quality of pile crown quality and cushion cap and drilled pile is effectively ensured that.The omission of artificial assembling reinforcement can be avoided using sizing steel mold, reinforcing bar sizing efficiency of construction is high, shortens the duration, it is more convenient to construct, and can reach more preferable construction quality and effect.

Description

A kind of bridge foundation and substructure construction method
Technical field
The invention belongs to bridge structure construction method technical field, more particularly to a kind of bridge foundation and substructure are applied Work method.
Background technology
At present, traditional prestressed concrete continuous beam is main by drilled pile, cushion cap, pier shaft, bearing and continuous beam group Into wherein pier shaft belongs to substructure, and drilled pile and cushion cap belong to basis, and bearing and continuous beam then belong to superstructure.Its In the basis commonly used and the construction method of substructure be that drilled pile is made in ground by workmen first, then in stake top Cushion cap foundation ditch is excavated in the ground in outside and cushion cap template is installed, afterwards crushed stake top to expose the reinforcing bar at the position, then Above-mentioned stake top reinforcing bar is banded together with cushion cap steel reinforcement cage bottom while cushion cap steel reinforcement cage is made in cushion cap template, afterwards Pier shaft mask reinforcing bar lower end is banded in cushion cap steel reinforcement cage top, then in cushion cap template casting concrete and cushion cap is made, so The cushion cap top surface on the inside of pier shaft mask reinforcing bar is progress dabbing processing at pier shaft to be placed afterwards, afterwards in pier shaft mask reinforcing bar Side ties up pier shaft steel reinforcement cage and sets pier body formwork in pier shaft mask reinforcing bar lateral branch, finally in pier body formwork casting concrete and Pier shaft is made, bridge foundation and substructure construction process is thus completed.But there is following point in above-mentioned construction method:1st, crush Generally carried out during stake top by workmen using pneumatic pick, because the reinforcing bar at stake top is hidden in outside cover to reinforcement It is interior, thus the careless slightly reinforcing bar for being just easy to damage at this, but also the integrality of stake top structure can be destroyed, so that stake top Absolute altitude can not meet design requirement.Used when the 2nd, tying up pier shaft mask reinforcing bar and binding method, reinforcing bar during reinforcing bar colligation is positioned manually Quantity, bar spacing fully rely on workmen's control, therefore bothersome laborious, and there is likely to be omission, and thus having can Star fracture can be produced on the surface of pier shaft and influence the quality of whole bridge, it can be seen that this method has not caught up with construction The requirement of development;3rd, dabbing is carried out using manual type, and dabbing depth can be different when workmen is different, entirely by rule of thumb, There is no control device, so the requirement of depth can not be met, height is concavo-convex inconsistent, and is easy to beyond defined pier shaft root Portion's physical dimension.
The content of the invention
In order to solve the above problems, it is an object of the invention to provide a kind of bridge foundation and substructure construction method.
In order to achieve the above object, the bridge foundation and substructure construction method that the present invention is provided include carrying out in order The following steps:
1) drilled pile is made in ground by workmen first, cushion cap foundation ditch is then excavated in the ground on the outside of stake top And install cushion cap template;
2) bipassage ring is carried out to cover to reinforcement using cutting machine in the designed elevation position of stake top and reinforcing bar apical position Shape is cut, and depth of cut is the thickness of cover to reinforcement, then protects the reinforcing bar within the depth of cut between ring cutting line Layer is removed, and thus makes reinforcing bar to exposing outside, and then carries out artificial to all concrete more than designed elevation position using pneumatic pick Abolish, reinforcing bar is completely exfoliated with concrete, the surface of last manual cleaning stake top;
3) by the reinforcing bar in above-mentioned stake top and cushion cap steel reinforcement cage bottom while making cushion cap steel reinforcement cage in cushion cap template Band together, the sizing steel mold customized in advance according to pier shaft mask rebar sizes and camber line is then fixed on cushion cap reinforcing bar At bridge pier to be placed at the top of cage;Described sizing steel mold is annular slab, shape and the lateral cross section outer wheels of pier shaft lower end Wide identical, interval is formed with multiple necks inside edge, and the spacing and the pier shaft mask reinforcing bar of design requirement of neck Spacing is identical;
4) a pier shaft mask reinforcing bar is inserted in each neck, and the lower end of pier shaft mask reinforcing bar is banded in pile cap steel Muscle cage top, then in cushion cap template casting concrete and cushion cap is made;
5) carry out annular together in the inside edge of the top surface edge sizing steel mold of cushion cap using cutting machine to cut, Ran Hou Dabbing processing is carried out in the annular region;
6) pier shaft steel reinforcement cage is tied up on the inside of pier shaft mask reinforcing bar and pier body formwork is set in pier shaft mask reinforcing bar lateral branch, most Afterwards in pier body formwork casting concrete and pier shaft is made, thus complete bridge foundation and substructure construction process.
In step 3) in, the diameter of described neck is equal to the diameter of pier shaft mask reinforcing bar.
In step 5) in, described depth of cut is 2cm, and dabbing depth is consistent with depth of cut.
The bridge foundation and substructure construction method that the present invention is provided have the advantages that:
1st, bicyclic cutting process ensure that the height and protective layer for going deep into cushion cap part pile foundation at stake top, so as to ensure that pile foundation Integrality.It is bicyclic cut after first expose reinforcing bar, it is ensured that reinforcing bar is not damaged when stake top is cut, effectively ensure that pile crown quality and The anchor connection quality of cushion cap and drilled pile.
2nd, the omission of artificial assembling reinforcement can be avoided using sizing steel mold, reinforcing bar sizing efficiency of construction is high, shortens work Phase, it is more convenient to construct, and can reach more preferable construction quality and effect.
3rd, workmen need to only be carried out in the inside of ring cutting line by ring cutting depth during dabbing, therefore, it is possible to ensure dabbing scope Accurately.
Brief description of the drawings
Structural facades during stake top ring cutting when Fig. 1 is the bridge foundation and substructure construction method that are provided using the present invention Figure.
Structure is overlooked during stake top ring cutting when Fig. 2 is the bridge foundation and substructure construction method that are provided using the present invention Figure.
The sizing set when Fig. 3 is the bridge foundation and substructure construction method that are provided using the present invention in cushion cap top surface Steel positioner structure top view.
The sizing set when Fig. 4 is the bridge foundation and substructure construction method that are provided using the present invention in cushion cap top surface Steel positioner structure front view.
Carried out when Fig. 5 is the bridge foundation and substructure construction method that are provided using the present invention on the inside of sizing steel mold Dabbing processing procedure top view.
Embodiment
The bridge foundation and substructure construction method provided below in conjunction with the accompanying drawings with specific embodiment the present invention is carried out Detailed description.
As Figure 1-Figure 5, the bridge foundation and substructure construction method that the present invention is provided include what is carried out in order The following steps:
1) drilled pile is made in ground by workmen first, cushion cap foundation ditch is then excavated in the ground on the outside of stake top And install cushion cap template;
2) cutting machine is used to carry out two to cover to reinforcement 2 in the designed elevation position A and reinforcing bar apical position B of stake top 1 Road annular cutting, depth of cut is the thickness of cover to reinforcement 2, then by the reinforcing bar within the depth of cut between ring cutting line Protective layer 2 is removed, and thus makes reinforcing bar 3 to exposing outside, then real to more than designed elevation position A all concrete using pneumatic pick Pedestrian's work is abolished, and reinforcing bar 3 and concrete are completely exfoliated, the surface of last manual cleaning stake top 1;
3) by under the reinforcing bar 3 in above-mentioned stake top 1 and cushion cap steel reinforcement cage while making cushion cap steel reinforcement cage in cushion cap template Portion is banded together, and the sizing steel mold 4 customized in advance according to pier shaft mask rebar sizes and camber line then is fixed on into cushion cap At bridge pier to be placed at the top of steel reinforcement cage;Described sizing steel mold 4 is outside annular slab, the lateral cross section of shape and pier shaft lower end Contouring is identical, and interval is formed with multiple necks 5, and the spacing and the pier shaft mask of design requirement of neck 5 inside edge The spacing of reinforcing bar 6 is identical, while the diameter of neck 5 is equal to the diameter of pier shaft mask reinforcing bar 6;
4) a piece pier shaft mask reinforcing bar 6 of insertion in each neck 5, and the lower end of pier shaft mask reinforcing bar 6 is banded in held Platform steel reinforcement cage top, then in cushion cap template casting concrete and cushion cap 7 is made;
5) carry out annular together in the inside edge of the top surface edge sizing steel mold 4 of cushion cap 7 using cutting machine to cut, cutting Depth is 2cm, and dabbing processing is then carried out in the annular region, and dabbing depth is consistent with depth of cut;
6) pier shaft steel reinforcement cage is tied up on the inside of pier shaft mask reinforcing bar and pier body formwork is set in pier shaft mask reinforcing bar lateral branch, most Afterwards in pier body formwork casting concrete and pier shaft is made, thus complete bridge foundation and substructure construction process.

Claims (3)

1. a kind of bridge foundation and substructure construction method, it is characterised in that:Described bridge foundation and substructure construction Method includes the following steps carried out in order:
1) drilled pile is made in ground by workmen first, cushion cap foundation ditch is then excavated in the ground on the outside of stake top and is propped up If cushion cap template;
2) cover to reinforcement (2) is entered using cutting machine in the designed elevation position (A) of stake top (1) and reinforcing bar apical position (B) The annular cutting of row twice, depth of cut is the thickness of cover to reinforcement (2), then will be within depth of cut between ring cutting line Cover to reinforcement (2) remove, thus make reinforcing bar (3) to exposing outside, then using pneumatic pick to designed elevation position (A) more than All concrete are carried out and manually abolished, and reinforcing bar (3) are completely exfoliated with concrete, the surface of last manual cleaning stake top (1);
3) by under the reinforcing bar (3) in above-mentioned stake top (1) and cushion cap steel reinforcement cage while making cushion cap steel reinforcement cage in cushion cap template Portion is banded together, and is then fixed on the sizing steel mold (4) customized in advance according to pier shaft mask rebar sizes and camber line and is held At bridge pier to be placed at the top of platform steel reinforcement cage;Described sizing steel mold (4) is annular slab, shape and the transverse cutting of pier shaft lower end Face exterior contour is identical, interval is formed with multiple necks (5) inside edge, and the spacing and design requirement of neck (5) The spacing of pier shaft mask reinforcing bar (6) is identical;
4) a piece pier shaft mask reinforcing bar (6) of insertion in each neck (5), and the lower end of pier shaft mask reinforcing bar (6) is banded in Cushion cap steel reinforcement cage top, then in cushion cap template casting concrete and cushion cap (7) is made;
5) carry out annular together in the inside edge of the top surface edge sizing steel mold (4) of cushion cap (7) using cutting machine to cut, then Dabbing processing is carried out in the annular region;
6) pier shaft steel reinforcement cage is tied up on the inside of pier shaft mask reinforcing bar and pier body formwork is set in pier shaft mask reinforcing bar lateral branch, finally existed Casting concrete in pier body formwork and pier shaft is made, thus complete bridge foundation and substructure construction process.
2. bridge foundation according to claim 1 and substructure construction method, it is characterised in that:In step 3) in, institute The diameter for the neck (5) stated is equal to the diameter of pier shaft mask reinforcing bar (6).
3. bridge foundation according to claim 1 and substructure construction method, it is characterised in that:In step 5) in, institute The depth of cut stated is 2cm, and dabbing depth is consistent with depth of cut.
CN201710450754.0A 2017-06-15 2017-06-15 A kind of bridge foundation and substructure construction method Pending CN107059909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710450754.0A CN107059909A (en) 2017-06-15 2017-06-15 A kind of bridge foundation and substructure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710450754.0A CN107059909A (en) 2017-06-15 2017-06-15 A kind of bridge foundation and substructure construction method

Publications (1)

Publication Number Publication Date
CN107059909A true CN107059909A (en) 2017-08-18

Family

ID=59594419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710450754.0A Pending CN107059909A (en) 2017-06-15 2017-06-15 A kind of bridge foundation and substructure construction method

Country Status (1)

Country Link
CN (1) CN107059909A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109332557A (en) * 2018-12-03 2019-02-15 中铁六局集团有限公司 Reinforcing bar mobile hydraulic binding clamping fixture
CN109555173A (en) * 2017-09-26 2019-04-02 安徽皖通高速公路股份有限公司 A kind of separate type bridge integrally lifts stake reinforcement means
CN113700033A (en) * 2021-08-06 2021-11-26 中铁大桥勘测设计院集团有限公司 Deep water pile group foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013125108A1 (en) * 2012-02-23 2013-08-29 日立造船株式会社 Joint structure for steel bridge pier and concrete pile foundation
CN103953054A (en) * 2014-04-01 2014-07-30 中铁大桥局集团第一工程有限公司 Dry-sealed concrete pile foundation for protecting pile head reinforcement and construction method thereof
CN105926470A (en) * 2016-06-01 2016-09-07 广州市公路勘察设计有限公司 Transformation method of elevated bridge
CN106245535A (en) * 2016-09-09 2016-12-21 中铁十局集团有限公司 A kind of pier shaft vertical reinforcement mold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013125108A1 (en) * 2012-02-23 2013-08-29 日立造船株式会社 Joint structure for steel bridge pier and concrete pile foundation
CN103953054A (en) * 2014-04-01 2014-07-30 中铁大桥局集团第一工程有限公司 Dry-sealed concrete pile foundation for protecting pile head reinforcement and construction method thereof
CN105926470A (en) * 2016-06-01 2016-09-07 广州市公路勘察设计有限公司 Transformation method of elevated bridge
CN106245535A (en) * 2016-09-09 2016-12-21 中铁十局集团有限公司 A kind of pier shaft vertical reinforcement mold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
苏永胜: "浅谈桥梁钻孔桩环切法剔除桩头施工工艺及预控要点", 《甘肃科技》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555173A (en) * 2017-09-26 2019-04-02 安徽皖通高速公路股份有限公司 A kind of separate type bridge integrally lifts stake reinforcement means
CN109332557A (en) * 2018-12-03 2019-02-15 中铁六局集团有限公司 Reinforcing bar mobile hydraulic binding clamping fixture
CN113700033A (en) * 2021-08-06 2021-11-26 中铁大桥勘测设计院集团有限公司 Deep water pile group foundation
CN113700033B (en) * 2021-08-06 2022-09-23 中铁大桥勘测设计院集团有限公司 Deep water pile group foundation

Similar Documents

Publication Publication Date Title
CN104074199B (en) Underwater bearing platform construction method
CN107059909A (en) A kind of bridge foundation and substructure construction method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN105545342B (en) The smoke shaft and its construction method of existing trimmed tunnel internal arch part
CN105350777A (en) Device and method for one-time pouring molding of ultra-high concrete column
CN206319886U (en) Tunnel lining structure
CN102535530A (en) Miniature pile model used for model tests and manufacturing method thereof
CN105297714A (en) Integrative construction device and method for pile cap and pile body of pouring pile
CN111502701A (en) Method for repairing deformed and damaged roadway and roadway structure thereof
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN106381937A (en) Concrete structured pre-buried hole repairing method
CN206144137U (en) Board formwork instrument falls
CN104947853B (en) A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method
CN107268627A (en) One kind is applied to large-scale cast-in-situ bored pile pile crown restructuring bankrupt
CN105002891B (en) A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method
CN206143608U (en) Assembled T beam bridge hogging moment district anchorage sealing system
CN110485421A (en) A kind of pile crown quickly abolishes construction technology
CN206173983U (en) Building foundation water -blocking weir
CN109944246A (en) A kind of construction method of broken pile head
CN105626138B (en) A kind of precipice passway for escaping structure and its construction method
CN107939094A (en) Conical concrete construction of funnel method
CN114045856A (en) Integrated pile-driving drilling mechanism of photovoltaic power station and construction method
CN110241817A (en) A kind of impaired after-construction method of the friction pile stake holes of emergency repair engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170818

WD01 Invention patent application deemed withdrawn after publication