CN107022958B - 使用缆索吊机安装斜拉桥的中跨主梁的方法 - Google Patents
使用缆索吊机安装斜拉桥的中跨主梁的方法 Download PDFInfo
- Publication number
- CN107022958B CN107022958B CN201710406409.7A CN201710406409A CN107022958B CN 107022958 B CN107022958 B CN 107022958B CN 201710406409 A CN201710406409 A CN 201710406409A CN 107022958 B CN107022958 B CN 107022958B
- Authority
- CN
- China
- Prior art keywords
- cable
- steel girder
- girder segment
- cable crane
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710406409.7A CN107022958B (zh) | 2017-06-02 | 2017-06-02 | 使用缆索吊机安装斜拉桥的中跨主梁的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710406409.7A CN107022958B (zh) | 2017-06-02 | 2017-06-02 | 使用缆索吊机安装斜拉桥的中跨主梁的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107022958A CN107022958A (zh) | 2017-08-08 |
CN107022958B true CN107022958B (zh) | 2019-04-16 |
Family
ID=59529976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710406409.7A Active CN107022958B (zh) | 2017-06-02 | 2017-06-02 | 使用缆索吊机安装斜拉桥的中跨主梁的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107022958B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972517B (zh) * | 2017-12-27 | 2021-09-10 | 中交第二航务工程局有限公司 | 一种钢混结合梁斜拉桥主梁的施工方法 |
CN108118622A (zh) * | 2018-02-06 | 2018-06-05 | 中交二公局第二工程有限公司 | 一种叠合梁斜拉桥主梁吊装施工缆索吊机系统 |
CN110438879A (zh) * | 2019-07-18 | 2019-11-12 | 广东冠粤路桥有限公司 | 一种超高性能混凝土桥梁结构及其施工方法 |
CN114977066B (zh) * | 2022-06-14 | 2024-03-12 | 国网黑龙江省电力有限公司牡丹江供电公司 | 一种扩建电缆沟用的支撑装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0617171A1 (en) * | 1993-03-26 | 1994-09-28 | P.G. Brown Ltd. | Method for erecting a suspension bridge and device therefor |
CN201400852Y (zh) * | 2008-11-13 | 2010-02-10 | 中交第二航务工程局有限公司 | 多功能双桥面吊机 |
CN103898834A (zh) * | 2014-04-24 | 2014-07-02 | 四川省交通运输厅公路规划勘察设计研究院 | 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法 |
CN104674668A (zh) * | 2015-01-19 | 2015-06-03 | 中铁大桥局集团有限公司 | 一种通过缆索吊装施工主梁节段的方法 |
CN105421236A (zh) * | 2015-10-29 | 2016-03-23 | 中交第二航务工程局有限公司 | 一种斜拉悬索协作体系桥梁的合拢方法 |
-
2017
- 2017-06-02 CN CN201710406409.7A patent/CN107022958B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0617171A1 (en) * | 1993-03-26 | 1994-09-28 | P.G. Brown Ltd. | Method for erecting a suspension bridge and device therefor |
CN201400852Y (zh) * | 2008-11-13 | 2010-02-10 | 中交第二航务工程局有限公司 | 多功能双桥面吊机 |
CN103898834A (zh) * | 2014-04-24 | 2014-07-02 | 四川省交通运输厅公路规划勘察设计研究院 | 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法 |
CN104674668A (zh) * | 2015-01-19 | 2015-06-03 | 中铁大桥局集团有限公司 | 一种通过缆索吊装施工主梁节段的方法 |
CN105421236A (zh) * | 2015-10-29 | 2016-03-23 | 中交第二航务工程局有限公司 | 一种斜拉悬索协作体系桥梁的合拢方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107022958A (zh) | 2017-08-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107022958B (zh) | 使用缆索吊机安装斜拉桥的中跨主梁的方法 | |
CN105421249B (zh) | 一种拖吊结合式挂篮结构及施工方法 | |
CN107338727B (zh) | 一种整体拆、装防撞墙模板及其步履式轨道吊移系统 | |
CN106976797A (zh) | 三吊点回转吊具 | |
CN100476076C (zh) | 移动式整体施工平台及施工方法和专用吊具 | |
CN107640706B (zh) | 一种起重设备及其施工方法 | |
CN102912730B (zh) | 一种大跨度钢筋混凝土拱桥单肋合龙缆索吊装施工方法 | |
CN105648916B (zh) | 一种架桥机及该架桥机的架设方法 | |
CN103882812B (zh) | 斜拉索桥中跨主梁的施工方法 | |
CN106049293B (zh) | 通航河流上悬索桥加劲梁安装方法及所用荡移系统 | |
CN102146660A (zh) | 一种跨拱肋龙门吊及蝴蝶拱桥空间结构体系的安装方法 | |
CN107938520B (zh) | 采用竖直拉索施工钢混组合梁的方法 | |
CN106917353B (zh) | 一种开合式过墩箱梁检修施工台车及其工作方法 | |
CN205223872U (zh) | 一种拖吊结合式新型挂篮结构 | |
CN208415073U (zh) | 一种新型缆索吊装拱桥装置 | |
CN107201719B (zh) | 高架桥防撞墙模板吊装转运机及防撞墙施工方法 | |
CN208934425U (zh) | 自行式多功能布料机 | |
CN110258352A (zh) | 两跨连做的钢混组合桥梁施工方法 | |
CN102134832A (zh) | 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架 | |
JP5918056B2 (ja) | 橋梁架設方法 | |
CN102635066A (zh) | 一种吊架铰接式桥梁检修车 | |
CN105019357A (zh) | 一种拱桥敞口格构式钢梁上异形预制桥面板的安装方法 | |
CN205529915U (zh) | 一种梯型桅杆式悬拼吊机 | |
CN209338005U (zh) | 一种架梁施工用移动式高低腿龙门吊 | |
CN113235460B (zh) | 用于桥梁悬臂拼装的预制节段荡移法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 530200 No.21 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region Patentee after: GUANGXI ROAD AND BRIDGE ENGINEERING GROUP Co.,Ltd. Patentee after: Han Yu Patentee after: Qin Dayan Patentee after: Lin Feng Patentee after: Jiang Wei Patentee after: Huang Shaojie Address before: 530012 Zhonghua Road 17, Xingning District, the Guangxi Zhuang Autonomous Region, Nanning Patentee before: GUANGXI ROAD AND BRIDGE ENGINEERING GROUP Co.,Ltd. Patentee before: Han Yu Patentee before: Qin Dayan Patentee before: Lin Feng Patentee before: Jiang Wei Patentee before: Huang Shaojie |