CN107015121A - A kind of distribution transforming stoppage in transit method for rapidly positioning - Google Patents

A kind of distribution transforming stoppage in transit method for rapidly positioning Download PDF

Info

Publication number
CN107015121A
CN107015121A CN201710365755.5A CN201710365755A CN107015121A CN 107015121 A CN107015121 A CN 107015121A CN 201710365755 A CN201710365755 A CN 201710365755A CN 107015121 A CN107015121 A CN 107015121A
Authority
CN
China
Prior art keywords
power failure
distribution transforming
area
line
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710365755.5A
Other languages
Chinese (zh)
Inventor
安义
范瑞祥
李升健
郭亮
邓才波
熊丽霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710365755.5A priority Critical patent/CN107015121A/en
Publication of CN107015121A publication Critical patent/CN107015121A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Abstract

A kind of distribution transforming stoppage in transit method for rapidly positioning, step is as follows:(1)Obtain corresponding Monitoring Data and basic data, set up " station owner's line branch line distribution transforming user side " topological relation, whether had a power failure by monitoring same branch line other area's distribution transformings, the different branch line platform area power-off conditions of same main line, whether final determining table area has a power failure comes from high-pressure side power failure;(2)After distribution transforming power-off event occurs, platform area key user intelligent meter data are carried out by main website to call survey together in real time, whether it is that low-voltage circuit power failure causes that determining table area has a power failure;(3)After the generation of distribution transforming power-off event, the critical electrical amount of platform area collector is carried out by main website to call survey together in real time, whether determining table area has a power failure is caused by acquisition terminal failure.The inventive method can quickly determine distribution transforming fault outage section, and distribution transforming power failure section is divided into main line power failure, branch line power failure, the power failure of platform area, acquisition terminal failure, the distribution transforming power failure lookup time is greatly shortened according to distribution transforming stoppage in transit method for rapidly positioning.

Description

A kind of distribution transforming stoppage in transit method for rapidly positioning
Technical field
The present invention relates to a kind of distribution transforming stoppage in transit method for rapidly positioning, belong to transformer station high-voltage side bus technical field.
Background technology
Distribution transforming have a power failure after often can not determining table area power failure range, operation maintenance personnel need platform area scene carry out failure Make an inspection tour, trouble shoot time and effort consuming has a strong impact on power supply reliability, invisible increase customer complaint risk.Therefore it is actual in platform area During O&M, how quick and precisely to distinguish high-pressure side have a power failure, platform area have a power failure, low-voltage circuit have a power failure can greatly reduce platform area failure The lookup time.
At present, production real-time managing and control system has been realized runs real time on-line monitoring to platform area, and distribute-electricity transformer district can be obtained in real time Electrical quantity, stop upper electric event.Dan Duitai areas occur after the electric event of stoppage in transit, it is impossible to quickly judge platform area power failure section, system is not yet There is a kind of distribution transforming stoppage in transit method for rapidly positioning, it is impossible to provide corresponding O&M and Strategies of Maintenance for operation maintenance personnel.
The content of the invention
The purpose of the present invention is, in order to solve the problem of distribution transforming stoppage in transit is quick and precisely positioned, to propose that a kind of distribution transforming is stopped transport fast Fast positioning method.
Realize the technical scheme is that, a kind of distribution transforming stoppage in transit method for rapidly positioning is as follows the step of methods described:
(1) corresponding Monitoring Data and basic data are obtained, "-main line-branch line-distribution transforming-user side of standing " topology is set up Whether relation, had a power failure by monitoring same branch line other area's distribution transformings, the different branch line platform area power-off conditions of same main line, it is final really Whether Ding Tai areas have a power failure comes from high-pressure side power failure;
(2) after distribution transforming power-off event occurs, platform area key user intelligent meter data are carried out by main website to call survey together in real time, really Whether it is that low-voltage circuit power failure causes that Ding Tai areas have a power failure;
(3) after the generation of distribution transforming power-off event, the critical electrical amount of platform area collector is carried out calling survey together in real time by main website, Whether determining table area has a power failure is caused by acquisition terminal failure.
The topological relation includes 10kV line topologicals relation and 0.4kV line topological relations;
10kV line topological relations:The each node of 10kV circuits includes node data, left child node pointer, right child node and referred to Pin;Node data include wire, distribution transformer parameter information;
0.4kV line topological relations:The each node of 0.4kV circuits includes node data, left child node pointer, right child node Pointer;Node data include wire, user parameter information.
It is described that the critical electrical amount of platform area collector is carried out calling survey together in real time by main website, if calling survey voltage, electric current, power together Factor is normal, then judges acquisition terminal failure;If it is abnormal to call survey voltage, electric current, power factor together, it is determined that other.
The beneficial effects of the invention are as follows a kind of distribution transforming stoppage in transit method for rapidly positioning of the invention can quickly determine distribution transforming failure Power failure section, is divided into main line power failure, branch line power failure, the power failure of platform area, acquisition terminal failure by distribution transforming power failure section, is stopped according to distribution transforming Fortune method for rapidly positioning greatly shortens the distribution transforming power failure lookup time.
Brief description of the drawings
Fig. 1 is the quick positioning flow figure of distribution transforming of the present invention stoppage in transit;
Fig. 2 is 10kV circuit connection diagrams;
Fig. 3 is 10kV circuit tree structure diagrams;
Fig. 4 is 0.4kV platforms area circuit connection diagram;
Fig. 5 is 0.4kV platforms area circuit tree structure diagram.
Embodiment
Fig. 1 show the quick positioning flow figure of distribution transforming stoppage in transit of the present invention.
Present invention specific implementation is as follows:
As shown in figure 1, distribution transforming is stopped transport, quick positioning step is as follows:
(1) distribution transforming stoppage in transit event occurs, and searches for the different branch line institute tape splicing distribution transforming fortune of same main line automatically by system first Row status switch, judges whether it is that main line has a power failureIf so, power failure of then serving as theme;If it is not, turning next step;
(2) searched for automatically by system and set up same branch line institute tape splicing distribution transforming running status sequence, judge whether it is branch line Have a power failureIf so, then having a power failure for branch line;If it is not, turning next step;
(3) low-voltage circuit user's electric data is surveyed by calling together in real time, the corresponding running process state of inspection desk area user is sentenced It is disconnected that whether platform area has a power failureIf so, Ze Weitai areas have a power failure;If it is not, turning next step;
(4) by calling scaffold tower area electric data together in real time, judge whether that platform area acquisition terminal is abnormalIf so, then acquisition terminal It is abnormal;If it is not, by determining other situations, and terminate flow.
A kind of distribution transforming stoppage in transit method for rapidly positioning embodiment of the present embodiment is as follows:
(1) building topology relation
Binary-tree coding is carried out to distribution, whole piece line basis data, distribution transforming power-off event are obtained from PMS2.0 systems Occur, set up "-main line-branch line-distribution transforming-user side of standing " topological relation, including same branch line fortune rapidly by inverting Market condition, adjacent legs platform area running situation, platform area low-voltage circuit running situation, acquisition terminal running situation, 10kV circuits and The contact of 0.4kV circuits is associated by the distribution transforming of platform area.
A) 10kV line topologicals relation
The each node of 10kV circuits includes node data, left child node pointer, right child node pointer, sees that formula 2 is represented, node Data include the parameter informations such as wire, distribution transformer, see that formula 1 is represented, whole topological relation such as Fig. 2 and Fig. 3.Fig. 2 is 10kV Circuit connection diagram;Fig. 3 is 10kV circuit tree structure diagrams.
Typedef struct BiTData10 { wire information;Distribution transformer information;Latitude and longitude information;……} (1)
typedef struct BiTNode10{BiTData bitdata;BiTNode*left;BiTNode*right;} (2)
B) 0.4kV line topologicals relation
The each node of 0.4kV circuits includes node data, left child node pointer, right child node pointer, sees that formula 4 is represented, ties Point data includes the parameter informations such as wire, user, sees that formula 3 is represented, whole topological relation such as Fig. 4 and Fig. 5.Fig. 4 is 0.4kV platforms area Circuit connection diagram;Fig. 5 is 0.4kV platforms area circuit tree structure diagram.
Typedef struct BiTData04 { wire information;Distribution transformer information;Latitude and longitude information;User believes Breath;……} (3)
typedef struct BiTNode04{BiTData bitdata;BiTNode*left;BiTNode*right;} (4)
(2) determine that main line has a power failure
Searched for automatically by system and set up the different branch line institute tape splicing distribution transforming running status sequences of same main line, such as same branch line 5 distribution transformings of tape splicing, corresponding running status sequence is [0 000 0], and 6 distribution transformings of adjacent legs tape splicing run shape accordingly State sequence is [0 0000 0], and quantity of state 0 has a power failure for distribution transforming, and quantity of state 1 is that distribution transforming is being transported, if two branch line distribution transformings have a power failure At 2 and more than, it is determined that main line has a power failure, if adjacent legs 1 and following distribution transforming are stopped transport, further determines that.
(3) determine that branch line has a power failure
Searched for automatically by system and set up same branch line institute tape splicing distribution transforming running status sequence, such as same branch line tape splicing 5 Distribution transforming, corresponding running status sequence is [0 000 0], and quantity of state 0 has a power failure for distribution transforming, and quantity of state 1 is that distribution transforming is being transported, if 2 When platform and above distribution transforming stoppage in transit, it is determined that have a power failure for branch line, only this distribution transforming transportation load is 0, remaining distribution transforming running status amount For 1, then further judged.
(4) determine that low voltage failure has a power failure
Low-voltage circuit user's electric data is surveyed by calling together in real time, 5 electric supply meter electrical quantity of survey are such as called together, if corresponding operation Status switch is [0 000 0], and quantity of state 0 has a power failure for user, and quantity of state 1 is that user does not have a power failure, if the family of user 2 and the above are stopped Electricity, then judge that platform area low-pressure side has a power failure and cause distribution transforming to be stopped transport, if user, which has a power failure, is less than or equal to 1 family, further judged.
(5) acquisition terminal failure is determined
By calling scaffold tower area electric data together in real time, such as call survey voltage, electric current, power factor together normally, then judge acquisition terminal Failure, if it is abnormal to call survey voltage, electric current, power factor together, it is determined that other.

Claims (3)

1. a kind of distribution transforming stoppage in transit method for rapidly positioning, it is characterised in that as follows the step of methods described:
(1)Corresponding Monitoring Data and basic data are obtained, "-main line-branch line-distribution transforming-user side of standing " topological relation is set up, Whether had a power failure by monitoring same branch line other area's distribution transformings, the different branch line platform area power-off conditions of same main line, final determining table Whether area has a power failure comes from high-pressure side power failure;
(2)After distribution transforming power-off event occurs, platform area key user intelligent meter data are carried out by main website to call survey, determining table together in real time Whether it is that low-voltage circuit power failure causes that area has a power failure;
(3)After the generation of distribution transforming power-off event, the critical electrical amount of platform area collector is carried out calling survey together in real time by main website, it is determined that Whether platform area has a power failure is caused by acquisition terminal failure.
2. a kind of distribution transforming stoppage in transit method for rapidly positioning according to claim 1, it is characterised in that the topological relation includes 10kV line topologicals relation and 0.4kV line topological relations;
10kV line topological relations:The each node of 10kV circuits includes node data, left child node pointer, right child node pointer; Node data include wire, distribution transformer parameter information;
0.4kV line topological relations:The each node of 0.4kV circuits includes node data, left child node pointer, right child node and referred to Pin;Node data include wire, user parameter information.
3. a kind of distribution transforming stoppage in transit method for rapidly positioning according to claim 1, it is characterised in that it is described by main website to platform The critical electrical amount of area's collector carries out calling survey together in real time, if calling survey voltage, electric current, power factor together normally, judges acquisition terminal Failure.
CN201710365755.5A 2017-05-23 2017-05-23 A kind of distribution transforming stoppage in transit method for rapidly positioning Pending CN107015121A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710365755.5A CN107015121A (en) 2017-05-23 2017-05-23 A kind of distribution transforming stoppage in transit method for rapidly positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710365755.5A CN107015121A (en) 2017-05-23 2017-05-23 A kind of distribution transforming stoppage in transit method for rapidly positioning

Publications (1)

Publication Number Publication Date
CN107015121A true CN107015121A (en) 2017-08-04

Family

ID=59449391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710365755.5A Pending CN107015121A (en) 2017-05-23 2017-05-23 A kind of distribution transforming stoppage in transit method for rapidly positioning

Country Status (1)

Country Link
CN (1) CN107015121A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108318782A (en) * 2018-01-29 2018-07-24 国网江苏省电力有限公司电力科学研究院 Distribution network failure domain identification method based on network topology Yu distribution transforming outage information
CN108695974A (en) * 2018-04-20 2018-10-23 国网宁夏电力有限公司吴忠供电公司 A method of 10 KV line basic routing lines of judgement have a power failure
CN109100675A (en) * 2018-06-12 2018-12-28 国网江西省电力有限公司南昌供电分公司 A kind of energy monitor method
CN110095694A (en) * 2019-05-30 2019-08-06 广东电网有限责任公司 A kind of area's low-voltage circuit monitors system
CN110146787A (en) * 2019-06-14 2019-08-20 国网江苏省电力有限公司常州供电分公司 Electrical power distribution network fault location method based on multi-source monitoring data
CN111813825A (en) * 2020-06-02 2020-10-23 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system
CN112766636A (en) * 2020-12-23 2021-05-07 国网河南省电力公司电力科学研究院 Distribution transformer power failure judgment method based on electric quantity information acquired by power consumption information acquisition terminal

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565572A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Platform and method for judging fault of match power grid
CN104655989A (en) * 2015-03-02 2015-05-27 国电南瑞科技股份有限公司 Smart meter collecting function based remote inspection method for power outage fields
CN105305393A (en) * 2015-10-21 2016-02-03 珠海许继芝电网自动化有限公司 Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN106228461A (en) * 2016-06-28 2016-12-14 国家电网公司 Low-voltage power supply reliability Accurate Analysis method and system based on Multi-data Source Mining
CN106600006A (en) * 2016-11-26 2017-04-26 国网安徽省电力公司宿州供电公司 Power failure monitoring system of 10 KV network topology structure and power failure determination method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565572A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Platform and method for judging fault of match power grid
CN104655989A (en) * 2015-03-02 2015-05-27 国电南瑞科技股份有限公司 Smart meter collecting function based remote inspection method for power outage fields
CN105305393A (en) * 2015-10-21 2016-02-03 珠海许继芝电网自动化有限公司 Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN106228461A (en) * 2016-06-28 2016-12-14 国家电网公司 Low-voltage power supply reliability Accurate Analysis method and system based on Multi-data Source Mining
CN106600006A (en) * 2016-11-26 2017-04-26 国网安徽省电力公司宿州供电公司 Power failure monitoring system of 10 KV network topology structure and power failure determination method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108318782A (en) * 2018-01-29 2018-07-24 国网江苏省电力有限公司电力科学研究院 Distribution network failure domain identification method based on network topology Yu distribution transforming outage information
CN108318782B (en) * 2018-01-29 2020-03-10 国网江苏省电力有限公司电力科学研究院 Power distribution network fault area identification method based on network topology and distribution transformer power failure information
CN108695974A (en) * 2018-04-20 2018-10-23 国网宁夏电力有限公司吴忠供电公司 A method of 10 KV line basic routing lines of judgement have a power failure
CN108695974B (en) * 2018-04-20 2021-05-28 国网宁夏电力有限公司吴忠供电公司 Method for judging power failure of 10 KV line trunk line
CN109100675A (en) * 2018-06-12 2018-12-28 国网江西省电力有限公司南昌供电分公司 A kind of energy monitor method
CN110095694A (en) * 2019-05-30 2019-08-06 广东电网有限责任公司 A kind of area's low-voltage circuit monitors system
CN110146787A (en) * 2019-06-14 2019-08-20 国网江苏省电力有限公司常州供电分公司 Electrical power distribution network fault location method based on multi-source monitoring data
CN111813825A (en) * 2020-06-02 2020-10-23 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system
CN111813825B (en) * 2020-06-02 2023-03-14 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system
CN112766636A (en) * 2020-12-23 2021-05-07 国网河南省电力公司电力科学研究院 Distribution transformer power failure judgment method based on electric quantity information acquired by power consumption information acquisition terminal
CN112766636B (en) * 2020-12-23 2022-11-15 国网河南省电力公司电力科学研究院 Distribution transformer power failure judgment method based on electric quantity information acquired by power consumption information acquisition terminal

Similar Documents

Publication Publication Date Title
CN107015121A (en) A kind of distribution transforming stoppage in transit method for rapidly positioning
CN110210095B (en) Power distribution network reliability index calculation method based on mixed integer linear programming
CN109188195A (en) A kind of distribution small current grounding fault localization method and system
CN108520370A (en) Based on the integrated alarm merger of main distribution net and source tracing method
CN106527394B (en) A kind of ECPS cascading failure methods of risk assessment considering multiple information factor
CN106918764B (en) Distribution network fault positioning method based on network-based matrix algorithm
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN111611662B (en) Reliability constraint power distribution network planning method based on feeder line corridor
CN113283041B (en) Power failure area rapid studying and judging method based on multi-source information fusion perception algorithm
CN102495850A (en) Method for splicing multi-stage multi-region interconnected power grid relay protection model
CN109687590A (en) A kind of be classified stops send a telegram in reply report method, system
CN104049178A (en) Fault locating method and system of active power distribution network
CN108711941A (en) Repair apparatus electriferous state detection method in a kind of power distribution network
CN103675520B (en) Remote analysis method for determining leakage protector faults and AC contactor obstruction or faults
CN112421615A (en) Power distribution station self-healing control method and system based on intelligent breaker action
CN115639441A (en) Method for detecting insulation fault of power distribution circuit of fire emergency lighting and evacuation indicating system
CN102043113A (en) Method for locating single phase ground fault locating system
CN104201766B (en) The method determining prepared auto restart sequential and combination is followed the trail of based on power supply point
CN112731062B (en) Method for diagnosing low-voltage user power failure by utilizing telecommunication terminal equipment
CN208112331U (en) A kind of 10kV pole type transformer monitoring system
CN109460896A (en) A kind of power grid 110kV route N-1 risk automatically scanning analysis method
CN108594076A (en) A kind of power distribution network power-off fault analysis method
CN104597899A (en) Technical performance test platform of distribution automation device
CN104124749B (en) The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation
Walliyamethee et al. Maintenance scheduling of distribution reclosers using rcm techniques

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication