CN104124749B - The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation - Google Patents

The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation Download PDF

Info

Publication number
CN104124749B
CN104124749B CN201410342267.9A CN201410342267A CN104124749B CN 104124749 B CN104124749 B CN 104124749B CN 201410342267 A CN201410342267 A CN 201410342267A CN 104124749 B CN104124749 B CN 104124749B
Authority
CN
China
Prior art keywords
auto restart
prepared auto
power supply
dual
ring network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410342267.9A
Other languages
Chinese (zh)
Other versions
CN104124749A (en
Inventor
刘健
顾建炜
张小庆
苏毅方
赵树仁
郑伟彦
张志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410342267.9A priority Critical patent/CN104124749B/en
Publication of CN104124749A publication Critical patent/CN104124749A/en
Application granted granted Critical
Publication of CN104124749B publication Critical patent/CN104124749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Small-Scale Networks (AREA)

Abstract

The present invention relates to the dual-ring network distribution line failure processing method that a kind of prepared auto restart coordinates with power distribution automation, by by prepared auto restart troubleshooting and distribution network automated coordinating, after breaking down, first utilize prepared auto restart quick action, the advantage of reliable in action, the power supply of fast quick-recovery to dead electricity load; Recycle afterwards centralized intelligence power distribution automation and carry out Correction and Control, based on global information, troubleshooting result is optimized to adjustment, and process failed in the situation that and can also generate the scheme of remedying at prepared auto restart, make up the only limitation based on local information of backup auto-activating device. The method can meet the requirement of dual-ring network distribution line failure processing well, improves its troubleshooting performance and power supply reliability.

Description

The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation
Technical field
The present invention relates to the troubleshooting field of power distribution network, particularly a kind of prepared auto restart (full name: inlet wire automatic throw-in equipment for subsequent use)The dual-ring network distribution line failure processing method coordinating with power distribution automation.
Background technology
In order to meet the requirement of high power supply reliability, carry out in a large number and ground from aspects such as Distribution Network Frame, electrical equipment and automatic technologiesStudy carefully work.
Power distribution automation is to realize fault fast positioning, isolation and service restoration, thereby improves the important means of power supply reliability,Obtain in recent years a large amount of achievements in research. But, for the exigent urban core of power supply reliability region, for mostAmount reduces the coverage of fault outage, thereby improves power supply reliability, needs the segments of division often more on circuit, and realOn the circuit of border, often do not possess the condition of the distribution terminal that sufficient amount is installed.
Zhejiang Electric Power Company is using for reference international advanced experience, and bases oneself upon on the basis of self rack, taking dual-ring network circuit as backbone networkFrame, has proposed " three pairs " Connection Mode of " dual power supply, double-circuit, two access ", and is that each user's distribution transforming is equipped with inlet wireBackup auto-activating device, distribution transforming can automatically switch to stand-by power supply and restore electricity in the time of main power supply fault, and the fault outage time is short (onlyFor the time of prepared auto restart action), processing logic simply and not relies on communication port and main website, therefore more reliable compared with power distribution automation.Troubleshooting and the repair process of upper level power supply (comprising transformer station, switching station, main cable, power distribution room inlet wire cable etc.) can notAffect customer power supply, can reach in theory very high power supply reliability.
But Zhejiang company also finds, only relies on " three pairs " wiring faults processing of prepared auto restart on the spot in actual applicationMode also exists some problems, and main manifestations is:
(1) distribution transforming backup auto-activating device lacks monitoring in real time, and distribution scheduling cannot be grasped on off state, for a certain load is actuallyBy main for line powering or available line powering, fault recovery afterload whether switch return main for circuit from administrative staff to operationPersonnel are unclear;
(2) prepared auto restart itself belongs to distributed intelligence character, can not the actual load situation based on global information and circuit carry out excellentChange fault recovery;
(3) layouted by electric substation and outgoing line interval limits, summer, line load still likely cannot meet N-1 when peak of power consumption,If do not consider extension wire loading condition when switching, probably cause another circuit overload tripping operation, cause two loop line roads all to have a power failure.Allow to meet N-1, but occurring, under the situation of N-2 fault, also likely to cause the extension of troubleshooting.
Summary of the invention
The dual-ring network distribution line failure processing method that the object of the present invention is to provide a kind of prepared auto restart to coordinate with power distribution automation, withSolve the existing defect of existing dual-ring network circuit backup power automatic switching troubleshooting mode, reliable to give full play to the high power supply of " three pairs " wiringThe advantage of property, improves its troubleshooting performance.
To achieve these goals, the present invention adopts following technical scheme:
The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation, comprises the following steps:
(1) each user's distribution transforming is all respectively got 1 road power supply from two circuits of dual-ring network, and for each user's distribution transforming be equipped with intoLine backup auto-activating device;
(2) Cooperation with Relay of backup auto-activating device and transformer station's wire-outgoing breaker on the spot, protects in transformer station's wire-outgoing breaker relayProtect and move tripping operation because of line failure or overload, and after reclosing failure, fast the distribution transforming on faulty line is transferred to twoOn the other circuit of looped network, recover the power supply to load;
(3) electrical power distribution automatization system carries out Correction and Control and optimizes and revises troubleshooting result based on global information: send out if checkNow also have because of the not residual not recoverable load of power supply of action reason of prepared auto restart, carry out Correction and Control by remote control and recover itPower supply; Break down again if turn the feeder line of on-load by prepared auto restart, electrical power distribution automatization system is optimized adjustment in conjunction with global information,And carry out the strategy generating by remote control, recover to greatest extent strong region-wide power supply;
(4) after fault restoration, carry out by manually starting electrical power distribution automatization system the control of returning to normal operating mode after fault restoration.
Preferably, in step (1), for overhead transmission line, prepared auto restart handoff delay set of time is greater than single shot reclosing delay time,For the overhead transmission line of distribution-free formula power supply, be set to 1-2s; For the overhead transmission line containing distributed power source, be set to 3.5-4.5s;For cable run, handoff delay set of time is 0.5-1s.
Preferably, prepared auto restart must take remote control or the manual operation just can be from the former master of stand-by power supply switchback after action in step (2)Power supply source.
Compared with the prior art, advantage of the present invention is: (1) prepared auto restart arranges short time delay, the power supply of fast quick-recovery to dead electricity load,Power supply reliability is high; (2) power distribution automation carries out Correction and Control, due to can be based on global information, and therefore zmodem, andCan further optimize fault recovery structure.
Brief description of the drawings
Fig. 1 a to Fig. 1 d is that prepared auto restart coordinates dual-ring network distribution line failure processing procedure schematic diagram with power distribution automation; Wherein, figure1a is the dual-ring network conspectus that is equipped with prepared auto restart; Fig. 1 b be equipped with in the dual-ring network circuit of prepared auto restart, on a circuit, occur thereforeAfter barrier, prepared auto restart completes the schematic diagram of load transfer fast; Fig. 1 c is equipped with in the dual-ring network circuit of prepared auto restart another circuit againBreak down, the schematic diagram that causes two circuits all to have a power failure; Fig. 1 d is that centralized intelligence power distribution automation carries out after Correction and ControlFault recovery result schematic diagram.
In figure: represent transformer station's outlet switch of "on" position with ■, represents transformer station's outlet switch of gate-dividing state ,/generationThe feeder switch of table "on" position, the feeder switch of × expression gate-dividing state,The load that represents normal power supply, △ represents mistakeThe load of electricity.
Detailed description of the invention
Below with reference to specific embodiment, the content of invention is described further.
Refer to shown in Fig. 1 a to Fig. 1 d the dual-ring network distribution line failure place that a kind of prepared auto restart of the present invention coordinates with power distribution automationReason method, comprises the following steps:
(1) each user's distribution transforming is all respectively got 1 road power supply from two circuits of dual-ring network, and for each user's distribution transforming be equipped with intoLine backup auto-activating device; For overhead transmission line, prepared auto restart handoff delay set of time is greater than single shot reclosing delay time, for nothing pointThe overhead transmission line of cloth formula power supply, is set to 1-2s; For the overhead transmission line containing distributed power source, be set to 3.5-4.5s; ForCable run, handoff delay set of time is 0.5-1s.
(2) Cooperation with Relay of backup auto-activating device and transformer station's wire-outgoing breaker on the spot, protects in transformer station's wire-outgoing breaker relayProtect and move tripping operation because of line failure or overload, and after reclosing failure, fast the distribution transforming on faulty line is transferred to separatelyOn an outer circuit, recover the power supply to load, and prepared auto restart must take after action remote control or the manual operation just can be from electricity for subsequent useThe former main power supply of source switchback.
(3) electrical power distribution automatization system carries out Correction and Control and optimizes and revises troubleshooting result based on global information: send out if checkNow also have because of the not residual not recoverable load of power supply of action reason of prepared auto restart, carry out Correction and Control by remote control and recover itPower supply; Break down again if turn the feeder line of on-load by prepared auto restart, electrical power distribution automatization system is optimized adjustment in conjunction with global information,And carry out the strategy generating by remote control, recover to greatest extent strong region-wide power supply.
(4) after fault restoration, carry out by manually starting electrical power distribution automatization system the control of returning to normal operating mode after fault restoration.
One, troubleshooting when N-1
As shown in Fig. 1 (b), after arbitrary feeder line breaks down, backup auto-activating device is cut whole distribution transformings on this circuit rapidly on the spotChange on another extension wire, fast its power supply of quick-recovery. Electrical power distribution automatization system is opened according to fault message and the prepared auto restart collectedWhether off status, also have the not recoverable load of power supply former thereby residual because of prepared auto restart tripping from overall angle inspection, finds instituteLose electric load and restore electricity, do not need to carry out Correction and Control, fault recovery result is as shown in Fig. 1 (b).
Two, under N-1 condition, there is again another processing of place when fault
As shown in Fig. 1 (c), when load switching is arrived another loop line Lu Shanghou by prepared auto restart, if this circuit breaks down again, can leadCause by prepared auto restart each other two circuits for subsequent use have a power failure simultaneously, if not in conjunction with power distribution automation, only rely on prepared auto restart on the spot,Final result is exactly that two loads on circuit all cannot restore electricity, after power distribution automation, and can be automatic by distributionChange system is carried out Correction and Control, recovers to greatest extent strong region-wide power supply, and fault recovery result is as shown in Fig. 1 (d).

Claims (2)

1. the dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation, is characterized in that, comprise withLower step:
(1) each user's distribution transforming is all respectively got 1 road power supply from two circuits of dual-ring network, and for each user's distribution transforming be equipped with intoLine backup auto-activating device;
(2) Cooperation with Relay of backup auto-activating device and transformer station's wire-outgoing breaker on the spot, protects in transformer station's wire-outgoing breaker relayProtect and move tripping operation because of line failure or overload, and after reclosing failure, fast the distribution transforming on faulty line is transferred to twoOn the other circuit of looped network, recover the power supply to load;
(3) electrical power distribution automatization system carries out Correction and Control and optimizes and revises troubleshooting result based on global information: send out if checkNow also have because of the not residual not recoverable load of power supply of action reason of prepared auto restart, carry out Correction and Control by remote control and recover itPower supply; Break down again if turn the feeder line of on-load by prepared auto restart, electrical power distribution automatization system is optimized adjustment in conjunction with global information,And carry out the strategy generating by remote control, recover to greatest extent strong region-wide power supply;
(4) after fault restoration, carry out by manually starting electrical power distribution automatization system the control of returning to normal operating mode after fault restoration;
In step (1), for overhead transmission line, prepared auto restart handoff delay set of time is greater than single shot reclosing delay time, for nothingThe overhead transmission line of distributed power source, is set to 1-2s; For the overhead transmission line containing distributed power source, be set to 3.5-4.5s; ForCable run, handoff delay set of time is 0.5-1s.
2. method according to claim 1, is characterized in that, in step (2), prepared auto restart must be taked remote control after actionOr manual operation is from the former main power supply of stand-by power supply switchback.
CN201410342267.9A 2014-07-17 2014-07-17 The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation Active CN104124749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410342267.9A CN104124749B (en) 2014-07-17 2014-07-17 The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410342267.9A CN104124749B (en) 2014-07-17 2014-07-17 The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation

Publications (2)

Publication Number Publication Date
CN104124749A CN104124749A (en) 2014-10-29
CN104124749B true CN104124749B (en) 2016-05-11

Family

ID=51770060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410342267.9A Active CN104124749B (en) 2014-07-17 2014-07-17 The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation

Country Status (1)

Country Link
CN (1) CN104124749B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786421A (en) * 2016-12-28 2017-05-31 国网上海市电力公司 Relay protection scheme system and the control method handed in hand based on 110KV under powering mode
CN106849328B (en) * 2017-01-20 2019-05-17 上海交通大学 Multi-voltage grade power distribution network automatic change-over device of emergency adaptive configuring method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545797A (en) * 2013-10-10 2014-01-29 国家电网公司 Distribution network area protecting and self-healing system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545797A (en) * 2013-10-10 2014-01-29 国家电网公司 Distribution network area protecting and self-healing system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Reliability Worth Assessment of an Automatic Loop Restoration Scheme for Urban Distribution Networks;Kazemi,S. Lehtonen,M. Fotuhi-Firuzabad,M.;《Innovative Smart Grid Technologies Conference Europe (ISGT Europe),2010 IEEE PES 》;20101013;1-8 *
智能配电网馈线自动化发展及展望;张敏,崔琪,吴斌;《电网与清洁能源》;20100430;第26卷(第4期);41-43,51 *
王莉,张予鄂,王娟,杨光,张建安,司瑞芹.电网中备用电源自投装置的安全应用.《电力系统保护与控制》.2010,第38卷(第20期),225-227,231. *
配电网模式化故障处理方法研究;刘健,张志华,张小庆,赵树仁,宋晓林;《电网技术》;20111130;第35卷(第11期);101-102 *

Also Published As

Publication number Publication date
CN104124749A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
WO2021139071A1 (en) Smart outdoor switch cabinet, and closed-loop i-shaped power distribution network for same
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN103840439A (en) Power distribution automation protecting method achieved by matching of master station and distributed terminals
CN106026088B (en) Distribution network automated strategy based on the transfer of load layering and zoning
CN109818410A (en) A kind of rapidly self-healing method of urban track traffic ac power supply system
CN104578386A (en) Automatic bus transfer circuit and method for transformer low-voltage side section breakers
CN203368127U (en) Spare power automatic switching control equipment for transformer substation network
CN106786418A (en) A kind of relay protection scheme system for being used to get in touch between 10 kilovolts of switchyard stations
CN110912253B (en) Low-voltage intelligent spare power automatic switching system
CN104124749B (en) The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation
CN201160223Y (en) Multi-ring website system
CN101860075A (en) Three-power supply automatic switching device
CN101707397A (en) Auto-switch-on system on basis of power grid dispatching and implementation method thereof
CN110783915A (en) Multi-distribution-platform-area power supply method and power supply system
CN103457350A (en) Automatic throw-in equipment of emergency power supply
CN102694419A (en) Management system for integrated test and control
CN111786383B (en) Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines
CN105703478A (en) Electrical power distribution terminal system
CN201690273U (en) Automatic management system for power matching network
CN102738896A (en) HP-9000 type switching station fault treatment system
CN105449835A (en) Regional spare power automatic switch method
CN101820184B (en) Communication power supply system
TWI591933B (en) Apparatus for fast and automatic electric power distribution of distributed generation with feeder load transfer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant