CN109818410A CN201711163712.5A CN201711163712A CN109818410A CN 109818410 A CN109818410 A CN 109818410A CN 201711163712 A CN201711163712 A CN 201711163712A CN 109818410 A CN109818410 A CN 109818410A
Authority
CN
China
Prior art keywords
power supply
supply system
looped network
switch
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711163712.5A
Other languages
Chinese (zh)
Inventor
刘永生
侯炜
魏巍
陈俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201711163712.5A priority Critical patent/CN109818410A/en
Publication of CN109818410A publication Critical patent/CN109818410A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of rapidly self-healing methods of urban track traffic ac power supply system, after failure occurs, can issue shunt tripping order to the protective device of its looped network cable opposite side while inlet-outlet line switching protective device acts;The protective device for receiving the shunt tripping order of looped network cable opposite side issues trip signal to this switch first; after switching tripping; receive looped network opposite side shunt tripping signal protective device can backup auto-activating device into station issue prepared auto restart enabling signal; meet from the condition of throwing; backup auto-activating device can act; and then bus connection switch is closed, so that fault point junior transformer substation system restores rapidly, ac power supply system continues to operate normally.In such a way that looped network opposite side shunt tripping signal triggers the starting of junior's transformer substation spare power automatic switching, so that this method has stronger adaptivity, it is not only adapted to the different operating condition of ac power supply system, but also the system self-healing under different faults type can be completed.

Description

A kind of rapidly self-healing method of urban track traffic ac power supply system
Technical field
The present invention relates to urban track traffic ac power supply system relay protection fields, hand over more particularly to a kind of city rail The rapidly self-healing method of logical ac power supply system.
Background technique
Urban track traffic ac power supply system provides required electric energy for the normal operation of urban track traffic.Once city Prolonged power failure occurs in city's rail transportation operation service process, not only results in the paralysis of urban track traffic transport Paralysis, or even the safety of passenger survival can be jeopardized and cause the loss of property.Therefore, the rapidly self-healing of post-fault system can have The coverage of the reduction accident of effect, and reduce the loss caused by it.
Urban track traffic ac power supply system is made of multiple power supply zones, and each power supply zone is supplied using single-side power The multi-Substation ring string structure of electricity, different power supply zones can realize that mutual support is supplied by interconnection switch and link cable Electricity.Therefore, each power supply zone has normal power supply and supports both power supply modes of powering, as shown in Figure 1.
Currently, there are two types of common self-healing methods for urban track traffic ac power supply system: differential starting spare power automatic switching method Start spare power automatic switching method with decompression.Since the Huan Chuan substation quantity of power supply system is more, looped network cable is longer, and looped network electricity Cable is laid among the environment of underground humidity more, and the probability that ring network fault occurs for AC system is larger.For These characteristics, mostly The urban transportation in number city uses the self-healing method of differential protection action launching prepared auto restart, i.e. event occurs for looped network cable After barrier, backup power automatic switching protection device in differential protection movement while initiating station.Although the event of looped network cable may be implemented in this method The rapidly self-healing of ac power supply system after barrier, but after bus-bar fault occurs, differential protection can not be acted, and be stood interior from throwing dress Setting just can not be activated, cause substation and substation, junior power loss, power supply system can not self-healings.
In view of problem above, the city rail ac power supply system in some places starts the self-healing side of prepared auto restart using decompression Method, i.e., after certain section of bus loss of pressure in station, the incoming breaker where backup auto-activating device to decompression bus issues trip signal, into After line breaker tripping, backup auto-activating device issues switching signal to bus connection switch, completes restoring electricity for system.Although this method It can solve the system self-healing under polymorphic type failure, however decompression starting prepared auto restart has certain limitation.Firstly, since losing Pressure starting spare power automatic switching method wants the incoming switch of first tripping decompression bus, it is therefore desirable to the incoming switch of preparatory clear bus.And When the method for operation changes, after system load flow changes, disengaging wiretap changes, and the method is just no longer applicable in.By This, decompression starting prepared auto restart may be only available for a kind of method of operation.Secondly as the substation in power supply zone is to pass through cable Together, when some station, interior bus loss of pressure will cause the bus while decompression of its substation, junior to ring string, therefore in different stations Decompression prepared auto restart need by the time it is differential cooperated, to prevent the decompression prepared auto restart in multiple substations from moving at the same time.Root From the point of view of experience according to domestic certain routes, decompression is differential usually all in 2s or more from the time thrown between adjacent substations, in this way Power supply zone a fairly large number of for ring string, substation's self-healing delay closer to power supply zone end are then longer.
Summary of the invention
The purpose of the present invention is to provide a kind of rapidly self-healing method of urban track traffic ac power supply system, with reality Existing fast quick-recovery of the urban track traffic ac power supply system under different types of faults and the different methods of operation.
In order to achieve the above objectives, the present invention uses following solution:
A kind of rapidly self-healing method of urban track traffic ac power supply system, includes the following steps:
(1) after ac power supply system failure occurs, urban track traffic ac power supply system passes in and out the protection of wiretap After device action, the protective device switched to its looped network cable opposite side issues shunt tripping signal;
(2) it after the protective device of looped network opposite side switch receives shunt tripping signal, is first switched to it and issues trip signal, wait open Close tripping after, then into station bus connection switch backup auto-activating device issue prepared auto restart start command;
(3) backup auto-activating device of bus connection switch receives prepared auto restart enabling signal in standing, and after meeting from the condition of throwing, it is standby from It throws device and issues order of closing a floodgate to bus connection switch through short be delayed.
Further, in the step (3), the backup auto-activating device of each substation can set unified delay time.
Further, in above-mentioned steps (1), when looped network cable breaks down, the protective device of looped network outlet switch is acted, Tripping outlet switch is by failure removal;While outlet switch protection act, issued to the switch protection of its looped network cable opposite side Shunt tripping signal, fault point is isolated, and provides trigger condition for the system self-healing after ring network fault.
Further, in above-mentioned steps (1), when bus breaks down in substation, the protection of fault bus incoming switch Device action, and shunt tripping order is issued to the outlet switch protective device of same bus, realize the excision and isolation of failure;Failure is female While the inlet-outlet line protection act of line, shunt tripping order is issued to its looped network cable opposite side switch protection respectively, realizes failure It is completely isolated, and trigger condition is provided for the system self-healing after bus-bar fault.
Method
After adopting the above method, the beneficial effects of the present invention are: bus-bar fault or ring network fault no matter occurs, looped network into While outlet protection act, the protective device that can switch to its looped network opposite side issues shunt tripping order, effectively completes failure It is complete excision and isolation, provide advantageous condition for the self-healing after power supply system failure, and provide touching for the movement of prepared auto restart Hair factor.Receive looped network shunt tripping signal protective device detect switch tripping after, immediately to bus connection switch backup auto-activating device Issue prepared auto restart enabling signal.After meeting from the condition thrown, backup auto-activating device, which can act, closes bus connection switch.Each station Between prepared auto restart action delay due to without cooperate, the rapidly self-healing of feasible system.The method of the present invention due to The system self-healing under different faults and the different methods of operation may be implemented, therefore there is stronger adaptive ability.
Detailed description of the invention
Fig. 1 is urban track traffic ac power supply system normal power supply mode;
Fig. 2 is that urban track traffic ac power supply system supports power supply mode;
Fig. 3 is the generation logic chart of the prepared auto restart enabling signal of the embodiment of the present invention;In figure, a- receives looped network opposite side connection Signal is jumped, b- switchs quartile, c- AND gate operation logic by shunt tripping;
Fig. 4 is the logic chart of the prepared auto restart movement of the embodiment of the present invention;In figure, mother's a-I prepared auto restart condition meets, and b-I is female Inlet wire prepared auto restart enabling signal, mother's c-I outlet prepared auto restart enabling signal, mother's d-II inlet wire prepared auto restart enabling signal, mother e-II go out Line prepared auto restart enabling signal, mother's f-II prepared auto restart condition meet, g- AND gate operation logic, h- OR-gate operation logic, and i- is standby From throwing action delay.
Specific embodiment
Below with reference to attached drawing 1 to 4, technical method of the invention is described in detail.
The present invention provides a kind of rapidly self-healing method of urban track traffic ac power supply system, includes the following steps:
(1) after the protective device movement of urban track traffic ac power supply system disengaging wiretap, to its looped network cable pair The protective device of side switch issues shunt tripping signal;
(2) it after the protective device of looped network opposite side switch receives shunt tripping signal, is first switched to it and issues trip signal, wait open Close tripping after, then into station bus connection switch backup auto-activating device issue prepared auto restart start command;
(3) backup auto-activating device of bus connection switch receives prepared auto restart enabling signal in standing, and after meeting from the condition of throwing, it is standby from It throws device and issues order of closing a floodgate to bus connection switch through short be delayed.
The protective device movement of disengaging wiretap of the present invention described in detail below.Urban track traffic Alternating Current Power Supply There are mainly three types of fault type, that is, ring network fault, bus-bar fault and feeder faults for system.Wherein, when feeder fault generation, feedback After wiretap tripping, ac power supply system can restore to operate normally.And after bus-bar fault or ring network fault occurs, due to For ac power supply system using single-side power power supply multi-Substation ring string structure, the tripping for passing in and out wiretap will lead to fault point All substations, junior while decompression.Therefore, the self-healing method of urban track traffic ac power supply system is mainly for looped network event System after the movement of the fast quick-recovery of power supply after barrier and bus-bar fault, i.e. inlet-outlet line switching protective device is restored.
The protective device of the present invention switched to its looped network opposite side issues shunt tripping signal.It is opened up in view of ac power supply system The characteristics of flutterring structure, when looped network cable two sides switch wherein side tripping, substation, junior can power loss.In this way, failure occurs Tripping will not only expand scope of power outage while the breaker of looped network cable two sides afterwards, but also can more effectively carry out to fault point Isolation.
Of the present invention from throwing condition includes that backup auto-activating device function investment, isolation switch be in closing position and former The conditions such as bus loss of pressure in station caused by barrier.According to self-healing method proposed by the present invention, after looped network cable breaks down, failure The incoming relay-protection device of point substation, junior receives the shunt tripping signal issued from looped network cable opposite side, just opens after switching tripping Backup auto-activating device in dynamic station.After failure removal, fault point junior substation power loss side bus can not restore, and prepared auto restart acts item Part meets, and the interior bus connection switch in station is closed in prepared auto restart movement, so that subordinate station service restoration.When bus-bar fault occurs, failure The outlet of point higher level substation and the inlet wire of substation, junior can receive the shunt tripping issued from looped network cable opposite side Signal also can star the backup auto-activating device in respectively standing after switching tripping respectively.After failure removal, fault point higher level substation Decompression side bus restores normal, and prepared auto restart operation condition is unsatisfactory for, and prepared auto restart is failure to actuate;Fault point junior substation power loss side is female Line can not restore, and prepared auto restart operation condition meets, and the interior bus connection switch in station is closed in prepared auto restart movement, and the power supply for completing subordinate station is extensive It is multiple.
In order to illustrate self-healing method of the present invention, following reality is now enumerated according to urban track traffic ac power supply system Example is applied, but Feeding System of Urban Rail Transit structure is only used as a kind of way of realization of inventive concept, for similar Power supply system structure, the present invention are equally applicable.Under two kinds of methods of operation, this self-healing method is analyzed as follows:
1) the K1 point in Fig. 1 breaks down, and the protective devices of 304 switches issue trip signals, and to looped network cable opposite side 402 switch protections issue shunt tripping order, realize fault point it is correct excision and be isolated;After 402 switch trippings, 402 switches Protective device issues enabling signal to the backup auto-activating device of 400 switches, after prepared auto restart condition satisfaction, closes 400 switches, realizes The recovery of power supply system;
2) the K2 point in Fig. 1 breaks down, and the protective device of 402 switches issues trip signal, and 404 to same bus are opened The protective device of pass issues shunt tripping signal;While 402 switches and 404 switch motion, respectively to the 304 of its looped network cable opposite side Switch and 502 switch protections issue shunt tripping order, realize the completely isolated of fault point;After 502 switch trippings, 502 switches Protective device issues enabling signal to the backup auto-activating device of 500 switches, after prepared auto restart condition satisfaction, closes 500 switches, completes Fault point substation, junior restores electricity;
3) the K1 point in Fig. 2 breaks down, and the protective devices of 402 switches issue trip signals, and to looped network cable opposite side 304 switch protections issue shunt tripping order, realize fault point it is correct excision and be isolated;After 304 switch trippings, 304 switches Protective device issues enabling signal to the backup auto-activating device of 300 switches, after prepared auto restart condition satisfaction, closes 300 switches, realizes The recovery of power supply system;
4) the K2 point in Fig. 2 breaks down, and the protective device of 404 switches issues trip signal, and 402 to same bus are opened The protective device of pass issues shunt tripping signal;While 402 switches and 404 switch motion, respectively to the 304 of its looped network cable opposite side Switch and 502 switch protections issue shunt tripping order, realize the completely isolated of fault point;After 304 switch trippings, 304 switches Protective device issues enabling signal to the backup auto-activating device of 300 switches, after prepared auto restart condition satisfaction, closes 300 switches, completes Fault point substation, junior restores electricity;
The above examples only illustrate the technical idea of the present invention, and this does not limit the scope of protection of the present invention, this guarantor The on-off models such as enabling signal of shunt tripping signal, backup auto-activating device between standing in maintaining method and in station can by GOOSE network, Hardwire, communication network or additional device transmit.Prepared auto restart enabling signal both can be as described in this patent by by shunt tripping Protective device can also be judged to generate to generate by mother backup auto-activating device or other devices.It is all to be proposed according to the present invention Technical idea, any change done on the basis of technical method falls within the scope of the present invention.

Claims (4)

1. a kind of rapidly self-healing method of urban track traffic ac power supply system, it is characterised in that include the following steps:
(1) when ac power supply system failure occurs, urban track traffic ac power supply system passes in and out the protective device of wiretap After movement, the protective device switched to its looped network cable opposite side issues shunt tripping signal;
(2) it after the protective device of looped network cable opposite side switch receives shunt tripping signal, is first switched to it and issues trip signal, wait open Close tripping after, then into station bus connection switch backup auto-activating device issue prepared auto restart start command;
(3) backup auto-activating device of bus connection switch receives prepared auto restart enabling signal in standing, and meet setting from after throwing condition, it is standby Delay of the automatic bus by setting issues order of closing a floodgate to bus connection switch.
2. a kind of rapidly self-healing method of urban track traffic ac power supply system as described in claim 1, it is characterised in that: In the step (3), the backup auto-activating device of each substation sets unified delay time.
3. a kind of rapidly self-healing method of urban track traffic ac power supply system as claimed in claim 1 or 2, feature exist In: in the step (1), when the ac power supply system failure is that looped network cable breaks down, the protection of looped network outlet switch Device action, tripping outlet switch is by failure removal;While outlet switch protection act, to the switch of its looped network cable opposite side Protection issues shunt tripping signal, fault point is isolated, and provide trigger condition for the system self-healing after ring network fault.
4. a kind of rapidly self-healing method of urban track traffic ac power supply system as claimed in claim 1 or 2, feature exist In: in the step (1), when the ac power supply system failure is that bus breaks down in substation, fault bus inlet wire is opened The protective device of pass acts, and issues shunt tripping order to the outlet switch protective device of same bus, realize failure excision and every From;While the inlet-outlet line protection act of fault bus, shunt tripping order is issued to its looped network cable opposite side switch protection respectively, it is real Now failure is completely isolated, and provides trigger condition for the system self-healing after bus-bar fault.
CN201711163712.5A 2017-11-21 2017-11-21 A kind of rapidly self-healing method of urban track traffic ac power supply system Withdrawn CN109818410A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711163712.5A CN109818410A (en) 2017-11-21 2017-11-21 A kind of rapidly self-healing method of urban track traffic ac power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711163712.5A CN109818410A (en) 2017-11-21 2017-11-21 A kind of rapidly self-healing method of urban track traffic ac power supply system

Publications (1)

Publication Number Publication Date
CN109818410A true CN109818410A (en) 2019-05-28

Family

ID=66598255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711163712.5A Withdrawn CN109818410A (en) 2017-11-21 2017-11-21 A kind of rapidly self-healing method of urban track traffic ac power supply system

Country Status (1)

Country Link
CN (1) CN109818410A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110364996A (en) * 2019-07-24 2019-10-22 国家电网有限公司 Improve the protective device of station service power supply reliability
CN111934288A (en) * 2020-07-09 2020-11-13 深圳供电局有限公司 110kV line protection wiring structure and backup power automatic switching starting method thereof
CN112260272A (en) * 2020-10-12 2021-01-22 许继电气股份有限公司 Coal mine fault isolation automatic recovery power supply method
CN112383033A (en) * 2020-10-10 2021-02-19 国网辽宁省电力有限公司电力科学研究院 System and method suitable for local rapid spare power automatic switching of power distribution network ring network line
CN113972653A (en) * 2021-11-01 2022-01-25 国网北京市电力公司 Electric network net rack
CN114243887A (en) * 2021-12-23 2022-03-25 天津凯发电气股份有限公司 Bus-tie spare power automatic switching method for urban rail transit intelligent transformer substation
CN118199057A (en) * 2024-04-30 2024-06-14 中国能源建设集团安徽省电力设计院有限公司 System for switching small power supply of regional power grid in cooperation with spare power automatic switching device and control method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110364996A (en) * 2019-07-24 2019-10-22 国家电网有限公司 Improve the protective device of station service power supply reliability
CN110364996B (en) * 2019-07-24 2021-08-20 国家电网有限公司 Protection device for improving service power supply reliability
CN111934288A (en) * 2020-07-09 2020-11-13 深圳供电局有限公司 110kV line protection wiring structure and backup power automatic switching starting method thereof
CN111934288B (en) * 2020-07-09 2022-09-02 深圳供电局有限公司 110kV line protection wiring structure and backup power automatic switching starting method thereof
CN112383033A (en) * 2020-10-10 2021-02-19 国网辽宁省电力有限公司电力科学研究院 System and method suitable for local rapid spare power automatic switching of power distribution network ring network line
CN112260272A (en) * 2020-10-12 2021-01-22 许继电气股份有限公司 Coal mine fault isolation automatic recovery power supply method
CN113972653A (en) * 2021-11-01 2022-01-25 国网北京市电力公司 Electric network net rack
CN113972653B (en) * 2021-11-01 2024-04-26 国网北京市电力公司 Grid rack
CN114243887A (en) * 2021-12-23 2022-03-25 天津凯发电气股份有限公司 Bus-tie spare power automatic switching method for urban rail transit intelligent transformer substation
CN114243887B (en) * 2021-12-23 2024-03-29 天津凯发电气股份有限公司 Method for bus-tie spare power automatic switching of intelligent substation for urban rail transit
CN118199057A (en) * 2024-04-30 2024-06-14 中国能源建设集团安徽省电力设计院有限公司 System for switching small power supply of regional power grid in cooperation with spare power automatic switching device and control method

Similar Documents

Publication Publication Date Title
CN109818410A (en) A kind of rapidly self-healing method of urban track traffic ac power supply system
CN101369739B (en) Spare power automatic switching device and method for three-segment bus two-segment switch
CN102790383B (en) Automatic rapid protection control method of novel feeder
CN103904626B (en) Distribution network failure automatic decision and control method that a kind of ring main unit is powered
CN106300285A (en) It is independent of the self adaptation type feeder automation fault handling method on the spot of network topology
CN205319792U (en) Double power source switch circuit and double power source switch system
CN105024361A (en) On-site feeder automatic protection method and application thereof
WO2014201989A1 (en) Distributed intelligence feeder line automated control method
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN112165090A (en) Cooperative self-healing system and method
US10951034B2 (en) Protection for an HVDC network
CN102738777A (en) Rapid distribution network fault self-recovery method based on generic object oriented substation event (GOOSE) message
CN102624088A (en) Method for controlling fault self-recovery of power distribution switching station
CN109245101A (en) The method for promoting statements based on collusion substation's power supply reliability
CN108011360B (en) Double loop round and round quickly unlinks method
CN102332710A (en) High-performance voltage timelike distribution automation terminal
CN107611946A (en) A kind of full killer switch feeder fault control method
CN103280880B (en) Decoupling control method for controlling backup power supply automatic switching by expansion inner bridge microcomputer
CN109473955A (en) A kind of adaptive distribution line failure treating method based on breaker
CN101860075A (en) Three-power supply automatic switching device
CN110086245A (en) Adaptive region power supply self-healing system and self-healing method under a kind of over-zone feeding mode
CN103915825B (en) Distribution network failure automatic decision that full load switch ring main unit is powered and control method
CN102931644B (en) Regional power grid fault isolation and recovery method
CN105024360A (en) Distribution network switching station relay protection operation optimization method
CN103746354B (en) One kind is based on transformer station's overcurrent protection method for isolating power distribution network fault without constant time lag in

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190528