CN106988230A - A kind of cradle structure in reinforced concrete arch bridge building course - Google Patents

A kind of cradle structure in reinforced concrete arch bridge building course Download PDF

Info

Publication number
CN106988230A
CN106988230A CN201710309402.3A CN201710309402A CN106988230A CN 106988230 A CN106988230 A CN 106988230A CN 201710309402 A CN201710309402 A CN 201710309402A CN 106988230 A CN106988230 A CN 106988230A
Authority
CN
China
Prior art keywords
main truss
roller
running gear
load bearing
bearing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710309402.3A
Other languages
Chinese (zh)
Other versions
CN106988230B (en
Inventor
龚兴生
孔余江
郑国�
孙全武
鲍灵高
陈竹
刘海奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd
Original Assignee
GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd filed Critical GUIZHOU BRIDGE CONSTRUCTION GROUP CO Ltd
Priority to CN201710309402.3A priority Critical patent/CN106988230B/en
Publication of CN106988230A publication Critical patent/CN106988230A/en
Application granted granted Critical
Publication of CN106988230B publication Critical patent/CN106988230B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the cradle structure in a kind of reinforced concrete arch bridge building course, include main truss load bearing system, the left and right sides is each provided with 1 secondary C-shaped hook in the middle part of main truss load bearing system, C-shaped hook top is connected with running gear, running gear bottom is located on the walking track poured at the top of the arch box of section, connecting plate is provided with C-shaped hook, connecting plate is each side connected by many oblique pull suspender belts with the pulling seat positioned at the preceding basket of main truss load bearing system and rear basket side, anti- roller devices are provided with rear basket, lifting load-bearing screw rod is provided with main truss load bearing system.The cradle structure can avoid sinking in concreting process larger when using, and Hanging Basket angle-regulation structure is fairly simple, using more convenient, and stopping mechanism will not be constituted on bridge structure and influenceed.

Description

A kind of cradle structure in reinforced concrete arch bridge building course
Technical field
The present invention relates to a kind of cradle structure, the Hanging Basket knot in particularly a kind of reinforced concrete arch bridge building course Structure.
Background technology
Since being used in Arch Bridge Construction from cast-in-place cantilever method, suspended casting suspended basket structure type successively occurs in that positive triangle rod member Formula Hanging Basket, inverted triangle rod member formula Hanging Basket, both Hanging Baskets achieve success on type of service, but with cantilever pouring length And the increasing of weight, both the above Hanging Basket also occurs in that corresponding drawback, and such as rod member stress is bigger than normal, the excessive feelings of cantilever end downwarp Condition so that existing Types of Cradles can not meet the requirement of cantilever pouring.
Hanging Basket is poured behind one section of completion, it is necessary to Hanging Basket be moved forward, because arch ring Hanging Basket is inclined, in deadweight Under power effect, there is the trend slid backward, to avoid moving after Hanging Basket, generally open up aperture in the arch box bottom poured, insert Shaped steel, forms stopping mechanism.But this mode has a problem that that is, port size is larger, reserve when cage bar avoid aperture, Situations such as rear benefit concrete of orifice position can not completely be combined with original structure, causes arch ring force structure can not be kissed with original design Close, bridge performance is impacted.
Furthermore, due to not effective anti-offset structure in existing cradle structure movement forward, cause before Hanging Basket Hanging Basket axis and arch ring axis not parallel situation occur during shifting so that horizontal drift condition occurs in Hanging Basket, and bridge is needed To be constructed according to design drawing, it is time-consuming and take so that need to carry out its horizontal skew error correction after hanging basket advancing Power.
The content of the invention
It is an object of the present invention to provide the cradle structure in a kind of bridge reinforcement concrete arch-type bridge building course.Should Cradle structure is improved with the shortcoming that the span of rod member formula Hanging Basket is small, deformation is larger, and cantilever pouring length extend into preceding institute The length for the 8.0m not having, and stopping mechanism is simple, convenient, and reliable, to arch ring structure not damaged, Hanging Basket angle of inclination is by hanging The counter-force roller devices adjustment of basket afterbody, structure is simple and direct, accurate, and stress is clear and definite.
Technical scheme:A kind of cradle structure in reinforced concrete arch bridge building course, includes main truss The left and right sides is each provided with 1 secondary C-shaped hook in the middle part of load bearing system, main truss load bearing system, and C-shaped hook top is connected with walking dress Put, running gear bottom is located on the walking track poured at the top of the arch box of section, be provided with connecting plate on C-shaped hook, connect Plate is each side connected by many oblique pull suspender belts with the pulling seat positioned at the preceding basket of main truss load bearing system and rear basket side, in rear basket On be provided with anti-roller devices, be provided with main truss load bearing system lifting load-bearing screw rod;The anti-roller devices include instead The anti-bearing pin of roller first is provided with roller supporting seat, anti-roller supporting seat, the bottom of the anti-roller supporting arm of more than 2 is penetrated In the anti-bearing pin of roller first, anti-roller supporting arm top is attached by the anti-bearing pin of roller second, in the anti-bearing pin of roller second Penetrate on anti-roller, anti-roller supporting seat and be also fed through 1 adjusting bolt, adjusting bolt head end is connected with positioned at anti-roller branch The anti-roller sliding block on seat is supportted, anti-roller sliding block props up the side of anti-roller supporting arm.
Cradle structure in foregoing reinforced concrete arch bridge building course, also includes horizontal stopping device, level Stopping device includes the counter-force support element for being embedded in the arch box bottom for having poured section, also includes and is arranged on main truss load-bearing system Counter-force screw rod is fixed with by counter-force nut on counter-force support on system, counter-force support.
Cradle structure in foregoing reinforced concrete arch bridge building course, the running gear includes running gear Bottom plate, running gear bottom base plate is provided with running gear slide plate, and running gear bottom plate is through running gear strengthening web and walking Device top plate is connected, and running gear top plate is fixed together with C-shaped hook head end, and running gear strengthening web front and rear sides are set There is shrouding;The walking track includes has poured section surface at the top of the U-shaped reinforcing bar that section has been poured in embedment, U-shaped reinforcing bar with being located at The connection of walking installing seat for rail, walking installing seat for rail includes and forms walking passageway between 2 blocks of side plates, side plate;Walking dress Put in walking passageway, the running gear counter-force seat being fixed on side plate is additionally provided with walking passageway, running gear is anti- Hydraulic jack is provided with power seat.
Cradle structure in foregoing reinforced concrete arch bridge building course, the running gear strengthening web and side plate On be provided with bearing pin and penetrate hole.
Cradle structure in foregoing reinforced concrete arch bridge building course, two secondary C-shaped hook top and bottom are respectively Connected by C-shaped hook connection cross bar.
Cradle structure in foregoing reinforced concrete arch bridge building course, the main truss load bearing system is divided into the knot that winds up Body structure is attached into by vertical rod and brace between structure and lower beam string structure, upper and lower beam string structure, upper and lower beam string structure includes Have between the longitudinal main truss piece of multi-disc, longitudinal main truss piece and to be attached by the horizontal main truss piece of multi-disc, main truss load bearing system is hung with C-shaped Hook is that node is divided into preceding basket and rear basket, wherein the horizontal main truss piece of preceding basket is more than longitudinal main truss in rear basket, preceding blue upper beam string structure It is also associated with being also associated between the multi-disc distribution purlin piece parallel with horizontal main truss piece, longitudinal main truss piece of rear basket between piece oblique Connection purlin piece.
Basket both sides are each after cradle structure in foregoing reinforced concrete arch bridge building course, the main truss load bearing system 1 anti-offset roller devices is provided with, anti-offset roller devices include the anti-offset roller being arranged on main truss load bearing system Be provided with mounting bracket, anti-offset roller mounting bracket between 2 pieces of horizontal mounting plates, 2 pieces of horizontal mounting plates be connected with it is anti-bias Move on rolling wheel installing shaft, anti-offset rolling wheel installing shaft and be provided with anti-offset roller, anti-offset roller props up the side for having poured section.
Beneficial effects of the present invention:Compared with prior art, cradle structure of the invention will be main by lifting load-bearing screw rod Purlin load bearing system, template system, concrete load are transferred to and have poured section, meanwhile, the horizontal pull produced after forward and backward basket stand under load Partial equilibrium and counteracting are realized by C-shaped hook, the sliding force of Hanging Basket generation is tiltedly climbed, the sliding force that concrete load is produced leads to Crossing stopping mechanism realizes balance, and main truss cradle intensity, rigidity are larger.During hanging basket advancing, lifting load-bearing screw rod decentralization, by C Shape links up with upper end pressure-bearing on vertical shift walking track, and the anti-roller in anti-roller devices reacts on arch box bottom surface, takes out lifting Load-bearing screw rod, the hydraulic jack of top surface rear end is linked up with by C-shaped, and moved forward Hanging Basket, and Hanging Basket is moved to and newly pours section position, and The adjustment at Hanging Basket angle of inclination can be carried out by the raising and lowering of the anti-roller devices in rear end, meanwhile, to avoid Hanging Basket in reach During the plan-position skew that is likely to occur, in the side of main truss rear end, anti-offset roller devices, anti-offset rolling are laterally set Wheel clamps arch ring side, is always ensured that Hanging Basket axis and arch ring diameter parallel, and the apparatus structure is simple, and can but effectively play prevents Hanging Basket produces the effect of lateral shift.During hanging basket advancing, hydraulic jack one end is supported on rail top face position relatively not The running gear counter-force seat of change, the other end is supported on C-shaped hook top surface rear end, start hydraulic jack can drive Hanging Basket to Before, move up, iterative cycles hydraulic jack stroke, so as to realize the walking of whole Hanging Basket;Horizontal stopping device is by counter-force Support element and counter-force support composition, counter-force support element are embedded in have poured and reserved on section arch box bottom, counter-force support element 12 bolts hole, upper surface of steel plate puts on nut, and nut top surface is closed using thickness 3mm steel plate, it is to avoid concreting process In, concrete immersion bolt hole.Hanging basket advancing in place after, counter-force support passes through 12 counter-force screw rods and counter-force support element and bolted Together, form horizontal stopping device, due to be need not be to arch box bottom in bolt connection, counter-force support element setting up procedure Reinforcing bar and concrete cause damage, after the completion of use remove counter-force support, arch ring outward appearance, Bu Huiying can be recovered by giving modification Ring bridge structure.The shortcoming that span is small, deformation is larger that the cradle structure of the present invention improves former rod member formula Hanging Basket, by cantilever Pour the length that length extend to unprecedented 8.0m by original 6.5m, and in casting process main truss load bearing system sink compared with It is small, no more than 20mm;And stopping mechanism is simple, convenient, and reliable, to arch ring structure not damaged, Hanging Basket angle of inclination passes through Hanging Basket The counter-force roller devices adjustment of afterbody, structure is simple and direct, accurate, and stress is clear and definite.
Brief description of the drawings
Accompanying drawing 1 is the structural representation of the present invention;
Accompanying drawing 2 is the overlooking the structure diagram of accompanying drawing 1;
Accompanying drawing 3 is the side structure schematic diagram of accompanying drawing 1;
Accompanying drawing 4 is the structural representation of anti-roller devices;
Accompanying drawing 5 is the side structure schematic diagram of accompanying drawing 4;
Accompanying drawing 6 is the overlooking the structure diagram of accompanying drawing 4;
Accompanying drawing 7 is the close-up schematic view of accompanying drawing 2;
Accompanying drawing 8 is the structural representation that C-shaped is linked up with;
Accompanying drawing 9 is the close-up schematic view of accompanying drawing 8;
Accompanying drawing 10 is the assembling schematic diagram of running gear and walking track;
Accompanying drawing 11 is the structural representation of anti-offset roller devices;
Reference:1- main truss load bearing systems, 2-C shapes hook, 3- running gears, 4- arch boxes, 5- walking tracks, 6- connecting plates, 7- oblique pull suspender belts, 8- pulling seats, the anti-roller devices of 9-, the anti-roller supporting seats of 10-, the anti-bearing pins of roller first of 11-, the anti-roller branch of 12- Brace, the anti-bearing pins of roller second of 13-, the anti-rollers of 14-, 15- adjusting bolts, the anti-roller sliding blocks of 16-, 17- lifting load-bearing screw rods, 18- counter-force support elements, 19- counter-force supports, 20- counter-force nuts, 21- counter-force screw rods, 22- running gear bottom plates, 23- walking dresses Put slide plate, 24- running gear strengthening webs, 25- running gear top plates, 26-U shape reinforcing bars, 27- walking installing seat for rail, 28- sides Plate, 29- walking passageways, 30- running gears counter-force seat, 31- hydraulic jacks, 32- bearing pins penetrate hole, and the hook connection of 33-C shapes is horizontal Bar, 34- longitudinal directions main truss piece, 35- transverse direction main truss pieces, 36- braces, 37- is coupled purlin piece, and 38- distribution purlin pieces, 39- shroudings, 40- is stood Bar, the anti-offset roller devices of 41-, the anti-offset roller mounting brackets of 42-, 43- horizontal mounting plates, the anti-offset rolling wheel installing shafts of 44-, The anti-offset rollers of 45-.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to According to.
Embodiments of the invention:Cradle structure in a kind of reinforced concrete arch bridge building course, such as accompanying drawing 1-11 institutes Show, include main truss load bearing system 1, the middle part left and right sides of main truss load bearing system 1 is each provided with 1 secondary C-shaped hook 2, C-shaped hook 2 Top is connected with running gear 3, and the bottom of running gear 3 is located on the walking track 5 at the top of arch box 4 for having poured section, C-shaped hook Be provided with connecting plate 6 on 2, connecting plate 6 each side by many oblique pull suspender belts 7 with positioned at basket before main truss load bearing system 1 and The pulling seat 8 of basket side is connected afterwards, and 2 anti-roller devices 9 are provided with rear basket, lifting is provided with main truss load bearing system 1 Load-bearing screw rod 17.Load-bearing screw rod 17 is lifted when using through after the reserved lifting load-bearing screw hole poured on section, its top with Hydraulic feed-through jack is connected, and is carried main truss load bearing system 1 by lifting load-bearing screw rod 17 using hydraulic feed-through jack It is raised to behind position and anchors.Then the front end of main truss load bearing system 1 is that bed die and other mould bases knots are installed on the preceding basket of Hanging Basket again Lifting load-bearing screw hole is reserved in structure, die carrier structure installation process, then casting concrete.The top of C-shaped hook 2 in whole process Portion hangs over the top for having poured section.Pour section it is up to standard after, release Hanging Basket lifting load-bearing screw rod 17 so that with C-shaped hook 2 connect The running gear 3 connect falls in walking track 5, by running gear 3 C-shaped can be driven to link up with 2 and the main truss being attached thereto Load bearing system 1 is walked.The anti-roller devices 9 include the anti-roller supporting seat 10 being fixed on main truss load bearing system 1, anti-rolling The bottom that the anti-roller supporting arm 12 of anti-the first bearing pin of roller more than 11,2 is provided with wheel support base 10 penetrates anti-roller the In one bearing pin 11, the anti-top of roller supporting arm 12 is attached by anti-the second bearing pin of roller 13, in anti-the second bearing pin of roller 13 Penetrate on anti-roller 14, anti-roller supporting seat 10 and be also fed through 1 adjusting bolt 15, the head end of adjusting bolt 15, which is connected with, to be located at Anti- roller sliding block 16 on anti-roller supporting seat 10, anti-roller sliding block 16 props up the side of anti-roller supporting arm 12.Whole Hanging Basket In moving process, roller 14 is pressed on the bottom surface for having poured section, is formed 1 strong point, is facilitated the movement of Hanging Basket.Bridge was poured , it is necessary to adjust the angle of bed die by the angle of main truss load bearing system 1 and horizontal plane in journey, method of adjustment is:Rotation adjustment Screw rod 15, because the other end of adjusting bolt 15 is contacted with anti-roller sliding block 16, rotates after adjusting bolt 15, adjusts spiral shell inwards Bar 15 can promote anti-roller sliding block 16 to move inwards, because anti-roller supporting arm 12 is contacted with anti-roller sliding block 16 again, anti-roller Sliding block 16 in moving process, can drive anti-roller supporting arm 12 to be rotated around anti-the first bearing pin of roller 11 so that anti-roller branch inwards Between the main truss load bearing system 1 of brace more than 12 angle increase, angle increase during can cause main truss load bearing system 1 it is preceding in the key Heavy, rear basket upwarps the angle adjustment for realizing main truss load bearing system 1, when adjusting bolt 15 is screwed out backward, can cause anti-roller branch Angle between the main truss load bearing system 1 of brace more than 12 diminishes, and angle can cause during diminishing on the preceding basket of main truss load bearing system 1 Stick up, after sink in the key.
Also include horizontal stopping device, horizontal stopping device, which includes, is embedded in the anti-of the bottom of arch box 4 for having poured section Power support element 18, also includes and passes through counter-force spiral shell on the counter-force support 19 being arranged on main truss load bearing system 1, counter-force support 19 Mother 20 is fixed with counter-force screw rod 21.When Hanging Basket, which is moved to, needs position, Hanging Basket is lifted up by lifting load-bearing screw rod 17, So that the rear end of counter-force screw rod 21 props up counter-force support element 18, it is to avoid Hanging Basket is moved after occurring under gravity.Due to counter-force branch Frame member 18 is just embedded in mould bases before casting concrete, therefore need not have been poured in the later stage and set counter-force support after concrete again Component 18, it is to avoid damaged in setting up procedure to the concrete poured.
The running gear 3 includes running gear bottom plate 22, and the bottom of running gear bottom plate 22 is provided with running gear cunning Plate 23, running gear bottom plate 22 is connected through running gear strengthening web 24 with running gear top plate 25, running gear top plate 25 and C Shape is linked up with 2 head ends and is welded and fixed together, and the front and rear sides of running gear strengthening web 24 are provided with shrouding 39;The walking track 5 include the U-shaped reinforcing bar 26 that section has been poured in embedment, and U-shaped reinforcing bar 26 is first embedded in die carrier structure when setting mould bases, Ran Houzai Casting concrete, and cause the head end of U-shaped reinforcing bar 26 is exposed to stop outside concrete, then again by the top of U-shaped reinforcing bar 26 with being located at The walking installing seat for rail 27 for having poured section surface is connected, and walking installing seat for rail 27 includes between 2 blocks of side plates 28, side plate 28 Form walking passageway 29;Running gear 3 is put into walking passageway 29, is additionally provided with and is fixed on side plate 28 in walking passageway 29 Running gear counter-force seat 30, be provided with hydraulic jack 31 on running gear counter-force seat 30.When Hanging Basket is moved, hydraulic jack 31 afterbodys prop up running gear counter-force seat 30, and hydraulic jack 31 is contacted after releasing with shrouding 39, so as to promote running gear 3 to exist Moved in the walking passageway 29 of walking track 5, running gear 3 drives C-shaped hook 2 and main truss load bearing system 1 to move together, works as shifting When moving to the range of hydraulic jack 31, first running gear 3 is fixed, then running gear counter-force seat 30 is dismantled, It is arranged on side plate 28, then unclamps securing running gear 3, hydraulic jack 31 is released again, you can again further along It is secondary to promote running gear 3 forward, and so on until Hanging Basket is moved to and needs position.
Bearing pin is provided with the running gear strengthening web 24 and side plate 28 and penetrates hole 32, when needing to running gear 3 when being fixed, and the bearing pin on fixed bearing pin insertion running gear strengthening web 24 and side plate 28 is penetrated into hole 32, you can Realize the fixation work of running gear 3.
The two secondary top and bottom of C-shaped hook 2 are connected by C-shaped hook connection cross bar 33 respectively.So that C-shaped hook 2 is formed One entirety, is easy to bear the gravity of main truss load bearing system 1.
1 point of the main truss load bearing system be between upper beam string structure and lower beam string structure, upper and lower beam string structure by vertical rod 40 and tiltedly Bar 36 is attached into body structure, and upper and lower beam string structure includes to be passed through between the longitudinal main truss piece 34 of multi-disc, longitudinal main truss piece 34 Multi-disc transverse direction main truss piece 35 is attached, and main truss load bearing system 1 is divided into preceding basket and rear basket by node of C-shaped hook, wherein preceding basket Horizontal main truss piece 35 be more than rear basket, be also associated with multi-disc and horizontal main truss between longitudinal main truss piece 34 in preceding blue upper beam string structure Oblique connection purlin piece 37 is also associated between the parallel distribution purlin piece 38 of piece 35, longitudinal main truss piece 34 of rear basket.It is easy to pour The gravity afforded is distributed when concrete.
Basket both sides are each provided with 1 anti-offset roller devices 41, anti-offset roller devices 41 after the main truss load bearing system 1 Include and set in the anti-offset roller mounting bracket 42 being arranged on main truss load bearing system 1, anti-offset roller mounting bracket 42 Have and anti-offset rolling wheel installing shaft 44 is connected between 2 pieces of horizontal mounting plates, 43,2 pieces of horizontal mounting plates 43, anti-offset roller is installed Anti-offset roller 45 is provided with axle 44, anti-offset roller 45 props up the side for having poured section.It is anti-offset during hanging basket advancing Roller 45 props up the side for having poured section all the time, is always ensured that Hanging Basket axis and arch ring diameter parallel, and the apparatus structure is simple, but The effect for preventing Hanging Basket from producing lateral shift can be effectively played.

Claims (7)

1. the cradle structure in a kind of reinforced concrete arch bridge building course, it is characterised in that:Include main truss load bearing system (1), main truss load bearing system(1)Middle part arranged on left and right sides is each provided with 1 secondary C-shaped hook(2), C-shaped hook(2)Top is connected with row Walking apparatus(3), running gear(3)Bottom is located at the arch box for having poured section(4)The walking track at top(5)On, C-shaped hook(2) On be provided with connecting plate(6), connecting plate(6)Arranged on left and right sides respectively passes through many oblique pull suspender belts(7)With positioned at main truss load bearing system (1)Preceding basket and the pulling seat of rear basket side(8)Connection, is provided with anti-roller devices on rear basket(9), in main truss load bearing system(1) On be provided with lifting load-bearing screw rod(17);The anti-roller devices(9)Include anti-roller supporting seat(10), anti-roller supporting seat (10)On be provided with the anti-bearing pin of roller first(11), the anti-roller supporting arm of more than 2(12)Bottom penetrate anti-roller first Bearing pin(11)In, anti-roller supporting arm(12)Top passes through the anti-bearing pin of roller second(13)It is attached, the anti-bearing pin of roller second (13)In penetrated anti-roller(14), anti-roller supporting seat(10)On be also fed through 1 adjusting bolt(15), adjusting bolt(15) Head end is connected with positioned at anti-roller supporting seat(10)On anti-roller sliding block(16), anti-roller sliding block(16)Prop up anti-roller supporting Arm(12)Side.
2. the cradle structure in reinforced concrete arch bridge building course according to claim 1, it is characterised in that:Also wrap Horizontal stopping device is included, horizontal stopping device, which includes, is embedded in the arch box for having poured section(4)The counter-force support element of bottom (18), also include and be arranged on main truss load bearing system(1)On counter-force support(19), counter-force support(19)It is upper to pass through counter-force nut (20)It is fixed with counter-force screw rod(21).
3. the cradle structure in reinforced concrete arch bridge building course according to claim 1, it is characterised in that:It is described Running gear(3)Include running gear bottom plate(22), running gear bottom plate(22)Bottom is provided with running gear slide plate(23), Running gear bottom plate(22)Through running gear strengthening web(24)With running gear top plate(25)Connection, running gear top plate(25) Linked up with C-shaped(2)Head end is fixed together, running gear strengthening web(24)Front and rear sides are provided with shrouding(39);The row Walk track(5)Include the U-shaped reinforcing bar that section has been poured in embedment(26), U-shaped reinforcing bar(26)Section surface has been poured with being located in top Walking installing seat for rail(27)Connection, installing seat for rail of walking(27)Include 2 blocks of side plates(28), side plate(28)Between formed row Walk passage(29);Running gear(3)It is put into walking passageway(29)In, in walking passageway(29)In be additionally provided with and be fixed on side plate (28)On running gear counter-force seat(30), running gear counter-force seat(30)On be provided with hydraulic jack(31).
4. the cradle structure in reinforced concrete arch bridge building course according to claim 3, it is characterised in that:It is described Running gear strengthening web(24)And side plate(28)On be provided with bearing pin and penetrate hole(32).
5. the cradle structure in reinforced concrete arch bridge building course according to claim 1, it is characterised in that:Two is secondary C-shaped is linked up with(2)Top and bottom pass through C-shaped hook connection cross bar respectively(33)Connection.
6. the cradle structure in reinforced concrete arch bridge building course according to claim 1, it is characterised in that:It is described Main truss load bearing system(1)It is divided between beam string structure and lower beam string structure, upper and lower beam string structure and passes through vertical rod(40)And brace(36)Enter Row connects into body structure, and upper and lower beam string structure includes the longitudinal main truss piece of multi-disc(34), longitudinal main truss piece(34)Between by many Piece transverse direction main truss piece(35)It is attached, main truss load bearing system(1)It is divided into preceding basket and rear basket by node of C-shaped hook, wherein before The horizontal main truss piece of basket(35)More than rear basket, longitudinal main truss piece in preceding blue upper beam string structure(34)Between be also associated with multi-disc with it is horizontal To main truss piece(35)Parallel distribution purlin piece(38), longitudinal main truss piece of rear basket(34)Between be also associated with oblique connection purlin piece (37).
7. the cradle structure in reinforced concrete arch bridge building course according to claim 1, it is characterised in that:It is described Main truss load bearing system(1)Basket both sides are each provided with 1 anti-offset roller devices afterwards(41), anti-offset roller devices(41)Include It is arranged on main truss load bearing system(1)On anti-offset roller mounting bracket(42), anti-offset roller mounting bracket(42)It is upper to set There are 2 pieces of horizontal mounting plates(43), 2 pieces of horizontal mounting plates(43)Between be connected with anti-offset rolling wheel installing shaft(44), anti-offset rolling Take turns installation axle(44)On be provided with anti-offset roller(45), anti-offset roller(45)Prop up the side for having poured section.
CN201710309402.3A 2017-05-04 2017-05-04 Hanging basket structure used in reinforced concrete arch bridge construction process Active CN106988230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710309402.3A CN106988230B (en) 2017-05-04 2017-05-04 Hanging basket structure used in reinforced concrete arch bridge construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710309402.3A CN106988230B (en) 2017-05-04 2017-05-04 Hanging basket structure used in reinforced concrete arch bridge construction process

Publications (2)

Publication Number Publication Date
CN106988230A true CN106988230A (en) 2017-07-28
CN106988230B CN106988230B (en) 2022-11-29

Family

ID=59417371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710309402.3A Active CN106988230B (en) 2017-05-04 2017-05-04 Hanging basket structure used in reinforced concrete arch bridge construction process

Country Status (1)

Country Link
CN (1) CN106988230B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611990A (en) * 2018-08-08 2018-10-02 贵州路桥集团有限公司 A kind of Hanging Basket for box arch bridge cantilever pouring
CN108867408A (en) * 2018-07-19 2018-11-23 重庆交通大学 A kind of cantilever pouring method of single box single chamber Arch Bridge Ribs
CN110485311A (en) * 2019-08-09 2019-11-22 中铁广州工程局集团有限公司 A kind of double C shape hook movable hanging basket and construction method
CN117604921A (en) * 2024-01-23 2024-02-27 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4366591A (en) * 1980-11-12 1983-01-04 Zimmerman Mahlon N Automatic safety gangplank
US5435410A (en) * 1993-07-21 1995-07-25 Langston; Ralph C. Bridge sidewalk vehicle
CN200967931Y (en) * 2006-08-23 2007-10-31 四川路桥建设股份有限公司 Side-truss cradle for suspension pouring arch-type bridge
JP2008285856A (en) * 2007-05-16 2008-11-27 Toyo Constr Co Ltd Basket for chipping pile head part
CN202055183U (en) * 2011-04-14 2011-11-30 中交武汉港湾工程设计研究院有限公司 Construction hanging basket for arched bridge formed by suspension casting
CN102359074A (en) * 2011-08-09 2012-02-22 贵州路桥集团有限公司 Upper inclined climbing type hanging basket
CN202202263U (en) * 2011-08-09 2012-04-25 贵州路桥集团有限公司 Top-arranged slantly-climbing type hanging basket
CN102797227A (en) * 2012-09-03 2012-11-28 贵州路桥集团有限公司 Construction method adopting inverted triangular obliquely-crawling hanging basket
CN104631324A (en) * 2014-12-17 2015-05-20 上海市基础工程集团有限公司 Front supporting point hanging basket construction process used for inclined pull bridge super-wide flange girder
CN105088968A (en) * 2015-08-28 2015-11-25 中交一公局第四工程有限公司 Travelling method of cantilever casting arch bridge hanging basket push-type tracked small tank
CN105926464A (en) * 2016-06-17 2016-09-07 贵州路桥集团有限公司 Inverted hanging type trapezoid inclined climbing form traveler
CN105951611A (en) * 2016-06-23 2016-09-21 贵州路桥集团有限公司 Inverted triangular obliquely-pulling obliquely-climbing hanging basket
CN206721694U (en) * 2017-05-04 2017-12-08 贵州桥梁建设集团有限责任公司 A kind of cradle structure in reinforced concrete arch bridge building course

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4366591A (en) * 1980-11-12 1983-01-04 Zimmerman Mahlon N Automatic safety gangplank
US5435410A (en) * 1993-07-21 1995-07-25 Langston; Ralph C. Bridge sidewalk vehicle
CN200967931Y (en) * 2006-08-23 2007-10-31 四川路桥建设股份有限公司 Side-truss cradle for suspension pouring arch-type bridge
JP2008285856A (en) * 2007-05-16 2008-11-27 Toyo Constr Co Ltd Basket for chipping pile head part
CN202055183U (en) * 2011-04-14 2011-11-30 中交武汉港湾工程设计研究院有限公司 Construction hanging basket for arched bridge formed by suspension casting
CN102359074A (en) * 2011-08-09 2012-02-22 贵州路桥集团有限公司 Upper inclined climbing type hanging basket
CN202202263U (en) * 2011-08-09 2012-04-25 贵州路桥集团有限公司 Top-arranged slantly-climbing type hanging basket
CN102797227A (en) * 2012-09-03 2012-11-28 贵州路桥集团有限公司 Construction method adopting inverted triangular obliquely-crawling hanging basket
CN104631324A (en) * 2014-12-17 2015-05-20 上海市基础工程集团有限公司 Front supporting point hanging basket construction process used for inclined pull bridge super-wide flange girder
CN105088968A (en) * 2015-08-28 2015-11-25 中交一公局第四工程有限公司 Travelling method of cantilever casting arch bridge hanging basket push-type tracked small tank
CN105926464A (en) * 2016-06-17 2016-09-07 贵州路桥集团有限公司 Inverted hanging type trapezoid inclined climbing form traveler
CN105951611A (en) * 2016-06-23 2016-09-21 贵州路桥集团有限公司 Inverted triangular obliquely-pulling obliquely-climbing hanging basket
CN206721694U (en) * 2017-05-04 2017-12-08 贵州桥梁建设集团有限责任公司 A kind of cradle structure in reinforced concrete arch bridge building course

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
常星: "165m悬链线箱形拱桥主拱圈悬臂浇筑施工技术", 《黑龙江交通科技》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867408A (en) * 2018-07-19 2018-11-23 重庆交通大学 A kind of cantilever pouring method of single box single chamber Arch Bridge Ribs
CN108611990A (en) * 2018-08-08 2018-10-02 贵州路桥集团有限公司 A kind of Hanging Basket for box arch bridge cantilever pouring
CN110485311A (en) * 2019-08-09 2019-11-22 中铁广州工程局集团有限公司 A kind of double C shape hook movable hanging basket and construction method
CN110485311B (en) * 2019-08-09 2024-03-19 中铁广州工程局集团有限公司 double-C-shaped hook movable hanging basket and construction method
CN117604921A (en) * 2024-01-23 2024-02-27 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge
CN117604921B (en) * 2024-01-23 2024-03-29 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge

Also Published As

Publication number Publication date
CN106988230B (en) 2022-11-29

Similar Documents

Publication Publication Date Title
CN106988230A (en) A kind of cradle structure in reinforced concrete arch bridge building course
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN208815424U (en) A kind of bridge descending hanging basket
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN106120568B (en) The construction method of cross a river Main Bridge bridge pier secondary locking temporary consolidation structure
CN101250856B (en) Echelon cradle as well as construction method thereof
CN105951610A (en) Support structure assisting in cantilever beam construction and construction method
CN203904851U (en) Continuous beam side span straight section hanger support system
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN104746883B (en) A kind of arcuate space truss lifts construction method of installation with three machines
WO2020052291A1 (en) Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN206721694U (en) A kind of cradle structure in reinforced concrete arch bridge building course
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN101672013A (en) Cable-stayed bailey hanging bracket without balance weight
CN106499411A (en) A kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method
KR20170040837A (en) Heavy lifting device
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN211472207U (en) Suspension beam system for hoisting prefabricated section box girder
WO2024087901A1 (en) Cantilever casting and locomotion all-in-one machine
CN105386414B (en) Lower-guide type main-truss-free hanging basket
CN103835497A (en) Bolt opposite-pulling type track sliding formwork
WO2023159853A1 (en) Suspension stepping type shed erecting machine
CN205975377U (en) Structure is concretied in locking of cross a river bridge owner pier secondary temporarily

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant