CN106979026A - One kind bores the integrated tunnel anchor pole of note and performs equipment - Google Patents

One kind bores the integrated tunnel anchor pole of note and performs equipment Download PDF

Info

Publication number
CN106979026A
CN106979026A CN201710347079.9A CN201710347079A CN106979026A CN 106979026 A CN106979026 A CN 106979026A CN 201710347079 A CN201710347079 A CN 201710347079A CN 106979026 A CN106979026 A CN 106979026A
Authority
CN
China
Prior art keywords
anchor pole
frame
rear frame
workbench
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710347079.9A
Other languages
Chinese (zh)
Other versions
CN106979026B (en
Inventor
李剑雄
刘伟涛
周远航
常孔磊
梁朋举
蒙先君
刘瑞庆
李大伟
胡卫平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201710347079.9A priority Critical patent/CN106979026B/en
Publication of CN106979026A publication Critical patent/CN106979026A/en
Application granted granted Critical
Publication of CN106979026B publication Critical patent/CN106979026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The invention belongs to tunnel anchor pole installation Technology field, propose that a kind of integrated tunnel anchor pole of note that bores performs equipment.The integrated tunnel anchor pole of brill note of proposition, which performs equipment, has front frame(66)And Rear frame(62);Front frame(66), Rear frame(62)Pass through articulated slab(55)It is connected;Rear frame(62)Afterbody be provided with slip casting machine(8);Front frame(66)Postmedian be provided with to control the operation bench that whole equipment works(3);Front frame(66)The left and right sides of front end is respectively arranged with the drilling mechanism forward extended out(1)And workbench(16);Drilling mechanism(1)And workbench(13)It is set up in parallel;The described front frame of correspondence(66), Rear frame(62)It is provided with chassis walking mechanism.The present invention once completes the working procedures such as brill, note, anchor, linked network, reduces buying and the maintenance cost of unit in charge of construction, improves the service efficiency of equipment, contribute to tunnel Fast Construction.

Description

One kind bores the integrated tunnel anchor pole of note and performs equipment
Technical field
The invention belongs to tunnel construction machinery technical field, relate generally to a kind of integrated tunnel anchor pole of note that bores and perform equipment.
Background technology
Anchor Care operation is one of key link of drill+blast tunnel construction, and it has the spy such as convenient, fast, safe efficient Point.In Anchor Care operation process, anchor pole, which is performed, mainly to be had:Punching, slip casting and install three processes of anchor pole.Punching and generally utilize machine Tool arm and hydraulic gate or hand fit's stand air rock drill are completed;According to different anchor pole type slip casting operations in anchor pole After the completion of hole, carried out before rockbolt installation or after rockbolt installation, the slurries for playing anchorage effect injected into bolthole using grouting equipment, Play a part of to anchor rock after solidification;According to the difference of anchor pole type, rockbolt installation is after the completion of bolthole, or in bolthole Having injected after the slurries of anchorage effect utilizes artificial or equipment to insert anchor pole in bolthole, for anchoring rock.Usual anchor pole Three processes performed are respectively completed by hand fit's plurality of devices, installation effectiveness is low, process conversion is frequent, construction cost is high, Security risk is big, does not reach the requirement of quick supporting after tunnel excavation, there is job safety hidden danger, and tunnel is narrow, Duo Geshe Standby and workman operates simultaneously, and spot dispatch difficulty is big, and operation scene is chaotic, influences other processes to be normally carried out.It is domestic to go back at present The corresponding tunnel anchor pole for boring note institutional operation is not inquired performs equipment.
The content of the invention
Bore the integrated tunnel anchor pole of note the purpose of the present invention is to propose to one kind and perform equipment, make it have punching, slip casting and installation The function of anchor pole, can cover different construction operating modes, different area of section, different designs grade, the Anchor Care of different surrounding rock situation and apply Worked industry, and takes into account the construction of overlength ductule and reinforced mesh installation, and the brill of Anchor Care operation, note, three processes of anchor are combined into one Body, meet tunnel Anchor Care operator just, fast, high-quality, it is economical the need for.
The present invention adopts the following technical scheme that to complete foregoing invention task:
One kind bores the integrated tunnel anchor pole of note and performs equipment, and the described integrated tunnel anchor pole of brill note, which performs equipment, has front frame And Rear frame;Described front frame, Rear frame are connected by articulated slab;Described articulated slab is provided with limited block, to limit Steering lock position;Steering cylinder and power transmission shaft are provided with the middle of articulated slab, to control complete machine to turn to and transmit power;After described The afterbody of vehicle frame is provided with slip casting machine;Described slip casting machine is arranged on the afterbody of Rear frame by slip casting machine hoisting mechanism;It is described The postmedian of front frame is provided with the operation bench for controlling whole equipment to work;The left and right sides difference of the front frame front end It is provided with the drilling mechanism and workbench forward extended out;Described drilling mechanism and workbench is set up in parallel;Correspondence is described Front frame, Rear frame be provided with chassis walking mechanism;Described chassis walking mechanism, which has, is arranged on front frame and Rear frame The two ends of the front axle and rear axle of middle part lower end, the front axle and rear axle are respectively provided with tire;Described front truck is set up It is equipped with positioned at front frame front end left and right sides front leg strut;Described Rear frame is provided with behind the left and right sides of Rear frame rear end Supporting leg;Described front leg strut, rear support leg are Collapsible structure;Walking operating desk to control front/rear frame to walk is arranged on In front frame, and positioned at the rear of operation bench;The described walking operating desk of correspondence is additionally provided with seat;The walking operating desk, Ceiling is provided with the top of seat;Described ceiling is by ceiling they sup-port in front frame;
Described drilling mechanism has drill boom crossbeam and forward beam;The rear end of the drill boom crossbeam passes through drill boom mounting seat and fixation Drill boom pedestal in front frame is hinged;The both sides of the drill boom crossbeam with to control drilling mechanism to swing and pitching motion Two oil cylinders I are connected;The external part of the oil cylinder I is hinged with drill boom pedestal, makes described drill boom crossbeam in the presence of oil cylinder I Relatively described drill boom pedestal is swung, pitching;The front end of the drill boom crossbeam is connected with the brill that can be moved along drill boom girder extensible Arm extensible canopy;The front end of the drill boom extensible canopy is hinged with backing pump;The output end of the backing pump is connected with connecting lever, is made Described connecting lever can rotate with backing pump;Forward beam pedestal is provided with the connecting lever;Described forward beam is arranged on propulsion On beam pedestal, it can be moved along forward beam pedestal;To promote forward beam move forward beam Shift cylinder one end and forward beam It is connected, one end is connected with forward beam pedestal, to control the relative motion between forward beam and forward beam pedestal;Described propulsion Rock drill is provided with beam;The described rock drill of correspondence is provided with rock drill propelling cylinder;The one of the rock drill propelling cylinder End is connected with rock drill, and one end is connected with forward beam, to control the relative motion between forward beam and rock drill;The rock drilling The output end of machine is connected with drilling rod;
Described workbench has workbench crossbeam;The rear end of the workbench crossbeam by workbench mounting seat with The workbench pedestal being fixed in front frame is hinged;The both sides of the workbench crossbeam are hinged with two oil cylinders II;It is described The external part of oil cylinder II is hinged by the mounting seat of oil cylinder II with workbench pedestal, and the swing of workbench is controlled by oil cylinder II And pitching motion;The workbench crossbeam is additionally provided with can be along its flexible workbench extensible canopy;The workbench is stretched The front end of contracting beam is hinged with hanging basket;The described hanging basket of correspondence is provided with to control the oil cylinder III of hanging basket posture;Described oil cylinder III one end is connected with hanging basket, and one end is connected with workbench extensible canopy, the posture to control hanging basket;Described bolt installer It is located on hanging basket, positioned at the lower left corner of hanging basket, to install anchor pole;Described hanging basket ceiling is hinged with hanging basket, passes through oil cylinder control Make its position;Described hanging basket is provided with anchor pole storehouse, positioned at the hanging basket left and right sides, to deposit anchor pole;Described anchor pole is laid In anchor pole storehouse;Described hanging basket console is located on hanging basket, positioned at hanging basket rear portion centre position, to control hanging basket position.
Be additionally provided with described Rear frame Reel of water pipe, cable drum, hydraulic oil container, water pump, power distribution cabinet, radiator, Diesel fuel tanks, motor, air compressor machine, main oil pump and shield;Rear portion of the described Reel of water pipe, cable drum respectively positioned at Rear frame is left Right both sides;Described hydraulic oil container is located at the rear portion of Rear frame, between Reel of water pipe and cable drum;Described water pump is located at Rear frame rear portion, Reel of water pipe back, the hydraulic oil container left side;Described engine is located at Rear frame centre position;Described dissipates Hot device is located at Rear frame postmedian centre position, is connected with engine;Described diesel fuel tanks are located at Rear frame front medial location, Close to engine;Described motor is located in Rear frame, positioned at the right of diesel fuel tanks, the front of power distribution cabinet;Described pneumatics Machine is located in Rear frame, positioned at the left side of diesel fuel tanks;Described main oil pump is located at below motor;Described shield is located at Rear frame On, respectively there is one around main oil pump and air compressor machine, to protect main oil pump and air compressor machine.
Described ceiling support bar is two, respectively in the front frame left and right sides.
Oil cylinder is provided with inside described ceiling support bar, the lifting to control ceiling, ceiling is provided with illuminating lamp.
The front leg strut, rear support leg structure it is identical;Described front leg strut, which has, is arranged on the front frame front end left and right sides Support oil cylinder extensible canopy;Described support oil cylinder extensible canopy is connected to the top of telescopic oil cylinder;Flexible afterbody with it is described Front frame is connected, and the movement of support oil cylinder extensible canopy is controlled by telescopic oil cylinder.
The present invention is used to tunnel Anchor Care, and during walking, power is provided by engine, front and rear car is passed to after speed change Bridge, its speed of travel and go to action are controlled by travelling control platform;During work, first slip casting machine is put down, anchor pole performs equipment and opened To working face, front and rear support oil cylinder is stretched out, and realizes stable support, and engine is shut down, and cable drum rotation, cable stretches out, connected Working power, motor start-up provides power when motor is work, workman station is acted in operation bench rear portion, control drill boom, Precalculated position is drilled, slip casting machine operator operation slip casting machine, and mix cement mortar, after drilling terminates, on workbench Workman's control workbench be moved to bore position, the pressure-air or water under high pressure produced using air compressor machine or water pump, to anchor Rod aperture is cleaned, and is noted the cement mortar being stirred into bolthole by slip casting flexible pipe, will be deposited using bolt installer Rockbolt installation is in bolthole in anchor pole storehouse, after reinforced mesh is arranged on anchor pole, a working cycles are completed.
A kind of integrated tunnel anchor pole of note that bores proposed by the present invention performs equipment, and slip casting machine and rock bolting jumbo are closed into two is One, and be creatively provided with bolt installer, it can once complete to bore, note, the working procedure such as anchor, linked network, reducing construction The buying of unit and maintenance cost, improve the service efficiency of equipment, contribute to tunnel Fast Construction;Pass through slip casting machine elevator Structure connects together slip casting machine with rock bolting jumbo, eliminates the inconvenience that other power-equipments move slip casting, is conducive to tunnel construction Scheduling;Slip casting machine easily can be put down or lifted by slip casting machine hoisting mechanism, and slip casting machine is put down during work, away from chassis, Slip casting machine is lifted during walking, it is to avoid pollute chassis during slip casting machine stirring;Equipment is performed for slip casting machine water and electricity supply by anchor pole, The arrangement of water pump and the quantity of cable and wire in tunnel are reduced, construction cost is saved, security risk is reduced;One arm one basket is set Put, the process such as drilling, slip casting and installation anchor pole can be carried out simultaneously, save construction period and cost;Workbench is dual control molding Formula, i.e. operation bench and hanging basket console can realize control, and have failure knob, and double control mode safety coefficient is high, behaviour Facilitate, the setting of failure knob can avoid maloperation again;Power is provided using engine during walking, motor is used during work Power is provided, noise and air pollution can be avoided;Anchor pole storehouse is set on hanging basket, anchor pole can be laid, workbench is reduced Mobile number of times, saves construction period and cost;Bolt installer is set on hanging basket, mechanical erection anchor pole, construction speed is realized Degree is fast, and construction effect is good;Grouting Pipe is extended on hanging basket, slip casting can be once completed, anchor pole is installed, reinforced mesh is hung, apply Work efficiency high;Case is set in air compressor machine and main oil pump periphery, air compressor machine and main oil pump, less maintenance time can be effectively protected Number, it is cost-effective;By the setting of connecting lever and backing pump, the rotation of 360 degree of forward beam is realized, working range is big, adapts to Property is wide;In oil cylinder junction provided with protection rubber blanket, link position can be protected not damaged by falling object;Protected outside rear support leg oil cylinder Shield uses stepped-style, that is, shields, and is climbed during easy access;Slip casting machine realizes remote control, can be in work Make to realize the start-stop of slip casting machine on platform, it is easy to operate, save man-hour;Using articulated steering, radius of turn is small, movement side Just, wide adaptability;Four-wheel drive during walking, powerful, to tunnel strong adaptability.
Brief description of the drawings
Fig. 1 is general assembly drawing of the invention.
Fig. 2 is the structural representation of drilling mechanism in the present invention.
Fig. 3 is the structural representation of workbench in the present invention.
Fig. 4 is the structural representation of vehicle frame in the present invention.
Fig. 5 is the top view that Fig. 4 removes ceiling.
Fig. 6 is front frame, the partial view of Rear frame coupling part in the present invention.
Fig. 7 is the partial view of telescopic legs part in the present invention.
In figure:1st, drilling mechanism, 2, arm seat, 3, operation bench, 4, ceiling, 5, engine, 6, Reel of water pipe, 7, slip casting machine carries Rise mechanism, 8, slip casting machine, 9, cable drum, 10, power distribution cabinet, 11, rear support leg, 12, rear axle, 13, motor, 14, front axle, 15th, front leg strut, 16, workbench, 17, drilling rod, 18, forward beam, 19, rock drill propelling cylinder, 20, forward beam pedestal, 21, chisel Rock machine, 22, forward beam Shift cylinder, 23, drill boom mounting seat, 24, drill boom pedestal, 25, the mounting seat of oil cylinder I, 26, oil cylinder I, 27, Drill boom crossbeam, 28, drill boom extensible canopy, 29, backing pump mounting seat, 30, backing pump, 31, connecting lever, 32, forward beam upset oil Cylinder, 33, hanging basket, 34, hanging basket ceiling, 35, hanging basket console, 36, anchor pole, 37, workbench mounting seat, 38, workbench base Seat, 39, the mounting seat of oil cylinder II, 40, oil cylinder II, 41, workbench crossbeam, 42, workbench extensible canopy, 43, bolt installer, 44th, anchor pole storehouse, 45, oil cylinder III, 46, water pump, 47, hydraulic oil container, 48, air compressor machine, 49, walking operation bench, 50, seat, 51, bavin Fuel tank, 52, radiator, 53, support oil cylinder extensible canopy, 54, telescopic oil cylinder, 55, articulated slab, 56, steering cylinder, 57, limited block, 58th, illuminating lamp, 59, ceiling expansion link, 60, ceiling support bar, 61, case skeleton, 62, Rear frame, 63, main oil pump, 64, shield Cover, 65, power transmission shaft, 66, front frame.
Embodiment
The present invention is further described with example with reference to accompanying drawing:
As shown in figure 1, a kind of integrated tunnel anchor pole of note that bores performs equipment, the described integrated tunnel anchor pole of brill note performs equipment With front frame 66 and Rear frame 62;With reference to Fig. 6, described front frame 66, Rear frame 62 are connected by articulated slab 55;Described Articulated slab 55 is provided with limited block 57, to limit steering lock position;Provided with steering cylinder 56 and transmission in the middle of articulated slab 55 Axle 65, to control complete machine to turn to and transmit power;The afterbody of the Rear frame 62 is provided with slip casting machine 8;Described slip casting machine 8 The afterbody of Rear frame 62 is arranged on by slip casting machine hoisting mechanism 7;In the embodiment, described slip casting machine 8, slip casting machine elevator Structure 7 uses existing ripe structure, no longer illustrates herein;
The postmedian of the front frame 66 is provided with the operation bench 3 for controlling whole equipment to work;The front end of front frame 66 The left and right sides be respectively arranged with arm seat 2;Arm seat 2 described in two is separately installed with drilling mechanism 1 and workbench 16;
Described drilling mechanism 1 and workbench 16 is set up in parallel;The described front frame 66 of correspondence, Rear frame 62 are provided with chassis Walking mechanism;Described chassis walking mechanism has the front axle 14 and rear axle for being arranged on lower end in the middle part of front frame and Rear frame 12, the two ends of the front axle 14 and rear axle 12 are respectively provided with tire;The front frame 66, Rear frame 62 are respectively by that can stretch The supporting leg support of contracting;Described front frame 66 is supported by the front leg strut 15 for being arranged on the front frame front end left and right sides;Propped up before described Leg 15, rear support leg 11 structure it is identical;With reference to Fig. 7, described front leg strut 15, which has, is arranged on the front frame front end left and right sides Support oil cylinder extensible canopy 53;Described support oil cylinder extensible canopy 53 is connected to the top of telescopic oil cylinder 54;The tail of telescopic oil cylinder 54 Portion is connected with described front frame 66, and the movement of support oil cylinder extensible canopy is controlled by telescopic oil cylinder;
Described Rear frame is supported by the rear support leg 11 for being arranged on the Rear frame rear end left and right sides;Described front leg strut 15, rear branch Leg 11 is Collapsible structure;Described rear support leg 11 has two, positioned at the left and right sides of Rear frame 62, rear respectively with coil of cable Disk 9 and Reel of water pipe 6 are adjacent, and front is connected with mud watt;Before controlling the walking operating desk 49 that front/rear frame is walked to be arranged on On vehicle frame 66, and positioned at the rear of operation bench 3;The described walking operating desk 49 of correspondence is additionally provided with seat 50;The walking behaviour Make platform 49, the top of seat 50 and be provided with ceiling 4;Described ceiling 4 is supported in front frame 66 by ceiling support bar 60;Institute The ceiling support bar 60 stated is two, respectively in the front frame left and right sides;The described inside of ceiling support bar 60 is provided with oil cylinder, uses To control the lifting of ceiling, ceiling is provided with illuminating lamp 58, and illuminating lamp has 6,4, front, 2, rear, uniform arrangement;Institute The walking operation bench 49 and seat 50 stated are located at the rear portion centre position of front frame 66, walking and supporting leg to control whole equipment Cylinder action;
As shown in Fig. 2 described drilling mechanism has drill boom crossbeam 27 and forward beam 18;The rear end of the drill boom crossbeam 27 passes through Drill boom mounting seat 23 is hinged with the drill boom pedestal 24 being fixed in front frame 66;The both sides of the drill boom crossbeam 27 with to control Drilling mechanism is swung and two oil cylinders I 26 of pitching motion are connected;The external part of the oil cylinder I 26 is connected firmly with drill boom pedestal 24, Make the drill boom pedestal swing relatively described in the presence of oil cylinder I of described drill boom crossbeam, pitching;Before the drill boom crossbeam 27 End is connected with the drill boom extensible canopy 28 that can be moved along drill boom girder extensible;The front end of the drill boom extensible canopy 28 is hinged with rotation oil Pump 30;The output end of the backing pump 30 is connected with connecting lever 31, described connecting lever 31 is rotated with backing pump 30;It is described Forward beam pedestal 20 is provided with connecting lever 31;Described forward beam 18 is arranged on forward beam pedestal 20, can be along forward beam pedestal 20 movements;One end of forward beam Shift cylinder 22 to promote the movement of forward beam 18 is connected with forward beam 18, and one end is with promoting Beam pedestal 20 is connected, to control the relative motion between forward beam 18 and forward beam pedestal 20;Set on described forward beam 18 It is equipped with rock drill 21;The described rock drill 21 of correspondence is provided with rock drill propelling cylinder 19;The rock drill propelling cylinder 19 One end is connected with rock drill 21, and one end is connected with forward beam 18, to control the relative fortune between forward beam 18 and rock drill 21 It is dynamic;The output end of the rock drill is connected with drilling rod 17;
As shown in figure 3, described workbench has workbench crossbeam 41;The rear end of the workbench crossbeam 41 passes through work Make the stage+module 37 workbench pedestal 38 with being fixed in front frame of seat to be hinged;The both sides hinge of the workbench crossbeam 41 It is connected to oil cylinder II 40;The external part of the oil cylinder II 40 is hinged by the mounting seat 39 of oil cylinder II and workbench pedestal 38, is passed through The swing of the control workbench of oil cylinder II and pitching motion;Being additionally provided with the workbench crossbeam 41 can be along its flexible work Make platform extensible canopy 42;The front end of the workbench extensible canopy 42 is hinged with hanging basket 33;The described hanging basket 33 of correspondence is provided with Oil cylinder III 45 to control hanging basket posture;Described one end of oil cylinder III 45 is connected with hanging basket 33, and one end is stretched with workbench Beam 42 is connected, the posture to control hanging basket;Described bolt installer 43 is located on hanging basket 33, positioned at the lower-left of hanging basket 33 Angle, to install anchor pole;Described hanging basket ceiling 34 is hinged with hanging basket 33, and its position is controlled by oil cylinder;Described hanging basket 33 Anchor pole storehouse 44 is provided with, positioned at the left and right sides of hanging basket 33, to deposit anchor pole 36;Described anchor pole 36 is placed in anchor pole storehouse 44 It is interior;Described hanging basket console 35 is located on hanging basket 33, positioned at hanging basket rear portion centre position, to control hanging basket position.
With reference to Fig. 4, Fig. 5, Reel of water pipe 6, cable drum 9, hydraulic oil container 47, water are additionally provided with described Rear frame 62 Pump 46, power distribution cabinet 10, engine 5, radiator 52, diesel fuel tanks 51, motor 13, air compressor machine 48, main oil pump 63 and shield 64;It is described Reel of water pipe 6, cable drum 9 respectively be located at Rear frame 62 the rear portion left and right sides;Described hydraulic oil container 47 is located at rear car The rear portion of frame, between Reel of water pipe 6 and cable drum 9;Described water pump 46 is located at Rear frame rear portion, the back of Reel of water pipe 6, The left side of hydraulic oil container 47;Described engine 5 is located at Rear frame centre position;Described power distribution cabinet 10 is located at the right side of Rear frame 62 On mud watt, directly over rear axle 12;Described radiator 52 is located at Rear frame postmedian centre position, with the phase of engine 5 Even;Described diesel fuel tanks 51 are located at Rear frame front medial location, close to engine 5;Described motor 13 is located in Rear frame, Positioned at the right of diesel fuel tanks 51, the front of power distribution cabinet 10;Described air compressor machine 48 is located in Rear frame, positioned at diesel fuel tanks 51 Left side;Described main oil pump 63 is located at below motor;Described shield 64 is located in Rear frame, each around main oil pump and air compressor machine There is one, to protect main oil pump and air compressor machine.
The present invention is used to tunnel Anchor Care, and during walking, power is provided by engine, front and rear car is passed to after speed change Bridge, its speed of travel and go to action are controlled by travelling control platform;During work, first slip casting machine is put down, anchor pole performs equipment and opened To working face, front and rear support oil cylinder is stretched out, and realizes stable support, and engine is shut down, and cable drum rotation, cable stretches out, connected Working power, motor start-up provides power when motor is work, workman station is acted in operation bench rear portion, control drill boom, Precalculated position is drilled, slip casting machine operator operation slip casting machine, and mix cement mortar, after drilling terminates, on workbench Workman's control workbench be moved to bore position, the pressure-air or water under high pressure produced using air compressor machine or water pump, to anchor Rod aperture is cleaned, and is noted the cement mortar being stirred into bolthole by slip casting flexible pipe, will be deposited using bolt installer Rockbolt installation is in bolthole in anchor pole storehouse, after reinforced mesh is arranged on anchor pole, a working cycles are completed.

Claims (6)

1. one kind bores the integrated tunnel anchor pole of note and performs equipment, it is characterised in that:The described integrated tunnel anchor pole of brill note is performed Equipment has front frame(66)And Rear frame(62);Described front frame(66), Rear frame(62)Pass through articulated slab(55)It is connected; Described articulated slab(55)It is provided with limited block(57), to limit steering position;Articulated slab(55)Centre is provided with steering cylinder (56)And power transmission shaft(65), to control complete machine to turn to and transmit power;The Rear frame(62)Afterbody be provided with slip casting machine (8);Described slip casting machine(8)Pass through slip casting machine hoisting mechanism(7)Installed in Rear frame(62)Afterbody;The front frame(66) Postmedian be provided with to control the operation bench that whole equipment works(3);The front frame(66)The left and right sides of front end point Drilling mechanism is not provided with it(1)And workbench(16);Described drilling mechanism(1)And workbench(16)It is set up in parallel;It is right Answer described front frame(66), Rear frame(62)It is provided with chassis walking mechanism;Described chassis walking mechanism, which has, to be arranged on The front axle of lower end in the middle part of front frame and Rear frame(14)And rear axle(12), the front axle(14)And rear axle(12)Two End is respectively provided with tire;The front frame(66), Rear frame(62)Supported respectively by telescopic supporting leg;Described front frame (66)By the front leg strut for being arranged on the front frame front end left and right sides(15)Support;Described Rear frame is by being arranged on Rear frame rear end The rear support leg of the left and right sides(11)Support;Described front leg strut(15), rear support leg(11)It is Collapsible structure;Before controlling The walking operating desk of Rear frame walking(49)It is arranged on front frame(66)On, and positioned at operation bench(3)Rear;Described in correspondence Walking operating desk(49)It is additionally provided with seat(50);The walking operating desk(49), seat(50)Top be provided with ceiling (4);Described ceiling(4)Pass through ceiling support bar(60)It is supported on front frame(66)On.
2. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described boring machine Structure has drill boom crossbeam(27)And forward beam(18);The drill boom crossbeam(27)Rear end pass through drill boom mounting seat(23)With fixation In front frame(66)On drill boom pedestal(24)It is hinged;The drill boom crossbeam(27)Both sides with to control drilling mechanism to swing With two oil cylinders I of pitching motion(26)Connection;The oil cylinder I(26)External part and drill boom pedestal(24)Connect firmly, make described Drill boom crossbeam in the presence of oil cylinder I relatively described drill boom pedestal swing, pitching;The drill boom crossbeam(27)Front end connect It is connected to the drill boom extensible canopy that can be moved along drill boom girder extensible(28);The drill boom extensible canopy(28)Front end be hinged with rotation oil Pump(30);The backing pump(30)Output end and connecting lever(31)Connection, makes described connecting lever(31)Can be with backing pump (30)Rotation;The connecting lever(31)On be provided with forward beam pedestal(20);Described forward beam(18)It is arranged on forward beam pedestal (20)On, can be along forward beam pedestal(20)It is mobile;To the forward beam Shift cylinder for promoting forward beam to move(22)One end with Forward beam(18)It is connected, one end and forward beam pedestal(20)It is connected, to control forward beam(18)With forward beam pedestal(20)It Between relative motion;Described forward beam(18)On be provided with rock drill(21);The described rock drill of correspondence(21)It is provided with chisel Rock machine propelling cylinder(19);The rock drill propelling cylinder(19)One end and rock drill(21)It is connected, one end and forward beam (18)It is connected, to control forward beam(18)And rock drill(21)Between relative motion;The output end connection of the rock drill There is drilling rod(17).
3. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described work is put down Platform has workbench crossbeam(41);The workbench crossbeam(41)Rear end pass through workbench mounting seat(37)With fixation Workbench pedestal in front frame(38)It is hinged;The workbench crossbeam(41)Both sides be hinged with two oil cylinders II (40);The oil cylinder II(40)External part pass through the mounting seat of oil cylinder II(39)With workbench pedestal(38)It is hinged, passes through oil The swing of the control workbench of cylinder II and pitching motion;The workbench crossbeam(41)On be additionally provided with can be along its flexible work Make platform extensible canopy(42);The workbench extensible canopy(42)Front end be hinged with hanging basket(33);The described hanging basket of correspondence (33)It is provided with to control the oil cylinder III of hanging basket posture(45);Described oil cylinder III(45)One end and hanging basket(33)It is connected, one End and workbench extensible canopy(42)It is connected, the posture to control hanging basket;Described bolt installer(43)It is located at hanging basket (33)On, positioned at hanging basket(33)The lower left corner, to install anchor pole;Described hanging basket ceiling(34)With hanging basket(33)It is hinged, leads to Cross oil cylinder and control its position;Described hanging basket(33)It is provided with anchor pole storehouse(44), positioned at the hanging basket left and right sides, to deposit anchor pole (36);Described anchor pole(36)It is placed in anchor pole storehouse(44)It is interior;Described hanging basket console(35)It is located at hanging basket(33)On, it is located at Hanging basket rear portion centre position, to control hanging basket position.
4. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described Rear frame (62)On be additionally provided with Reel of water pipe(6), cable drum(9), hydraulic oil container(47), water pump(46), power distribution cabinet(10), engine (5), radiator(52), diesel fuel tanks(51), motor(13), air compressor machine(48), main oil pump(63)And shield(64);Described water pipe Reel(6), cable drum(9)It is located at Rear frame respectively(62)The rear portion left and right sides;Described hydraulic oil container(47)After being located at The rear portion of vehicle frame, in Reel of water pipe(6)And cable drum(9)Between;Described water pump(46)It is located at Rear frame rear portion, water pipe volume Disk(6)Back, hydraulic oil container(47)The left side;Described engine(5)Positioned at Rear frame centre position;Described radiator(52) Rear frame postmedian centre position is located at, with engine(5)It is connected;Described diesel fuel tanks(51)It is located at Rear frame anteriomedial position Put, close to engine(5);Described motor(13)It is located in Rear frame, positioned at diesel fuel tanks(51)The right, power distribution cabinet(10)'s Front;Described air compressor machine(48)It is located in Rear frame, positioned at diesel fuel tanks(51)Left side;Described main oil pump(63)It is located at Below motor;Described shield(64)It is located in Rear frame, respectively has one around main oil pump and air compressor machine, to protect main oil pump With air compressor machine.
5. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described ceiling branch Strut(60)For two, respectively in the front frame left and right sides.
6. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described ceiling branch Strut(60)Inside is provided with oil cylinder, and the lifting to control ceiling, ceiling is provided with illuminating lamp.
CN201710347079.9A 2017-05-17 2017-05-17 Drilling and injecting integrated tunnel anchor rod construction equipment Active CN106979026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710347079.9A CN106979026B (en) 2017-05-17 2017-05-17 Drilling and injecting integrated tunnel anchor rod construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710347079.9A CN106979026B (en) 2017-05-17 2017-05-17 Drilling and injecting integrated tunnel anchor rod construction equipment

Publications (2)

Publication Number Publication Date
CN106979026A true CN106979026A (en) 2017-07-25
CN106979026B CN106979026B (en) 2023-07-04

Family

ID=59342179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710347079.9A Active CN106979026B (en) 2017-05-17 2017-05-17 Drilling and injecting integrated tunnel anchor rod construction equipment

Country Status (1)

Country Link
CN (1) CN106979026B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218070A (en) * 2017-08-07 2017-09-29 徐工集团工程机械有限公司 Construction of underground tunnel equipment
CN108708240A (en) * 2018-08-14 2018-10-26 上海力阳道路加固科技股份有限公司 The brill note integration apparatus and construction method reinforced for roadbase
CN108868841A (en) * 2018-07-06 2018-11-23 中国铁建重工集团有限公司 A kind of rock bolting jumbo
CN108868600A (en) * 2018-08-15 2018-11-23 中铁工程装备集团有限公司 A kind of tunnel boring trolley being loaded with the more mechanisms that drill
CN108979688A (en) * 2018-07-06 2018-12-11 中国铁建重工集团有限公司 A kind of full-automatic rock bolting jumbo
CN112696217A (en) * 2021-02-01 2021-04-23 滕开永 Small-section anchoring and rock drilling integrated machine
CN113833505A (en) * 2021-11-25 2021-12-24 徐州徐工基础工程机械有限公司 Anchor rod drilling and grouting integrated machine
CN114876537A (en) * 2022-07-11 2022-08-09 湖南鹏翔星通汽车有限公司 Anchor drilling and grouting integrated system
CN116084835A (en) * 2023-03-06 2023-05-09 安徽佳乐矿山设备有限公司 Drilling and blasting trolley

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470267A (en) * 2013-09-28 2013-12-25 中铁二十局集团第二工程有限公司 Long tunnel fast construction process
CN105967538A (en) * 2016-05-06 2016-09-28 中国水利水电第十工程局有限公司 Tunneling whole-section advanced composite material casting slurry and preparation method thereof
CN205918368U (en) * 2016-08-10 2017-02-01 中铁七局集团西安铁路工程有限公司 Bore notes an organic whole and retreat formula slip casting drilling rod
CN207004549U (en) * 2017-05-17 2018-02-13 中铁隧道集团有限公司 One kind bores the integrated tunnel anchor pole of note and performs equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470267A (en) * 2013-09-28 2013-12-25 中铁二十局集团第二工程有限公司 Long tunnel fast construction process
CN105967538A (en) * 2016-05-06 2016-09-28 中国水利水电第十工程局有限公司 Tunneling whole-section advanced composite material casting slurry and preparation method thereof
CN205918368U (en) * 2016-08-10 2017-02-01 中铁七局集团西安铁路工程有限公司 Bore notes an organic whole and retreat formula slip casting drilling rod
CN207004549U (en) * 2017-05-17 2018-02-13 中铁隧道集团有限公司 One kind bores the integrated tunnel anchor pole of note and performs equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李剑雄等: "新型隧道锚杆台车技术解读", 《工程机械与维修》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218070A (en) * 2017-08-07 2017-09-29 徐工集团工程机械有限公司 Construction of underground tunnel equipment
CN107218070B (en) * 2017-08-07 2023-08-01 江苏徐工工程机械研究院有限公司 Underground tunnel construction equipment
CN108868841A (en) * 2018-07-06 2018-11-23 中国铁建重工集团有限公司 A kind of rock bolting jumbo
CN108979688A (en) * 2018-07-06 2018-12-11 中国铁建重工集团有限公司 A kind of full-automatic rock bolting jumbo
CN108708240A (en) * 2018-08-14 2018-10-26 上海力阳道路加固科技股份有限公司 The brill note integration apparatus and construction method reinforced for roadbase
CN108868600A (en) * 2018-08-15 2018-11-23 中铁工程装备集团有限公司 A kind of tunnel boring trolley being loaded with the more mechanisms that drill
CN112696217A (en) * 2021-02-01 2021-04-23 滕开永 Small-section anchoring and rock drilling integrated machine
CN113833505A (en) * 2021-11-25 2021-12-24 徐州徐工基础工程机械有限公司 Anchor rod drilling and grouting integrated machine
CN114876537A (en) * 2022-07-11 2022-08-09 湖南鹏翔星通汽车有限公司 Anchor drilling and grouting integrated system
CN116084835A (en) * 2023-03-06 2023-05-09 安徽佳乐矿山设备有限公司 Drilling and blasting trolley

Also Published As

Publication number Publication date
CN106979026B (en) 2023-07-04

Similar Documents

Publication Publication Date Title
CN207004549U (en) One kind bores the integrated tunnel anchor pole of note and performs equipment
CN106979026A (en) One kind bores the integrated tunnel anchor pole of note and performs equipment
CN205977245U (en) Road multifunctional machinery ization tunnel supporting platform truck
CN106401476A (en) Multifunctional arching drill jambo
CN102094579A (en) Full-hydraulic tire rock drilling anchoring drill carriage
CN107401418A (en) A kind of tunnel rock bolting jumbo
CN102808623A (en) Coal mine underground multipurpose vehicle
CN101975077B (en) High-outburst coal mine coal roadway drilling-loading-bolting integrated machine
CN108252720A (en) A kind of multifunctional tunnel repair machine
CN202325230U (en) Walking-pedrail type rotary drilling machine integrating crane
CN202001024U (en) Engineering van capable of rapidly repairing tunnel defects
CN107130963B (en) Full hydraulic rock loader for vertical shaft
CN203905071U (en) Multifunctional special mechanical engineering operating vehicle
CN201280718Y (en) Complete-hydraulic anchor rod grouting trolley
CN110206571B (en) Anchor rod trolley for tunnel anchor rod support construction and operation method thereof
CN109779656A (en) A kind of radial type wet shot trolley
CN207420597U (en) A kind of tunnel rock bolting jumbo
CN207989027U (en) A kind of multifunctional tunnel repair machine
CN1105726A (en) A road-surface finisher
CN207177897U (en) A kind of all-hydraulic dirt loader of vertical shaft
CN203248072U (en) Self-walking shale gas drilling machine
CN202594665U (en) Multifunctional engineering truck
CN109681245A (en) A kind of tunnel steel arch frame installation trolley
CN210310099U (en) Multifunctional operation vehicle for underground engineering construction
CN210917514U (en) Multifunctional rescue vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Jianxiong

Inventor after: Hu Weiping

Inventor after: Liu Weitao

Inventor after: Zhang Xun

Inventor after: Zhou Yuanhang

Inventor after: Chang Konglei

Inventor after: Liang Pengju

Inventor after: Meng Xianjun

Inventor after: Liu Ruiqing

Inventor after: Li Dawei

Inventor before: Li Jianxiong

Inventor before: Liu Weitao

Inventor before: Zhou Yuanhang

Inventor before: Chang Konglei

Inventor before: Liang Pengju

Inventor before: Meng Xianjun

Inventor before: Liu Ruiqing

Inventor before: Li Dawei

Inventor before: Hu Weiping

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant