CN207004549U - One kind bores the integrated tunnel anchor pole of note and performs equipment - Google Patents

One kind bores the integrated tunnel anchor pole of note and performs equipment Download PDF

Info

Publication number
CN207004549U
CN207004549U CN201720546635.0U CN201720546635U CN207004549U CN 207004549 U CN207004549 U CN 207004549U CN 201720546635 U CN201720546635 U CN 201720546635U CN 207004549 U CN207004549 U CN 207004549U
Authority
CN
China
Prior art keywords
anchor pole
frame
rear frame
workbench
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720546635.0U
Other languages
Chinese (zh)
Inventor
李剑雄
刘伟涛
周远航
常孔磊
梁朋举
蒙先君
刘瑞庆
李大伟
胡卫平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201720546635.0U priority Critical patent/CN207004549U/en
Application granted granted Critical
Publication of CN207004549U publication Critical patent/CN207004549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to tunnel anchor pole installation Technology field, proposes that a kind of integrated tunnel anchor pole of note that bores performs equipment.The integrated tunnel anchor pole of brill note of proposition, which performs equipment, has front frame(66)And Rear frame(62);Front frame(66), Rear frame(62)Pass through articulated slab(55)It is connected;Rear frame(62)Afterbody be provided with slip casting machine(8);Front frame(66)Postmedian be provided with to control the operation bench that whole equipment works(3);Front frame(66)The drilling mechanism forward extended out is respectively arranged with left and right sides of front end(1)And workbench(16);Drilling mechanism(1)And workbench(13)It is set up in parallel;Corresponding described front frame(66), Rear frame(62)It is provided with chassis walking mechanism.The working procedures such as the utility model is once completed to bore, noted, anchor, linked network, reduce buying and the maintenance cost of unit in charge of construction, improve the service efficiency of equipment, contribute to tunnel Fast Construction.

Description

One kind bores the integrated tunnel anchor pole of note and performs equipment
Technical field
The utility model belongs to tunnel construction machinery technical field, relates generally to a kind of integrated tunnel anchor pole of note that bores and performs Equipment.
Background technology
Anchor Care operation is one of key link of drill+blast tunnel construction, and it has the spy such as convenient, fast, safe efficient Point.In Anchor Care operation process, anchor pole, which performs, mainly to be had:Punching, slip casting and installation three processes of anchor pole.Punching and generally utilize machine Tool arm and hydraulic gate or hand fit's stand air rock drill are completed;According to different anchor pole type slip casting operations in anchor pole After the completion of hole, carried out before rockbolt installation or after rockbolt installation, the slurries for playing anchorage effect injected into bolthole using grouting equipment, Play a part of to anchor rock after solidification;According to the difference of anchor pole type, rockbolt installation is after the completion of bolthole, or in bolthole Inject after the slurries of anchorage effect and inserted anchor pole in bolthole using artificial or equipment, for anchoring rock.Usual anchor pole Three processes performed are respectively completed by hand fit's plurality of devices, installation effectiveness is low, process conversion is frequent, construction cost is high, Security risk is big, does not reach the requirement of quick supporting after tunnel excavation, job safety hidden danger be present, and tunnel is narrow, Duo Geshe Standby and worker operates simultaneously, and spot dispatch difficulty is big, and operation scene is chaotic, influences other processes and is normally carried out.It is domestic to go back at present The corresponding tunnel anchor pole for boring note institutional operation is not inquired performs equipment.
Utility model content
The purpose of this utility model is to propose that a kind of integrated tunnel anchor pole of note that bores performs equipment, makes it have and punchinges, notes The function of slurry and installation anchor pole, different construction operating modes, different area of sections, different designs grade, different surrounding rock situation can be covered Anchor Care construction operation, and take into account overlength ductule construction and reinforced mesh installation, by three brill of Anchor Care operation, note, anchor works Sequence is integrated, and meets the needs of tunnel Anchor Care operator just, quick, high-quality, economic.
The utility model adopts the following technical scheme that to complete above-mentioned utility model task:
One kind, which is bored, to be noted integrated tunnel anchor pole and performs equipment, and described brill is noted integrated tunnel anchor pole and performed before equipment has Vehicle frame and Rear frame;Described front frame, Rear frame are connected by articulated slab;Described articulated slab is provided with limited block, to Limit steering lock position;Steering cylinder and power transmission shaft are provided among articulated slab, to control complete machine to turn to and transmit power;Institute The afterbody for stating Rear frame is provided with slip casting machine;Described slip casting machine is arranged on the afterbody of Rear frame by slip casting machine hoisting mechanism; The postmedian of the front frame is provided with the operation bench for controlling whole equipment to work;The left and right sides of the front frame front end It is respectively arranged with the drilling mechanism and workbench forward extended out;Described drilling mechanism and workbench is set up in parallel;It is corresponding Described front frame, Rear frame are provided with chassis walking mechanism;Described chassis walking mechanism, which has, is arranged on front frame with after The both ends of the front axle and rear axle of lower end in the middle part of vehicle frame, the front axle and rear axle are respectively provided with tire;Described front truck Erection is equipped with positioned at front leg strut at left and right sides of front frame front end;Described Rear frame is provided with left and right sides of Rear frame rear end Rear support leg;Described front leg strut, rear support leg are Collapsible structure;Walking operating desk to control front/rear frame to walk is set Put in front frame, and positioned at the rear of operation bench;Corresponding described walking operating desk is additionally provided with seat;The walking operation Ceiling is provided with the top of platform, seat;Described ceiling is by ceiling they sup-port in front frame;
Described drilling mechanism has drill boom crossbeam and forward beam;The rear end of the drill boom crossbeam by drill boom mounting seat with The drill boom pedestal being fixed in front frame is hinged;The both sides of the drill boom crossbeam with to control drilling mechanism swing and pitching move Two oil cylinders I made connect;The external part of the oil cylinder I is hinged with drill boom pedestal, makes described drill boom crossbeam in the work of oil cylinder I Swung with lower relatively described drill boom pedestal, pitching;The front end of the drill boom crossbeam, which is connected with, to be moved along drill boom girder extensible Drill boom extensible canopy;The front end of the drill boom extensible canopy is hinged with backing pump;The output end of the backing pump connects with connecting lever Connect, described connecting lever is rotated with backing pump;Forward beam pedestal is provided with the connecting lever;Described forward beam is arranged on On forward beam pedestal, it can be moved along forward beam pedestal;To promote one end of the forward beam Shift cylinder of forward beam movement with pushing away Enter beam to be connected, one end is connected with forward beam pedestal, to control the relative motion between forward beam and forward beam pedestal;Described Rock drill is provided with forward beam;Corresponding described rock drill is provided with rock drill propelling cylinder;The rock drill propelling cylinder One end be connected with rock drill, one end is connected with forward beam, to control the relative motion between forward beam and rock drill;It is described The output end of rock drill is connected with drilling rod;
Described workbench has workbench crossbeam;Installed by workbench the rear end of the workbench crossbeam Seat is hinged with the workbench pedestal being fixed in front frame;The both sides of the workbench crossbeam are hinged with two oil cylinders II; The external part of the oil cylinder II is hinged by the mounting seat of oil cylinder II and workbench pedestal, and workbench is controlled by oil cylinder II Swing and pitching motion;The workbench crossbeam is additionally provided with can be along its flexible workbench extensible canopy;The work is put down The front end of platform extensible canopy is hinged with hanging basket;Corresponding described hanging basket is provided with to control the oil cylinder III of hanging basket posture;Described The one end of oil cylinder III is connected with hanging basket, and one end is connected with workbench extensible canopy, to control the posture of hanging basket;Described anchor pole peace Dress device is located on hanging basket, positioned at the lower left corner of hanging basket, to install anchor pole;Described hanging basket ceiling is hinged with hanging basket, passes through oil Cylinder controls its position;Described hanging basket is provided with anchor pole storehouse, at left and right sides of hanging basket, to deposit anchor pole;Described anchor pole It is placed in anchor pole storehouse;Described hanging basket console is located on hanging basket, positioned at hanging basket rear portion centre position, to control hanging basket position Put.
Be additionally provided with described Rear frame Reel of water pipe, cable drum, hydraulic oil container, water pump, power distribution cabinet, radiator, Diesel fuel tanks, motor, air compressor machine, main oil pump and shield;Described Reel of water pipe, cable drum are left positioned at the rear portion of Rear frame respectively Right both sides;Described hydraulic oil container is located at the rear portion of Rear frame, between Reel of water pipe and cable drum;Described water pump is located at Rear frame rear portion, Reel of water pipe back, the hydraulic oil container left side;Described engine is located at Rear frame centre position;Described dissipates Hot device is located at Rear frame postmedian centre position, is connected with engine;Described diesel fuel tanks are located at Rear frame front medial location, Close to engine;Described motor is located in Rear frame, positioned at the right of diesel fuel tanks, the front of power distribution cabinet;Described pneumatics Machine is located in Rear frame, positioned at the left side of diesel fuel tanks;Described main oil pump is located at below motor;Described shield is located at Rear frame On, respectively there is one around main oil pump and air compressor machine, to protect main oil pump and air compressor machine.
Described ceiling support bar is two, respectively at left and right sides of front frame.
Oil cylinder is provided with inside described ceiling support bar, to control the lifting of ceiling, ceiling is provided with illuminating lamp.
The front leg strut, the structure of rear support leg are identical;Described front leg strut, which has, to be arranged at left and right sides of front frame front end Support oil cylinder extensible canopy;Described support oil cylinder extensible canopy is connected to the top of telescopic oil cylinder;Flexible afterbody with it is described Front frame is connected, and the movement of support oil cylinder extensible canopy is controlled by telescopic oil cylinder.
The utility model uses to tunnel Anchor Care, during walking, power is provided by engine, before being passed to after speed change Rear axle, its speed of travel and go to action are controlled by travelling control platform;During work, first slip casting machine is put down, anchor pole, which performs, to be set Standby to open to working face, front and rear support oil cylinder is stretched out, and realizes stable support, and engine is shut down, and cable drum rotation, cable stretches out, Working power is connected, motor start-up, motor to provide power during work, in operation bench rear portion, control drill boom move by worker station Make, drilled in precalculated position, slip casting machine operator operates slip casting machine, and mix cement mortar, and after drilling terminates, work is flat Worker on platform controls workbench to be moved to bore position, using pressure-air or water under high pressure caused by air compressor machine or water pump, Bolthole is cleaned, noted the cement mortar being stirred into bolthole by slip casting flexible pipe, will using bolt installer Rockbolt installation is stored in anchor pole storehouse in bolthole, after reinforced mesh is arranged on anchor pole, a working cycles are completed.
The utility model proposes a kind of bore note integrated tunnel anchor pole and perform equipment, slip casting machine and rock bolting jumbo are closed two For one, and bolt installer is creatively provided with, can once complete to bore, note, the working procedure such as anchor, linked network, reducing and apply The buying of work order position and maintenance cost, the service efficiency of equipment is improved, contributes to tunnel Fast Construction;Lifted by slip casting machine Mechanism connects together slip casting machine and rock bolting jumbo, eliminates the inconvenience of other power-equipments movement slip casting, is advantageous to tunnel and builds If scheduling;Slip casting machine easily can be put down or lifted by slip casting machine hoisting mechanism, and slip casting machine is put down during work, away from platform Car, slip casting machine is lifted during walking, pollute chassis when avoiding slip casting machine stirring;Equipment is performed by anchor pole to supply water for slip casting machine Electricity, reduce the arrangement of water pump and the quantity of cable and wire in tunnel, save construction cost, reduce security risk;The basket of one arm one Setting, drilling, slip casting and the installation process such as anchor pole can carry out simultaneously, save construction period and cost;Workbench is dual control Molding formula, i.e. operation bench and hanging basket console can realize control, and have failure knob, double control mode safety coefficient Height, easy to operate, the setting for the knob that fails can avoid maloperation again;Power is provided using engine during walking, is adopted during work Power is provided with motor, noise and air pollution can be avoided;Anchor pole storehouse is set on hanging basket, anchor pole can be laid, reduce work Make platform movement number, save construction period and cost;Bolt installer is set on hanging basket, realizes mechanical erection anchor pole, Speed of application is fast, and construction effect is good;Grouting Pipe is extended on hanging basket, slip casting, installation anchor pole can be once completed, hang bar-mat reinforcement Piece, efficiency of construction are high;Case is set in air compressor machine and main oil pump periphery, can effectively protect air compressor machine and main oil pump, less dimension Number is protected, it is cost-effective;By the setting of connecting lever and backing pump, the rotation of 360 degree of forward beam is realized, working range is big, Wide adaptability;Protection rubber blanket is provided with oil cylinder junction, link position can be protected not damaged by falling object;Rear support leg oil cylinder Outer protective cover uses stepped-style, that is, shields, and climbed during easy access;Slip casting machine realizes remote control, can be with The start-stop of slip casting machine is realized on workbench, it is easy to operate, save man-hour;Using articulated steering, radius of turn is small, mobile It is convenient, wide adaptability;Four-wheel drive during walking, powerful, to tunnel strong adaptability.
Brief description of the drawings
Fig. 1 is general assembly drawing of the present utility model.
Fig. 2 is the structural representation of drilling mechanism in the utility model.
Fig. 3 is the structural representation of workbench in the utility model.
Fig. 4 is the structural representation of vehicle frame in the utility model.
Fig. 5 is the top view that Fig. 4 removes ceiling.
Fig. 6 is front frame, the partial view of Rear frame coupling part in the utility model.
Fig. 7 is the partial view of telescopic legs part in the utility model.
In figure:1st, drilling mechanism, 2, arm seat, 3, operation bench, 4, ceiling, 5, engine, 6, Reel of water pipe, 7, slip casting machine carries Rise mechanism, 8, slip casting machine, 9, cable drum, 10, power distribution cabinet, 11, rear support leg, 12, rear axle, 13, motor, 14, front axle, 15th, front leg strut, 16, workbench, 17, drilling rod, 18, forward beam, 19, rock drill propelling cylinder, 20, forward beam pedestal, 21, chisel Rock machine, 22, forward beam Shift cylinder, 23, drill boom mounting seat, 24, drill boom pedestal, 25, the mounting seat of oil cylinder I, 26, oil cylinder I, 27, Drill boom crossbeam, 28, drill boom extensible canopy, 29, backing pump mounting seat, 30, backing pump, 31, connecting lever, 32, forward beam upset oil Cylinder, 33, hanging basket, 34, hanging basket ceiling, 35, hanging basket console, 36, anchor pole, 37, workbench mounting seat, 38, workbench base Seat, 39, the mounting seat of oil cylinder II, 40, oil cylinder II, 41, workbench crossbeam, 42, workbench extensible canopy, 43, bolt installer, 44th, anchor pole storehouse, 45, oil cylinder III, 46, water pump, 47, hydraulic oil container, 48, air compressor machine, 49, walking operation bench, 50, seat, 51, bavin Fuel tank, 52, radiator, 53, support oil cylinder extensible canopy, 54, telescopic oil cylinder, 55, articulated slab, 56, steering cylinder, 57, limited block, 58th, illuminating lamp, 59, ceiling expansion link, 60, ceiling support bar, 61, case skeleton, 62, Rear frame, 63, main oil pump, 64, shield Cover, 65, power transmission shaft, 66, front frame.
Embodiment
The utility model is further described with example with reference to accompanying drawing:
As shown in figure 1, a kind of integrated tunnel anchor pole of note that bores performs equipment, described brill is noted integrated tunnel anchor pole and performed Equipment has front frame 66 and Rear frame 62;With reference to Fig. 6, described front frame 66, Rear frame 62 are connected by articulated slab 55;Institute The articulated slab 55 stated is provided with limited block 57, to limit steering lock position;The He of steering cylinder 56 is provided among articulated slab 55 Power transmission shaft 65, to control complete machine to turn to and transmit power;The afterbody of the Rear frame 62 is provided with slip casting machine 8;Described note Pulp grinder 8 is arranged on the afterbody of Rear frame 62 by slip casting machine hoisting mechanism 7;In the embodiment, described slip casting machine 8, slip casting machine Hoisting mechanism 7 uses existing ripe structure, no longer illustrates herein;
The postmedian of the front frame 66 is provided with the operation bench 3 for controlling whole equipment to work;The front frame 66 Arm seat 2 is respectively arranged with left and right sides of front end;Arm seat 2 described in two is separately installed with drilling mechanism 1 and workbench 16;
Described drilling mechanism 1 and workbench 16 is set up in parallel;Corresponding described front frame 66, Rear frame 62 are provided with Chassis walking mechanism;Described chassis walking mechanism has the front axle 14 for being arranged on front frame and Rear frame middle part lower end with after The both ends of vehicle bridge 12, the front axle 14 and rear axle 12 are respectively provided with tire;The front frame 66, Rear frame 62 pass through respectively Telescopic supporting leg support;Described front frame 66 is supported by being arranged on the front leg strut 15 at left and right sides of front frame front end;It is described Front leg strut 15, the structure of rear support leg 11 are identical;With reference to Fig. 7, described front leg strut 15, which has, is arranged on front frame front end or so two The support oil cylinder extensible canopy 53 of side;Described support oil cylinder extensible canopy 53 is connected to the top of telescopic oil cylinder 54;Telescopic oil cylinder 54 Afterbody be connected with described front frame 66, pass through telescopic oil cylinder control support oil cylinder extensible canopy movement;
Described Rear frame is supported by being arranged on the rear support leg 11 at left and right sides of Rear frame rear end;Described front leg strut 15, Rear support leg 11 is Collapsible structure;Described rear support leg 11 has two, positioned at the left and right sides of Rear frame 62, rear respectively with electricity Cable reel 9 and Reel of water pipe 6 are adjacent, and front is connected with mud watt;Walking operating desk 49 to control front/rear frame to walk is set In front frame 66, and positioned at the rear of operation bench 3;Corresponding described walking operating desk 49 is additionally provided with seat 50;The row Walk operating desk 49, the top of seat 50 is provided with ceiling 4;Described ceiling 4 is supported on front frame 66 by ceiling support bar 60 On;Described ceiling support bar 60 is two, respectively at left and right sides of front frame;The described inside of ceiling support bar 60 is provided with oil Cylinder, to control the lifting of ceiling, ceiling is provided with illuminating lamp 58, and illuminating lamp shares 6,4, front, 2, rear, uniformly arranged Cloth;Described walking operation bench 49 and seat 50 are located at the rear portion centre position of front frame 66, to control the walking of whole equipment Acted with support oil cylinder;
As shown in Fig. 2 described drilling mechanism has drill boom crossbeam 27 and forward beam 18;The rear end of the drill boom crossbeam 27 It is be hinged by drill boom mounting seat 23 and the drill boom pedestal 24 being fixed in front frame 66;The both sides of the drill boom crossbeam 27 with to Control drilling mechanism to swing to connect with two oil cylinders I 26 of pitching motion;The external part of the oil cylinder I 26 is solid with drill boom pedestal 24 Connection, swing described drill boom crossbeam drill boom pedestal relatively described in the presence of oil cylinder I, pitching;The drill boom crossbeam 27 Be connected with can be along the drill boom extensible canopy 28 that drill boom girder extensible moves for front end;The front end of the drill boom extensible canopy 28 is hinged with rotation Turn oil pump 30;The output end of the backing pump 30 is connected with connecting lever 31, described connecting lever 31 is rotated with backing pump 30; Forward beam pedestal 20 is provided with the connecting lever 31;Described forward beam 18 is arranged on forward beam pedestal 20, can be along forward beam Pedestal 20 moves;One end of forward beam Shift cylinder 22 to promote forward beam 18 to move is connected with forward beam 18, one end and Forward beam pedestal 20 is connected, to control the relative motion between forward beam 18 and forward beam pedestal 20;Described forward beam 18 On be provided with rock drill 21;Corresponding described rock drill 21 is provided with rock drill propelling cylinder 19;The rock drill propelling cylinder 19 one end is connected with rock drill 21, and one end is connected with forward beam 18, to control the phase between forward beam 18 and rock drill 21 To motion;The output end of the rock drill is connected with drilling rod 17;
As shown in figure 3, described workbench has workbench crossbeam 41;The rear end of the workbench crossbeam 41 leads to The workbench pedestal 38 crossed workbench mounting seat 37 and be fixed in front frame is be hinged;The two of the workbench crossbeam 41 Side is hinged with oil cylinder II 40;The external part of the oil cylinder II 40 is be hinged by the mounting seat 39 of oil cylinder II and workbench pedestal 38, Swing and the pitching motion of workbench are controlled by oil cylinder II;Being additionally provided with the workbench crossbeam 41 can be flexible along it Workbench extensible canopy 42;The front end of the workbench extensible canopy 42 is hinged with hanging basket 33;Corresponding described hanging basket 33 is set It is equipped with to control the oil cylinder III 45 of hanging basket posture;Described one end of oil cylinder III 45 is connected with hanging basket 33, one end and workbench Extensible canopy 42 is connected, to control the posture of hanging basket;Described bolt installer 43 is located on hanging basket 33, positioned at a left side for hanging basket 33 Inferior horn, to install anchor pole;Described hanging basket ceiling 34 is be hinged with hanging basket 33, and its position is controlled by oil cylinder;Described hanging basket 33 are provided with anchor pole storehouse 44, positioned at the left and right sides of hanging basket 33, to deposit anchor pole 36;Described anchor pole 36 is placed in anchor pole storehouse 44 It is interior;Described hanging basket console 35 is located on hanging basket 33, positioned at hanging basket rear portion centre position, to control hanging basket position.
With reference to Fig. 4, Fig. 5, Reel of water pipe 6, cable drum 9, hydraulic oil container 47, water are additionally provided with described Rear frame 62 Pump 46, power distribution cabinet 10, engine 5, radiator 52, diesel fuel tanks 51, motor 13, air compressor machine 48, main oil pump 63 and shield 64;It is described Reel of water pipe 6, cable drum 9 respectively positioned at Rear frame 62 rear portion at left and right sides of;Described hydraulic oil container 47 is located at rear car The rear portion of frame, between Reel of water pipe 6 and cable drum 9;Described water pump 46 is located at Rear frame rear portion, the back of Reel of water pipe 6, The left side of hydraulic oil container 47;Described engine 5 is located at Rear frame centre position;Described power distribution cabinet 10 is located at the right side of Rear frame 62 On mud watt, directly over rear axle 12;Described radiator 52 is located at Rear frame postmedian centre position, with the phase of engine 5 Even;Described diesel fuel tanks 51 are located at Rear frame front medial location, close to engine 5;Described motor 13 is located in Rear frame, Positioned at the right of diesel fuel tanks 51, the front of power distribution cabinet 10;Described air compressor machine 48 is located in Rear frame, positioned at diesel fuel tanks 51 Left side;Described main oil pump 63 is located at below motor;Described shield 64 is located in Rear frame, each around main oil pump and air compressor machine There is one, to protect main oil pump and air compressor machine.
The utility model uses to tunnel Anchor Care, during walking, power is provided by engine, before being passed to after speed change Rear axle, its speed of travel and go to action are controlled by travelling control platform;During work, first slip casting machine is put down, anchor pole, which performs, to be set Standby to open to working face, front and rear support oil cylinder is stretched out, and realizes stable support, and engine is shut down, and cable drum rotation, cable stretches out, Working power is connected, motor start-up, motor to provide power during work, in operation bench rear portion, control drill boom move by worker station Make, drilled in precalculated position, slip casting machine operator operates slip casting machine, and mix cement mortar, and after drilling terminates, work is flat Worker on platform controls workbench to be moved to bore position, using pressure-air or water under high pressure caused by air compressor machine or water pump, Bolthole is cleaned, noted the cement mortar being stirred into bolthole by slip casting flexible pipe, will using bolt installer Rockbolt installation is stored in anchor pole storehouse in bolthole, after reinforced mesh is arranged on anchor pole, a working cycles are completed.

Claims (6)

1. one kind bores the integrated tunnel anchor pole of note and performs equipment, it is characterised in that:Described brill is noted integrated tunnel anchor pole and performed Equipment has front frame(66)And Rear frame(62);Described front frame(66), Rear frame(62)Pass through articulated slab(55)It is connected; Described articulated slab(55)It is provided with limited block(57), to limit steering position;Articulated slab(55)Centre is provided with steering cylinder (56)And power transmission shaft(65), to control complete machine to turn to and transmit power;The Rear frame(62)Afterbody be provided with slip casting machine (8);Described slip casting machine(8)Pass through slip casting machine hoisting mechanism(7)Installed in Rear frame(62)Afterbody;The front frame(66) Postmedian be provided with to control the operation bench that whole equipment works(3);The front frame(66)The left and right sides of front end point Drilling mechanism is not provided with it(1)And workbench(16);Described drilling mechanism(1)And workbench(16)It is set up in parallel;It is right Answer described front frame(66), Rear frame(62)It is provided with chassis walking mechanism;Described chassis walking mechanism, which has, to be arranged on The front axle of lower end in the middle part of front frame and Rear frame(14)And rear axle(12), the front axle(14)And rear axle(12)Two End is respectively provided with tire;The front frame(66), Rear frame(62)Supported respectively by telescopic supporting leg;Described front frame (66)By the front leg strut being arranged at left and right sides of front frame front end(15)Support;Described Rear frame is by being arranged on Rear frame rear end The rear support leg of the left and right sides(11)Support;Described front leg strut(15), rear support leg(11)It is Collapsible structure;Before controlling The walking operating desk of Rear frame walking(49)It is arranged on front frame(66)On, and it is located at operation bench(3)Rear;Described in corresponding Walking operating desk(49)It is additionally provided with seat(50);The walking operating desk(49), seat(50)Top be provided with ceiling (4);Described ceiling(4)Pass through ceiling support bar(60)It is supported on front frame(66)On.
2. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described boring machine Structure has drill boom crossbeam(27)And forward beam(18);The drill boom crossbeam(27)Rear end pass through drill boom mounting seat(23)With fixation In front frame(66)On drill boom pedestal(24)It is be hinged;The drill boom crossbeam(27)Both sides with controlling drilling mechanism to swing With two oil cylinders I of pitching motion(26)Connection;The oil cylinder I(26)External part and drill boom pedestal(24)Connect firmly, make described Drill boom crossbeam in the presence of oil cylinder I relatively described drill boom pedestal swing, pitching;The drill boom crossbeam(27)Front end connect Being connected to can be along the drill boom extensible canopy that drill boom girder extensible moves(28);The drill boom extensible canopy(28)Front end be hinged with rotation oil Pump(30);The backing pump(30)Output end and connecting lever(31)Connection, makes described connecting lever(31)Can be with backing pump (30)Rotation;The connecting lever(31)On be provided with forward beam pedestal(20);Described forward beam(18)It is arranged on forward beam pedestal (20)On, can be along forward beam pedestal(20)It is mobile;To promote the forward beam Shift cylinder that forward beam moves(22)One end with Forward beam(18)It is connected, one end and forward beam pedestal(20)It is connected, to control forward beam(18)With forward beam pedestal(20)It Between relative motion;Described forward beam(18)On be provided with rock drill(21);Corresponding described rock drill(21)It is provided with chisel Rock machine propelling cylinder(19);The rock drill propelling cylinder(19)One end and rock drill(21)It is connected, one end and forward beam (18)It is connected, to control forward beam(18)And rock drill(21)Between relative motion;The output end connection of the rock drill There is drilling rod(17).
3. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described work is put down Platform has workbench crossbeam(41);The workbench crossbeam(41)Rear end pass through workbench mounting seat(37)With fixation Workbench pedestal in front frame(38)It is be hinged;The workbench crossbeam(41)Both sides be hinged with two oil cylinders II (40);The oil cylinder II(40)External part pass through the mounting seat of oil cylinder II(39)With workbench pedestal(38)It is be hinged, pass through oil Cylinder II controls swing and the pitching motion of workbench;The workbench crossbeam(41)On be additionally provided with can be along its flexible work Make platform extensible canopy(42);The workbench extensible canopy(42)Front end be hinged with hanging basket(33);Corresponding described hanging basket (33)It is provided with to control the oil cylinder III of hanging basket posture(45);Described oil cylinder III(45)One end and hanging basket(33)It is connected, one End and workbench extensible canopy(42)It is connected, to control the posture of hanging basket;The hanging basket(33)The lower left corner be provided with anchor pole Erector(43), to install anchor pole;Described hanging basket(33)On be also hinged with hanging basket ceiling(34), hanging basket is controlled by oil cylinder Ceiling(34)Position;
Described hanging basket(33)It is provided with anchor pole storehouse(44), at left and right sides of hanging basket, to deposit anchor pole(36);Described anchor Bar(36)It is placed in anchor pole storehouse(44)It is interior;The hanging basket(33)The centre position at rear portion is provided with hanging basket console(35).
4. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described Rear frame (62)On be additionally provided with Reel of water pipe(6), cable drum(9), hydraulic oil container(47), water pump(46), power distribution cabinet(10), engine (5), radiator(52), diesel fuel tanks(51), motor(13), air compressor machine(48), main oil pump(63)And shield(64);Described water pipe Reel(6), cable drum(9)It is located at Rear frame respectively(62)Rear portion at left and right sides of;Described hydraulic oil container(47)After being located at The rear portion of vehicle frame, in Reel of water pipe(6)And cable drum(9)Between;Described water pump(46)It is located at Rear frame rear portion, water pipe volume Disk(6)Back, hydraulic oil container(47)The left side;Described engine(5)Positioned at Rear frame centre position;Described radiator(52) Rear frame postmedian centre position is located at, with engine(5)It is connected;Described diesel fuel tanks(51)It is located at Rear frame anteriomedial position Put, close to engine(5);Described motor(13)It is located in Rear frame, positioned at diesel fuel tanks(51)The right, power distribution cabinet(10)'s Front;Described air compressor machine(48)It is located in Rear frame, positioned at diesel fuel tanks(51)Left side;Described main oil pump(63)It is located at Below motor;Described shield(64)It is located in Rear frame, respectively there is one around main oil pump and air compressor machine, protects main oil pump With air compressor machine.
5. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described ceiling branch Strut(60)For two, respectively at left and right sides of front frame.
6. a kind of integrated tunnel anchor pole of note that bores as claimed in claim 1 performs equipment, it is characterised in that:Described ceiling branch Strut(60)Inside is provided with oil cylinder, and to control the lifting of ceiling, ceiling is provided with illuminating lamp.
CN201720546635.0U 2017-05-17 2017-05-17 One kind bores the integrated tunnel anchor pole of note and performs equipment Expired - Fee Related CN207004549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720546635.0U CN207004549U (en) 2017-05-17 2017-05-17 One kind bores the integrated tunnel anchor pole of note and performs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720546635.0U CN207004549U (en) 2017-05-17 2017-05-17 One kind bores the integrated tunnel anchor pole of note and performs equipment

Publications (1)

Publication Number Publication Date
CN207004549U true CN207004549U (en) 2018-02-13

Family

ID=61444487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720546635.0U Expired - Fee Related CN207004549U (en) 2017-05-17 2017-05-17 One kind bores the integrated tunnel anchor pole of note and performs equipment

Country Status (1)

Country Link
CN (1) CN207004549U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106979026A (en) * 2017-05-17 2017-07-25 中铁隧道集团有限公司 One kind bores the integrated tunnel anchor pole of note and performs equipment
CN108612551A (en) * 2018-07-06 2018-10-02 中国铁建重工集团有限公司 A kind of slip casting pipe support for rock bolting jumbo
CN109236334A (en) * 2018-11-28 2019-01-18 佛山科学技术学院 A kind of support construction of the constructing tunnel with depositing dust slip casting function
CN109441495A (en) * 2018-11-02 2019-03-08 湖南五新隧道智能装备股份有限公司 A kind of tunnel arch installation vehicle and its method of controlling security
CN110206571A (en) * 2019-04-23 2019-09-06 四川新筑智能工程装备制造有限公司 A kind of rock bolting jumbo and its operation engineering method for Tunnel Rock Bolt construction
CN110219308A (en) * 2018-05-29 2019-09-10 韩玉锐 A kind of soil nail wall slope retaining grouting device
CN110306928A (en) * 2019-08-01 2019-10-08 重庆渝交机电设备有限公司 A kind of multifunctional drill and the non-blasting construction method of hard rock tunnel
CN110439474A (en) * 2019-08-27 2019-11-12 中铁隧道局集团有限公司 A kind of double forward beam propulsive mechanisms of hinge type
CN110486063A (en) * 2019-07-04 2019-11-22 四川新筑智能工程装备制造有限公司 One kind being used for vcehicular tunnel, railway tunnel suspension roof support construction equipment and engineering method
CN113006843A (en) * 2020-06-15 2021-06-22 浙江开山重工股份有限公司 Three-station push beam and anchoring device thereof
CN116988821A (en) * 2023-09-25 2023-11-03 湖南创远高新机械有限责任公司 Net-hanging jumbolter

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106979026B (en) * 2017-05-17 2023-07-04 中铁隧道集团有限公司 Drilling and injecting integrated tunnel anchor rod construction equipment
CN106979026A (en) * 2017-05-17 2017-07-25 中铁隧道集团有限公司 One kind bores the integrated tunnel anchor pole of note and performs equipment
CN110219308A (en) * 2018-05-29 2019-09-10 韩玉锐 A kind of soil nail wall slope retaining grouting device
CN108612551A (en) * 2018-07-06 2018-10-02 中国铁建重工集团有限公司 A kind of slip casting pipe support for rock bolting jumbo
CN108612551B (en) * 2018-07-06 2020-04-14 中国铁建重工集团股份有限公司 A slip casting pipe support for stock platform truck
CN109441495A (en) * 2018-11-02 2019-03-08 湖南五新隧道智能装备股份有限公司 A kind of tunnel arch installation vehicle and its method of controlling security
CN109236334A (en) * 2018-11-28 2019-01-18 佛山科学技术学院 A kind of support construction of the constructing tunnel with depositing dust slip casting function
CN110206571A (en) * 2019-04-23 2019-09-06 四川新筑智能工程装备制造有限公司 A kind of rock bolting jumbo and its operation engineering method for Tunnel Rock Bolt construction
CN110206571B (en) * 2019-04-23 2023-08-22 四川新筑智能工程装备制造有限公司 Anchor rod trolley for tunnel anchor rod support construction and operation method thereof
CN110486063A (en) * 2019-07-04 2019-11-22 四川新筑智能工程装备制造有限公司 One kind being used for vcehicular tunnel, railway tunnel suspension roof support construction equipment and engineering method
CN110306928A (en) * 2019-08-01 2019-10-08 重庆渝交机电设备有限公司 A kind of multifunctional drill and the non-blasting construction method of hard rock tunnel
CN110439474A (en) * 2019-08-27 2019-11-12 中铁隧道局集团有限公司 A kind of double forward beam propulsive mechanisms of hinge type
CN113006843A (en) * 2020-06-15 2021-06-22 浙江开山重工股份有限公司 Three-station push beam and anchoring device thereof
CN116988821A (en) * 2023-09-25 2023-11-03 湖南创远高新机械有限责任公司 Net-hanging jumbolter
CN116988821B (en) * 2023-09-25 2024-02-09 湖南创远高新机械有限责任公司 Net-hanging jumbolter

Similar Documents

Publication Publication Date Title
CN207004549U (en) One kind bores the integrated tunnel anchor pole of note and performs equipment
CN106979026A (en) One kind bores the integrated tunnel anchor pole of note and performs equipment
CN205977245U (en) Road multifunctional machinery ization tunnel supporting platform truck
CN107060844B (en) Two-arm two-basket steel arch installing machine for tunnel and steel arch construction method
CN106401476A (en) Multifunctional arching drill jambo
CN104879061A (en) Multifunctional self-propelled portal wagon drill
CN103244151A (en) Multifunctional support trolley for tunnel arches
CN102094579A (en) Full-hydraulic tire rock drilling anchoring drill carriage
CN102808623A (en) Coal mine underground multipurpose vehicle
CN102733433A (en) Hole-digging and poling all-in-one machine
CN110206571B (en) Anchor rod trolley for tunnel anchor rod support construction and operation method thereof
CN202866810U (en) Multifunctional car for underground coal mine
CN202325230U (en) Walking-pedrail type rotary drilling machine integrating crane
CN207944882U (en) Multifunctional all upright bar mechanical arm
CN203905071U (en) Multifunctional special mechanical engineering operating vehicle
CN206360642U (en) A kind of multi-functional arching drill jumbo
CN207420597U (en) A kind of tunnel rock bolting jumbo
CN206972279U (en) The tunnel basket steel arch-shelf fitting machine of two-arm two
CN203248072U (en) Self-walking shale gas drilling machine
CN202594665U (en) Multifunctional engineering truck
CN109779656A (en) A kind of radial type wet shot trolley
CN204505167U (en) Be applicable to the snap joint on graden machine
CN210917514U (en) Multifunctional rescue vehicle
CN210310099U (en) Multifunctional operation vehicle for underground engineering construction
CN212503717U (en) Crawler crane for coal mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

CF01 Termination of patent right due to non-payment of annual fee