CN106971266A - A kind of modern plant managing device - Google Patents

A kind of modern plant managing device Download PDF

Info

Publication number
CN106971266A
CN106971266A CN201710187306.6A CN201710187306A CN106971266A CN 106971266 A CN106971266 A CN 106971266A CN 201710187306 A CN201710187306 A CN 201710187306A CN 106971266 A CN106971266 A CN 106971266A
Authority
CN
China
Prior art keywords
management device
production
raw material
modern plant
warehousing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710187306.6A
Other languages
Chinese (zh)
Inventor
汪根生
任小体
游锦山
王勇
武鹏程
张鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Hundred Million Good Fortune Automation Science And Technology Ltd
Original Assignee
Hefei Hundred Million Good Fortune Automation Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Hundred Million Good Fortune Automation Science And Technology Ltd filed Critical Hefei Hundred Million Good Fortune Automation Science And Technology Ltd
Priority to CN201710187306.6A priority Critical patent/CN106971266A/en
Publication of CN106971266A publication Critical patent/CN106971266A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)

Abstract

A kind of modern plant managing device, including central controller, purchasing management device, material quality detection means, warehousing management device, production management device, production performs device, unqualified raw material silo, raw material silo and finished room.Instant invention overcomes the deficiencies in the prior art, linking is automated using central controller, purchasing management device, material quality detection means, warehousing management device, production management device, production performs device, unqualified raw material silo, raw material silo and finished room, improve the interaction compactness of various pieces in modern plant, intelligent management is realized, so as to improve processing efficiency and implementation capacity.

Description

A kind of modern plant managing device
Technical field
The present invention relates to intelligent plant technical field, a kind of modern plant managing device is particularly belonged to.
Background technology
Also known as manufactory, is large industrial buildings thing of the class to produce goods.Most of factory is owned by with large-scale The production line that machine or equipment are constituted.Refer to the big production of capitalism's machine in modern world history, i.e., worked using mechanization Instead of capitalism's industrial site of hand labour.18th~19 century, by the industrial revolution, machine extensive use in production, Solid material technological foundation has been established for capitalist mode.Capitalist economy relies on robotic big production, finally Feudal economy and small commodity economy are defeated, the dominant position of oneself is established.Modern times are also referred to as " manufactory ", " production to factory Enterprise ".
Intelligent plant, is exactly the office, management and the production automation that factory is realized using various up to date technics, reached To strengthening and specification business administration, reduce work mistake, block various leaks, improve operating efficiency, kept the safety in production, provide Decision references, the purpose strengthened extraneous contact, widen international market.Middle deep pool science and technology C4TA wisdom factory, specializes in the soft of this respect Part is developed.Middle deep C4TA wisdom factory dynamic management system can dynamically grasp order situation, progress situation, in product feelings Condition including recruitment, materials, cost change, can quick response customer demand, help enterprise to realize and service end to end, from disappearing The person of expense arrives producer.
The content of the invention
It is an object of the invention to provide a kind of modern plant managing device, the deficiencies in the prior art are overcome, are utilized Central controller, purchasing management device, material quality detection means, warehousing management device, production management device, production perform dress Put, unqualified raw material silo, raw material silo and finished room automate linking, improve the friendship of various pieces in modern plant Mutual compactness, realizes intelligent management, so as to improve processing efficiency and implementation capacity.
To solve the above problems, the technical solution used in the present invention is as follows:
A kind of modern plant managing device, including central controller, purchasing management device, material quality detection means, storage Managing device, production management device, production performs device, unqualified raw material silo, raw material silo and finished room, it is described in Centre controller is connected with production management device, for being arranged production task to you, described purchasing management device respectively with raw material Quality detection device and warehousing management device connection, for receive material quality data and warehousing management device to its convey it is total Starting material left inventory, described purchasing management device and material quality detection means is respectively connected with remote signal transmitting device, led to It is crossed to send on information, described production management device equipped with product structure, technique storage device to supplier's mobile phone, it is described Production management device respectively with warehousing management device and production performs device be connected, be connected with warehousing management device to its send Resourcing manifest, it is connected with production performs device and is sent to it in resourcing manifest and packaging technology, described production performs device point Several displays are not connected with, and described display is separately positioned in composing room, shown by display come spontaneous Produce managing device and sent to it in resourcing manifest and packaging technology, described workshop and also include final product quality tape deck.
Further, described unqualified raw material silo is connected with material quality detection means, for storing in raw material not Qualified products.
Further, described raw material silo is connected with warehousing management device, for storing the qualified products in raw material.
Further, described finished room be connected with final product quality tape deck and warehousing management device, for store and Record qualified finished product.
Further, described central controller is computer.
Further, described purchasing management device includes display module, the module that places an order and settlement module, described display mould Block is connected with warehousing management device, for showing raw material master list in warehouse, and the described module that places an order is transmitted with remote signal to be filled Put connection, give supplier's mobile phone transmission sequence information by it, described settlement module is connected with banking system, for supply Business pays the bill.
Further, described material quality detection means includes tape deck and conveyer, does not conform to for recording raw material Lattice product quantity and to purchasing management device and warehousing management device feedback data.
Further, described warehousing management device includes tape deck and conveyer, for recording raw material and finished product number Amount.
Further, described production management device is transfer conveyer, the constitutive material of product is issued into warehousing management Device is got the raw materials ready by it, and the technique of product is issued into production performs device, is shown in often by the display produced in performs device Individual workshop, for informing workman's production task and assemble method.
Compared with prior art, implementation result of the invention is as follows by the present invention:
A kind of modern plant managing device of the present invention, is detected using central controller, purchasing management device, material quality Device, warehousing management device, production management device, production performs device, unqualified raw material silo, raw material silo and finished room To automate linking, the interaction compactness of various pieces in modern plant is improved, intelligent management is realized, so as to improve processing Efficiency and implementation capacity.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
Embodiment
With reference to embodiment, the invention will be further described, but the present invention is not limited only to these examples, to be de- On the premise of from present inventive concept, carried out by it is any improvement be within the scope of the present invention.
As illustrated, a kind of modern plant managing device of the present invention, including central controller, purchasing management dress Put, material quality detection means, warehousing management device, production management device, production performs device, unqualified raw material silo, original Bin area and finished room, described central controller is connected with production management device, for being arranged production task to you, described Purchasing management device be connected respectively with material quality detection means and warehousing management device, for receive material quality data and Warehousing management device connects to the remaining inventory of total raw material that it is conveyed, described purchasing management device and material quality detection means It is connected to remote signal transmitting device, is sent by it to supplier's mobile phone on information, described production management device equipped with production Product structure, technique storage device, described production management device be connected respectively with warehousing management device and production performs device and Warehousing management device connects and sends resourcing manifest to it, is connected with production performs device to its transmission resourcing manifest and assembling work Several displays are connected in skill, described production performs device, described display is separately positioned on composing room It is interior, shown by display sent from production management device to it in resourcing manifest and packaging technology, described workshop and also Include final product quality tape deck;Described unqualified raw material silo is connected with material quality detection means, for storing original Substandard product in material;Described raw material silo is connected with warehousing management device, for storing the qualified products in raw material;Institute The finished room stated is connected with final product quality tape deck and warehousing management device, for storing and recording qualified finished product;Institute The central controller stated is computer;Described purchasing management device includes display module, the module that places an order and settlement module, described Display module be connected with warehousing management device, for showing raw material master list in warehouse, described place an order module and long-range letter The connection of number transmitting device, sequence information to supplier's mobile phone sent by it, described settlement module is connected with banking system, used Paid the bill in supplier;Described material quality detection means includes tape deck and conveyer, does not conform to for recording raw material Lattice product quantity and to purchasing management device and warehousing management device feedback data;Described warehousing management device includes record and filled Put and conveyer, for recording raw material and finished product quantity;Described production management device is transfer conveyer, by product Constitutive material is issued warehousing management device and got the raw materials ready by it, and the technique of product is issued into production performs device, and dress is performed by production The display put is shown in each workshop, for informing workman's production task and assemble method.

Claims (9)

1. a kind of modern plant managing device, it is characterised in that:Including central controller, purchasing management device, material quality Detection means, warehousing management device, production management device, production performs device, unqualified raw material silo, raw material silo and finished product Warehouse, described central controller is connected with production management device, for being arranged production task, described purchasing management dress to you Put and be connected respectively with material quality detection means and warehousing management device, for receiving material quality data and warehousing management device The remaining inventory of total raw material to its conveying, described purchasing management device and material quality detection means is respectively connected with remote signal Transmitting device, sent and deposited on information, described production management device equipped with product structure, technique to supplier mobile phone by it Equipment is stored up, described production management device is connected and warehousing management device with warehousing management device and production performs device respectively Connect and send resourcing manifest to it, be connected with production performs device to its transmission resourcing manifest and packaging technology, described production Several displays are connected in performs device, described display is separately positioned in composing room, by display Also include final product quality to show to send in resourcing manifest and packaging technology, described workshop to it from production management device Tape deck.
2. a kind of modern plant managing device according to claim 1, it is characterised in that:Described unqualified raw material cabin Storehouse is connected with material quality detection means, for storing the substandard product in raw material.
3. according to a kind of modern plant managing device described in claim 1 or 2 still one, it is characterised in that:Described original Bin area is connected with warehousing management device, for storing the qualified products in raw material.
4. a kind of modern plant managing device according to claim 3, it is characterised in that:Described finished room with into Quality tape deck and warehousing management device are connected, for storing and recording qualified finished product.
5. a kind of modern plant managing device according to claim 1, it is characterised in that:Described central controller is Computer.
6. a kind of modern plant managing device according to claim 1, it is characterised in that:Described purchasing management device Including display module, the module that places an order and settlement module, described display module is connected with warehousing management device, for showing warehouse Interior raw material master list, the described module that places an order is connected with remote signal transmitting device, gives supplier's mobile phone transmission order by it Information, described settlement module is connected with banking system, for being paid the bill to supplier.
7. a kind of modern plant managing device according to claim 1, it is characterised in that:Described material quality detection Device includes tape deck and conveyer, for recording raw material substandard product quantity and being managed to purchasing management device and storage Manage device feedback data.
8. a kind of modern plant managing device according to claim 1, it is characterised in that:Described warehousing management device Including tape deck and conveyer, for recording raw material and finished product quantity.
9. a kind of modern plant managing device according to claim 1, it is characterised in that:Described production management device Warehousing management device is issued for transfer conveyer, by the constitutive material of product to get the raw materials ready by it, and the technique of product is issued into production Performs device, each workshop is shown in, for informing workman's production task and assembling by the display produced in performs device Method.
CN201710187306.6A 2017-03-27 2017-03-27 A kind of modern plant managing device Pending CN106971266A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710187306.6A CN106971266A (en) 2017-03-27 2017-03-27 A kind of modern plant managing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710187306.6A CN106971266A (en) 2017-03-27 2017-03-27 A kind of modern plant managing device

Publications (1)

Publication Number Publication Date
CN106971266A true CN106971266A (en) 2017-07-21

Family

ID=59329842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710187306.6A Pending CN106971266A (en) 2017-03-27 2017-03-27 A kind of modern plant managing device

Country Status (1)

Country Link
CN (1) CN106971266A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886256A (en) * 2017-12-07 2018-04-06 温州中壹技术服务有限公司 A kind of plant information construction system based on Internet of Things
TWI771971B (en) * 2021-03-31 2022-07-21 宇辰系統科技股份有限公司 Plant management system
WO2023087726A1 (en) * 2021-11-19 2023-05-25 银川隆基光伏科技有限公司 Material control method and system, and storage medium and electronic device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202394265U (en) * 2011-12-20 2012-08-22 常州中晟智能科技有限公司 Coating line board-reading material management system
CN102737296A (en) * 2012-06-13 2012-10-17 南京康尼机电股份有限公司 Workflow managing and controlling system
CN103679322A (en) * 2012-10-24 2014-03-26 杭州金色能源科技有限公司 Production data processing method, device thereof, and system thereof
CN104217300A (en) * 2014-09-18 2014-12-17 安徽三只松鼠电子商务有限公司 Product traceability system and operation method thereof
US20150066565A1 (en) * 2013-08-30 2015-03-05 Kimberly-Clark Worldwide, Inc. Systems and methods for managing an inventory of component parts
CN106485383A (en) * 2015-08-31 2017-03-08 上海合印包装服务有限公司 A kind of printing quality monitoring system for carrying out putting judgement in storage

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202394265U (en) * 2011-12-20 2012-08-22 常州中晟智能科技有限公司 Coating line board-reading material management system
CN102737296A (en) * 2012-06-13 2012-10-17 南京康尼机电股份有限公司 Workflow managing and controlling system
CN103679322A (en) * 2012-10-24 2014-03-26 杭州金色能源科技有限公司 Production data processing method, device thereof, and system thereof
US20150066565A1 (en) * 2013-08-30 2015-03-05 Kimberly-Clark Worldwide, Inc. Systems and methods for managing an inventory of component parts
CN104217300A (en) * 2014-09-18 2014-12-17 安徽三只松鼠电子商务有限公司 Product traceability system and operation method thereof
CN106485383A (en) * 2015-08-31 2017-03-08 上海合印包装服务有限公司 A kind of printing quality monitoring system for carrying out putting judgement in storage

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886256A (en) * 2017-12-07 2018-04-06 温州中壹技术服务有限公司 A kind of plant information construction system based on Internet of Things
TWI771971B (en) * 2021-03-31 2022-07-21 宇辰系統科技股份有限公司 Plant management system
WO2023087726A1 (en) * 2021-11-19 2023-05-25 银川隆基光伏科技有限公司 Material control method and system, and storage medium and electronic device

Similar Documents

Publication Publication Date Title
CN104268738B (en) Material intelligent is stored in a warehouse and access method
CN107380990B (en) A kind of intelligent storage sorting station and its method for sorting
KR20190003214A (en) Warehouse Management System using smart glasses having bar code or QR code scan function and capable of communicating with RFID reader
CN106971266A (en) A kind of modern plant managing device
CN104978646A (en) Intelligent goods distribution system and method
CN104809609A (en) Intelligent warehouse management system and management method
CN104680354A (en) Storage task assignment and control system in logistics center
KR20190016015A (en) Warehouse Management System using smart glasses having QR code scan function and capable of communicating with RFID reader
CN102117433A (en) Warehouse management system
KR20190005006A (en) Warehouse Management System using smart glasses having bar code or QR code scan function and capable of communicating with RFID reader, and providing location management based on Beacon ID
CN105225028A (en) A kind of liquid crystal glass base production information method for tracing based on virtual ID
CN109284953A (en) Weight equipment manufacturing shop steel member is in product tracking management method
CN105894235A (en) Warehouse material distribution guiding system and method
CN105321059A (en) RFID based management method for packaged finished product warehouse
US11948120B2 (en) Systems and methods of merging retail products between containers to optimize storing capacity of retail storage facilities
CN107705073A (en) A kind of intelligent storage logistic management system and equipment based on 4G platform of internet of things
CN105160508A (en) Management method for power material storage
CN106803161A (en) Intelligent dispensing work station
CN108898333A (en) A kind of logistics control system and method for view-based access control model identification
CN201698487U (en) RFID logistics management system
CN103383754A (en) Automatic office service system based on bar codes
US20210133667A1 (en) Systems and methods for processing online product orders
CN101593309A (en) The computing machine system of operation and management of production enterprise
CN110738286B (en) Supply chain storage sorting method and system based on virtual data chain
CN202120317U (en) Visualization operation bar code in-out warehouse management system

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170721