CN106968707A - A kind of coal seam prevents and treats design method for the water damage of Main aquifer mine - Google Patents

A kind of coal seam prevents and treats design method for the water damage of Main aquifer mine Download PDF

Info

Publication number
CN106968707A
CN106968707A CN201710256250.5A CN201710256250A CN106968707A CN 106968707 A CN106968707 A CN 106968707A CN 201710256250 A CN201710256250 A CN 201710256250A CN 106968707 A CN106968707 A CN 106968707A
Authority
CN
China
Prior art keywords
working face
water
face
work
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710256250.5A
Other languages
Chinese (zh)
Other versions
CN106968707B (en
Inventor
巨峰
肖猛
李百宜
郭帅
裴玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710256250.5A priority Critical patent/CN106968707B/en
Priority to RU2019136167A priority patent/RU2729291C1/en
Priority to AU2017410433A priority patent/AU2017410433B2/en
Priority to PCT/CN2017/087330 priority patent/WO2018192067A1/en
Publication of CN106968707A publication Critical patent/CN106968707A/en
Application granted granted Critical
Publication of CN106968707B publication Critical patent/CN106968707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F11/00Rescue devices or other safety devices, e.g. safety chambers or escape ways
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Emergency Management (AREA)
  • Pulmonology (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

A kind of coal seam of the present invention prevents and treats design method for Main aquifer mine working face exploitation water damage, it is adaptable to which underground coal mine is used.By judging working face drainage system displacement, if there is working face local to oblique, if there is face roof wash zone and adjacent goaf, so that the drainability for being operated face is adjusted and guarantee and advance dewatering water in gob area.It is directed to the information gathering result of multiple objects, according to corresponding criterion, propose specific water control measures, the early warning of a variety of gushing water forms can be provided, it can reduce and be lost caused by Pitwater disaster hazard event, it might even be possible to reduce the casualties caused by Pitwater disaster hazard event.

Description

A kind of coal seam prevents and treats design method for the water damage of Main aquifer mine
Technical field
The present invention is that a kind of mine water disaster prevents and treats design method, is especially adapted for use in the coal seam that the anti-water damage of underground coal mine is used Design method is prevented and treated for Main aquifer mine water disaster.
Background technology
China's mine sudden flooding problem is always the significant technology issues for restricting Mine Safety in Production.For this problem, state It is inside and outside formd safety pillar under wa ter bodies stay set, the water-inrush prevention method such as draining depressurization, rock stratum grout transformation.Coal seam is Main aquifer Hydrogeological characteristics within coal mines to find first, such mine water disaster Prevention Technique has no both at home and abroad clearly to be reported.
The content of the invention
Technical problem:The present invention seeks to simple there is provided a kind of step in view of the deficiencies of the prior art, differentiate accurate Really, the coal seam of effectively reduction mine water disaster prevents and treats design method for Main aquifer mine water disaster.
Coal seam is that there is provided one kind with preventing and treating gushing water problem for safe working caused by Main aquifer this special hydrology geology Coal seam prevents and treats design method for the water damage of Main aquifer mine.
Technical scheme:Water damage prevention and controls are exploited in the coal seam of the present invention for Main aquifer mine working face, including step is such as Under:
A. the essential information of collection exploitation working face, including working face drainage system information, working face it is local to oblique information, Face roof washes away carrier state and adjacent goaf information;
B. periodically the working face drainage system drainability of split mining face is judged, so as to obtain drainage system work Make ability and state, locally judged for working face to oblique information, obtain working face and locally put and it is expected that disclose to loxosis Length information, washes away area's information for face roof and is judged, obtain put to loxosis and it is expected that disclose length information, for Adjacent goaf information is judged, obtains water in gob area situation information;
C. the combined drainage system work condition state, the working face that are obtained in appeal step are locally put to loxosis and it is expected that disclosed Length information, put to loxosis and it is expected that length information is disclosed and water in gob area situation information is adjusted, so as to obtain currently Exploit working face drainability;
D. the drainability calculated according to current exploitation working face, carries out advance dewatering using conventional control water technology and adopts The preventing and treating outlet capacity of dead zone ponding.
The working face drainage system ability to work criterion is 100-150m3/ h, if detection work at present face draining System ability to work is less than the value, then needs displacement needed for calculating work at present face and change drainage equipment;If working face draining System ability to work is more than the value, then needs further to check whether the working condition of working face drainage system is normal.
The working face drainage system Criterion To Judge The Energy Contribution be with the presence or absence of failure, if drainage system does not have failure, Then working face can be with normal construction;If drainage system has failure, early warning is carried out, and carries out working face drainability ensureing work Make.
Judge that working face is local to tiltedly whether there is, if in the absence of working face locally to oblique, working face can be applied normally Work;If it is local to oblique to there is working face, need to determine whether working face locally put to loxosis and it is expected that disclose length be more than or Less than criterion value.
It is described to be put to loxosis and it is expected that length judgment criterion value is disclosed for 50-100m, if being less than to the tiltedly estimated length that discloses The value, then working face can be with normal construction;If being more than the value to the tiltedly estimated length that discloses, provide alert, and carry out working face Drainability is adjusted and safeguard work.
On-site inspection washes away area with the presence or absence of top plate, if washing away area in the absence of top plate, working face can be with normal construction;If There is top plate and wash away area, then need to determine whether that top plate washes away zone position and it is expected that disclosing length is more than or less than standard value.
The top plate washes away zone position and it is expected that it is 50-100m to disclose length judgment criterion, if top plate washes away, area is estimated to take off Reveal length and be less than the value, then working face can be with normal construction;If top plate washes away area, the estimated length that discloses is more than the value, carries out pre- It is alert, and carry out the accounting of working face drainability and safeguard work.
Investigation whether there is adjacent goaf, if in the absence of adjacent goaf, working face can be with normal construction;If in the presence of Adjacent goaf, then need to determine whether adjacent water in gob area state.
Adjacent water in gob area state is judged, investigation whether there is adjacent water in gob area, if in the absence of adjacent goaf Ponding, then working face can be with normal construction;If there is adjacent water in gob area, need further to investigate adjacent water in gob area position Put, water accumulating volume and advance dewatering situation.
Advance dewatering was judged whether to according to on-site inspection, if having carried out advance dewatering, working face can be with Normal construction;If not yet carrying out advance dewatering, provide alert, and carry out advance dewatering engineering and checking and accepting.
Beneficial effect:It is the preventing and treating of main water-bearing layer water damage that the present invention breaks through prior art to solve coal seam with multi-crossed disciplines Problem, using the teaching of the invention it is possible to provide the early warning of a variety of gushing water forms, it is possible to reduce lost caused by Pitwater disaster hazard event, or even can To reduce the casualties caused by Pitwater disaster hazard event, it is this special geologic condition of Main aquifer to have filled up coal seam Lower water damage prevents and treats the blank of design method.The present invention is by collecting work face details, and judge module judges and selects preventing and treating Water measure, for directly driving and back production provide a kind of early warning system and Corresponding Countermeasures in aqueous coal seam, is that safety is tunneled and returned Adopt there is provided ensureing, the present invention is to solve the effective means that coal seam is the preventing and treating of main water-bearing layer water damage, its method simple linear, scheme Reasonable in design, implementation cost is low, and actual operation is strong.
Brief description of the drawings
Fig. 1 is that the coal seam of the present invention prevents and treats design method flow chart for the water damage of Main aquifer mine.
Embodiment
One embodiment of the present of invention is further described below in conjunction with the accompanying drawings:
As shown in figure 1, water damage prevention and controls are exploited in the coal seam of the present invention for Main aquifer mine working face, it is characterised in that It is as follows including step:
A. the essential information of collection exploitation working face, including working face drainage system information, working face it is local to oblique information, Face roof washes away carrier state and adjacent goaf information;
B. periodically the working face drainage system drainability of split mining face is judged, the work of working face drainage system Ability criterion is 100-150m3/ h, if detection work at present face drainage system ability to work is less than the value, needs to calculate and works as Displacement needed for leading face simultaneously changes drainage equipment;If working face drainage system ability to work is more than the value, need further Check whether the working condition of working face drainage system is normal, judge that working face drainage system whether there is failure, if draining system Unite no failure, then working face can be with normal construction;If drainage system has failure, early warning is carried out, and carry out working face row Outlet capacity safeguard work, so as to obtain drainage system ability to work and state;
Locally judged for working face to oblique information, obtain working face and locally put to loxosis and it is expected that disclose length letter Breath, judges that working face is local to tiltedly whether there is, if working face is not present locally to oblique, working face can be with normal construction;If There is working face local to oblique, then need to determine whether that working face is locally put to loxosis and it is expected that disclosing length and being more than or less than sentenced Disconnected standard value, judges to put to loxosis and it is expected that disclose length and standard value 50-100m relation, if to disclose length small to tiltedly estimated In the value, then working face can be with normal construction;If being more than the value to the tiltedly estimated length that discloses, provide alert, and be operated Face drainability is adjusted and safeguard work;
Area's information is washed away for face roof to be judged, is obtained and is put to loxosis and it is expected that disclose length information, on the spot Investigation washes away area with the presence or absence of top plate, if washing away area in the absence of top plate, working face can be with normal construction;If having top plate to wash away Area, then need to determine whether that top plate washes away zone position and it is expected that disclosing length is more than or less than criterion value 50-100m, if top Plate washes away the estimated length that discloses in area and is less than the value, then working face can be with normal construction;If top plate washes away area, estimated exposure length is big In the value, then early warning is carried out, and carry out the accounting of working face drainability and safeguard work;
Judged for adjacent goaf information, investigation whether there is adjacent goaf, if in the absence of adjacent goaf, Then working face can be with normal construction;If there is adjacent goaf, need to determine whether adjacent water in gob area state, judge phase Adjacent water in gob area state, investigation whether there is adjacent water in gob area, if in the absence of adjacent water in gob area, working face can With normal construction;If there is adjacent water in gob area, need further to investigate adjacent water in gob area position, water accumulating volume and advanced Unrestrained situation;Advance dewatering was judged whether to according to on-site inspection, if having carried out advance dewatering, working face can be with Normal construction;If not yet carrying out advance dewatering, provide alert, and carry out advance dewatering engineering and checking and accepting;
C. the combined drainage system work condition state, the working face that are obtained in appeal step are locally put to loxosis and it is expected that disclosed Length information, put to loxosis and it is expected that length information is disclosed and water in gob area situation information is adjusted, so as to obtain currently Exploit working face drainability;
D. the drainability calculated according to current exploitation working face, carries out advance dewatering using conventional control water technology and adopts The preventing and treating outlet capacity of dead zone ponding.
Embodiment one:
By taking the aqueous coal seam underground driving of certain ore deposit and back production as an example, ore deposit master adopts 2# coal seams.Wherein 2# coal seams simultaneously based on contain Water layer, buried depth 350m.The main water damage of working face threatens more, mainly there is local to Xie Qu and straight sieve group wash zone, 2# coal seam waters And roof water, when a variety of water source comprehensive functions, driving and stope water yield will be increased to 110-160m3/ h, if Now working face drainability is not enough or breaks down, may local ponding even flood equipment;In addition, the ore deposit working face with Based on slow exploitation of going up a hill, goaf west side Adjacent Working Face driving and back production have to face water in gob area threat, if Water in gob area not discharge or the closed failure of connection roadway in time, it may occur that the old empty water water inrush accident of working face.For this Situation, by collecting work face details, corresponding water control measures are selected using judge module, are embodied as follows:
A. gather 11213 driving face essential informations, acquisition target include working face drainage system, working face it is local to Tiltedly, face roof wash zone and adjacent goaf;
B. 11213 driving face essential informations are inputted into judge module, selects working face to prevent according to specific criterion Harness the river concrete measure;
C. drainage system ability to work criterion is 100-150m in the judge module3/ h, if 11213 headworks Face drainage system ability to work is less than the value, then needs to carry out drainability accounting;If 11213 driving face drainage systems work Ability is more than the value, then needs further to check the working condition of working face drainage system;
D. whether the working face drainage system Criterion To Judge The Energy Contribution is normal, if 11213 driving face drainings System is working properly, then working face can be with normal construction;If the work of 11213 driving face drainage systems is abnormal, propose Early warning, and carry out working face drainability safeguard work;
E. it to oblique criterion is local to oblique with the presence or absence of working face that working face is local in the judge module, if 11213 driving faces are not present local to oblique, then working face can be with normal construction;If 11213 driving faces exist local To oblique, then need to determine whether that working face is locally put to loxosis and it is expected that discloses length;
F. it is described to be put to loxosis and it is expected that it is 50-100m to disclose length judgment criterion, if 11213 headworks are towards tiltedly pre- Meter discloses length and is less than the value, then working face can be with normal construction;If 11213 headworks are more than towards the tiltedly estimated length that discloses The value, then provide alert, and carries out the accounting of working face drainability and safeguard work;
G. top plate washes away area's criterion to wash away area with the presence or absence of top plate in the judge module, if 11213 heading drivers Make face and wash away area in the absence of top plate, then working face can be with normal construction;If 11213 driving faces, which have top plate, washes away area, It need to determine whether that top plate washes away zone position and it is expected that discloses length;
H. the top plate washes away zone position and it is expected that it is 50-100m to disclose length judgment criterion, if 11213 driving faces Top plate washes away the estimated length that discloses in area and is less than the value, then working face can be with normal construction;If 11213 driving face top plates wash away The estimated length that discloses in area is more than the value, then provides alert, and carry out the accounting of working face drainability and safeguard work;
I. the adjacent goaf criterion is with the presence or absence of adjacent goaf, if 11213 driving faces are not present Adjacent goaf, then working face can be with normal construction;If 11213 driving faces have adjacent goaf, need further to sentence Disconnected adjacent water in gob area state;
J. the adjacent water in gob area condition adjudgement standard is with the presence or absence of adjacent water in gob area, if 11213 drivings Adjacent water in gob area is not present in working face, then working face can be with normal construction;If 11213 driving faces exist adjacent mined out Area's ponding, then need further to investigate adjacent water in gob area position, water accumulating volume and advance dewatering situation;
K. whether the adjacent goaf advance dewatering criterion is carried out advance dewatering, if having carried out advanced Unrestrained, then working face can be with normal construction;If not yet carrying out advance dewatering, provide alert, and carry out advance dewatering engineering and Checking and accepting.

Claims (10)

1. a kind of coal seam, which is Main aquifer mine working face, exploits water damage prevention and controls, it is characterised in that as follows including step:
A. the essential information of collection exploitation working face, including working face drainage system information, working face are locally to oblique information, work Make face top plate and wash away carrier state and adjacent goaf information;
B. periodically the working face drainage system drainability of split mining face is judged, so as to obtain drainage system work Ability and state, are locally judged for working face to oblique information, are obtained working face and are locally put to loxosis and it is expected that disclose length Information is spent, area's information is washed away for face roof and is judged, is obtained and is put to loxosis and it is expected that length information is disclosed, for phase Adjacent goaf information is judged, obtains water in gob area situation information;
C. the combined drainage system work condition state, the working face that are obtained in appeal step are locally put to loxosis and grown it is expected that disclosing Degree information, put to loxosis and it is expected that length information is disclosed and water in gob area situation information is adjusted, so as to currently be opened Mining face drainability;
D. the drainability calculated according to current exploitation working face, carries out advance dewatering mined out using conventional control water technology The preventing and treating outlet capacity of area's ponding.
2. coal seam according to claim 1 is the water damage prevention and controls of Main aquifer mine, it is characterised in that:The work Face drainage system ability to work criterion is 100-150m3/ h, if detection work at present face drainage system ability to work is less than The value, then need displacement needed for calculating work at present face and change drainage equipment;If working face drainage system ability to work is more than The value, then need further to check whether the working condition of working face drainage system is normal.
3. coal seam according to claim 2 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that:It is described Working face drainage system Criterion To Judge The Energy Contribution is that with the presence or absence of failure, if drainage system does not have a failure, working face can be with Normal construction;If drainage system has failure, early warning is carried out, and carry out working face drainability safeguard work.
4. coal seam according to claim 1 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that:Judge Working face is local to tiltedly whether there is, if in the absence of working face locally to oblique, working face can be with normal construction;If there is work Face is local to oblique, then needs to determine whether that working face is locally put to loxosis and it is expected that disclosing length is more than or less than criterion Value.
5. coal seam according to claim 4 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that:It is described Put to loxosis and it is expected that it is 50-100m to disclose length judgment criterion value, if being less than the value, working face to the tiltedly estimated length that discloses Can be with normal construction;If being more than the value to the tiltedly estimated length that discloses, provide alert, and carry out the accounting of working face drainability and Safeguard work.
6. a kind of coal seam according to claim 1 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that: On-site inspection washes away area with the presence or absence of top plate, if washing away area in the absence of top plate, working face can be with normal construction;If there is top plate Area is washed away, then needs to determine whether that top plate washes away zone position and it is expected that disclosing length is more than or less than standard value.
7. a kind of coal seam according to claim 6 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that: The top plate washes away zone position and it is expected that it is 50-100m to disclose length judgment criterion, if top plate washes away area, estimated exposure length is small In the value, then working face can be with normal construction;If top plate washes away area, the estimated length that discloses is more than the value, carries out early warning, goes forward side by side Row working face drainability is adjusted and safeguard work.
8. a kind of coal seam according to claim 1 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that: Investigation whether there is adjacent goaf, if in the absence of adjacent goaf, working face can be with normal construction;If existing adjacent mined out Area, then need to determine whether adjacent water in gob area state.
9. a kind of coal seam according to claim 8 prevents and treats design method for the water damage of Main aquifer mine, it is characterised in that: Adjacent water in gob area state is judged, investigation whether there is adjacent water in gob area, if in the absence of adjacent water in gob area, work Making face can be with normal construction;If there is adjacent water in gob area, need further to investigate adjacent water in gob area position, water accumulating volume With advance dewatering situation.
10. a kind of coal seam according to claim 9 prevents and treats design method for the water damage of Main aquifer mine, its feature exists In:Advance dewatering was judged whether to according to on-site inspection, if having carried out advance dewatering, working face can be applied normally Work;If not yet carrying out advance dewatering, provide alert, and carry out advance dewatering engineering and checking and accepting.
CN201710256250.5A 2017-04-19 2017-04-19 Design method for preventing and controlling water damage of mine with coal seam as main water-containing layer Active CN106968707B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201710256250.5A CN106968707B (en) 2017-04-19 2017-04-19 Design method for preventing and controlling water damage of mine with coal seam as main water-containing layer
RU2019136167A RU2729291C1 (en) 2017-04-19 2017-06-06 Method for planning prevention and elimination of accidents associated with accumulation of water for mine containing coal bed in form of main water-bearing horizon
AU2017410433A AU2017410433B2 (en) 2017-04-19 2017-06-06 Water disaster prevention and treatment design method for mine taking coal bed as main aquifer
PCT/CN2017/087330 WO2018192067A1 (en) 2017-04-19 2017-06-06 Water disaster prevention and treatment design method for mine taking coal bed as main aquifer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256250.5A CN106968707B (en) 2017-04-19 2017-04-19 Design method for preventing and controlling water damage of mine with coal seam as main water-containing layer

Publications (2)

Publication Number Publication Date
CN106968707A true CN106968707A (en) 2017-07-21
CN106968707B CN106968707B (en) 2020-01-21

Family

ID=59332338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256250.5A Active CN106968707B (en) 2017-04-19 2017-04-19 Design method for preventing and controlling water damage of mine with coal seam as main water-containing layer

Country Status (4)

Country Link
CN (1) CN106968707B (en)
AU (1) AU2017410433B2 (en)
RU (1) RU2729291C1 (en)
WO (1) WO2018192067A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468566A (en) * 2018-03-26 2018-08-31 中煤科工集团西安研究院有限公司 Really method is put in spy to empty crystal to mine based on underground pencil directional drilling always
CN115324592A (en) * 2022-07-26 2022-11-11 陕西延长石油矿业有限责任公司 Dynamic monitoring and dynamic response control method for aquifer for well construction

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110675273B (en) * 2019-10-15 2022-08-12 神华神东煤炭集团有限责任公司 Method for judging water and sand bursting disasters of coal face
CN111577382A (en) * 2020-04-14 2020-08-25 河北昕佳工程勘查设计有限公司 Water damage prevention and comprehensive water resource utilization method for karst big water iron mine in Hebei Handan chen region
CN114837739A (en) * 2022-01-24 2022-08-02 中国矿业大学(北京) Coal-water-heat collaborative co-mining and water disaster heat damage treatment system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090316530A1 (en) * 2008-06-18 2009-12-24 Jerry Bunyard Bi-directional seismic communication system and method
KR20120089017A (en) * 2011-02-01 2012-08-09 김태환 Key stone monitoring system and tunnel construction method thereof
CN104265371A (en) * 2014-10-21 2015-01-07 中煤科工集团西安研究院有限公司 Coal mine working face water prevention water damage detecting method
CN105930634A (en) * 2016-04-06 2016-09-07 中国神华能源股份有限公司 Mine water disaster early warning method
CN106089296A (en) * 2016-06-16 2016-11-09 陕西省煤田地质有限公司 A kind of prevention and treatment method of roof absciss layer water
CN106246224A (en) * 2016-08-11 2016-12-21 山东科技大学 Mine water disaster at-once monitor early warning system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU676737A1 (en) * 1978-06-26 1979-07-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method of reducing inflow of water into mine workings
CN101008317A (en) * 2006-01-27 2007-08-01 李维熙 Coal mine safety disaster-resistant type automatic main drainage system
US8381726B2 (en) * 2006-08-16 2013-02-26 Rescue Air Systems, Inc. Safety system and method of an underground mine
KR100883400B1 (en) * 2008-06-05 2009-02-12 경인시설안전기술단(주) Water leak detecting and safety diagnosis device for tunnel
CN103742145B (en) * 2013-12-24 2016-01-20 山东新阳能源有限公司 Colliery rich water abnormal area water prevention method
CN103899356A (en) * 2014-02-21 2014-07-02 北京华安奥特科技有限公司 Integrated information system for monitoring, early warning, management and control of mine water disasters

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090316530A1 (en) * 2008-06-18 2009-12-24 Jerry Bunyard Bi-directional seismic communication system and method
KR20120089017A (en) * 2011-02-01 2012-08-09 김태환 Key stone monitoring system and tunnel construction method thereof
CN104265371A (en) * 2014-10-21 2015-01-07 中煤科工集团西安研究院有限公司 Coal mine working face water prevention water damage detecting method
CN105930634A (en) * 2016-04-06 2016-09-07 中国神华能源股份有限公司 Mine water disaster early warning method
CN106089296A (en) * 2016-06-16 2016-11-09 陕西省煤田地质有限公司 A kind of prevention and treatment method of roof absciss layer water
CN106246224A (en) * 2016-08-11 2016-12-21 山东科技大学 Mine water disaster at-once monitor early warning system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国煤炭工业协会: "《煤矿防治水技术》", 31 March 2014, 中国矿业大学 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468566A (en) * 2018-03-26 2018-08-31 中煤科工集团西安研究院有限公司 Really method is put in spy to empty crystal to mine based on underground pencil directional drilling always
CN108468566B (en) * 2018-03-26 2019-11-26 中煤科工集团西安研究院有限公司 Empty crystal really visits and puts method mine based on underground pencil directional drilling always
CN115324592A (en) * 2022-07-26 2022-11-11 陕西延长石油矿业有限责任公司 Dynamic monitoring and dynamic response control method for aquifer for well construction

Also Published As

Publication number Publication date
CN106968707B (en) 2020-01-21
AU2017410433B2 (en) 2021-03-11
AU2017410433A1 (en) 2019-11-28
WO2018192067A1 (en) 2018-10-25
RU2729291C1 (en) 2020-08-05

Similar Documents

Publication Publication Date Title
CN106968707A (en) A kind of coal seam prevents and treats design method for the water damage of Main aquifer mine
CN101403314B (en) Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique
CN108119142A (en) "-three-two subregions of band of five figures " water-protection coal-mining method
CN103924975B (en) A kind of for the water-retaining method in coal mining process
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN100560937C (en) A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
CN106089296B (en) A kind of prevention and treatment method of roof absciss layer water
CN109281707B (en) Advanced prevention and control method for water damage of working face roof separation layer
CN104074541A (en) Solid filling mining design method under water body
CN105179014A (en) Coal mine water inrush disaster pre-warning method and device
CN111980756B (en) Abnormity monitoring method and abnormity monitoring system for mine roof
CN102943690A (en) Method for preventing and treating separation layer water of top plate of coal face
CN103726844A (en) Automatic coal mining method based on coal mining work surface
CN105930634A (en) Mine water disaster early warning method
CN111379562B (en) Water-controlled coal mining method and device under composite water body
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN113586160B (en) Comprehensive-caving face water condition monitoring system based on artificial intelligence
CN111652509B (en) Method for classifying and distinguishing water inrush risk of Taiyuan limestone aquifer based on multiple variables
CN115467639A (en) Water interception and emission reduction method for directionally exploring and blocking ground
CN215109009U (en) Drilling system for realizing continuous gas extraction in working face extraction process
CN208330457U (en) The coal mine empty unrestrained filtering water control device of water always
CN113217096A (en) Goaf accumulated water treatment method suitable for multi-coal-seam mining monoclinic structure mining area
CN112901272A (en) Geophysical prospecting and drilling cooperative advanced water detection and drainage construction method
CN112576306B (en) Method for controlling water inflow of large water mine roof in descending mode

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant