CN106958260A - A kind of pipe gallery - Google Patents
A kind of pipe gallery Download PDFInfo
- Publication number
- CN106958260A CN106958260A CN201710282103.5A CN201710282103A CN106958260A CN 106958260 A CN106958260 A CN 106958260A CN 201710282103 A CN201710282103 A CN 201710282103A CN 106958260 A CN106958260 A CN 106958260A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- lane body
- water treatment
- pipe
- dividing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 164
- 238000003860 storage Methods 0.000 claims abstract description 67
- 230000035939 shock Effects 0.000 claims abstract description 38
- 210000005056 cell body Anatomy 0.000 claims abstract description 31
- 239000013049 sediment Substances 0.000 claims abstract description 28
- 238000004804 winding Methods 0.000 claims description 36
- 239000011152 fibreglass Substances 0.000 claims description 35
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 210000004027 cell Anatomy 0.000 claims description 9
- 230000035699 permeability Effects 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 4
- 230000008569 process Effects 0.000 claims description 4
- 238000005286 illumination Methods 0.000 claims description 3
- 230000003139 buffering effect Effects 0.000 claims 1
- 239000010865 sewage Substances 0.000 abstract description 14
- 230000015572 biosynthetic process Effects 0.000 abstract description 6
- 238000006243 chemical reaction Methods 0.000 abstract description 5
- 238000009440 infrastructure construction Methods 0.000 abstract description 2
- 230000009471 action Effects 0.000 description 10
- 230000007774 longterm Effects 0.000 description 8
- 239000011521 glass Substances 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 5
- 238000000926 separation method Methods 0.000 description 5
- 238000004140 cleaning Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000003973 irrigation Methods 0.000 description 4
- 230000002262 irrigation Effects 0.000 description 4
- 230000001681 protective effect Effects 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 239000000567 combustion gas Substances 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 238000000338 in vitro Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000012384 transportation and delivery Methods 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001727 in vivo Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of pipe gallery, belong to and dividing plate is provided with civilian infrastructure construction field, including piping lane body, piping lane body, lower surface and the piping lane body formation blowdown area of dividing plate, it is characterised in that:Water treatment facilities and storage tank are provided with the dividing plate; water treatment facilities includes sediment separator and water treatment machine; sediment separator is connected by the first clear water pipe with water treatment machine; water treatment machine is connected by the second clear water pipe with storage tank; the outlet pipe for passing piping lane body is connected with storage tank; guard box is additionally provided with the piping lane body; the water treatment machine is located in guard box; shock mount is provided with dividing plate; cell body is provided with shock mount; cell body is embedded with cystosepiment, and guard box is fixed on cystosepiment.Reasonable utilization of the present invention piping lane body interior space, has carried out rational layout, water treatment machine operates steadily, shock resistance is good to each part, is capable of the good conversion of effective guarantee sewage and rainwater.
Description
Technical field
The present invention relates to civilian infrastructure construction field, more particularly to a kind of pipe gallery.
Background technology
Pipe gallery is exactly the comprehensive corridor of underground urban duct.I.e. Urban Underground build a tunnel space, by electric power,
Communicate, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, provided with special access hole, hoisting port and monitoring system
System, implements unified planning, Uniting, unified construction and manages.
Underground pipe gallery system not only solves Urban Traffic Jam Based, also greatly facilitate electric power, communication, combustion gas,
The maintenance and maintenance of the urban operating mechanisms such as water supply and sewage.
Underground pipe gallery is played an important role to meeting people's livelihood primary demand and improving city integrated bearing capacity.Reduction
Expense and the maintenance cost of utilities pipeline that road surface is repeatedly overhauled.Maintain road surface integrality and all kinds of pipelines it is durable
Property, it is easy to laying, increase and decrease, repairing and daily management for various pipelines.And pipeline enters ground together, trolley line and greening are reduced
Contradiction.But common pipe gallery be only used for various pipelines paving just and sewage rainwater discharge, fail fully effective profit
With the space under road, urban land fails complete reasonable utilization.
Publication No. CN 203256773U, publication date discloses one kind for the Chinese patent literature on October 30th, 2013
Heavy in section arch prestressing force Urban Underground pipe gallery, it is characterised in that:Including concrete arch body and being arranged on arch tube
Internal outer layer skeleton and nexine skeleton, is provided with arch bobbin, between outer layer skeleton and nexine skeleton on outer layer skeleton
Longitudinal bobbin is provided with, the bottom of arch body is provided with connecting bottom board, horizontal bobbin is provided with connecting bottom board, in arch
The steel strand wires fixed through tensioning generation prestressing force, with anchorage are provided with shape bobbin and longitudinal bobbin and horizontal bobbin, in arch
The end of shape body is provided with connecting box.
Heavy in section arch prestressing force Urban Underground pipe gallery disclosed in the patent document, although with higher intensity,
But, because structure design is unreasonable, piping lane inner space can not rationally be utilized, and space waste is larger.
Publication No. CN 104294845A, publication date disclosed one kind for the Chinese patent literature of on 01 21st, 2015
City integrated piping lane, it is characterised in that:Comprising gallery main body, the gallery body interior is provided with central dividing plate, the centre
Gallery main body is divided into pipe trench portion and drainage channel for placing municipal pipeline by dividing plate, the pipe trench portion and drainage channel it is upper
Side, which is respectively arranged with pipeline cover plate and water drainage cover board, the water drainage cover board, is provided with some spilled water holes, the central dividing plate
Lower section is connected by upset bearing pin with the bottom surface of gallery main body.
City integrated piping lane disclosed in the patent document, although the rainwater and sewage on ground can effectively be drained, but
It is undoubtedly to cause the waste of water, rainwater and sewage can not be utilized rationally.
The content of the invention
The present invention is in order to overcome the defect of above-mentioned prior art there is provided a kind of pipe gallery, reasonable utilization of the present invention pipe
Corridor body interior space, rational layout has been carried out to each part, and water treatment machine operates steadily, and shock resistance is good, can effectively be protected
Hinder the good conversion of sewage and rainwater.
The present invention is achieved through the following technical solutions:
Dividing plate is provided with a kind of pipe gallery, including piping lane body, piping lane body, lower surface and the piping lane body of dividing plate are formed
Blowdown area, it is characterised in that:Water treatment facilities and storage tank are provided with the dividing plate, the water treatment facilities includes silt point
From device and water treatment machine, sediment separator is connected by the first clear water pipe with water treatment machine, and water treatment machine passes through the second clear water pipe
It is connected with storage tank, is connected with the storage tank in the outlet pipe for passing piping lane body, the piping lane body and is additionally provided with guarantor
Protecting box, the water treatment machine is located in guard box, is provided with the dividing plate on shock mount, shock mount and is provided with cell body, in cell body
Cystosepiment is embedded with, the guard box is fixed on cystosepiment.
It is provided with the piping lane body on explosion-proof fan, explosion-proof fan and is connected with exhaust tube, exhaust tube stretches into piping lane sheet
In vivo, check valve is connected with exhaust tube, it is external that check valve is located at piping lane sheet.
It is additionally provided with the piping lane body on induced-draught fan, induced-draught fan and is connected with air inlet pipe, air inlet pipe stretches into piping lane body
It is interior.
Illuminating lamp is provided with the piping lane body, illuminating lamp is fixed on the inner roof wall of piping lane body.
The storage tank includes glass reinforced plastic winding pipeline, the first end cap and the second end cap, the first end cap and glass reinforced plastic winding
One end of pipeline is tightly connected, and the other end of the second end cap and glass reinforced plastic winding pipeline is tightly connected.
Groove is provided with the dividing plate, the cross section semicircular in shape of groove, glass reinforced plastic winding pipeline is placed in groove.
It is provided with the roof of the glass reinforced plastic winding pipeline on manhole and permeability cell, manhole and is hinged with cover plate.
The top of second end cap is connected with overflow pipe, and bottom is connected with blow-off pipe.
Bumper bracket is provided with the shock mount, bumper bracket is made up of rectangle inside casing, buffer spring and rectangular outer frame, buffered
One end of spring is connected with rectangle inside casing, and the other end is connected with rectangular outer frame, the inwall of rectangle inside casing and the outer wall phase of guard box
Contact.
Column is provided with the piping lane body, one end of column is embedded on the inner roof wall of piping lane body, and the other end is embedded in
In the inner bottom wall of piping lane body, steel screen layer is fixedly connected with the inwall of piping lane body.
In use, the entrance of rainwater and sewage through sediment separator enters the silt separation for being arranged on piping lane body interior
Device, sediment separator is started working, and silt and water are separated, and sewage draining exit of the silt through sediment separator enters blowdown area,
Water is then flowed into water treatment machine by the first clear water pipe, and water treatment machine is started working, and purified treatment is carried out to the water separated,
Water after after-treatment most enters in storage tank through the second clear water pipe afterwards is used as domestic water.When crop irrigation, city
When ground cleaning etc. needs to need to use water with the place of water, the water being stored in storage tank can just be discharged through outlet pipe and utilized.
By the way that water treatment machine is arranged in guard box, under the protective action of guard box, the damage of water treatment machine can be reduced;Every
Shock mount is set on plate, cystosepiment is embedded in the cell body of shock mount, then guard box is fixed on cystosepiment, cystosepiment has
Good cushioning effect, cell body can play good position-limiting action to guard box, so that whole guard box has well
Antihunt action.
Beneficial effects of the present invention are mainly manifested in following aspect:
First, it is of the invention, water treatment facilities and storage tank are provided with dividing plate, water treatment facilities includes sediment separator and water process
Machine, sediment separator is connected by the first clear water pipe with water treatment machine, and water treatment machine is connected by the second clear water pipe with storage tank,
It is connected with storage tank in the outlet pipe for passing piping lane body, piping lane body and is additionally provided with guard box, water treatment machine is located at protection
In case, it is provided with dividing plate on shock mount, shock mount and is provided with cell body, cell body is embedded with cystosepiment, guard box is fixed on cystosepiment
On, rainwater and sewage on ground enter sediment separator, and the silt after sediment separator is separated enters blowdown area,
Water after separation is then entered in water treatment machine by the first clear water pipe, the water that water treatment machine is separated to sediment separator again
Handled, the water after after-treatment most enters in storage tank as domestic water through the second clear water pipe afterwards, works as crops
When irrigation, ground cleaning, the water in storage tank can be discharged by outlet pipe;Because car is more on ground, easily
Vibrations are produced, under external environment influence, the ground after long-term use, which is easily produced, to be collapsed, by the way that water treatment machine is arranged on into guarantor
In protecting box, under the protective action of guard box, the damage of water treatment machine can be reduced;Shock mount is set on dividing plate, by foam
Plate is embedded in the cell body of shock mount, then guard box is fixed on cystosepiment, and cystosepiment has good cushioning effect, cell body energy
It is enough that good position-limiting action is played to guard box, so that whole guard box has good antihunt action;Overall plan is closed
Reason has used piping lane body interior space, has carried out rational layout to each part, water treatment machine operates steadily, shock resistance is good,
It is capable of the good conversion of effective guarantee sewage and rainwater.
2nd, it is of the invention, it is provided with piping lane body on explosion-proof fan, explosion-proof fan and is connected with exhaust tube, exhaust tube is stretched into
In piping lane body, check valve is connected with exhaust tube, check valve is located at piping lane sheet in vitro, after long-term use, piping lane body interior
Air is muddy, extracts the muddy air of piping lane body interior out by explosion-proof fan, is easy to attendant to each portion in piping lane inside
Part is overhauled, and security is safeguarded in guarantee.
3rd, it is of the invention, it is additionally provided with piping lane body on induced-draught fan, induced-draught fan and is connected with air inlet pipe, air inlet pipe stretches into pipe
In corridor body, piping lane body exterior fresh air can be drawn into by piping lane body interior by induced-draught fan, beneficial to attendant
Carry out service work.
4th, it is of the invention, illuminating lamp is provided with piping lane body, illuminating lamp is fixed on the inner roof wall of piping lane body, passed through
Illuminating lamp is set in piping lane body, good illumination can be provided for piping lane body interior, be easy to attendant to be overhauled
Work.
5th, of the invention, storage tank includes glass reinforced plastic winding pipeline, the first end cap and the second end cap, the first end cap and glass
The one end in steel winding pipe road is tightly connected, and the other end of the second end cap and glass reinforced plastic winding pipeline is tightly connected, using fiberglass
Winding pipe, with higher toughness and mechanical strength, can ensure the long-term of whole storage tank as the main element of storage tank
Stability in use.
6th, it is of the invention, groove is provided with dividing plate, the cross section semicircular in shape of groove, glass reinforced plastic winding pipeline is placed in groove
Interior, support and position-limiting action that the groove on dividing plate can be good to glass fiber reinforced plastic wound tube offer prevent that whole storage tank from producing
Rock, with certain shock resistance, beneficial to the water delivery work for ensureing that water treatment machine is stablized to storage tank.
7th, it is of the invention, it is provided with the roof of glass reinforced plastic winding pipeline on manhole and permeability cell, manhole and is hinged with cover plate,
By setting manhole, it is easy to attendant to enter in storage tank and cleans, good ventilation is carried out by permeability cell, it is possible to increase dimension
Protect security.
8th, of the invention, the top of the second end cap is connected with overflow pipe, and bottom is connected with the water dress in blow-off pipe, storage tank
Gone out after full by overflow pipe overflow, the tension force of water suffered by water storage chamber interior wall can be reduced, it is to avoid storage tank is damaged, and passes through blowdown
Pipe can discharge the muddy silt water that the bottom of storage tank is deposited in after long-time.
9th, it is of the invention, bumper bracket is provided with shock mount, bumper bracket is by rectangle inside casing, buffer spring and rectangular outer frame structure
Into one end of buffer spring is connected with rectangle inside casing, and the other end is connected with rectangular outer frame, the inwall of rectangle inside casing and guard box
Outer wall is in contact, when piping lane is by greater impact, and the buffer spring in bumper bracket can reduce the horizontal punching that guard box is subject to
Power is hit, the double swerve of guard box by a relatively large margin is prevented, and then the stability of water treatment machine can be improved, so as to ensure water process
Work operation steady in a long-term.
Tenth, it is of the invention, column is provided with piping lane body, one end of column is embedded on the inner roof wall of piping lane body, another
End is embedded in the inner bottom wall of piping lane body, and column can provide good support for piping lane body, strengthens the intensity of piping lane;Piping lane
Steel screen layer is fixedly connected with the inwall of body, the toughness of piping lane is further increased, extends the service life of piping lane.
Brief description of the drawings
The present invention is described in further detail below in conjunction with specification drawings and specific embodiments, wherein:
Fig. 1 is structural representation of the invention;
Fig. 2 is the structural representation of the embodiment of the present invention 2;
Fig. 3 is the structural representation of the embodiment of the present invention 3;
Fig. 4 is the structural representation of the embodiment of the present invention 4;
Fig. 5 is the structural representation of the embodiment of the present invention 5;
Marked in figure:1st, piping lane body, 2, dividing plate, 3, storage tank, 4, sediment separator, 5, water treatment machine, the 6, first clear water pipe,
7th, the second clear water pipe, 8, outlet pipe, 9, guard box, 10, shock mount, 11, cell body, 12, cystosepiment, 13, explosion-proof fan, 14, take out
Tracheae, 15, check valve, 16, induced-draught fan, 17, air inlet pipe, 18, illuminating lamp, 19, glass reinforced plastic winding pipeline, the 20, first end cap,
21st, the second end cap, 22, groove, 23, manhole, 24, permeability cell, 25, cover plate, 26, overflow pipe, 27, blow-off pipe, 28, in rectangle
Frame, 29, buffer spring, 30, rectangular outer frame, 31, column, 32, steel screen layer.
Embodiment
Embodiment 1
Referring to Fig. 1, a kind of pipe gallery, including piping lane body 1 is provided with dividing plate 2 in piping lane body 1, the lower surface of dividing plate 2 with
Water treatment facilities and storage tank 3 are provided with the formation blowdown of piping lane body 1 area, the dividing plate 2, the water treatment facilities includes mud
Husky separator 4 and water treatment machine 5, sediment separator 4 are connected by the first clear water pipe 6 with water treatment machine 5, and water treatment machine 5 passes through
Second clear water pipe 7 is connected with storage tank 3, and the outlet pipe 8 for passing piping lane body 1, the piping lane sheet are connected with the storage tank 3
Guard box 9 is additionally provided with body 1, the water treatment machine 5 is located in guard box 9, and shock mount 10 is provided with the dividing plate 2, prevents
Cell body 11 is provided with shake seat 10, cell body 11 is embedded with cystosepiment 12, and the guard box 9 is fixed on cystosepiment 12.
The present embodiment is to be provided with water treatment facilities and storage tank, water treatment facilities on most basic embodiment, dividing plate
Including sediment separator and water treatment machine, sediment separator is connected by the first clear water pipe with water treatment machine, and water treatment machine passes through
Second clear water pipe is connected with storage tank, is connected with the outlet pipe for passing piping lane body, piping lane body and is additionally provided with storage tank
Guard box, water treatment machine is located in guard box, is provided with dividing plate on shock mount, shock mount and is provided with cell body, cell body is embedded with bubble
Foam plate, guard box is fixed on cystosepiment, and the rainwater and sewage on ground enter sediment separator, by sediment separator
Silt after separation enters blowdown area, and the water after separation is then entered in water treatment machine by the first clear water pipe, and water treatment machine is again
The water that sediment separator is separated is handled, the water after after-treatment most enters storage tank through the second clear water pipe afterwards
It is interior as domestic water, when crop irrigation, ground cleaning, can by outlet pipe by storage tank water discharge;Ground
On due to car it is more, easily produce vibrations, under external environment influence, ground after long-term use, which is easily produced, collapses
Fall into, by the way that water treatment machine is arranged in guard box, under the protective action of guard box, the damage of water treatment machine can be reduced;
Shock mount is set on dividing plate, cystosepiment is embedded in the cell body of shock mount, then guard box is fixed on cystosepiment, cystosepiment
With good cushioning effect, cell body can play good position-limiting action to guard box, so that whole guard box has
Good antihunt action;Overall plan reasonable utilization piping lane body interior space, to each part has carried out rational layout, water
Processor operation is steady, and shock resistance is good, is capable of the good conversion of effective guarantee sewage and rainwater.
Embodiment 2
Referring to Fig. 2, a kind of pipe gallery, including piping lane body 1 is provided with dividing plate 2 in piping lane body 1, the lower surface of dividing plate 2 with
Water treatment facilities and storage tank 3 are provided with the formation blowdown of piping lane body 1 area, the dividing plate 2, the water treatment facilities includes mud
Husky separator 4 and water treatment machine 5, sediment separator 4 are connected by the first clear water pipe 6 with water treatment machine 5, and water treatment machine 5 passes through
Second clear water pipe 7 is connected with storage tank 3, and the outlet pipe 8 for passing piping lane body 1, the piping lane sheet are connected with the storage tank 3
Guard box 9 is additionally provided with body 1, the water treatment machine 5 is located in guard box 9, and shock mount 10 is provided with the dividing plate 2, prevents
Cell body 11 is provided with shake seat 10, cell body 11 is embedded with cystosepiment 12, and the guard box 9 is fixed on cystosepiment 12.
It is provided with the piping lane body 1 on explosion-proof fan 13, explosion-proof fan 13 and is connected with exhaust tube 14, exhaust tube 14 is stretched
Enter in piping lane body 1, check valve 15 is connected with exhaust tube 14, check valve 15 is located at outside piping lane body 1.
It is additionally provided with the piping lane body 1 on induced-draught fan 16, induced-draught fan 16 and is connected with air inlet pipe 17, air inlet pipe 17 is stretched into
In piping lane body 1.
The present embodiment is to be provided with to be connected with explosion-proof fan, explosion-proof fan on a better embodiment, piping lane body to take out
Tracheae, exhaust tube is stretched into piping lane body, and check valve is connected with exhaust tube, and check valve is located at piping lane sheet in vitro, used for a long time
Afterwards, piping lane body interior air is muddy, extracts the muddy air of piping lane body interior out by explosion-proof fan, is easy to attendant
Each part in piping lane inside is overhauled, security is safeguarded in guarantee.
It is additionally provided with piping lane body on induced-draught fan, induced-draught fan and is connected with air inlet pipe, air inlet pipe is stretched into piping lane body, is led to
Piping lane body interior can be drawn into by piping lane body exterior fresh air by crossing induced-draught fan, and check man is carried out beneficial to attendant
Make.
Embodiment 3
Referring to Fig. 3, a kind of pipe gallery, including piping lane body 1 is provided with dividing plate 2 in piping lane body 1, the lower surface of dividing plate 2 with
Water treatment facilities and storage tank 3 are provided with the formation blowdown of piping lane body 1 area, the dividing plate 2, the water treatment facilities includes mud
Husky separator 4 and water treatment machine 5, sediment separator 4 are connected by the first clear water pipe 6 with water treatment machine 5, and water treatment machine 5 passes through
Second clear water pipe 7 is connected with storage tank 3, and the outlet pipe 8 for passing piping lane body 1, the piping lane sheet are connected with the storage tank 3
Guard box 9 is additionally provided with body 1, the water treatment machine 5 is located in guard box 9, and shock mount 10 is provided with the dividing plate 2, prevents
Cell body 11 is provided with shake seat 10, cell body 11 is embedded with cystosepiment 12, and the guard box 9 is fixed on cystosepiment 12.
It is provided with the piping lane body 1 on explosion-proof fan 13, explosion-proof fan 13 and is connected with exhaust tube 14, exhaust tube 14 is stretched
Enter in piping lane body 1, check valve 15 is connected with exhaust tube 14, check valve 15 is located at outside piping lane body 1.
It is additionally provided with the piping lane body 1 on induced-draught fan 16, induced-draught fan 16 and is connected with air inlet pipe 17, air inlet pipe 17 is stretched into
In piping lane body 1.
Illuminating lamp 18 is provided with the piping lane body 1, illuminating lamp 18 is fixed on the inner roof wall of piping lane body 1.
The storage tank 3 includes glass reinforced plastic winding pipeline 19, the first end cap 20 and the second end cap 21, the first end cap 20 and glass
The one end in glass steel winding pipe road 19 is tightly connected, and the other end of the second end cap 21 and glass reinforced plastic winding pipeline 19 is tightly connected.
Groove 22 is provided with the dividing plate 2, the cross section semicircular in shape of groove 22, glass reinforced plastic winding pipeline 19 is placed in groove
In 22.
The present embodiment is to be provided with illuminating lamp in another better embodiment, piping lane body, and illuminating lamp is fixed on piping lane sheet
On the inner roof wall of body, by setting illuminating lamp in piping lane body, good illumination can be provided for piping lane body interior, be easy to
Attendant carries out service work.
Storage tank includes glass reinforced plastic winding pipeline, the first end cap and the second end cap, the first end cap and glass reinforced plastic winding pipeline
One end be tightly connected, the other end of the second end cap and glass reinforced plastic winding pipeline is tightly connected, using glass fiber reinforced plastic wound tube conduct
The main element of storage tank, with higher toughness and mechanical strength, can ensure the long-term stability in use of whole storage tank.
It is provided with groove on dividing plate, the cross section semicircular in shape of groove, glass reinforced plastic winding pipeline is placed in groove, on dividing plate
Groove can provide good support and position-limiting action to glass fiber reinforced plastic wound tube, prevent that whole storage tank from producing and rock, with one
Fixed shock resistance, beneficial to the water delivery work for ensureing that water treatment machine is stablized to storage tank.
Embodiment 4
Referring to Fig. 4, a kind of pipe gallery, including piping lane body 1 is provided with dividing plate 2 in piping lane body 1, the lower surface of dividing plate 2 with
Water treatment facilities and storage tank 3 are provided with the formation blowdown of piping lane body 1 area, the dividing plate 2, the water treatment facilities includes mud
Husky separator 4 and water treatment machine 5, sediment separator 4 are connected by the first clear water pipe 6 with water treatment machine 5, and water treatment machine 5 passes through
Second clear water pipe 7 is connected with storage tank 3, and the outlet pipe 8 for passing piping lane body 1, the piping lane sheet are connected with the storage tank 3
Guard box 9 is additionally provided with body 1, the water treatment machine 5 is located in guard box 9, and shock mount 10 is provided with the dividing plate 2, prevents
Cell body 11 is provided with shake seat 10, cell body 11 is embedded with cystosepiment 12, and the guard box 9 is fixed on cystosepiment 12.
It is provided with the piping lane body 1 on explosion-proof fan 13, explosion-proof fan 13 and is connected with exhaust tube 14, exhaust tube 14 is stretched
Enter in piping lane body 1, check valve 15 is connected with exhaust tube 14, check valve 15 is located at outside piping lane body 1.
It is additionally provided with the piping lane body 1 on induced-draught fan 16, induced-draught fan 16 and is connected with air inlet pipe 17, air inlet pipe 17 is stretched into
In piping lane body 1.
Illuminating lamp 18 is provided with the piping lane body 1, illuminating lamp 18 is fixed on the inner roof wall of piping lane body 1.
The storage tank 3 includes glass reinforced plastic winding pipeline 19, the first end cap 20 and the second end cap 21, the first end cap 20 and glass
The one end in glass steel winding pipe road 19 is tightly connected, and the other end of the second end cap 21 and glass reinforced plastic winding pipeline 19 is tightly connected.
Groove 22 is provided with the dividing plate 2, the cross section semicircular in shape of groove 22, glass reinforced plastic winding pipeline 19 is placed in groove
In 22.
It is provided with the roof of the glass reinforced plastic winding pipeline 19 on manhole 23 and permeability cell 24, manhole 23 and is hinged with cover plate
25。
The top of second end cap 21 is connected with overflow pipe 26, and bottom is connected with blow-off pipe 27.
The present embodiment is to be provided with manhole and permeability cell on another better embodiment, the roof of glass reinforced plastic winding pipeline,
Cover plate is hinged with manhole, by setting manhole, is easy to attendant to enter in storage tank and cleans, carried out by permeability cell good
Ventilation, it is possible to increase safeguard security.
The top of second end cap is connected with overflow pipe, the water that bottom is connected with blow-off pipe, storage tank fill after by overflowing
Flow tube overflow is gone out, and can reduce the tension force of water suffered by water storage chamber interior wall, it is to avoid storage tank damage, by blow-off pipe can by through
Cross after long-time and be deposited in the muddy silt water discharge of the bottom of storage tank.
Embodiment 5
Referring to Fig. 5, a kind of pipe gallery, including piping lane body 1 is provided with dividing plate 2 in piping lane body 1, the lower surface of dividing plate 2 with
Water treatment facilities and storage tank 3 are provided with the formation blowdown of piping lane body 1 area, the dividing plate 2, the water treatment facilities includes mud
Husky separator 4 and water treatment machine 5, sediment separator 4 are connected by the first clear water pipe 6 with water treatment machine 5, and water treatment machine 5 passes through
Second clear water pipe 7 is connected with storage tank 3, and the outlet pipe 8 for passing piping lane body 1, the piping lane sheet are connected with the storage tank 3
Guard box 9 is additionally provided with body 1, the water treatment machine 5 is located in guard box 9, and shock mount 10 is provided with the dividing plate 2, prevents
Cell body 11 is provided with shake seat 10, cell body 11 is embedded with cystosepiment 12, and the guard box 9 is fixed on cystosepiment 12.
It is provided with the piping lane body 1 on explosion-proof fan 13, explosion-proof fan 13 and is connected with exhaust tube 14, exhaust tube 14 is stretched
Enter in piping lane body 1, check valve 15 is connected with exhaust tube 14, check valve 15 is located at outside piping lane body 1.
It is additionally provided with the piping lane body 1 on induced-draught fan 16, induced-draught fan 16 and is connected with air inlet pipe 17, air inlet pipe 17 is stretched into
In piping lane body 1.
Illuminating lamp 18 is provided with the piping lane body 1, illuminating lamp 18 is fixed on the inner roof wall of piping lane body 1.
The storage tank 3 includes glass reinforced plastic winding pipeline 19, the first end cap 20 and the second end cap 21, the first end cap 20 and glass
The one end in glass steel winding pipe road 19 is tightly connected, and the other end of the second end cap 21 and glass reinforced plastic winding pipeline 19 is tightly connected.
Groove 22 is provided with the dividing plate 2, the cross section semicircular in shape of groove 22, glass reinforced plastic winding pipeline 19 is placed in groove
In 22.
It is provided with the roof of the glass reinforced plastic winding pipeline 19 on manhole 23 and permeability cell 24, manhole 23 and is hinged with cover plate
25。
The top of second end cap 21 is connected with overflow pipe 26, and bottom is connected with blow-off pipe 27.
Bumper bracket is provided with the shock mount 10, bumper bracket is by rectangle inside casing 28, buffer spring 29 and rectangular outer frame 30
Constitute, one end of buffer spring 29 is connected with rectangle inside casing 28, and the other end is connected with rectangular outer frame 30, the inwall of rectangle inside casing 28
It is in contact with the outer wall of guard box 9.
Column 31 is provided with the piping lane body 1, one end of column 31 is embedded on the inner roof wall of piping lane body 1, another
End is embedded in the inner bottom wall of piping lane body 1, and steel screen layer 32 is fixedly connected with the inwall of piping lane body 1.
The present embodiment is that water treatment facilities and storage tank are provided with preferred forms, dividing plate, and water treatment facilities includes
Sediment separator and water treatment machine, sediment separator are connected by the first clear water pipe with water treatment machine, and water treatment machine passes through second
Clear water pipe is connected with storage tank, is connected with storage tank in the outlet pipe for passing piping lane body, piping lane body and is additionally provided with protection
Case, water treatment machine is located in guard box, is provided with dividing plate on shock mount, shock mount and is provided with cell body, cell body is embedded with cystosepiment,
Guard box is fixed on cystosepiment, and the rainwater and sewage on ground enter sediment separator, are separated by sediment separator
Silt afterwards enters blowdown area, and the water after separation is then entered in water treatment machine by the first clear water pipe, and water treatment machine is again to mud
The water that husky separator is separated is handled, and the water after after-treatment most enters in storage tank through the second clear water pipe afterwards to be made
For domestic water, when crop irrigation, ground cleaning, the water in storage tank can be discharged by outlet pipe;On ground by
It is more in car, vibrations are easily produced, under external environment influence, the ground after long-term use, which is easily produced, to be collapsed, and is led to
Cross and water treatment machine is arranged in guard box, under the protective action of guard box, the damage of water treatment machine can be reduced;In dividing plate
Upper setting shock mount, cystosepiment is embedded in the cell body of shock mount, then guard box is fixed on cystosepiment, and cystosepiment has good
Good cushioning effect, cell body can play good position-limiting action to guard box, so that whole guard box has well
Antihunt action;Overall plan reasonable utilization piping lane body interior space, to each part has carried out rational layout, water treatment machine
Operate steadily, shock resistance is good, be capable of the good conversion of effective guarantee sewage and rainwater.Bumper bracket is provided with shock mount, is buffered
Frame is made up of rectangle inside casing, buffer spring and rectangular outer frame, and one end of buffer spring is connected with rectangle inside casing, the other end and rectangle
Housing is connected, and the inwall of rectangle inside casing is in contact with the outer wall of guard box, when piping lane is by greater impact, slow in bumper bracket
The lateral impact forces that guard box is subject to can be reduced by rushing spring, prevent the double swerve of guard box by a relatively large margin, and then can carry
The stability of high water treatment machine, so as to ensure water process work operation steady in a long-term.Column, column are provided with piping lane body
One end be embedded on the inner roof wall of piping lane body, the other end is embedded in the inner bottom wall of piping lane body, and column can be piping lane body
Good support is provided, strengthens the intensity of piping lane;Steel screen layer is fixedly connected with the inwall of piping lane body, is further increased
The toughness of piping lane, extends the service life of piping lane.
Claims (10)
1. a kind of pipe gallery, including piping lane body(1), piping lane body(1)Inside it is provided with dividing plate(2), dividing plate(2)Lower surface
With piping lane body(1)Form blowdown area, it is characterised in that:The dividing plate(2)On be provided with water treatment facilities and storage tank(3),
The water treatment facilities includes sediment separator(4)And water treatment machine(5), sediment separator(4)Pass through the first clear water pipe(6)With
Water treatment machine(5)Connection, water treatment machine(5)Pass through the second clear water pipe(7)With storage tank(3)Connection, the storage tank(3)Upper company
It is connected to and passes piping lane body(1)Outlet pipe(8), the piping lane body(1)Inside it is additionally provided with guard box(9), the water process
Machine(5)Positioned at guard box(9)It is interior, the dividing plate(2)On be provided with shock mount(10), shock mount(10)On be provided with cell body(11),
Cell body(11)It is embedded with cystosepiment(12), the guard box(9)It is fixed on cystosepiment(12)On.
2. a kind of pipe gallery according to claim 1, it is characterised in that:The piping lane body(1)On be provided with it is explosion-proof
Blower fan(13), explosion-proof fan(13)On be connected with exhaust tube(14), exhaust tube(14)Stretch into piping lane body(1)It is interior, exhaust tube
(14)On be connected with check valve(15), check valve(15)Positioned at piping lane body(1)Outside.
3. a kind of pipe gallery according to claim 1, it is characterised in that:The piping lane body(1)On be additionally provided with suction
Blower fan(16), induced-draught fan(16)On be connected with air inlet pipe(17), air inlet pipe(17)Stretch into piping lane body(1)It is interior.
4. a kind of pipe gallery according to claim 1, it is characterised in that:The piping lane body(1)Inside it is provided with illumination
Lamp(18), illuminating lamp(18)It is fixed on piping lane body(1)Inner roof wall on.
5. a kind of pipe gallery according to claim 1, it is characterised in that:The storage tank(3)Including glass reinforced plastic winding
Pipeline(19), the first end cap(20)With the second end cap(21), the first end cap(20)With glass reinforced plastic winding pipeline(19)One end it is close
Envelope connection, the second end cap(21)With glass reinforced plastic winding pipeline(19)The other end be tightly connected.
6. a kind of pipe gallery according to claim 5, it is characterised in that:The dividing plate(2)On be provided with groove(22), it is recessed
Groove(22)Cross section semicircular in shape, glass reinforced plastic winding pipeline(19)It is placed in groove(22)It is interior.
7. a kind of pipe gallery according to claim 5, it is characterised in that:The glass reinforced plastic winding pipeline(19)Roof
On be provided with manhole(23)And permeability cell(24), manhole(23)On be hinged with cover plate(25).
8. a kind of pipe gallery according to claim 5, it is characterised in that:Second end cap(21)Top be connected with
Overflow pipe(26), bottom is connected with blow-off pipe(27).
9. a kind of pipe gallery according to claim 1, it is characterised in that:The shock mount(10)On be provided with buffering
Frame, bumper bracket is by rectangle inside casing(28), buffer spring(29)And rectangular outer frame(30)Constitute, buffer spring(29)One end and square
Shape inside casing(28)Connection, the other end and rectangular outer frame(30)Connection, rectangle inside casing(28)Inwall and guard box(9)Outer wall phase
Contact.
10. a kind of pipe gallery according to claim 1, it is characterised in that:The piping lane body(1)Inside it is provided with column
(31), column(31)One end be embedded in piping lane body(1)Inner roof wall on, the other end is embedded in piping lane body(1)Inner bottom wall on,
Piping lane body(1)Inwall on be fixedly connected with steel screen layer(32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710282103.5A CN106958260A (en) | 2017-04-26 | 2017-04-26 | A kind of pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710282103.5A CN106958260A (en) | 2017-04-26 | 2017-04-26 | A kind of pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106958260A true CN106958260A (en) | 2017-07-18 |
Family
ID=59484384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710282103.5A Pending CN106958260A (en) | 2017-04-26 | 2017-04-26 | A kind of pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106958260A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396776A (en) * | 2018-04-13 | 2018-08-14 | 沈阳建筑大学 | Three layers of class rectangle Urban Underground Complex for having both sqouynd absorption lowering noise, collecting airway dysfunction |
CN108532629A (en) * | 2018-04-28 | 2018-09-14 | 安徽砼宇特构科技有限公司 | A kind of reinforced concrete pipe gallery of lightweight |
CN113152519A (en) * | 2020-01-23 | 2021-07-23 | 秦磊 | Wisdom city construction is with sponge city utility tunnel |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0988102A (en) * | 1995-09-20 | 1997-03-31 | Shimizu Corp | Method of constructing underground structure |
CN105366203A (en) * | 2014-08-28 | 2016-03-02 | 天津市百得纸业有限公司 | Shock-resisting packaging box |
CN205635101U (en) * | 2015-12-24 | 2016-10-12 | 无锡康霸环保设备有限公司 | Concurrent flow sewage treatment plant |
CN106039804A (en) * | 2016-08-18 | 2016-10-26 | 张铁耀 | Mud-and-water auto-separating pipeline apparatus |
CN106245676A (en) * | 2016-10-10 | 2016-12-21 | 张青富 | A kind of body and pipe gallery |
CN205935041U (en) * | 2016-08-17 | 2017-02-08 | 天津沃佰艾斯科技有限公司 | Arid area rainwater collection device |
CN106480902A (en) * | 2016-11-25 | 2017-03-08 | 沈阳建筑大学 | There is water-retention and the underground pipe gallery of preliminary filtering function |
CN206800449U (en) * | 2017-04-26 | 2017-12-26 | 张铁耀 | A kind of pipe gallery |
-
2017
- 2017-04-26 CN CN201710282103.5A patent/CN106958260A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0988102A (en) * | 1995-09-20 | 1997-03-31 | Shimizu Corp | Method of constructing underground structure |
CN105366203A (en) * | 2014-08-28 | 2016-03-02 | 天津市百得纸业有限公司 | Shock-resisting packaging box |
CN205635101U (en) * | 2015-12-24 | 2016-10-12 | 无锡康霸环保设备有限公司 | Concurrent flow sewage treatment plant |
CN205935041U (en) * | 2016-08-17 | 2017-02-08 | 天津沃佰艾斯科技有限公司 | Arid area rainwater collection device |
CN106039804A (en) * | 2016-08-18 | 2016-10-26 | 张铁耀 | Mud-and-water auto-separating pipeline apparatus |
CN106245676A (en) * | 2016-10-10 | 2016-12-21 | 张青富 | A kind of body and pipe gallery |
CN106480902A (en) * | 2016-11-25 | 2017-03-08 | 沈阳建筑大学 | There is water-retention and the underground pipe gallery of preliminary filtering function |
CN206800449U (en) * | 2017-04-26 | 2017-12-26 | 张铁耀 | A kind of pipe gallery |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396776A (en) * | 2018-04-13 | 2018-08-14 | 沈阳建筑大学 | Three layers of class rectangle Urban Underground Complex for having both sqouynd absorption lowering noise, collecting airway dysfunction |
CN108532629A (en) * | 2018-04-28 | 2018-09-14 | 安徽砼宇特构科技有限公司 | A kind of reinforced concrete pipe gallery of lightweight |
CN113152519A (en) * | 2020-01-23 | 2021-07-23 | 秦磊 | Wisdom city construction is with sponge city utility tunnel |
CN113152519B (en) * | 2020-01-23 | 2022-05-27 | 秦磊 | Wisdom city construction is with sponge city utility tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638681B (en) | A kind of pipe gallery | |
CN106958260A (en) | A kind of pipe gallery | |
CN102995660A (en) | Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof | |
CN107630464A (en) | Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function | |
CN206090610U (en) | Utility tunnel system | |
CN106013221A (en) | Four-layer rectangle-like urban underground complex | |
WO2013135104A1 (en) | Multifunctional rainwater regulating drainage and storage utilization integrated system and construction method thereof | |
CN206233688U (en) | A kind of urban construction guardrail | |
CN206110182U (en) | Three large -scale arcading city utility tunnel | |
CN206800449U (en) | A kind of pipe gallery | |
CN110593390A (en) | Intelligent rainwater collection system based on Internet of things technology | |
CN103628609A (en) | Thin ventilating skylight | |
CN206800447U (en) | A kind of integrated form piping lane | |
CN207597425U (en) | A kind of strong prefabricated piping lane of anti-pressure ability | |
CN103161192A (en) | Power-free rainwater collection device | |
CN203007978U (en) | Multifunctional net-shaped combined prestressed underground pipe gallery | |
CN206800448U (en) | A kind of Urban Underground piping lane | |
CN206090801U (en) | Rainwater pollutant intercepting equipment | |
CN212743604U (en) | Novel multi-functional road bridge construction encloses fender | |
CN207062995U (en) | Hoisting port | |
CN201056715Y (en) | Device for recovering, filtering and recycling rainwater on buildings | |
CN209145605U (en) | The round more cabin pipe galleries of shield-tunneling construction | |
CN203256773U (en) | Comprehensive urban underground pipe gallery with large-cross-section arched pre-stress | |
CN206396786U (en) | Suitable for the pipe gallery section structure of area of heavy rainfull | |
CN205742466U (en) | Prestressing force is to adding series rain dirt shunting underground pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170718 |