CN206396786U - Suitable for the pipe gallery section structure of area of heavy rainfull - Google Patents

Suitable for the pipe gallery section structure of area of heavy rainfull Download PDF

Info

Publication number
CN206396786U
CN206396786U CN201621347832.1U CN201621347832U CN206396786U CN 206396786 U CN206396786 U CN 206396786U CN 201621347832 U CN201621347832 U CN 201621347832U CN 206396786 U CN206396786 U CN 206396786U
Authority
CN
China
Prior art keywords
bilge
pipe gallery
area
well
section structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621347832.1U
Other languages
Chinese (zh)
Inventor
宋薇
陈远新
肖文
廖宜勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Design Group Co., Ltd
Original Assignee
Jiangxi Tongji Design Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Tongji Design Group Ltd By Share Ltd filed Critical Jiangxi Tongji Design Group Ltd By Share Ltd
Priority to CN201621347832.1U priority Critical patent/CN206396786U/en
Application granted granted Critical
Publication of CN206396786U publication Critical patent/CN206396786U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of pipe gallery section structure suitable for area of heavy rainfull, including the synthesis cabin, combustion gas cabin and bilge tank being arranged side by side, comprehensive freight space is between combustion gas cabin and bilge tank, the side of bilge tank is provided with maintaining roadway, opposite side is provided with bilge well, the underlying space of maintaining roadway is as rainwater flow section during small rainfall, and space of the bilge tank outside bilge well is provided with sewage pipe as rainwater flow section during big rainfall, bilge well.The utility model is by setting maintaining roadway, and easy access personnel are overhauled, and bilge tank carries out power and energy according to rainfall size, it is adaptable to the deeper area of heavy rainfull of downstream storm outfall sewer, can greatly reduce the cross dimensions of pipe gallery, saves cost.

Description

Suitable for the pipe gallery section structure of area of heavy rainfull
Technical field
The utility model is related to pipe gallery technical field, and in particular to a kind of pipe gallery suitable for area of heavy rainfull breaks Face structure.
Background technology
To implement unified planning, design, construction and safeguarding, being built in Urban Underground is used for the municipal public use of municipal public use pipeline Facility is referred to as pipe gallery, and rain pipe, sewage pipe are a kind of pipeline that must take into consideration during pipe gallery is designed, traditional integrated pipe In corridor engineering, do not consider generally to include rainwater, sewage pipe in pipe gallery, though into pipe gallery also with synthesis Piping lane bottom space, and aid in setting rain gutter, draining phenomenon not in time occurs when running into rainy season, influences other to manage The normal operation of line.
The Chinese utility model patent of Patent No. 201620624892.7 discloses a kind of pipe gallery section structure, it It is related to pipe gallery technical field.It includes comprehensive storehouse, combustion gas storehouse, rainwater storehouse, early-stage rainwater storehouse and clear water storehouse, comprehensive storehouse side Combustion gas storehouse, clear water storehouse are provided with, combustion gas storehouse is arranged on above clear water storehouse, and the upper strata in clear water storehouse is additionally provided with early-stage rainwater storehouse, just The upper strata in phase rainwater storehouse sets rain storehouse, and rainwater storehouse end is provided with river course connected entrance and purifying processing device connected entrance, Rainwater storehouse is connected by purifying processing device with clear water storehouse, and internal clear water can be promoted to ground and poured by being internally provided with of clear water storehouse Sewage pipe, communication tube, power pipe, feed pipe and provided pipe, comprehensive storehouse side are disposed with inside the clear water elevator pump spilt, comprehensive storehouse The sewage pipe of arrangement is connected by pipeline with the sewage pump being arranged in early-stage rainwater storehouse.This pipe gallery section structure Structure is more complicated, is not suitable for area of heavy rainfull, and maintenance repair inconvenience is, it is necessary to be improved.
Utility model content
It is rainy that the purpose of this utility model is to overcome the above-mentioned problems in the prior art to be applied to there is provided one kind The pipe gallery section structure in area.
To realize above-mentioned technical purpose and the technique effect, the utility model is to be achieved through the following technical solutions:
A kind of pipe gallery section structure suitable for area of heavy rainfull, including synthesis cabin, combustion gas cabin and the dirt being arranged side by side Water tank, the comprehensive freight space is between combustion gas cabin and bilge tank, and the side of the bilge tank is provided with maintaining roadway, and opposite side is provided with dirt Well, the underlying space of the maintaining roadway is as rainwater flow section during small rainfall, and the bilge tank is located at outside bilge well Space is provided with sewage pipe as rainwater flow section during big rainfall, the bilge well.
Further, the space for maintenance above the maintaining roadway is highly more than 2.4m.
Further, the sewage pipe is suspended in bilge well by fixed support.
Further, the bilge well, which is located in the top top plate of sewage pipe, is provided with sealed well lid.
Further, a diameter of 650-750mm of the sealed well lid.
The beneficial effects of the utility model are:
The utility model integrates and the various pipelines such as electric power, communication, feedwater is stored in cabin, and combustion gas cabin passes through comprehensive cabin and sewage Cabin is separated;By setting maintaining roadway, easy access personnel are overhauled, and bilge tank carries out power and energy according to rainfall size, are fitted The area of heavy rainfull deeper for downstream storm outfall sewer, can greatly reduce the cross dimensions of pipe gallery, save cost.
Certainly, implement any product of the present utility model to it is not absolutely required to while reaching all the above advantage.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, make required for being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present utility model, For those of ordinary skill in the art, on the premise of not paying creative work, it can also be obtained according to these accompanying drawings Other accompanying drawings.
Fig. 1 is structural representation of the present utility model;
In accompanying drawing, the list of parts representated by each label is as follows:
1- integrates cabin, and 2- combustion gas cabin, 3- bilge tanks, 4- maintaining roadways, 5- bilge wells, 6- sewage pipes, 7- fixed supports, 8- is close Shut-in well lid.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belongs to the scope of the utility model protection.
Refer to shown in Fig. 1, the utility model is a kind of pipe gallery section structure suitable for area of heavy rainfull, including simultaneously Synthesis cabin 1, combustion gas cabin 2 and the bilge tank 3 set is arranged, comprehensive cabin 1 is located between combustion gas cabin 2 and bilge tank 3, the one of bilge tank 3 Side is provided with maintaining roadway 4, and opposite side is provided with bilge well 5, and the space for maintenance of the top of maintaining roadway 4 is highly more than 2.4m, and underlying space is made Break as rainwater excessively stream during big rainfall in rainwater flow section during for small rainfall, the space that bilge tank 3 is located at outside bilge well 5 Face, bilge well 5 is provided with sewage pipe 6, and sewage pipe 6 is suspended in bilge well by fixed support 7, and bilge well 5 is located at sewage pipe 6 Sealed well lid 8 is provided with the top plate of top, a diameter of 650-750mm of sealed well lid 8 meets the discrepancy demand of maintainer.
One of the present embodiment has particular application as:The various pipelines, combustion gas cabin such as electric power, communication, feedwater are stored in comprehensive cabin 1 2 are separated by comprehensive cabin 1 with bilge tank 3.The utility model pipe gallery section structure is by setting maintaining roadway 4, easy access Personnel are overhauled, bilge tank 3 according to rainfall size carry out power and energy, it is adaptable to downstream storm outfall sewer it is deeper rainyly Area, can greatly reduce the cross dimensions of pipe gallery, save cost.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means With reference to specific features, structure, material or the feature that the embodiment or example are described be contained in it is of the present utility model at least one In embodiment or example.In this manual, the schematic representation of above-mentioned term is not necessarily referring to identical embodiment or Example.Moreover, specific features, structure, material or the feature of description can be in any one or more embodiments or examples In combine in an appropriate manner.
The utility model preferred embodiment disclosed above is only intended to help and illustrates the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, it is only described embodiment that the utility model is not limited yet.Obviously, according to this theory The content of bright book, can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is in order to preferably Principle of the present utility model and practical application are explained, so that skilled artisan can be best understood by and utilize this Utility model.The utility model is only limited by claims and its four corner and equivalent.

Claims (5)

1. a kind of pipe gallery section structure suitable for area of heavy rainfull, it is characterised in that:Including be arranged side by side synthesis cabin, combustion Gas cabin and bilge tank, the comprehensive freight space is between combustion gas cabin and bilge tank, and the side of the bilge tank is provided with maintaining roadway, another Side is provided with bilge well, and the underlying space of the maintaining roadway is as rainwater flow section during small rainfall, and the bilge tank is located at dirt Space outside well is as rainwater flow section during big rainfall, and the bilge well is provided with sewage pipe.
2. the pipe gallery section structure according to claim 1 suitable for area of heavy rainfull, it is characterised in that:The maintenance Space for maintenance above road is highly more than 2.4m.
3. the pipe gallery section structure according to claim 1 suitable for area of heavy rainfull, it is characterised in that:The sewage Pipe is suspended in bilge well by fixed support.
4. the pipe gallery section structure according to claim 1 suitable for area of heavy rainfull, it is characterised in that:The sewage Well location is provided with sealed well lid in the top top plate of sewage pipe.
5. the pipe gallery section structure according to claim 4 suitable for area of heavy rainfull, it is characterised in that:The sealing A diameter of 650-750mm of well lid.
CN201621347832.1U 2016-12-09 2016-12-09 Suitable for the pipe gallery section structure of area of heavy rainfull Active CN206396786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621347832.1U CN206396786U (en) 2016-12-09 2016-12-09 Suitable for the pipe gallery section structure of area of heavy rainfull

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621347832.1U CN206396786U (en) 2016-12-09 2016-12-09 Suitable for the pipe gallery section structure of area of heavy rainfull

Publications (1)

Publication Number Publication Date
CN206396786U true CN206396786U (en) 2017-08-11

Family

ID=59509569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621347832.1U Active CN206396786U (en) 2016-12-09 2016-12-09 Suitable for the pipe gallery section structure of area of heavy rainfull

Country Status (1)

Country Link
CN (1) CN206396786U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267491A (en) * 2020-10-15 2021-01-26 中交烟台环保疏浚有限公司 Flood storage type city utility tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267491A (en) * 2020-10-15 2021-01-26 中交烟台环保疏浚有限公司 Flood storage type city utility tunnel

Similar Documents

Publication Publication Date Title
CN106638681B (en) A kind of pipe gallery
CN205124580U (en) Irrigation system is collected with rainwater in gardens
CN204690591U (en) A kind of bridge drainage system
CN205688461U (en) Pipe gallery section structure
CN205474681U (en) Formula curb is held in cabin
CN107630464A (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN206396785U (en) The common cabin pattern synthesis piping lane section structure of the rain sewage of easy access
CN205024802U (en) Energy -saving rainwater recycling system
CN205242445U (en) Intelligent integrated piping lane maintenance of city underground is imported and exported
CN206396786U (en) Suitable for the pipe gallery section structure of area of heavy rainfull
CN204352649U (en) Construction rainwater-collecting cyclic utilization system
CN206368389U (en) One kind backwash and sewage sucking system
CN206418520U (en) A kind of comprehensive pipe gallery structure for accessing storm sewer
CN205296229U (en) Sewer manhole in utility tunnel
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN201459900U (en) Drainage system for towns and districts
CN201072026Y (en) Drainage shunting structure of dry method red mud yard
CN203383853U (en) Buffering system for solving problem of insufficient drainage ability of tunnel central ditch
CN202298873U (en) Novel GRP (glass-reinforced plastic) drainage inspection well
CN203795512U (en) Rainwater recycling device
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN207062995U (en) Hoisting port
CN207597427U (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN202298863U (en) Pipe network rainwater collecting cellar
CN201924280U (en) Drainage system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 199, No. 2799, Tianxiang Avenue, Nanchang hi tech Industrial Development Zone, 330000, Jiangxi Province

Patentee after: Huawei Design Group Co., Ltd

Address before: 330000 No. five, No. 966, hi tech Development Zone, Jiangxi, Nanchang

Patentee before: Jiangxi Tongji design group Limited by Share Ltd