CN106480902A - There is water-retention and the underground pipe gallery of preliminary filtering function - Google Patents

There is water-retention and the underground pipe gallery of preliminary filtering function Download PDF

Info

Publication number
CN106480902A
CN106480902A CN201611054951.2A CN201611054951A CN106480902A CN 106480902 A CN106480902 A CN 106480902A CN 201611054951 A CN201611054951 A CN 201611054951A CN 106480902 A CN106480902 A CN 106480902A
Authority
CN
China
Prior art keywords
cabin
rainwater
pipe
tank
comprehensive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611054951.2A
Other languages
Chinese (zh)
Other versions
CN106480902B (en
Inventor
张延年
庚佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ziqin Construction Development Co ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201611054951.2A priority Critical patent/CN106480902B/en
Publication of CN106480902A publication Critical patent/CN106480902A/en
Application granted granted Critical
Publication of CN106480902B publication Critical patent/CN106480902B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/10Dividing the first rain flush out of the stormwater flow

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种具有蓄水和初步过滤功能的地下综合管廊,包括设置在市政路面下端的地下综合管廊和市政路面上的综合绿廊。本发明有效的解决了城市交通拥堵以及电力、通信、燃气、供排水等市政设施的维护和检修不方便的问题,有效利用了地下空间,缓解了城市内涝的圧力,同时可将多余雨水收集储存利用起来,缓解城市绿化、道路冲洗、降尘等市政用水压力,也推动我国海绵城市发展进程,降低资源及能源消耗。

The invention discloses an underground comprehensive pipe gallery with functions of water storage and preliminary filtration, which comprises an underground comprehensive pipe gallery arranged at the lower end of the municipal road surface and a comprehensive green corridor on the municipal road surface. The invention effectively solves the problems of urban traffic congestion and inconvenient maintenance and repair of municipal facilities such as electric power, communication, gas, water supply and drainage, effectively utilizes the underground space, alleviates the pressure of urban waterlogging, and can collect and store excess rainwater at the same time When used, it can alleviate the pressure of municipal water such as urban greening, road washing, and dust reduction, and also promote the development of sponge cities in my country, reducing resource and energy consumption.

Description

具有蓄水和初步过滤功能的地下综合管廊Underground comprehensive pipe gallery with water storage and preliminary filtration functions

技术领域technical field

本发明涉及市政管网工程技术领域,具体涉及一种具有蓄水功能的地下综合管廊。The invention relates to the technical field of municipal pipe network engineering, in particular to an underground comprehensive pipe gallery with water storage function.

背景技术Background technique

综合管廊是一种建于城市地下用于容纳两类及以上城市工程管线的构筑物及附属设施,是城市地下管道综合走廊,即在城市地下建造一个隧道空间,将电力、通讯,燃气、供热、给排水等各种工程管线集于一体,设有专门的检修口、吊装口和监测系统,实施统一规划、统一设计、统一建设和管理,是保障城市运行的重要基础设施和生命线。The comprehensive pipe corridor is a structure and auxiliary facilities built underground to accommodate two or more types of urban engineering pipelines. Various engineering pipelines such as heating, water supply and drainage are integrated into one body, with special inspection ports, hoisting ports and monitoring systems, and the implementation of unified planning, unified design, unified construction and management is an important infrastructure and lifeline to ensure urban operation.

地下综合管廊系统不仅解决城市交通拥堵问题,还极大方便了电力、通信、燃气、供排水等市政设施的维修和检修。The underground comprehensive pipe gallery system not only solves the problem of urban traffic congestion, but also greatly facilitates the maintenance and repair of municipal facilities such as electricity, communications, gas, water supply and drainage.

海绵城市是新一代城市雨洪管理概念,是指城市在适应环境变化和应对雨水带来的自然灾害等方面具有良好的“弹性”,也可称之为“水弹性城市''。国际通用术语为“低影响开发雨水系统构建''。下雨时吸水、蓄水、渗水、净水,需要时将蓄存的水“释放”并加以利用。建海绵城市就要有“海绵体”。城市“海绵体”既包括河、湖、池、塘等水系,也包括绿地、花园、可渗透路面这样的城市配套设施。雨水通过这些“海绵体”下渗、滞蓄、净化、回用,最后剩余部分径流通过管网、泵站外排,从而可有效提高城市排水系统的标准,缓减城市内涝的压力。Sponge city is a new generation of urban stormwater management concept, which means that the city has good "elasticity" in adapting to environmental changes and responding to natural disasters caused by rainwater. It can also be called "water elastic city". International general term Stormwater Systems Constructed for "Low Impact Development". When it rains, it absorbs, stores, infiltrates, and purifies water, and "releases" the stored water for use when needed. To build a sponge city, there must be a "sponge body". The urban "sponge body" includes not only water systems such as rivers, lakes, ponds, and ponds, but also urban supporting facilities such as green spaces, gardens, and permeable pavements. Rainwater infiltrates, stores, purifies, and reuses rainwater through these "sponge bodies", and finally the remaining part of the runoff is discharged through pipe networks and pumping stations, which can effectively improve the standard of urban drainage systems and reduce the pressure of urban waterlogging.

而结合地下综合管廊的建设,在管廊中设置雨水舱室,用于存储城市“海绵体”无法吸收的雨水,进一步缓解城市内涝的压力,同时初步过滤雨水中杂质充当中水使用,可以缓解城市绿化、道路冲洗、降尘等市政用水压力。Combined with the construction of the underground comprehensive pipe gallery, a rainwater compartment is set up in the pipe gallery to store rainwater that cannot be absorbed by the city's "sponge body" and further relieve the pressure of urban waterlogging. Municipal water pressure such as urban greening, road flushing, and dust reduction.

发明内容Contents of the invention

针对上述问题,本发明提供了一种有效利用了地下空间,将多余雨水收集利用储存起来利用的具有蓄水功能的地下综合管廊。In view of the above problems, the present invention provides an underground comprehensive utility gallery with a water storage function that effectively utilizes the underground space and collects, utilizes and stores excess rainwater for utilization.

一种具有蓄水和初步过滤功能的地下综合管廊,包括市政路面、综合绿廊以及地下综合管廊;综合绿廊位于市政路面上,端面为椭圆形地下综合管廊位于市政路面下方;An underground comprehensive pipe gallery with water storage and preliminary filtering functions, including a municipal road surface, a comprehensive green corridor and an underground comprehensive pipe gallery; the comprehensive green corridor is located on the municipal road surface, and the underground comprehensive pipe gallery with an elliptical end surface is located below the municipal road surface;

所述地下综合管廊包括天然气舱、综合舱、强电舱、污水管舱、雨水舱、中水管舱、排水管、初步过滤装置、维修步梯以及二次防倒灌装置;雨水舱置于地下综合管舱的底部中间,雨水舱的正上方左右分别为强电舱和综合舱;综合舱和雨水舱通过维修步梯相连接;综合舱右侧为天然气舱,天然气舱正下方设置有中水管舱,中水管舱通过二次防倒灌装置与雨水舱相通;强电舱和雨水舱的左侧为污水管舱,污水管舱通过二次防倒灌装置与雨水舱相通;排水管的一端接入综合绿廊,另一端贯穿污水管舱连接至雨水舱;The underground comprehensive pipe gallery includes a natural gas tank, a comprehensive tank, a strong electric tank, a sewage tank, a rain tank, a reclaimed water tank, a drainage pipe, a preliminary filter device, a maintenance ladder, and a secondary anti-backflow device; the rain tank is placed underground In the middle of the bottom of the integrated management cabin, the left and right sides directly above the rainwater cabin are the strong electric cabin and the integrated cabin; the integrated cabin and the rainwater cabin are connected by maintenance steps; The reclaimed water pipe cabin communicates with the rainwater cabin through the secondary anti-inflow device; the left side of the strong electric cabin and the rainwater cabin is the sewage pipe cabin, and the sewage pipe cabin communicates with the rainwater cabin through the secondary anti-inflow device; one end of the drain pipe is connected to The comprehensive green corridor, the other end runs through the sewage pipe tank and connects to the rainwater tank;

所述天然气舱包括天然气管道和排水沟;天然气管道分上下若干层固定在天然气舱的竖直内壁上,排水沟位于天然气舱的内底面右下角;The natural gas tank includes a natural gas pipeline and a drain; the natural gas pipeline is fixed on the vertical inner wall of the natural gas tank in upper and lower layers, and the drain is located at the lower right corner of the inner bottom of the natural gas tank;

所述综合舱包括给水管道、通信光缆以及排水沟;给水管道固定于综合舱一侧竖直内壁上,通信光缆分上下若干层固定在综合舱的另一侧竖直内壁上,排水沟位于综合舱的内底面右下角;The integrated cabin includes a water supply pipeline, a communication optical cable and a drainage ditch; the water supply pipeline is fixed on the vertical inner wall of one side of the integrated cabin, and the communication optical cable is fixed on the vertical inner wall of the other side of the integrated cabin in several layers. The lower right corner of the inner bottom of the tank;

所述强电舱包括电力电缆和排水沟;电力电缆分上下若干层固定于强电舱的左侧竖直内壁上,排水沟位于强电舱的内底面右下角;The strong electric cabin includes a power cable and a drainage ditch; the power cable is fixed on the left vertical inner wall of the strong electric cabin in upper and lower layers, and the drainage ditch is located at the lower right corner of the inner bottom of the strong electric cabin;

所述污水管舱包括污水管道、排水沟以及混凝土砌台;污水管道与二次防倒灌装置相接,混凝土砌台设于污水管道下方用以支撑污水管道,混凝土砌台与地下综合管廊内壁夹角处设有排水沟;The sewage pipe compartment includes a sewage pipe, a drainage ditch and a concrete block; the sewage pipe is connected with the secondary anti-intrusion device, the concrete block is arranged under the sewage pipe to support the sewage pipe, and the concrete block is connected to the inner wall of the underground comprehensive pipe gallery. There is a drainage ditch at the angle;

所述雨水舱两侧均设有二次防倒灌装置;Both sides of the rainwater tank are equipped with secondary anti-backflow devices;

所述中水管舱包括中水管道、排水沟以及混凝土砌台;中水管道与二次防倒灌装置相接,混凝土砌台设于中水管道下方用以支撑中水管道,混凝土砌台与地下综合管廊内壁夹角处设有排水沟。The reclaimed water pipe cabin includes a reclaimed water pipe, a drainage ditch and a concrete block; the reclaimed water pipe is connected with a secondary anti-intrusion device, and the concrete block is arranged under the reclaimed water pipe to support the reclaimed water pipe; There is a drainage ditch at the corner of the inner wall of the comprehensive pipe gallery.

一种具有蓄水和初步过滤功能的地下综合管廊的工作过程,包括如下工作步骤A working process of an underground comprehensive utility gallery with water storage and preliminary filtering functions, including the following working steps

步骤一雨水的收集:雨水由市政路面上的综合绿廊流经排水管进入雨水舱;Step 1 Rainwater collection: Rainwater flows from the comprehensive green corridor on the municipal road through the drainage pipe into the rainwater tank;

步骤二初步过滤以中水排除:雨水舱内液面超过中水管道的二次防倒灌装置时,雨水经由二次防倒灌装置进入中水管舱,经中水管道排出用于市政绿化、道路冲洗、降尘等;Step 2 Preliminary filtration to remove reclaimed water: When the liquid level in the rainwater tank exceeds the secondary anti-inverting device of the reclaimed water pipe, the rainwater enters the reclaimed water pipe compartment through the secondary anti-inverting device, and is discharged through the reclaimed water pipe for municipal greening and road flushing , dust reduction, etc.;

步骤三初步过滤以污水排除:雨水舱内液面超过污水管道的二次防倒灌装置时,雨水经由二次防倒灌装置进入污水管舱,经污水管道排出。Step 3 Preliminary filtration to remove sewage: When the liquid level in the rainwater tank exceeds the secondary anti-inflow device of the sewage pipe, the rainwater enters the sewage pipe compartment through the secondary anti-inflow device and is discharged through the sewage pipe.

作为一种优选的技术方案:所述初步过滤装置包括粗格栅、细格栅和净化除臭装置;初步过滤装置靠近雨水舱的一侧设有粗格栅,远离雨水舱的一侧设有细格栅,净化除臭装置填满二次防倒灌装置的内部空腔。As a preferred technical solution: the preliminary filtering device includes a coarse grille, a fine grille and a purification and deodorization device; the preliminary filtering device is provided with a coarse grille on the side close to the rainwater cabin, and on the side far away from the rainwater cabin. The fine grille, the purification and deodorization device fills the internal cavity of the secondary anti-backflow device.

作为一种优选的技术方案:所述二次防倒灌装置包括宽不锈钢百叶片、窄不锈钢百叶片、不锈钢钢轴;粗格栅远离雨水舱的一侧通过不锈钢轴由上至下连接有宽不锈钢百叶片,细格栅远离雨水舱的一侧通过不锈钢轴由上至下连接有窄不锈钢百叶片。As a preferred technical solution: the secondary anti-backflow device includes wide stainless steel louvers, narrow stainless steel louvers, and stainless steel shafts; the side of the thick grid away from the rainwater tank is connected from top to bottom with wide stainless steel shafts. Louvers, the side of the fine grill away from the rainwater tank is connected with narrow stainless steel louvers from top to bottom through stainless steel shafts.

作为一种优选的技术方案:所述排水管为轻质软管。As a preferred technical solution: the drain pipe is a lightweight hose.

作为一种优选的技术方案:所述雨水舱底部为沉砂池,起到点状蓄水池的作用。As a preferred technical solution: the bottom of the rainwater tank is a grit chamber, which acts as a point-shaped reservoir.

作为一种优选的技术方案:所述二次防倒灌装置与污水管道连接的水平高度高于其与中水管道连接的水平高度。As a preferred technical solution: the level of the connection between the secondary anti-backflow device and the sewage pipeline is higher than the level of the connection between the secondary backflow prevention device and the reclaimed water pipeline.

作为一种优选的技术方案:所述电力电缆、通信光缆、给水管道以及天然气管道均采用钢筋混凝土支架进行固定。As a preferred technical solution: the power cables, communication optical cables, water supply pipelines and natural gas pipelines are all fixed by reinforced concrete supports.

作为一种优选的技术方案:所述排水管内壁设有防水层。As a preferred technical solution: the inner wall of the drainage pipe is provided with a waterproof layer.

本发明的有益效果是:(1)本发明综合管廊舱内管线布置紧凑合理,有效利用了道路下的空问,节约了城市用地;使于各种管线的敷设、增減、维修和日常管理,符合安全、经济、实用的原则;(2)天然气舱、综合舱、强电舱、污水管舱、中水舱内底面均设有排水沟,这样可以将进入到天然气舱、综合舱、强电舱、污水管舱、中水舱内的水进行排除,防止积水的情況发生;(3)雨水地通过排水管与综合绿廊连接,这样雨水舱可以用于存储城市“海绵体”无法吸收的雨水,进一步缓解城市内涝的压力,同时雨水舱里面初步过滤过的雨水可以用于绿化、道路冲洗、降尘等用途。The beneficial effects of the present invention are: (1) The layout of pipelines in the comprehensive pipeline gallery cabin of the present invention is compact and reasonable, effectively utilizing the space under the road, and saving urban land; management, in line with the principles of safety, economy, and practicability; (2) Drainage ditches are provided on the bottom of the natural gas tank, comprehensive tank, strong electric tank, sewage pipe tank, and reclaimed water tank, so that the natural gas tank, comprehensive tank, The water in the strong electricity cabin, sewage pipe cabin, and medium water cabin is drained to prevent water accumulation; (3) The rainwater ground is connected to the comprehensive green corridor through the drainage pipe, so that the rainwater cabin can be used to store the urban "sponge body" The rainwater that cannot be absorbed further relieves the pressure of urban waterlogging. At the same time, the rainwater initially filtered in the rainwater tank can be used for greening, road washing, dust reduction and other purposes.

附图说明Description of drawings

图1为一种具有蓄水功能的地下综合管廊的横截面构造示意图;Fig. 1 is a schematic diagram of the cross-sectional structure of an underground comprehensive utility gallery with water storage function;

图2为一种具有蓄水功能的地下综合管廊的二次防倒灌水装置放大示意图;Fig. 2 is an enlarged schematic diagram of a secondary anti-inverting irrigation device of an underground comprehensive utility gallery with a water storage function;

图中:1市政路面、2综合绿廊、3天然气舱、4综合舱、5强电舱、6污水管舱、7雨水舱、8天然气管道、9给水管道、10中水管道、11通信光缆、12电力电缆、13污水管道、14排水管、15排水沟、16地下综合管廊、17中水管舱、18初步过滤装置、18-1粗格栅、18-2细格栅、18-3宽不锈钢百叶片、19维修步梯、20二次防倒灌水装置、20-1窄不锈钢百叶片、20-2不锈钢钢轴、20-3净化除臭装置。In the figure: 1 municipal road surface, 2 comprehensive green corridor, 3 natural gas tank, 4 comprehensive tank, 5 strong electric tank, 6 sewage pipe tank, 7 rainwater tank, 8 natural gas pipeline, 9 water supply pipeline, 10 reclaimed water pipeline, 11 communication optical cable , 12 power cables, 13 sewage pipes, 14 drainage pipes, 15 drainage ditches, 16 underground comprehensive pipe gallery, 17 middle water pipe cabin, 18 preliminary filter device, 18-1 coarse grille, 18-2 fine grille, 18-3 Wide stainless steel louvers, 19 maintenance steps, 20 secondary anti-inverting water devices, 20-1 narrow stainless steel louvers, 20-2 stainless steel shafts, 20-3 purification and deodorization devices.

具体实施方式detailed description

为了进一步说明本发明,下面结合附图及实施例对本发明进行详细地描述,但不能将它们理解为对本发明保护范围的限定。In order to further illustrate the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments, but they should not be construed as limiting the protection scope of the present invention.

参考附图1和附图2,一种具有蓄水和初步过滤功能的地下综合管廊,包括市政路面1、综合绿廊2以及地下综合管廊16;综合绿廊2位于市政路面1上,端面为椭圆形地下综合管廊16位于市政路面1下方;Referring to accompanying drawings 1 and 2, an underground comprehensive utility gallery with water storage and preliminary filtering functions includes a municipal road surface 1, a comprehensive green corridor 2, and an underground comprehensive utility gallery 16; the comprehensive green corridor 2 is located on the municipal road surface 1, The end face is an elliptical underground comprehensive pipe gallery 16 located below the municipal road surface 1;

所述地下综合管廊16包括天然气舱3、综合舱4、强电舱5、污水管舱6、雨水舱7、中水管舱17、排水管14、初步过滤装置18、维修步梯19以及二次防倒灌装置20;雨水舱7置于地下综合管舱16的底部中间,雨水舱7的正上方左右分别为强电舱(5)和综合舱4;综合舱4和雨水舱7通过维修步梯19相连接;综合舱4右侧为天然气舱3,天然气舱3正下方设置有中水管舱17,中水管舱17通过二次防倒灌装置20与雨水舱7相通;强电舱5和雨水舱7的左侧为污水管舱6,污水管舱6通过二次防倒灌装置与雨水舱7相通;排水管14的一端接入综合绿廊2,另一端贯穿污水管舱6连接至雨水舱7;The underground comprehensive pipe gallery 16 includes a natural gas cabin 3, a comprehensive cabin 4, a strong electric cabin 5, a sewage pipe cabin 6, a rainwater cabin 7, a reclaimed water pipe cabin 17, a drainage pipe 14, a preliminary filter device 18, a maintenance ladder 19 and two Secondary anti-backflow device 20; Rainwater cabin 7 is placed in the middle of the bottom of underground comprehensive pipe cabin 16, and the left and right sides of rainwater cabin 7 are strong electricity cabin (5) and comprehensive cabin 4 respectively; Comprehensive cabin 4 and rainwater cabin 7 pass maintenance step The ladder 19 is connected; the right side of the integrated cabin 4 is a natural gas tank 3, and a reclaimed water pipe tank 17 is arranged directly below the natural gas tank 3, and the reclaimed water tube tank 17 communicates with the rainwater tank 7 through a secondary anti-backflow device 20; the strong electric tank 5 and the rainwater The left side of the cabin 7 is the sewage pipe cabin 6, which communicates with the rainwater cabin 7 through the secondary backflow prevention device; one end of the drainage pipe 14 is connected to the comprehensive green corridor 2, and the other end runs through the sewage pipe cabin 6 and is connected to the rainwater cabin 7;

所述天然气舱3包括天然气管道8和排水沟15;天然气管道8分上下若干层固定在天然气舱3的竖直内壁上,排水沟15位于天然气舱3的内底面右下角;The natural gas tank 3 includes a natural gas pipeline 8 and a drain 15; the natural gas pipeline 8 is fixed on the vertical inner wall of the natural gas tank 3 in upper and lower layers, and the drain 15 is located at the bottom right corner of the inner bottom of the natural gas tank 3;

所述综合舱4包括给水管道9、通信光缆11以及排水沟15;给水管道9固定于综合舱4一侧竖直内壁上,通信光缆11分上下若干层固定在综合舱4的另一侧竖直内壁上,排水沟15位于综合舱4的内底面右下角;The integrated cabin 4 includes a water supply pipeline 9, a communication optical cable 11 and a drainage ditch 15; the water supply pipeline 9 is fixed on the vertical inner wall on one side of the integrated cabin 4, and the communication optical cable 11 is fixed on the other side of the integrated cabin 4 vertically in several layers up and down. On the straight inner wall, the drainage ditch 15 is located at the lower right corner of the inner bottom surface of the integrated cabin 4;

所述强电舱5包括电力电缆12和排水沟15;电力电缆12分上下若干层固定于强电舱5的左侧竖直内壁上,排水沟15位于强电舱5的内底面右下角;The strong electric cabin 5 includes a power cable 12 and a drainage ditch 15; the power cable 12 is fixed on the left vertical inner wall of the strong electric cabin 5 in several layers up and down, and the drainage ditch 15 is located at the bottom right corner of the inner bottom of the strong electric cabin 5;

所述污水管舱6包括污水管道13、排水沟15以及混凝土砌台21;污水管道13与二次防倒灌装置20相接,混凝土砌台21设于污水管道13下方用以支撑污水管道13,混凝土砌台21与地下综合管廊16内壁夹角处设有排水沟15;The sewage pipe compartment 6 includes a sewage pipe 13, a drainage ditch 15 and a concrete block 21; the sewage pipe 13 is connected with the secondary anti-backflow device 20, and the concrete block 21 is arranged below the sewage pipe 13 to support the sewage pipe 13, A drainage ditch 15 is provided at the angle between the concrete masonry platform 21 and the inner wall of the underground comprehensive pipe gallery 16;

所述雨水舱7两侧均设有二次防倒灌装置20;Both sides of the rainwater cabin 7 are provided with secondary anti-backflow devices 20;

所述中水管舱17包括中水管道10、排水沟15以及混凝土砌台21;中水管道10与二次防倒灌装置20相接,混凝土砌台21设于中水管道10下方用以支撑中水管道10,混凝土砌台21与地下综合管廊16内壁夹角处设有排水沟15。The reclaimed water pipe cabin 17 includes a reclaimed water pipeline 10, a drainage ditch 15, and a concrete block 21; the reclaimed water pipe 10 is connected to a secondary anti-backflow device 20, and the concrete block 21 is arranged under the reclaimed water pipe 10 to support the reclaimed water pipeline. Drainage ditch 15 is provided at the angle between water pipeline 10 , concrete masonry 21 and the inner wall of underground comprehensive pipe gallery 16 .

一种具有蓄水和初步过滤功能的地下综合管廊的工作过程,包括如下工作步骤A working process of an underground comprehensive utility gallery with water storage and preliminary filtering functions, including the following working steps

步骤一雨水的收集:雨水由市政路面1上的综合绿廊2流经排水管14进入雨水舱7;Step 1 Rainwater collection: rainwater flows from the integrated green corridor 2 on the municipal road surface 1 through the drainage pipe 14 into the rainwater compartment 7;

步骤二初步过滤以中水排除:雨水舱7内液面超过中水管道10的二次防倒灌装置18时,雨水经由二次防倒灌装置20进入中水管舱17,经中水管道10排出用于市政绿化、道路冲洗、降尘等;Step 2 Preliminary filtering to remove reclaimed water: when the liquid level in the rainwater tank 7 exceeds the secondary anti-inverting device 18 of the reclaimed water pipeline 10, the rainwater enters the reclaimed water pipe compartment 17 through the secondary anti-inverting device 20, and is discharged through the reclaimed water pipeline 10. Used in municipal greening, road washing, dust reduction, etc.;

步骤三初步过滤以污水排除:雨水舱7内液面超过污水管道13的二次防倒灌装置18时,雨水经由二次防倒灌装置18进入污水管舱6,经污水管道13排出。排水沟为雨季汛期/发生时,管道意外破裂,排水沟才会发挥作用,正常情况下无用。Step 3: Preliminary filtering to remove sewage: When the liquid level in the rainwater tank 7 exceeds the secondary anti-backflow device 18 of the sewage pipe 13, the rainwater enters the sewage pipe cabin 6 through the secondary anti-backflow device 18 and is discharged through the sewage pipe 13. The drainage ditch will only work when the rainy season/flood season occurs, and the pipe will burst unexpectedly, and it will be useless under normal circumstances.

所述的初步过滤装置18包括粗格栅18-1、细格栅18-2和净化除臭装置18-3;初步过滤装置18靠近雨水舱7的一侧设有粗格栅18-1,远离雨水舱7的一侧设有细格栅18-2,净化除臭装置18-3填满二次防倒灌装置18的内部空腔。Described preliminary filtering device 18 comprises coarse grid 18-1, fine grid 18-2 and purification deodorization device 18-3; The side of preliminary filtering device 18 near rainwater cabin 7 is provided with coarse grid 18-1, The side away from the rainwater cabin 7 is provided with a fine grid 18-2, and the purification and deodorization device 18-3 fills the internal cavity of the secondary anti-backflow device 18.

所述的二次防倒灌装置20包括宽不锈钢百叶片20-1、窄不锈钢百叶片20-2、不锈钢钢轴20-3;粗格栅18-1远离雨水舱7的一侧通过不锈钢轴20-3由上至下连接有宽不锈钢百叶片20-1,细格栅18-2远离雨水舱7的一侧通过不锈钢轴20-3由上至下连接有窄不锈钢百叶片20-2。The secondary anti-backflow device 20 includes a wide stainless steel louver 20-1, a narrow stainless steel louver 20-2, and a stainless steel shaft 20-3; the side of the coarse grid 18-1 away from the rainwater cabin 7 passes through the stainless steel shaft 20 -3 is connected with a wide stainless steel louver 20-1 from top to bottom, and the side of the fine grid 18-2 away from the rainwater cabin 7 is connected with a narrow stainless steel louver 20-2 from top to bottom through a stainless steel shaft 20-3.

所述的排水管14为轻质软管。Described drainpipe 14 is lightweight flexible pipe.

所的述雨水舱7底部为沉砂池,起到点状蓄水池的作用。The bottom of said rainwater tank 7 is a grit chamber, which acts as a dotted reservoir.

所述的二次防倒灌装置20与污水管道13连接的水平高度高于其与中水管道10连接的水平高度。The level of the secondary anti-backflow device 20 connected to the sewage pipeline 13 is higher than the level connected to the reclaimed water pipeline 10 .

所述的电力电缆12、通信光缆11、给水管道9以及天然气管道8均采用钢筋混凝土支架进行固定。The power cables 12, communication optical cables 11, water supply pipelines 9 and natural gas pipelines 8 are all fixed by reinforced concrete supports.

所述的排水管15内壁设有防水层。The inner wall of the drain pipe 15 is provided with a waterproof layer.

最后所应说明的是,以上实施例仅用以补充阐释本实用新型的技术方案而非限制。尽管参照实施例对本实用新型进行了详细说明,本领域的广大技术人员应当理解,对本实用新型的技术方案进行修改或者同等替换,都不脱离本实用新型技术方案的精神和范围,其均应涵盖在本实用新型的权利要求范围当中。Finally, it should be noted that the above embodiments are only used for supplementary illustration of the technical solutions of the present utility model rather than limitation. Although the utility model has been described in detail with reference to the embodiments, those skilled in the art should understand that any modification or equivalent replacement of the technical solution of the utility model does not depart from the spirit and scope of the technical solution of the utility model, and all should cover In the scope of the claims of the present utility model.

Claims (9)

1.一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:包括市政路面(1)、综合绿廊(2)以及地下综合管廊(16);综合绿廊(2)位于市政路面(1)上,端面为椭圆形地下综合管廊(16)位于市政路面(1)下方;1. An underground comprehensive pipe gallery with water storage and preliminary filtering functions, characterized in that it includes municipal road surface (1), comprehensive green corridor (2) and underground comprehensive pipe gallery (16); the comprehensive green corridor (2) is located in On the municipal road surface (1), the end face is an oval-shaped underground comprehensive pipe gallery (16) located below the municipal road surface (1); 所述地下综合管廊(16)包括天然气舱(3)、综合舱(4)、强电舱(5)、污水管舱(6)、雨水舱(7)、中水管舱(17)、排水管(14)、初步过滤装置(18)、维修步梯(19)以及二次防倒灌装置(20);雨水舱(7)置于地下综合管舱(16)的底部中间,雨水舱(7)的正上方左右分别为强电舱(5)和综合舱(4);综合舱(4)和雨水舱(7)通过维修步梯(19)相连接;综合舱(4)右侧为天然气舱(3),天然气舱(3)正下方设置有中水管舱(17),中水管舱(17)通过二次防倒灌装置(20)与雨水舱(7)相通;强电舱(5)和雨水舱(7)的左侧为污水管舱(6),污水管舱(6)通过二次防倒灌装置与雨水舱(7)相通;排水管(14)的一端接入综合绿廊(2),另一端贯穿污水管舱(6)连接至雨水舱(7);The underground comprehensive pipe gallery (16) includes a natural gas tank (3), a comprehensive tank (4), a strong electric tank (5), a sewage tank (6), a rainwater tank (7), a reclaimed water tank (17), a drainage pipe (14), preliminary filtering device (18), maintenance step ladder (19) and secondary anti-backflow device (20); the rainwater cabin (7) is placed in the bottom middle of the underground comprehensive management cabin (16), and the rainwater cabin (7 ) are the strong electric cabin (5) and the integrated cabin (4) on the left and right respectively; the integrated cabin (4) and the rainwater cabin (7) are connected by the maintenance ladder (19); the right side of the integrated cabin (4) is the natural gas cabin (3), a reclaimed water pipe cabin (17) is arranged directly below the natural gas tank (3), and the reclaimed water pipe cabin (17) communicates with the rainwater cabin (7) through a secondary anti-backflow device (20); the strong electric cabin (5) And the left side of the rainwater cabin (7) is the sewage pipe cabin (6), and the sewage pipe cabin (6) communicates with the rainwater cabin (7) through the secondary anti-backflow device; one end of the drainage pipe (14) is connected to the comprehensive green corridor ( 2), the other end passes through the sewage pipe compartment (6) and connects to the rainwater compartment (7); 所述天然气舱(3)包括天然气管道(8)和排水沟(15);天然气管道(8)分上下若干层固定在天然气舱(3)的竖直内壁上,排水沟(15)位于天然气舱(3)的内底面右下角;The natural gas tank (3) includes a natural gas pipeline (8) and a drain (15); the natural gas pipeline (8) is fixed on the vertical inner wall of the natural gas tank (3) in several upper and lower layers, and the drain (15) is located in the natural gas tank (3) The lower right corner of the inner bottom surface; 所述综合舱(4)包括给水管道(9)、通信光缆(11)以及排水沟(15);给水管道(9)固定于综合舱(4)一侧竖直内壁上,通信光缆(11)分上下若干层固定在综合舱(4)的另一侧竖直内壁上,排水沟(15)位于综合舱(4)的内底面右下角;The integrated cabin (4) includes a water supply pipeline (9), a communication optical cable (11) and a drainage ditch (15); the water supply pipeline (9) is fixed on the vertical inner wall on one side of the integrated cabin (4), and the communication optical cable (11) The upper and lower layers are fixed on the vertical inner wall on the other side of the comprehensive cabin (4), and the drainage ditch (15) is located at the lower right corner of the inner bottom surface of the comprehensive cabin (4); 所述强电舱(5)包括电力电缆(12)和排水沟(15);电力电缆(12)分上下若干层固定于强电舱(5)的左侧竖直内壁上,排水沟(15)位于强电舱(5)的内底面右下角;The strong electric cabin (5) includes a power cable (12) and a drainage ditch (15); the power cable (12) is fixed on the left vertical inner wall of the strong electric cabin (5) in several upper and lower layers, and the drainage ditch (15) ) is located in the lower right corner of the inner bottom surface of the strong electric compartment (5); 所述污水管舱(6)包括污水管道(13)、排水沟(15)以及混凝土砌台(21);污水管道(13)与二次防倒灌装置(20)相接,混凝土砌台(21)设于污水管道(13)下方用以支撑污水管道(13),混凝土砌台(21)与地下综合管廊(16)内壁夹角处设有排水沟(15);The sewage pipe compartment (6) includes a sewage pipe (13), a drainage ditch (15) and a concrete block (21); the sewage pipe (13) is connected with the secondary anti-backflow device (20), and the concrete block (21) ) is installed under the sewage pipe (13) to support the sewage pipe (13), and a drainage ditch (15) is provided at the angle between the concrete masonry (21) and the inner wall of the underground comprehensive pipe gallery (16); 所述雨水舱(7)两侧均设有二次防倒灌装置(20);Both sides of the rainwater cabin (7) are equipped with secondary anti-backflow devices (20); 所述中水管舱(17)包括中水管道(10)、排水沟(15)以及混凝土砌台(21);中水管道(10)与二次防倒灌装置(20)相接,混凝土砌台(21)设于中水管道(10)下方用以支撑中水管道(10),混凝土砌台(21)与地下综合管廊(16)内壁夹角处设有排水沟(15)。The reclaimed water tank (17) includes a reclaimed water pipeline (10), a drainage ditch (15) and a concrete building (21); the reclaimed water pipeline (10) is connected to the secondary anti-backflow device (20), and the concrete (21) It is arranged under the reclaimed water pipeline (10) to support the reclaimed water pipeline (10), and a drainage ditch (15) is provided at the angle between the concrete masonry (21) and the inner wall of the underground comprehensive pipe gallery (16). 2.一种具有蓄水和初步过滤功能的地下综合管廊的工作过程,其特征在于:包括如下工作步骤2. A working process of an underground comprehensive pipe gallery with water storage and preliminary filtering functions, characterized in that: it includes the following working steps 步骤一雨水的收集:雨水由市政路面(1)上的综合绿廊(2)流经排水管(14)进入雨水舱(7);Step 1 Rainwater collection: rainwater flows from the comprehensive green corridor (2) on the municipal road surface (1) through the drainage pipe (14) into the rainwater compartment (7); 步骤二初步过滤以中水排除:雨水舱(7)内液面超过中水管道(10)的二次防倒灌装置(18)时,雨水经由二次防倒灌装置(20)进入中水管舱(17),经中水管道(10)排出用于市政绿化、道路冲洗、降尘等;Step 2 Preliminary filtration to remove reclaimed water: When the liquid level in the rainwater tank (7) exceeds the secondary anti-backflow device (18) of the reclaimed water pipeline (10), the rainwater enters the reclaimed water pipe cabin ( 17), discharged through the reclaimed water pipeline (10) for municipal greening, road washing, dust reduction, etc.; 步骤三初步过滤以污水排除:雨水舱(7)内液面超过污水管道(13)的二次防倒灌装置(18)时,雨水经由二次防倒灌装置(18)进入污水管舱(6),经污水管道(13)排出。Step 3 Preliminary filtration to remove sewage: When the liquid level in the rainwater tank (7) exceeds the secondary anti-backflow device (18) of the sewage pipe (13), the rainwater enters the sewage pipe cabin (6) through the secondary anti-backflow device (18) , discharged through the sewage pipe (13). 3.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述初步过滤装置(18)包括粗格栅(18-1)、细格栅(18-2)和净化除臭装置(18-3);初步过滤装置(18)靠近雨水舱(7)的一侧设有粗格栅(18-1),远离雨水舱(7)的一侧设有细格栅(18-2),净化除臭装置(18-3)填满二次防倒灌装置(18)的内部空腔。3. An underground comprehensive utility gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the preliminary filtering device (18) includes a coarse grille (18-1), a fine grille ( 18-2) and purification and deodorization device (18-3); the side of the preliminary filter device (18) near the rainwater cabin (7) is provided with a coarse grille (18-1), and the side away from the rainwater cabin (7) A fine grid (18-2) is provided, and the purification and deodorization device (18-3) fills the internal cavity of the secondary anti-backflow device (18). 4.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述二次防倒灌装置(20)包括宽不锈钢百叶片(20-1)、窄不锈钢百叶片(20-2)、不锈钢钢轴(20-3);粗格栅(18-1)远离雨水舱(7)的一侧通过不锈钢轴(20-3)由上至下连接有宽不锈钢百叶片(20-1),细格栅(18-2)远离雨水舱(7)的一侧通过不锈钢轴(20-3)由上至下连接有窄不锈钢百叶片(20-2)。4. An underground comprehensive utility gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the secondary anti-backflow device (20) includes wide stainless steel louvers (20-1), narrow Stainless steel louvers (20-2), stainless steel shafts (20-3); the side of the coarse grille (18-1) away from the rainwater tank (7) is connected from top to bottom by a stainless steel shaft (20-3). The stainless steel louver (20-1), the side of the fine grid (18-2) away from the rainwater cabin (7) is connected with a narrow stainless steel louver (20-2) from top to bottom by a stainless steel shaft (20-3). 5.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述排水管(14)为轻质软管。5. The underground comprehensive pipe gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the drainage pipe (14) is a lightweight hose. 6.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述雨水舱(7)底部为沉砂池,起到点状蓄水池的作用。6. An underground integrated pipe gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the bottom of the rainwater tank (7) is a grit chamber, which acts as a point-shaped reservoir . 7.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述二次防倒灌装置(20)与污水管道(13)连接的水平高度高于其与中水管道(10)连接的水平高度。7. An underground comprehensive utility gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the level of connection between the secondary anti-backflow device (20) and the sewage pipe (13) is higher than It is the level connected with the gray water pipeline (10). 8.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述电力电缆(12)、通信光缆(11)、给水管道(9)以及天然气管道(8)均采用钢筋混凝土支架进行固定。8. An underground comprehensive utility gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the power cables (12), communication optical cables (11), water supply pipelines (9) and natural gas pipelines (8) All are fixed with reinforced concrete brackets. 9.根据权利要求1所述的一种具有蓄水和初步过滤功能的地下综合管廊,其特征在于:所述排水管(15)内壁设有防水层。9. The underground comprehensive pipe gallery with water storage and preliminary filtering functions according to claim 1, characterized in that: the inner wall of the drainage pipe (15) is provided with a waterproof layer.
CN201611054951.2A 2016-11-25 2016-11-25 Underground comprehensive pipe gallery with water storage and preliminary filtration functions Expired - Fee Related CN106480902B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611054951.2A CN106480902B (en) 2016-11-25 2016-11-25 Underground comprehensive pipe gallery with water storage and preliminary filtration functions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611054951.2A CN106480902B (en) 2016-11-25 2016-11-25 Underground comprehensive pipe gallery with water storage and preliminary filtration functions

Publications (2)

Publication Number Publication Date
CN106480902A true CN106480902A (en) 2017-03-08
CN106480902B CN106480902B (en) 2019-10-15

Family

ID=58274322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611054951.2A Expired - Fee Related CN106480902B (en) 2016-11-25 2016-11-25 Underground comprehensive pipe gallery with water storage and preliminary filtration functions

Country Status (1)

Country Link
CN (1) CN106480902B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958260A (en) * 2017-04-26 2017-07-18 张铁耀 A kind of pipe gallery
CN106996135A (en) * 2017-04-05 2017-08-01 中铁建设集团有限公司 A kind of intelligent peak rain-water accumulating heat-extraction system and method based on city integrated piping lane
CN107090892A (en) * 2017-04-02 2017-08-25 宁波市若水助创商务咨询服务有限公司 A kind of global function Urban Underground city planting ductwork structure and implementation
CN107653907A (en) * 2017-10-31 2018-02-02 江苏金贸科技发展有限公司 A kind of multifunctional fabricated underground pipe gallery
CN107747320A (en) * 2017-11-23 2018-03-02 中冶京诚工程技术有限公司 Double-layer comprehensive pipe gallery
CN107761763A (en) * 2017-10-18 2018-03-06 西安交通大学 A kind of pipe gallery and its application method
CN109024673A (en) * 2018-07-05 2018-12-18 沈阳工业大学 A kind of sponge road surface-underground pipe gallery system and construction technology
CN109972722A (en) * 2019-03-22 2019-07-05 安徽亚井雨水利用科技有限公司 A kind of novel section dirty formula environmentally-friendly gutter inlet
CN111424705A (en) * 2020-03-30 2020-07-17 中国一冶集团有限公司 Utility tunnel and sponge city system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202519780U (en) * 2012-03-27 2012-11-07 上海市城市建设设计研究总院 Embedded sewage intercepting facility inside river bank
KR101511366B1 (en) * 2014-06-16 2015-04-09 한국건설기술연구원 Rainwater retention system and method having green/road runoff seperating-filtering function
CN105926676A (en) * 2016-06-23 2016-09-07 上海市城市建设设计研究总院 Comprehensive pipe rack system with sponge urban function
CN106013236A (en) * 2016-07-19 2016-10-12 上海宝冶集团有限公司 Underground comprehensive pipe gallery with water storage function
CN206289655U (en) * 2016-11-25 2017-06-30 沈阳建筑大学 A kind of underground pipe gallery with retaining and preliminary filtering function

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202519780U (en) * 2012-03-27 2012-11-07 上海市城市建设设计研究总院 Embedded sewage intercepting facility inside river bank
KR101511366B1 (en) * 2014-06-16 2015-04-09 한국건설기술연구원 Rainwater retention system and method having green/road runoff seperating-filtering function
CN105926676A (en) * 2016-06-23 2016-09-07 上海市城市建设设计研究总院 Comprehensive pipe rack system with sponge urban function
CN106013236A (en) * 2016-07-19 2016-10-12 上海宝冶集团有限公司 Underground comprehensive pipe gallery with water storage function
CN206289655U (en) * 2016-11-25 2017-06-30 沈阳建筑大学 A kind of underground pipe gallery with retaining and preliminary filtering function

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090892A (en) * 2017-04-02 2017-08-25 宁波市若水助创商务咨询服务有限公司 A kind of global function Urban Underground city planting ductwork structure and implementation
CN106996135A (en) * 2017-04-05 2017-08-01 中铁建设集团有限公司 A kind of intelligent peak rain-water accumulating heat-extraction system and method based on city integrated piping lane
CN106996135B (en) * 2017-04-05 2024-01-16 中铁建设集团有限公司 Intelligent peak rainwater storage and drainage system and method based on urban comprehensive pipe rack
CN106958260A (en) * 2017-04-26 2017-07-18 张铁耀 A kind of pipe gallery
CN107761763A (en) * 2017-10-18 2018-03-06 西安交通大学 A kind of pipe gallery and its application method
CN107653907A (en) * 2017-10-31 2018-02-02 江苏金贸科技发展有限公司 A kind of multifunctional fabricated underground pipe gallery
CN107747320A (en) * 2017-11-23 2018-03-02 中冶京诚工程技术有限公司 Double-layer comprehensive pipe gallery
CN109024673A (en) * 2018-07-05 2018-12-18 沈阳工业大学 A kind of sponge road surface-underground pipe gallery system and construction technology
CN109972722A (en) * 2019-03-22 2019-07-05 安徽亚井雨水利用科技有限公司 A kind of novel section dirty formula environmentally-friendly gutter inlet
CN109972722B (en) * 2019-03-22 2023-12-22 安徽亚井雨水利用科技有限公司 Dirty formula environmental protection inlet for stom water cuts
CN111424705A (en) * 2020-03-30 2020-07-17 中国一冶集团有限公司 Utility tunnel and sponge city system

Also Published As

Publication number Publication date
CN106480902B (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN106480902B (en) Underground comprehensive pipe gallery with water storage and preliminary filtration functions
CN201276718Y (en) Rainwater collecting and recycling system on building roofing
CN106400648B (en) Sponge City Water Collection and Purification Ecological Road
CN106013236A (en) Underground comprehensive pipe gallery with water storage function
CN107630464A (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN111963357A (en) Roof rainwater recycling power generation system
CN206289655U (en) A kind of underground pipe gallery with retaining and preliminary filtering function
CN206360047U (en) A kind of environment-friendly type road drainage system in civil engineering
CN206467751U (en) A kind of pumping equipment in construction of modern city
CN211547991U (en) Rainwater drainage and utilization system capable of preventing urban road waterlogging
CN210194373U (en) Road drainage structure is recycled to water resource
CN202519784U (en) Inflow energy dissipation exhaust and outflow multifunctional combined well of storage adjusting pipe
CN206368311U (en) A kind of ecological road of sponge city water collecting and purifying
CN215594290U (en) Novel zero-power-consumption lawn water storage device for sponge city
CN207597427U (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN109356224A (en) A rainwater collection self-circulation system for high-rise buildings
CN110593389A (en) Rainwater recycling and reuse system
CN115288266A (en) A system combining road water supply and drainage with green irrigation
CN206784558U (en) Underground type rainwater storage collection device suitable for dispersed placement
CN207846535U (en) Roof rain water collecting reclaiming system
CN208088690U (en) A kind of novel roof rain collector
CN108179785A (en) Automatic flow abandoning rainwater-collecting is built
CN220521535U (en) Underground rainwater storage pool for building design
CN215483403U (en) Reinforced hardened paving lower rainwater storage and rainwater recycling device
CN218713688U (en) System combining road water supply and drainage and greening irrigation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201201

Address after: Room 50, building 3, Hongji Fortune Plaza, Kunshan Development Zone, Kunshan City, Suzhou City, Jiangsu Province

Patentee after: Jiangsu Ziqin Construction Development Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Patentee before: SHENYANG JIANZHU University

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191015

CF01 Termination of patent right due to non-payment of annual fee