CN106956060B - The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature - Google Patents

The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature Download PDF

Info

Publication number
CN106956060B
CN106956060B CN201710177506.3A CN201710177506A CN106956060B CN 106956060 B CN106956060 B CN 106956060B CN 201710177506 A CN201710177506 A CN 201710177506A CN 106956060 B CN106956060 B CN 106956060B
Authority
CN
China
Prior art keywords
electromagnetic induction
induction heating
temperature
electric arc
material manufacturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710177506.3A
Other languages
Chinese (zh)
Other versions
CN106956060A (en
Inventor
钱锦文
宋二军
欧艳
肖逸锋
许艳飞
吴靓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangtan University
Original Assignee
Xiangtan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan University filed Critical Xiangtan University
Priority to CN201710177506.3A priority Critical patent/CN106956060B/en
Publication of CN106956060A publication Critical patent/CN106956060A/en
Application granted granted Critical
Publication of CN106956060B publication Critical patent/CN106956060B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/095Monitoring or automatic control of welding parameters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/04Welding for other purposes than joining, e.g. built-up welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/32Accessories

Abstract

The invention discloses a kind of methods of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterized in that, its formation system is mainly by computer, the compositions such as electric arc deposited control system, six-joint robot I, master control system I, Cryocooler Temperature Closed Loop Control System, the Cryocooler Temperature Closed Loop Control System are made of temperature closed-loop control device II and master control system II.Infrared thermometer, electromagnetic induction heating coil and cooling device are installed in temperature closed-loop control device II.During increasing material manufacturing, infrared thermometer is used to measure the variation of surface temperature after each layer heap is accumulated, and measured value real-time Transmission is to computer.According to preset interlayer temperature, computer controls electromagnetic induction heating coil and cooling device by master control system II and is shaped part application sensing heating or pressure cooling effect to the part of part to realize the purpose of active control interlayer temperature.The present invention provides a kind of effective ways for active control electric arc increasing material manufacturing interlayer temperature.

Description

The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature
Technical field
The invention belongs to increases material manufacturing technology fields, and in particular to a kind of electromagnetic induction heating active control electric arc increasing material system The method for making interlayer temperature.
Background technology
Increases material manufacturing technology is a kind of based on discrete-accumulation principle, under the auxiliary of computer, using wire feed or powdering Mode, with high energy beam(Laser, electron beam, plasma, electric arc)Part is realized into melting original material successively deposition accumulation for heat source The manufacturing process without mold, Quick-forming.Electric arc increases material manufacturing technology refers to being based on(TIG welderings, MAG welderings, MIG welderings or CMT Weldering)Electric arc is heat source, uses the mode of synchronous wire feed for manufacturing stainless steel, high strength alloy steel and carbon steel etc. as the height of raw material A kind of technique of performance complex parts.Compared to using laser, electron beam, plasma as the increases material manufacturing technology of heat source, the technology Have many advantages, such as that production efficiency is high, production cost is low, raw material availability is high and mechanical property is good, is particularly suitable for automobile and aviation Enlargement, complication and the manufacture of light-weighted integrated member in equal fields.
Currently, electric arc increases material manufacturing technology still suffers from bigger difficulty in terms of controlling shape control, crucial reason it One is the control of interlayer temperature.Substantially, electric arc increasing material manufacturing process is the process of a micro- casting, and molten bath passes through by " point- The process of line-face " realizes the entity manufacture of part.During electric arc increasing material manufacturing, with accumulation the number of plies increase, part with Heat-exchange capacity between surrounding medium reduces so that the heat accumulation amount that part is shaped part is continuously increased, and leads to interlayer temperature Degree increases.When interlayer temperature is higher than a certain temperature range, during next layer heap is accumulated, then cause bath temperature excessively high, molten Liquid setting time increases, melt is more liquid and the anti-interference ability in molten bath greatly reduces, especially in drip molding marginal portion Easily generate " trickling " phenomenon.This is not only serious to reduce the surface quality and dimensional accuracy of part, and easily leads to part There is coarsening phenomenon in internal grain, to reduce the overall mechanical properties of part.If interlayer temperature is too low, molten bath solidification speed Degree is very fast, and the mobility of melt is relatively low, serious to reduce zero the defects of easily leading to the non-soldering of interlayer formation or generate hole The mechanical property of part.Therefore, during electric arc increasing material manufacturing, reasonably controlling the range of electric arc increasing material manufacturing interlayer temperature is Improve one of the critical path of drip molding surface quality and mechanical property.
Currently, researcher passes through the method for increase time interval between layers using instruments such as infrared thermometer and thermocouples The variation for controlling interlayer temperature, has studied affecting laws of the interlayer temperature to drip molding surface quality and mechanical property.Such as Ha Er Shore polytechnical university Zhang Guangjun professor has studied the variation that temperature during wall shape part is shaped using GMAW increases material manufacturing technologies, experiment Show:During increasing material manufacturing, the variation range that interlayer temperature is controlled by increasing time interval between layers is conducive to raising zero The surface quality and dimensional accuracy of part;Meanwhile excessively the increase interlayer cooling time can not be effectively reduced the heat product of part Tired amount, and reduce the production efficiency of part(Referring to Yang D, Wang G, Zhang G. Thermal analysis for single-pass multi-layer GMAW based additive manufacturing using infrared thermography[J]. Journal of Materials Processing Technology, 2017, 244: 215- 224).For another example University Of Tianjin doctor Shen Junqi is based on AC-TIG WELDING and welds increases material manufacturing technology, has studied interlayer temperature to forming quality Affecting laws, experiment shows:Reasonably the stability in molten bath in banking process can be improved in control interlayer temperature range, produces Surface topography is good, the part of even tissue densification(Referring to Shen Junqi, Hu Shengsun, Liu Wanglan, wait Weldeds quick It shapes time interval between layers analysis [J] and welds journal, 2008,29 (5): 110).But when by increasing interlayer interval Between method not only significantly reduce the efficiency of electric arc increasing material manufacturing to control interlayer temperature, and be difficult to accurately control interlayer The range of temperature.Therefore, a kind of method of active control electric arc increasing material manufacturing interlayer temperature is invented to be of great significance.
Invention content
For the technical barrier faced at present, the invention discloses a kind of electromagnetic induction heating active control electric arcs to increase material system The method for making interlayer temperature.During increasing material manufacturing, using Cryocooler Temperature Closed Loop Control System by being shaped part to part Apply sensing heating and forces cooling effect to realize the purpose of active control interlayer temperature, i.e., with the increase of the accumulation number of plies, Electromagnetic induction heating coil and cooling device are passed through in the part that is shaped of substrate and part successively, real-time using infrared thermometer The variation of surface temperature after each stack layer is measured, and by the temperature value real-time Transmission of measurement to computer;According to advance The interlayer temperature value of setting, computer is by real-time control electromagnetic induction heating coil and cooling device to being shaped the office of part Portion applies sensing heating and forces cooling effect quickly to control the variation of interlayer temperature, to realize active control interlayer temperature Purpose.The present invention provides a kind of effective ways efficiently to accurately control the interlayer temperature of electric arc increasing material manufacturing, to real Now to the control of drip molding surface quality and mechanical property.
The technical scheme is that:During increasing material manufacturing, computer passes through master control system I and electric arc deposited control The motion track of welding gun and the variation of build up process parameter are to complete the accumulation of each layer of profile on system control six-joint robot I At the same time forming it is each in banking process to control to control the second servo motor adjustment bearing flat plate by master control system II Accumulate the variation of layer thickness;With the increase of the accumulation number of plies, bearing flat plate constantly declines, and the height declined every time is by part three-dimensional The thickness of model layers determines so that electromagnetic induction heating coil and cooling dress are passed through in the part that is shaped of substrate and part successively It sets;The temperature measurement location of infrared thermometer is controlled with quick obtaining stack layer by first servo motor after each layer heap product The temperature value on surface, and by measured value real-time Transmission to computer, simultaneous computer passes through according to preset interlayer temperature Master control system II controls electromagnetic induction heating coil and cooling device and applies sensing heating and pressure to the part that is shaped of part Cooling effect, to realize the purpose of active control interlayer temperature.
Specifically, the specific implementation of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature method Steps are as follows:
(1)The layering of part model:According to the three-dimensional CAD model of part, layered shaping is carried out to model.
(2)The planning that accumulation path is carried out according to the size and shape feature of each hierarchy slicing generates needed for each layer forming Numerical control code, control the mobile route and branch of welding gun on I mechanical arm of six-joint robot respectively using the numerical control code of production The distance that peaceful plate declines every time along piling height direction.
(3)According to the physical characteristic of material, interlayer temperature value is presetT 1T 2T 3、…T n , whereinT 1Refer to the 1st layer of accumulation When substrate surface temperature value,T n Refer to accumulation thenThe when layernThe temperature value of -1 layer surface.
(4)During successively accumulating, bearing flat plate is according to step(2)The thickness of middle layering constantly declines, with heap Electromagnetic induction heating coil and cooling device are passed through in the part that is shaped of the increase of lamination number, substrate and part successively.When each After layer heap is accumulated, bearing flat plate declines the distance of a lift height, and subsequent computer is adjusted in real time by first servo motor The temperature value of layer surface is accumulated with quick obtaining in the position of whole infrared thermometerT n’ , and by measured value real-time Transmission to calculating Machine.According to step(3)Middle predetermined temperature value, computer make differentiation, whenT n ´<T n When, computer passes through master control system Size of current, frequency and the variation of sensing heating time in II adjustment electromagnetic induction heating coil, add to being in electromagnetic induction Apply sensing heating close to the part drip molding of accumulation top layer in heat coil, to make interlayer temperature be rapidly achievedT n , whenT n ´>T n When, stop electromagnetic induction heating, computer starts cooling device by master control system II, and is adjusted by fluid pressure drive device II The position of cooling device applies pressure cooling effect to the part that is shaped of part, to make interlayer temperature quickly drop toT n .When Interlayer temperature reachesT n When, computer stops electromagnetic induction heating and forces cooling effect, and according to step(2)The numerical control of generation The motion track of program control welding gun starts next layer of stack shaping, recycles the above process, until realizing the entity manufacture of part.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:In advance The interlayer temperature value of settingT 1T 2T 3、…T n Not necessarily essentially equal, value can be by under identical accumulation forming parameters Preliminary experiment determine.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:It is described Electric arc increases material manufacturing technology refer to MAG weldering, MIG weldering or CMT weld for heat source, use the mode of synchronous wire feed to manufacture with stainless Steel, high strength alloy steel and carbon steel are a kind of forming technique of the metal parts of raw material.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:Electromagnetism Induction heating mode is using three kinds of ultralow frequency, low frequency or intermediate frequency induction heating modes.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:According to The physical characteristic of moulding material, cooling device use air or recirculated cooling water two media.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:It utilizes When the forming of electric arc increases material manufacturing technology is using stainless steel silk material as the part of raw material, preferred interlayer temperature is:10℃≤T n ≤500 ℃。
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:Electromagnetism The number of turns of load coil is depending on the length of heating region, it is preferred that electromagnetic induction heating coil is accumulated high along part The length for spending direction heating region is 5 ~ 300mm.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:Master control System II makes to add in electromagnetic induction by adjusting size of current, frequency and the variation of heating time in electromagnetic induction heating coil Part drip molding induction heat production in heat coil close to accumulation top layer makes interlayer temperature be rapidly achieved predetermined temperature.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:It is infrared The thermometric region of line temperature measurer is controlled by first servo motor, for measuring surface temperature after each layer heap is accumulated in real time Variation, and by measured value real-time Transmission to computer.
The method of the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:Hydraulic pressure Driving device I and fluid pressure drive device II are respectively used to the heating of adjustment electromagnetic induction heating coil and the position of cooling device.
During electric arc increasing material manufacturing, made in the way of electromagnetic induction heating tight in electromagnetic induction heating coil Regional area at the top of adjacent stack layer incudes heat production, to make interlayer temperature rapidly reach preset interlayer temperature value, When stack layer surface temperature is higher than preset interlayer temperature value, stopping sensing heating acting on, while being filled using pressure is cooling Setting to apply the part for being shaped part forces cooling effect so that interlayer temperature drops to rapidly preset interlayer temperature value, from And realize the purpose of active control electric arc increasing material manufacturing interlayer temperature.The present invention not only increases the production effect of electric arc increasing material manufacturing Rate, and improve the pattern quality and mechanical property of drip molding.
Description of the drawings
Fig. 1 is the formation system of the method for electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature in the present invention Schematic diagram.
Fig. 2 is the A-A direction structure schematic diagrames of the temperature scaling factor structure II in Fig. 1 of the present invention.
Wherein, 1- computers, 2- master control systems I, the electric arc deposited control systems of 3-, 4- protect gas bottle, 5- welding guns, 6- at Shape part, 7- infrared thermometers, 8- first servo motors, 9- electromagnetic induction heating coils, 10- induction coil fixed card slots, 11- cooling nozzles, 12- cool down medium pipeline, 13- hydraulic stems I, 14- master control systems II, 15- laser range finders, the drive of 16- hydraulic pressure Dynamic device I, 17- pedestals, the second servo motors of 18-, 19- ball screws, 20- bearing flat plates, 21- substrates, 22- fixing bolts, 23- cooling tube fixed card slots, 24- hydraulic stems II, 25- fluid pressure drive devices II.
Specific implementation mode
Present invention will be further explained below with reference to the attached drawings and examples.
As depicted in figs. 1 and 2, a kind of method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, institute The formation system of the method for the electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature stated includes mainly:Computer 1, Master control system I, electric arc deposited control system 3, protection gas bottle 4, six-joint robot I, temperature closed-loop control device II and master Control systems II etc. are constituted, and computer 1 is connect with master control system I, master control system II respectively to be respectively used on control six-joint robot I The motion track and temperature closed-loop control device II of welding gun.Master control system II and infrared thermometer 7, first servo motor 8, the Two servo motors 18, fluid pressure drive device I, fluid pressure drive device II and cooling device are connected, the thermometric of infrared thermometer 7 The variation of surface temperature, the second servo motor after position is controlled by first servo motor 8 with each stack layer of quick obtaining 18, for adjusting the displacement that bearing flat plate 20 declines every time, according to the height of stack shaping part, pass through fluid pressure drive device I and liquid Hydraulic driver II is respectively used to the position of setting electromagnetic induction heating circle and cooling device.
It is special according to the shape of part for using continuous wire feed MAG weldering electric arc increasing material manufacturing circular ring shape stainless steel parts Point, electromagnetic induction heating coil 9 are the multiturn solenoid made of red copper material, the shape and heap of electromagnetic induction heating coil 9 The contour feature in product drip molding layering section is almost the same;It is designed to circular configuration.First, totally simultaneously by 21 surface clean of substrate It is fixed on bearing flat plate 20, substrate 21 is used to carry the part of stack shaping, secondly, according to the height of formation of parts, calculates Machine 1 adjusts separately electromagnetic induction heating coil 9 and cooling medium pipeline 12 by fluid pressure drive device I, fluid pressure drive device II Position, and the position of electromagnetic induction heating coil 9 is made to be higher than the height of drip molding, cooling medium pipeline 12 is located at electromagnetic induction In certain distance below heater wire coil 9;Recirculated cooling water is by cooling nozzles 11 to being located at below cooling medium pipeline 12 Be shaped part apply force cooling effect quickly to make interlayer temperature drop to preset interlayer temperature value.It is watched by second The height that motor 18 adjusts bearing flat plate 20 is taken, so that substrate 21 is in electromagnetic induction heating coil 9, and the upper surface of substrate 21 Slightly higher than electromagnetic induction heating coil 9, bearing flat plate 20 are located at below electromagnetic induction heating coil 9.Pass through master control system II Size of current, frequency and the variation of sensing heating time of control electromagnetic induction heating coil 9 make to be in electromagnetic induction heating line Part is shaped close to the part of accumulation top layer incude heat production so that interlayer temperature is rapidly achieved preset interlayer temperature in circle 9 Value.
Its specific implementation steps is:(1)The layering of part model:According to the three-dimensional CAD model of part, model is carried out Layered shaping;(2)The planning that accumulation path is carried out according to the size and shape feature of each hierarchy slicing generates needed for each layer forming Numerical control code, utilize production numerical control code control I mechanical arm of six-joint robot on welding gun 5 mobile route and Zhi Chengping The distance that plate 20 declines every time along piling height direction;(3)Temperature value between setting banking process middle levelT 1T 2T 3、…T n ,(4) Substrate is set to incude heat production using electromagnetic induction heating coil 9, when the surface temperature of substrate 21 reaches predetermined temperature value, According to step(2)The motion track of production numerical control program control welding gun 5 starts the stack shaping of first layer profile, when each layer heap After product, bearing flat plate 20 declines the distance of a lift height.Layer surface is accumulated using 7 quick obtaining of infrared thermometer Temperature valueT n ', and by the temperature real-time Transmission of measurement to computer 1, computer 1 is done according to preset interlayer temperature value Go out to differentiate, ifT n ' < T n , then computer 1 passes through the adjustment electromagnetic induction heating coil 9 of master control system II size of current, frequency And the variation of heating time applies sensing heating to the part in electromagnetic induction heating coil 9 and keeps interlayer temperature rapid ReachT n ;IfT n ´>T n , stop electromagnetic induction heating effect, computer 1 starts cooling device by master control system II, and passes through Cooling effect is forced to make layer the part application that is shaped of part in the position of the adjustment cooling of fluid pressure drive device II medium pipeline 12 Between temperature quickly drop toT n .When interlayer temperature reachesT n When, computer 1 stops electromagnetic induction heating and forces cooling effect, then Welding gun 5 on six-joint robot I is according to step(2)The numerical control program of generation starts next layer of stack shaping, recycles the above process, Until realizing the entity manufacture of part.
Above-mentioned the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, but not to the scope of the present invention Limitation, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art do not need The various modifications that making the creative labor can make still fall within protection scope of the present invention.

Claims (6)

1. a kind of method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature, it is characterised in that:The electricity It is heat source that arc increasing material manufacturing interlayer temperature, which refers to based on MAG welderings, MIG welderings or CMT welderings, and the mode of synchronous wire feed is used to manufacture with not Steel, high strength alloy steel and carbon steel become rusty for the interlayer temperature during the metal parts of raw material, the electromagnetic induction heating master The formation system of dynamic control electric arc increasing material manufacturing interlayer temperature method is mainly by computer(1), master control system I, electric arc deposited control System processed(3), protection gas bottle(4), six-joint robot I, temperature closed-loop control device II and master control system II constitute, it is described Master control system I and electric arc deposited control system(3)Motion track and build up process for controlling welding gun on six-joint robot I The variation of parameter, the temperature closed-loop control device II is mainly by infrared thermometer(7), first servo motor(8), electromagnetism Load coil(9), cooling device, fluid pressure drive device I, fluid pressure drive device II and the second servo motor(18)It constitutes, The cooling device is mainly by cooling nozzles(11), cooling medium pipeline(12)It constitutes, the infrared thermometer(7)With Master control system II connects, for measuring each stack layer in real time after surface temperature variation, and it is the temperature of measurement is real-time It is transferred to computer, the first servo motor(8)For adjusting the temperature measurement location of infrared thermometer with quick obtaining heap The temperature of build-up surface, the electromagnetic induction heating coil(9)And cooling device to substrate and part by being shaped portion The temperature value for adding sensing heating or cooling effect being forced to terminate rear surface with quick control base board and each stack layer is given, it is described Fluid pressure drive device I and fluid pressure drive device II be respectively used to adjustment electromagnetic induction heating coil and cooling device position, Second servo motor(18)For controlling the motion state of bearing flat plate to adjust bearing flat plate in real time along piling height The distance that direction declines, the computer are connect with master control system I and master control system II for controlling electric arc increasing material manufacturing heap The variation of product technological parameter and the active control of interlayer temperature;The electromagnetic induction heating active control electric arc increasing material manufacturing layer Between temperature method, specific implementation steps are:(1)The layering of part model:According to the three-dimensional CAD model of part, to mould Type carries out layered shaping;(2)According to the size and shape feature of each hierarchy slicing carry out accumulation path planning, generate each layer at Numerical control code needed for shape controls the movement locus and temperature closed loop of six-joint robot mechanical arm using the numerical control code of production The distance that bearing flat plate declines every time along stacked direction in control device II;(3)According to the physical characteristic of material, layer is preset Between temperature valueT 1T 2T 3、…T n , whereinT 1Refer to the surface temperature value of substrate when accumulating the 1st layer,T n Refer to accumulation thenThe when layern-1 The temperature value of layer surface;(4)During successively accumulating, bearing flat plate is according to step(2)The thickness of middle layering constantly declines, With the increase of the accumulation number of plies, electromagnetic induction heating coil and cooling device are passed through in the part that is shaped of substrate and part successively, After each layer heap is accumulated, computer adjusts the position of infrared thermometer by first servo motor with quick obtaining in real time The surface temperature value of stack layerT n ', and by measured value real-time Transmission to computer, and computer is according to step(3)In set in advance Fixed interlayer temperature makes differentiation, that is, works asT n ´<T n When, computer adjusts electromagnetic induction heating coil in real time by master control system II The time of middle size of current, frequency and sensing heating makes to shape close to the part of accumulation top layer in electromagnetic induction heating coil Part induction heat production makes interlayer temperature be rapidly achievedT n , whenT n ´>T n When, stop electromagnetic induction heating, computer passes through master control system II opens cooling device, and is applied to the part that is shaped of part by the position of the real-time adjustment cooling device of fluid pressure drive device II Reinforce cooling effect processed so that interlayer temperature quickly drops toT n , when interlayer temperature reachesT n When, computer stops electromagnetic induction heating And cooling effect is forced, and according to step(2)The scan path of the numerical control program control welding gun of generation starts next layer and is piled into Shape recycles the above process, until realizing the entity manufacture of part.
2. the method for electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature according to claim 1, special Sign is:Preset interlayer temperature valueT 1T 2T 3、…T n It is not necessarily essentially equal, it can be joined by identical build up process Preliminary experiment under several determines.
3. the method for electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature according to claim 1, special Sign is:According to the features of shape of formation of parts, electromagnetic induction heating mode is added using three kinds of ultralow frequency, low frequency or intermediate frequency inductions Hot mode.
4. the method for electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature according to claim 1, special Sign is:Cooling device uses air or recirculated cooling water two media.
5. the method for electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature according to claim 1, special Sign is:When using electric arc increasing material manufacturing using stainless steel as the part of raw material, interlayer temperature is:10℃≤T n ≤500℃。
6. the method for electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature according to claim 1, special Sign is:The number of turns of electromagnetic induction heating coil is depending on the length of heating region, and electromagnetic induction heating coil is along part heap The length of product short transverse heating region is 5 ~ 300mm.
CN201710177506.3A 2017-03-23 2017-03-23 The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature Expired - Fee Related CN106956060B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710177506.3A CN106956060B (en) 2017-03-23 2017-03-23 The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710177506.3A CN106956060B (en) 2017-03-23 2017-03-23 The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature

Publications (2)

Publication Number Publication Date
CN106956060A CN106956060A (en) 2017-07-18
CN106956060B true CN106956060B (en) 2018-08-24

Family

ID=59471155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710177506.3A Expired - Fee Related CN106956060B (en) 2017-03-23 2017-03-23 The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature

Country Status (1)

Country Link
CN (1) CN106956060B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108067706A (en) * 2017-12-28 2018-05-25 南方增材科技有限公司 The increasing material manufacturing equipment of metal component
CN108907188B (en) * 2018-07-20 2023-08-22 西安增材制造国家研究院有限公司 Temperature control device for additive manufacturing and control method thereof
CN109514068B (en) * 2018-10-31 2022-01-14 南京理工大学 Device based on electron beam hot filament fuse vibration material disk
CN109514066B (en) * 2018-10-31 2021-06-29 南京理工大学 Device for controlling interlayer temperature based on electron beam fuse additive manufacturing
CN109604773A (en) * 2018-11-16 2019-04-12 南京理工大学 Inner wall temperature monitoring method and device when for non-melt pole electrical arc cylinder built-up welding
CN109530880A (en) * 2018-11-30 2019-03-29 沈阳工业大学 A kind of TIG wire feed electric arc increasing material manufacturing hammering method and apparatus
CN109604808B (en) * 2018-12-11 2020-10-09 东北大学 Friction stir material increase manufacturing device and method applying cooling
CN109986206A (en) * 2019-04-11 2019-07-09 上海联擎动力技术有限公司 Increasing material manufacturing device and its working method
CN114245764B (en) * 2019-08-09 2023-08-29 株式会社神户制钢所 Lamination planning method for laminated molded article, and method and apparatus for manufacturing laminated molded article
CN110421167B (en) * 2019-08-14 2021-09-24 大连理工大学 Method for depositing metal material by direct laser assisted by inductive ultrasonic coupling
CN111283305A (en) * 2019-12-30 2020-06-16 南京理工大学 Liquid nitrogen follow-up cooling additive manufacturing device and method
CN111633304B (en) * 2020-05-20 2022-02-01 华中科技大学 Atmosphere protection equipment for nickel-titanium alloy arc fuse wire additive manufacturing
CN112059182B (en) * 2020-09-08 2022-06-21 浙江智熔增材制造技术有限公司 Surface temperature measuring device for electron beam fuse additive manufacturing part and measuring method thereof
CN112548270B (en) * 2020-11-26 2022-02-22 西安交通大学 Automatic temperature measuring system and method for electric arc additive manufacturing
CN112589229A (en) * 2020-12-25 2021-04-02 广东省科学院中乌焊接研究所 Electric arc additive manufacturing device and method
CN112975054A (en) * 2021-02-22 2021-06-18 西安铂力特增材技术股份有限公司 Device and method for controlling surface temperature of part in electric arc additive manufacturing process
CN113275568A (en) * 2021-05-26 2021-08-20 华中科技大学 Electromagnetic induction heating auxiliary SLM forming device and forming method
CN113333976B (en) * 2021-05-28 2022-07-19 南京理工大学 Tungsten carbide powder core wire double-induction and electric arc composite heating material increasing device and method
CN113909491B (en) * 2021-09-26 2022-11-01 华中科技大学 EBF additive manufacturing method and system
CN113909633B (en) * 2021-10-01 2023-07-18 江苏烁石焊接科技有限公司 Synchronous heating stress deformation control system and method for robot arc material-adding shaft parts
CN113953625B (en) * 2021-11-05 2023-04-25 上海和达汽车配件有限公司 Device and method for controlling flow of CMT arc additive manufacturing molten pool
CN114888418A (en) * 2022-05-18 2022-08-12 南京航空航天大学 Coil self-adaption based induction welding method and device for complex curvature plate

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012012344B4 (en) * 2012-03-21 2018-05-17 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Method and device for the production of workpieces by jet melting of pulverulent material
CN103341625B (en) * 2013-07-10 2015-05-13 湖南航天工业总公司 3D printing manufacturing device and method of metal parts
CA2859414C (en) * 2014-04-04 2017-03-14 Matsuura Machinery Corporation Metal powder processing equipment
CN104289797A (en) * 2014-08-20 2015-01-21 青岛尤尼科技有限公司 Rapid MIG forming system
CN104959604B (en) * 2015-07-23 2017-03-08 华中科技大学 A kind of controlled high energy beam selective melting method and apparatus of shaped region thermograde
CN105499569B (en) * 2015-12-24 2017-09-15 华中科技大学 A kind of temperature field active control system and its control method for high energy beam increasing material manufacturing
CN105855544B (en) * 2016-04-29 2018-10-19 西安交通大学 A kind of selective laser fusing electromagnetic induction three-dimensional heating system
CN106180986B (en) * 2016-07-08 2018-06-26 湘潭大学 A kind of Active Control Method of electric arc increasing material manufacturing forming quality
CN205888085U (en) * 2016-08-13 2017-01-18 中北大学 Shaping jar of selective laser melting SLM under high -intensity magnetic field

Also Published As

Publication number Publication date
CN106956060A (en) 2017-07-18

Similar Documents

Publication Publication Date Title
CN106956060B (en) The method of electromagnetic induction heating active control electric arc increasing material manufacturing interlayer temperature
CN106670623B (en) A kind of device of active control electric arc increasing material manufacturing interlayer temperature
US11485083B2 (en) Preheating of material in an additive manufacturing apparatus
CN106965421B (en) Three-dimensional printing method
Wu et al. Stable layer-building strategy to enhance cold-spray-based additive manufacturing
CN106735967B (en) A kind of method of ultrasonic vibration assistant electric arc increasing material manufacturing control shape control
CN106180986B (en) A kind of Active Control Method of electric arc increasing material manufacturing forming quality
CN105312573B (en) Method and device for conducting 3D printing directly with liquid metal
CN108555301B (en) Partitioned parallel three-dimensional printing forming method for large precise metal parts
CN109514066B (en) Device for controlling interlayer temperature based on electron beam fuse additive manufacturing
WO2019000523A1 (en) Method and device for rapidly forming component using combined arc fused deposition and laser impact forging
CN108405863B (en) Parallel metal three-dimensional printing forming method based on induction melting
CN108421976B (en) A kind of pyromagnetic coupled field collaboration selective laser melting device and its heating means
CN109514068A (en) Device based on electron beam heated filament fuse increasing material manufacturing
CN104289797A (en) Rapid MIG forming system
CN105903970A (en) Device and method for rapidly forming metal part through induction heating
CN106392076A (en) 3D printing system and print head device thereof
Fang et al. An investigation on effects of process parameters in fused-coating based metal additive manufacturing
CN106021795A (en) Solidification temperature gradient controllable method for 3D printing of metal material
CN108380871B (en) Nano metal powder three-dimensional printing forming method based on induction heating
CN115055699B (en) Device and method for manufacturing particle reinforced aluminum matrix composite material by using molten drop composite arc additive
WO2023142212A1 (en) Device and method for mitigating problem of workpiece edge subside by means of closed-loop control of laser power
CN205673604U (en) 3D print system and ejecting device thereof
CN105665702A (en) Mold plasma 3D printing device and 3D printing method
CN108405864B (en) Direct-writing type metal three-dimensional printing forming method based on induction melting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824

Termination date: 20210323

CF01 Termination of patent right due to non-payment of annual fee