CN106939695A - Scaffold jacking system with position-limit mechanism - Google Patents

Scaffold jacking system with position-limit mechanism Download PDF

Info

Publication number
CN106939695A
CN106939695A CN201610000278.8A CN201610000278A CN106939695A CN 106939695 A CN106939695 A CN 106939695A CN 201610000278 A CN201610000278 A CN 201610000278A CN 106939695 A CN106939695 A CN 106939695A
Authority
CN
China
Prior art keywords
limit mechanism
scaffold
lifting casing
connecting rod
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610000278.8A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd
Original Assignee
CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd filed Critical CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd
Priority to CN201610000278.8A priority Critical patent/CN106939695A/en
Publication of CN106939695A publication Critical patent/CN106939695A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a kind of scaffold jacking system with position-limit mechanism, including lifting casing, a kind of scaffold jacking system with position-limit mechanism, including lifting casing, it is arranged with parallel on the base of lifting casing on cross track bar, cross track bar and is provided with track;Cave inward to form accommodation space in elevator chamber body phase adjacent two side intersection, position-limit mechanism is installed in accommodation space, parallel with cross track bar when the position-limit mechanism is protruding, position-limit mechanism includes cylinder, connecting rod and pulley.Using above structure, cross track bar and track connecting rod are set on the base of lifting casing, it can be docked with the track cross bar of scaffold, railcar is driven on scaffold out of elevator chamber body, laterally transport workmen or goods reaches specified location, so as to substantially increase operating efficiency, while greatly reducing the risk for occurring security incident.

Description

Scaffold jacking system with position-limit mechanism
Technical field
The invention belongs to Construction Formwork & Scaffold Technology field, and in particular to a kind of scaffold jacking system with position-limit mechanism.
Background technology
Lifting device for scaffold is the construction machinery of the manned cargo-carrying used in construction.At present, in construction site generally scaffold is erected with the exterior wall for build higher buildings, workmen wants the higher operating location of arrival can only be by way of climbing scaffold, part building site is provided with elevator, but can only be by workmen or goods handling to specified floor height, railcar can not be carried, it is set to be driven to after reaching specified floor height on the scaffold for being provided with track, and then on scaffold transverse shifting, transport workmen or goods reaches the assignment position of the floor height, thus there is low construction efficiency, the deficiencies such as degree of danger height, the problem is solved as the task of top priority.
The content of the invention
To solve above technical problem, the present invention, which provides one kind, can transport railcar, the scaffold jacking system with position-limit mechanism that again can be with the orbital docking on scaffold.
Its technical scheme is as follows:
A kind of scaffold jacking system with position-limit mechanism, including lifting casing(1), it is characterized by:In the lifting casing(1)Base(1a)On be arranged with cross track bar in parallel(2), the cross track bar(2)On be provided with track;
In the lifting casing(1)Adjacent two side intersection caves inward to form accommodation space(6), in the accommodation space(6)Position-limit mechanism is inside installed, with cross track bar when the position-limit mechanism is protruding(2)Parallel, the position-limit mechanism includes cylinder(3), connecting rod(4)And pulley(5), the connecting rod(4)One end and the lifting casing(1)It is side walls hinged, the connecting rod(3)The other end pulley is installed(5), the cylinder(3)Cylinder body and the lifting casing(1)It is side walls hinged, the cylinder(3)Piston rod outer end and the connecting rod(4)Middle part is hinged.
Using above structure, railcar is placed in the present invention, when needing to be constructed in a certain floor height, railcar is sent to the floor height, now, due to lifting casing(1)Built-in cross track bar(2), the track cross bar that can be docked and connection cross bar are provided with scaffold, so that railcar can be from lifting casing(1)Inside drive on scaffold, laterally transport workmen or goods reaches specified location, in addition, lifting device for scaffold during lifting due to provided with position-limit mechanism, operating steadily, fault rate is low, greatly reduces security risk, and substantially increase efficiency of construction.
As preferred:The cylinder(3)Positioned at the connecting rod(4)Top.It is relatively reliable, stably using this structure.
As preferred:The cross track bar(2)It is described track for the notch of channel-section steel, and channel-section steel.Using above structure, track can be selected at lower cost.
As preferred:The lifting casing(1)Perpendicular to cross track bar(2)Both sides side wall installed lowering or hoisting gear door(8).Using above structure, it is ensured that the safety in lifting process, the design that both sides side wall is equipped with door also increases practicality.
As preferred:The lifting casing(1)Top is installed with suspension ring(7).Simple and reliable for structure above, practicality is high.
Beneficial effect:Using the scaffold jacking system with position-limit mechanism of above technical scheme, novelty simple in construction improves efficiency of construction, it is to avoid security risk, it is easy to accomplish, it is simple to operate.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is Fig. 1 top view;
Fig. 3 is Fig. 1 left view.
Embodiment
With reference to embodiment and accompanying drawing, the invention will be further described.
As Figure 1-3, a kind of scaffold jacking system with position-limit mechanism includes lifting casing 1, the top of lifting casing 1 is installed with suspension ring 7, the lifting casing 1 has installed lowering or hoisting gear door 8 perpendicular to the both sides side wall of cross track bar 2, it is arranged with parallel on the base 1a of the lifting casing 1 on cross track bar 2, the cross track bar 2 and is provided with track;Cave inward to form accommodation space 6 in the adjacent two side intersection of the lifting casing 1, position-limit mechanism is installed in the accommodation space 6, it is parallel with cross track bar 2 when the position-limit mechanism is protruding, the position-limit mechanism includes cylinder 3, connecting rod 4 and pulley 5, one end of the connecting rod 4 and the lifting casing 1 are side walls hinged, the other end of the connecting rod 3 is provided with the pulley 5, the cylinder body of the cylinder 3 and the lifting casing 1 are side walls hinged, the piston rod outer end of the cylinder 3 is hinged with the middle part of connecting rod 4, and the cylinder 3 is located at the top of the connecting rod 4.The cross track bar 2 is channel-section steel, and the notch of channel-section steel is described track.
When scaffold jacking system with position-limit mechanism is used, railcar is placed in lifting casing 1, when needing to be constructed in a certain floor height or transporting goods to a certain floor height, lifting device for scaffold starts position-limit mechanism, pulley 5 is pushed outwardly, into in the groove of scaffold upright rod, then lifting casing 1 rises or dropped to up to the floor height, position-limit mechanism is packed up after coming to a complete stop, cylinder 3, connecting rod 4 and pulley 5 are completely retracted into the concave side wall of lifting casing 1, lowering or hoisting gear door 8 is opened, cross track bar 2 and the connection orbital docking on scaffold, railcar rolls lifting casing 1 away from, reach the track cross bar of scaffold, the transverse shifting on scaffold, by workmen or goods handling to specified location.

Claims (5)

1. a kind of scaffold jacking system with position-limit mechanism, including lifting casing(1), it is characterised in that:In the lifting casing(1)Base(1a)On be arranged with cross track bar in parallel(2), the cross track bar(2)On be provided with track;
In the lifting casing(1)Adjacent two side intersection caves inward to form accommodation space(6), in the accommodation space(6)Position-limit mechanism is inside installed, with cross track bar when the position-limit mechanism is protruding(2)Parallel, the position-limit mechanism includes cylinder(3), connecting rod(4)And pulley(5), the connecting rod(4)One end and the lifting casing(1)It is side walls hinged, the connecting rod(4)The other end pulley is installed(5), the cylinder(3)Cylinder body and the lifting casing(1)It is side walls hinged, the cylinder(3)Piston rod outer end and the connecting rod(4)Middle part is hinged.
2. the scaffold jacking system according to claim 1 with position-limit mechanism, it is characterised in that:The cylinder(3)Positioned at the connecting rod(4)Top.
3. the scaffold jacking system according to claim 1 with position-limit mechanism, it is characterised in that:The cross track bar(2)It is described track for the notch of channel-section steel, and channel-section steel.
4. the lifting device for scaffold according to claim 1 with track, it is characterised in that:The lifting casing(1)Perpendicular to cross track bar(2)Both sides side wall installed lowering or hoisting gear door(8).
5. the lifting device for scaffold with track according to claim 1 or 4, it is characterised in that:The lifting casing(1)Top is installed with suspension ring(7).
CN201610000278.8A 2016-01-03 2016-01-03 Scaffold jacking system with position-limit mechanism Pending CN106939695A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610000278.8A CN106939695A (en) 2016-01-03 2016-01-03 Scaffold jacking system with position-limit mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610000278.8A CN106939695A (en) 2016-01-03 2016-01-03 Scaffold jacking system with position-limit mechanism

Publications (1)

Publication Number Publication Date
CN106939695A true CN106939695A (en) 2017-07-11

Family

ID=59469821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610000278.8A Pending CN106939695A (en) 2016-01-03 2016-01-03 Scaffold jacking system with position-limit mechanism

Country Status (1)

Country Link
CN (1) CN106939695A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408662A (en) * 2018-05-12 2018-08-17 华北理工大学 A kind of building outer layer translating hoist
CN109707147A (en) * 2018-12-10 2019-05-03 筑梦高科建筑有限公司 Exterior wall carrying platform
CN113530200A (en) * 2021-08-25 2021-10-22 成都兰腾科技有限公司 Protection type hanging flower basket device for construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408662A (en) * 2018-05-12 2018-08-17 华北理工大学 A kind of building outer layer translating hoist
CN108408662B (en) * 2018-05-12 2023-10-31 江苏帜飞建设有限公司 Building outer layer translation lift
CN109707147A (en) * 2018-12-10 2019-05-03 筑梦高科建筑有限公司 Exterior wall carrying platform
CN109707147B (en) * 2018-12-10 2021-04-13 广东博智林机器人有限公司 Outer wall bearing platform
CN113530200A (en) * 2021-08-25 2021-10-22 成都兰腾科技有限公司 Protection type hanging flower basket device for construction

Similar Documents

Publication Publication Date Title
CN204716124U (en) Portable removable level-sensing device inspection platform
CN105668428B (en) A kind of lifting conveying device being adapted to mount at window
CN106939695A (en) Scaffold jacking system with position-limit mechanism
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN102777048A (en) Vertical transportation device
CN106939694A (en) Scaffold jacking system
CN210764061U (en) Multilayer container hoisting device
CN205739930U (en) It is provided with the lifting device for scaffold of cross track
CN106939693A (en) The scaffold jacking system of built-in tracks
CN106939692A (en) Scaffold jacking system provided with cross track
CN205472479U (en) A supplementary transfer device for wallboard
CN106938814A (en) It is provided with the scaffold jacking system of cross track
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN203320922U (en) Supporting device for forming of elevator shaft template
CN203257073U (en) Elevator shaft operating platform
CN205259564U (en) Can guidance tape track lift scaffold
CN106629438A (en) Pneumatic device for hanging basket
CN205531262U (en) Steel construction construction platform can rise automatically
CN205894641U (en) Elevartor shaft lifting platform
CN104328920A (en) Building material conveying method
CN208234337U (en) A kind of vertical transferring apparatus in building
CN203938366U (en) Wallboard Lift-on/Lift-off System
CN106703391A (en) Supporting block connecting type track scaffold structure capable of guiding
CN205259569U (en) Concatenation formula that can lead track scaffold
CN106560571A (en) Folding docking type guiding track scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170711