CN106930730A - 一种废弃矿井采空区煤层气的抽采方法 - Google Patents
一种废弃矿井采空区煤层气的抽采方法 Download PDFInfo
- Publication number
- CN106930730A CN106930730A CN201710142991.0A CN201710142991A CN106930730A CN 106930730 A CN106930730 A CN 106930730A CN 201710142991 A CN201710142991 A CN 201710142991A CN 106930730 A CN106930730 A CN 106930730A
- Authority
- CN
- China
- Prior art keywords
- drainage tube
- drilling well
- well
- goaf
- coal bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 19
- 238000005086 pumping Methods 0.000 title claims abstract description 11
- 238000000034 method Methods 0.000 title claims abstract description 7
- 238000005553 drilling Methods 0.000 claims abstract description 25
- 238000012360 testing method Methods 0.000 claims abstract description 13
- 238000007689 inspection Methods 0.000 claims abstract description 11
- 238000000605 extraction Methods 0.000 claims abstract description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 239000011083 cement mortar Substances 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 claims abstract description 4
- 238000002347 injection Methods 0.000 claims description 2
- 239000007924 injection Substances 0.000 claims description 2
- 238000007789 sealing Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/002—Survey of boreholes or wells by visual inspection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geophysics (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
一种废弃矿井采空区煤层气的抽采方法。由地面垂直向下施工测试井,采用钻孔窥视仪自测试井口向下移动确定含水层、裂隙带上边界和采空区底部的位置。由地面垂直向下施工大钻井至含水层以下5~10m,向大钻井内下入抽采管并用水泥砂浆固井;以大钻井轴线为中心向下施工小钻井直至采空区底部,向小钻井内下入筛管直至采空区底部,其中筛管的上端位于裂隙带上边界以上5~10m;将抽采管上端口密封,且抽采管的侧面经阀门与泵站连通;最后打开阀门经抽采管抽采采空区煤层气。本发明实现了对废弃矿井采空区煤层气的抽采。
Description
技术领域
本发明涉及一种废弃矿井采空区煤层气的抽采方法,属于煤层气抽采领域。
背景技术
由于长期的工业化开采,我国存在着众多的废弃矿井和面积巨大的采空区。在报废的矿井中大多为高瓦斯矿井,赋存着丰富的煤层气资源。煤层气是一种清洁能源,对废弃矿井采空区煤层气的能源化利用可有效缓解我国清洁能源供应不足的局面,对我国国民经济的持续发展具有至关重要的意义。但是,我国目前煤层气的抽采技术都是针对采动井和预抽井,为了促进对废弃矿井采空区煤层气的抽采,亟待一种适合废弃矿井采空区煤层气抽采的方法。
发明内容
本发明的目的在于提供结构简单,操作简便的一种废弃矿井采空区煤层气的抽采方法。
本发明的技术方案:一种废弃矿井采空区煤层气的抽采方法,具体步骤如下:
a.由地面(1)垂直向下施工测试井(2)直至采空区(3)底部;
b.采用钻孔窥视仪(4)自测试井(2)井口向下移动确定含水层(5)、裂隙带(6)上边界和采空区(3)底部的位置;
c.由地面(1)垂直向下施工大钻井(7)直至钻孔窥视仪(4)所探测到的含水层(5)以下5~10m处;向大钻井(7)内下入抽采管(8)至大钻井(7)底部,并向大钻井(7)和抽采管(8)所形成的环形空间(9)中注入水泥砂浆(10)以固定抽采管(8);
d.以大钻井(7)的轴线为中心向下施工小钻井(11)直至采空区(3)底部;向小钻井(11)内下入筛管(12)直至采空区(3)底部,筛管(12)的上端位于钻孔窥视仪(4)所探测到的裂隙带(6)上边界以上5~10m处;
e.将抽采管(8)上端口密封,且抽采管(8)的侧面经阀门(13)与泵站(14)连通;
f.打开阀门(13)经抽采管(8)抽采采空区(3)煤层气。
本发明具有结构简单,操作简便的特点。
附图说明
图1为测试井中确定含水层、裂隙带上边界和采空区底部位置图。
图2为本发明的技术原理示意图。
图中:1-地面,2-测试井,3-采空区,4-钻孔窥视仪,5-含水层,6-裂隙带,7-大钻井,8-抽采管,9-环形空间,10-水泥砂浆,11-小钻井,12-筛管,13-阀门,14-泵站。
具体实施方式
下面结合附图对本发明的实例作进一步描述:由地面垂直向下施工测试井直至采空区底部;采用钻孔窥视仪自测试井井口向下移动确定含水层、裂隙带上边界和采空区底部的位置;由地面垂直向下施工大钻井直至钻孔窥视仪所探测到的含水层以下5~10m处;向大钻井内下入套管至大钻井底部,并向大钻井和抽采管所形成的环形空间中注入水泥砂浆以固定抽采管;以大钻井的轴线为中心向下施工小钻井直至采空区底部;向小钻井内下入筛管直至采空区底部,筛管的上端位于钻孔窥视仪所探测到的裂隙带上边界以上5~10m处;将抽采管上端口密封,且抽采管的侧面经阀门与泵站连通;打开阀门经抽采管抽采采空区煤层气。
Claims (1)
1.一种废弃矿井采空区煤层气的抽采方法,其特征在于包括下述步骤:
由地面(1)垂直向下施工测试井(2)直至采空区(3)底部;
采用钻孔窥视仪(4)自测试井(2)井口向下移动确定含水层(5)、裂隙带(6)上边界和采空区(3)底部的位置;
由地面(1)垂直向下施工大钻井(7)直至钻孔窥视仪(4)所探测到的含水层(5)以下5~10m处;向大钻井(7)内下入抽采管(8)至大钻井(7)底部,并向大钻井(7)和抽采管(8)所形成的环形空间(9)中注入水泥砂浆(10)以固定抽采管(8);
以大钻井(7)的轴线为中心向下施工小钻井(11)直至采空区(3)底部;向小钻井(11)内下入筛管(12)直至采空区(3)底部,筛管(12)的上端位于钻孔窥视仪(4)所探测到的裂隙带(6)上边界以上5~10m处;
将抽采管(8)上端口密封,且抽采管(8)的侧面经阀门(13)与泵站(14)连通;
打开阀门(13)经抽采管(8)抽采釆空区(3)煤层气。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710142991.0A CN106930730A (zh) | 2017-03-10 | 2017-03-10 | 一种废弃矿井采空区煤层气的抽采方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710142991.0A CN106930730A (zh) | 2017-03-10 | 2017-03-10 | 一种废弃矿井采空区煤层气的抽采方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106930730A true CN106930730A (zh) | 2017-07-07 |
Family
ID=59432023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710142991.0A Pending CN106930730A (zh) | 2017-03-10 | 2017-03-10 | 一种废弃矿井采空区煤层气的抽采方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930730A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762554A (zh) * | 2017-09-15 | 2018-03-06 | 徐州工程学院 | 一种老废弃矿井放置废弃混凝土及封存二氧化碳的系统 |
CN108533223A (zh) * | 2018-02-12 | 2018-09-14 | 太原理工大学 | 一种井下采空区残留煤层气抽采利用系统 |
CN109162676A (zh) * | 2018-09-27 | 2019-01-08 | 太原理工大学 | 一种采空区内煤层气及积水同时抽采利用的方法 |
WO2019029178A1 (zh) * | 2017-08-10 | 2019-02-14 | 中节能宁夏新能源股份有限公司 | 一种废弃煤矿地面卸压钻孔瓦斯治理新工艺 |
CN110863801A (zh) * | 2019-11-12 | 2020-03-06 | 山西蓝焰煤层气集团有限责任公司 | 一种煤层气预抽井改采动井的方法 |
CN110939407A (zh) * | 2018-09-25 | 2020-03-31 | 山西省煤炭地质勘查研究院 | 一种双层重叠采空区地面抽采井身结构及回收装置 |
CN111155952A (zh) * | 2019-12-30 | 2020-05-15 | 山西晋城无烟煤矿业集团有限责任公司 | 一种采空区废弃煤层气井再利用方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003021079A1 (de) * | 2001-08-28 | 2003-03-13 | Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. | Verfahren und vorrichtung zur gewinnung und förderung von gashydraten und gasen aus gashydraten |
CN2926501Y (zh) * | 2006-04-17 | 2007-07-25 | 中国海洋石油总公司 | 井下电视成像测井系统 |
CN101886540A (zh) * | 2010-06-23 | 2010-11-17 | 西安石油大学 | 一种侧向多镜头复合成像视频测井装置 |
CN101915072A (zh) * | 2010-08-04 | 2010-12-15 | 煤炭科学研究总院重庆研究院 | 地面钻井抽采采动稳定区煤层气的方法 |
CN103643893A (zh) * | 2013-12-19 | 2014-03-19 | 中煤科工集团西安研究院有限公司 | 煤矿井下突出煤层段筛管钻进工艺 |
CN104405283A (zh) * | 2014-10-22 | 2015-03-11 | 山西蓝焰煤层气集团有限责任公司 | 一种采动区地面钻l型井抽采瓦斯的工艺 |
-
2017
- 2017-03-10 CN CN201710142991.0A patent/CN106930730A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003021079A1 (de) * | 2001-08-28 | 2003-03-13 | Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. | Verfahren und vorrichtung zur gewinnung und förderung von gashydraten und gasen aus gashydraten |
CN2926501Y (zh) * | 2006-04-17 | 2007-07-25 | 中国海洋石油总公司 | 井下电视成像测井系统 |
CN101886540A (zh) * | 2010-06-23 | 2010-11-17 | 西安石油大学 | 一种侧向多镜头复合成像视频测井装置 |
CN101915072A (zh) * | 2010-08-04 | 2010-12-15 | 煤炭科学研究总院重庆研究院 | 地面钻井抽采采动稳定区煤层气的方法 |
CN103643893A (zh) * | 2013-12-19 | 2014-03-19 | 中煤科工集团西安研究院有限公司 | 煤矿井下突出煤层段筛管钻进工艺 |
CN104405283A (zh) * | 2014-10-22 | 2015-03-11 | 山西蓝焰煤层气集团有限责任公司 | 一种采动区地面钻l型井抽采瓦斯的工艺 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019029178A1 (zh) * | 2017-08-10 | 2019-02-14 | 中节能宁夏新能源股份有限公司 | 一种废弃煤矿地面卸压钻孔瓦斯治理新工艺 |
CN107762554A (zh) * | 2017-09-15 | 2018-03-06 | 徐州工程学院 | 一种老废弃矿井放置废弃混凝土及封存二氧化碳的系统 |
CN107762554B (zh) * | 2017-09-15 | 2019-03-19 | 徐州工程学院 | 一种老废弃矿井放置废弃混凝土及封存二氧化碳的系统 |
CN108533223A (zh) * | 2018-02-12 | 2018-09-14 | 太原理工大学 | 一种井下采空区残留煤层气抽采利用系统 |
CN110939407A (zh) * | 2018-09-25 | 2020-03-31 | 山西省煤炭地质勘查研究院 | 一种双层重叠采空区地面抽采井身结构及回收装置 |
CN110939407B (zh) * | 2018-09-25 | 2023-03-31 | 山西省煤炭地质勘查研究院 | 一种双层重叠采空区地面抽采井身结构及回收装置 |
CN109162676A (zh) * | 2018-09-27 | 2019-01-08 | 太原理工大学 | 一种采空区内煤层气及积水同时抽采利用的方法 |
CN110863801A (zh) * | 2019-11-12 | 2020-03-06 | 山西蓝焰煤层气集团有限责任公司 | 一种煤层气预抽井改采动井的方法 |
CN111155952A (zh) * | 2019-12-30 | 2020-05-15 | 山西晋城无烟煤矿业集团有限责任公司 | 一种采空区废弃煤层气井再利用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106930730A (zh) | 一种废弃矿井采空区煤层气的抽采方法 | |
CN101275469B (zh) | 松软煤岩层下向钻孔抽采卸压瓦斯施工方法 | |
CN103195390B (zh) | 一种本煤层近水平瓦斯抽采钻孔密封方法 | |
CN103883293B (zh) | 水力喷射径向钻孔与压裂一体化方法 | |
CN203655249U (zh) | 一种地浸采铀工艺井 | |
CN104695908B (zh) | 一种地面钻井抽采煤矿老空区残留煤层气的方法 | |
CN104131831A (zh) | 一种煤层气井上下立体联合抽采方法 | |
CN102080526A (zh) | 地面煤层顶板顺层水平压裂井抽采瓦斯方法 | |
CN207647494U (zh) | 一种双封隔器分层抽水装置 | |
CN110939407B (zh) | 一种双层重叠采空区地面抽采井身结构及回收装置 | |
CN205063929U (zh) | 一种煤矿井下封压一体化分段水力压裂装置 | |
CN106761584A (zh) | 一种含水条件下废弃矿井采空区煤层气地面排采方法 | |
CN104234638A (zh) | 套管完井多段压裂水平井机械找水管柱及其找水方法 | |
CN103603651A (zh) | 煤层瓦斯抽采钻孔稳定性测试装置及方法 | |
CN102434192A (zh) | 增加煤层致裂效果的装置及增加煤层致裂效果的方法 | |
CN107420100A (zh) | 一种分层抽水装置及分层抽水系统 | |
CN103161405B (zh) | 矿用井下探放高压岩溶水钻孔施工的套管隔离地层破碎带方法 | |
CN107489394A (zh) | 一种裸眼封隔器三椭圆实验装置 | |
CN203008883U (zh) | 一种注汽采油工艺管柱 | |
CN108533223A (zh) | 一种井下采空区残留煤层气抽采利用系统 | |
CN104481468A (zh) | 一种煤层气井裸眼井完井工艺 | |
CN102536213B (zh) | 煤矿瓦斯渗流范围观测方法 | |
CN109973051A (zh) | 一种高压水转换控制装置和应力测量系统 | |
CN202851052U (zh) | 瓦斯抽采钻孔延时自膨胀胶囊-膏体组合封孔装置 | |
CN110939408A (zh) | 一种优化的采空区煤层气地面抽采井身结构及固井方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170707 |
|
RJ01 | Rejection of invention patent application after publication |