CN103195390B - 一种本煤层近水平瓦斯抽采钻孔密封方法 - Google Patents
一种本煤层近水平瓦斯抽采钻孔密封方法 Download PDFInfo
- Publication number
- CN103195390B CN103195390B CN201310122581.1A CN201310122581A CN103195390B CN 103195390 B CN103195390 B CN 103195390B CN 201310122581 A CN201310122581 A CN 201310122581A CN 103195390 B CN103195390 B CN 103195390B
- Authority
- CN
- China
- Prior art keywords
- gas pumping
- grouting pipe
- pipe
- slurry tank
- mud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005086 pumping Methods 0.000 title claims abstract description 46
- 239000003245 coal Substances 0.000 title claims abstract description 24
- 238000005553 drilling Methods 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 18
- 239000002002 slurry Substances 0.000 claims abstract description 42
- 239000011405 expansive cement Substances 0.000 claims abstract description 17
- 238000012856 packing Methods 0.000 claims abstract description 9
- 229920002635 polyurethane Polymers 0.000 claims description 16
- 239000004814 polyurethane Substances 0.000 claims description 16
- 230000000694 effects Effects 0.000 claims description 10
- 125000006850 spacer group Chemical group 0.000 claims description 9
- 238000007789 sealing Methods 0.000 abstract description 20
- 238000007569 slipcasting Methods 0.000 abstract description 7
- 238000002347 injection Methods 0.000 abstract description 4
- 239000007924 injection Substances 0.000 abstract description 4
- 230000003068 static effect Effects 0.000 abstract description 4
- 238000000605 extraction Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 2
- JOYRKODLDBILNP-UHFFFAOYSA-N Ethyl urethane Chemical compound CCOC(N)=O JOYRKODLDBILNP-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000008393 encapsulating agent Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000001988 toxicity Effects 0.000 description 1
- 231100000419 toxicity Toxicity 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
一种本煤层近水平瓦斯抽采钻孔密封方法,主要适用于煤矿井下采煤工作面、煤巷等地点的瓦斯抽采钻孔。该密封方法主要包括两个部分:静态密封和动态密封。对于一个瓦斯抽采钻孔,首先进行静态密封,其包括两次注浆过程:第一次注浆采用膨胀水泥浆液,密封钻孔裂隙带以外位置;第二次注浆采用泥浆,密封裂隙带以内位置。一段时间之后,进行动态密封,利用井下压风将膨胀水泥浆液和泥浆源源不断地注入钻孔内,使得膨胀水泥浆液和泥浆始终充满钻孔及其周围裂隙,实现动态密封。此方法可使所注浆液实时、有效地封堵钻孔内部空间及其周围煤体破裂区,实现空间、裂隙封堵最大化,且其结构简单、操作方便、成本低廉、效果显著。
Description
技术领域
本发明涉及一种本煤层近水平瓦斯抽采钻孔密封方法,主要适用于煤矿井下采煤工作面、石门揭煤处、煤巷等地点的瓦斯抽采钻孔。
背景技术
瓦斯灾害是我国煤矿主要自然灾害之一,目前已成为制约煤矿安全生产的主要矛盾。通过施工钻孔抽采煤层瓦斯是煤矿治理瓦斯灾害的重要手段。在煤矿瓦斯抽采工作中,钻孔的封孔质量是抽采效果的关键因素。
由于单一高瓦斯低透气性煤层近水平抽采钻孔周围的煤岩体强度较低(尤其在松软煤层中),钻孔周围往往存在微裂隙,这种情况增加了密封难度。目前,密封方法主要有:水泥沙浆密封、聚氨脂密封,前者密封后容易产生收缩,密封效果差;后者则往往因密封长度不够而达不到理想的密封状态,密封材料有一定毒性,且价格高,造成密封成本高,煤矿难于承受。因此,为了解决瓦斯抽采钻孔的密封难题,急需寻求全新的密封方法,满足煤矿井下高质量钻孔密封要求。
发明内容
技术问题:本发明的目的是针对本煤层近水平瓦斯抽采钻孔密封存在的问题,提供一种结构简单、操作方便、成本低廉、效果显著的本煤层近水平瓦斯抽采钻孔密封方法。
技术方案:本发明本煤层近水平瓦斯抽采钻孔密封方法,包括如下步骤:
a. 瓦斯抽采钻孔成孔之后,在瓦斯抽采管的上侧布置一长注浆管,下侧布置一短注浆管,用聚氨酯反应袋卷缠在瓦斯抽采管前、中、后三个部位,同时将长注浆管 和短注浆管分别固定在瓦斯抽采管的中、后两个部位,长注浆管的前端部伸入前间隔段L3内,短注浆管的前端部伸入后间隔段L2内;
b.在聚氨酯反应袋反应之前,将卷缠有聚氨酯反应袋的瓦斯抽采管和注浆管一并送入钻孔内,直至后部聚氨酯反应袋距离孔口L1为1.5-2m处,在长注浆管和短注浆管的外露端分别用管路连接不同浆液的浆料罐;
c.待聚氨酯反应袋膨胀后,开启浆料罐与短注浆管相连的控制阀,在高压气流内的作用下,通过短注浆管将浆料罐中的膨胀水泥浆液注入后间隔段L2内,直至注满,开启浆料罐与长注浆管 相连的控制阀,在井下压风气流内的作用下,通过长注浆管 将浆料罐中的泥浆注入前间隔段L3 ,直至注满,然后连接瓦斯抽采管网对钻孔进行瓦斯抽采;
d. 经过24小时的瓦斯抽采之后,再次开启浆料罐,施加0.3~0.4 MPa的井下压风不断地将浆料罐中的膨胀水泥浆液和泥浆分别压入钻孔内,直至膨胀水泥浆液和泥浆始终充满钻孔及其周围裂隙,实现动态密封。
所述的后间隔段L2长度为5.5-6.5m;所述的前间隔段L3的长度为3.5-4.5m。
有益效果:由于采用了上述技术方案,本发明将瓦斯抽采管间隔密封为两个注浆段,在瓦斯抽采负压的作用下将膨胀水泥和泥浆两种材料渗入钻孔周边裂隙群内,大大增加了裂隙内气体的流动阻力,阻隔了外界空气的导入,使钻孔内的漏风量减少,从而提高了钻孔内瓦斯抽采浓度,显著改善瓦斯抽采效果,确保瓦斯抽采系统的高效性,最终实现本煤层近水平瓦斯抽采钻孔的有效密封。本方法可使所注浆液实时、有效地封堵钻孔内部空间及其周围煤体破裂区,实现空间、裂隙封堵最大化,其结构简单、操作方便、成本低廉、效果显著。
附图说明
图1是本发明所示方法示意图。
图中:1-膨胀水泥浆液,2-泥浆,3-井下压风,4-短注浆管,5-长注浆管, 6-浆料罐,7-聚氨酯反应袋,8-瓦斯抽采管,9-钻孔,10-煤壁。
具体实施方式
下面结合附图对本发明的一个实施例作进一步描述:
本发明的本煤层近水平瓦斯抽采钻孔密封方法,包括:静态密封和动态密封两个部分,对于一个瓦斯抽采钻孔,先进行静态密封,其包括两次注浆过程:第一次注浆采用膨胀水泥浆液,密封钻孔裂隙带以外位置;第二次注浆采用泥浆,密封裂隙带以内位置;瓦斯一段时间之后,进行动态密封,利用井下压风将膨胀水泥浆液和泥浆源源不断地注入钻孔内,使得膨胀水泥浆液和泥浆始终充满钻孔及其周围裂隙,实现动态密封,具体步骤如下:
a. 瓦斯抽采钻孔(9)成孔之后,在瓦斯抽采管(8)的上侧布置一长注浆管(5),下侧布置一短注浆管(4),用聚氨酯反应袋(7)卷缠在瓦斯抽采管(8)前、中、后三个部位,同时将长注浆管(5)和短注浆管(4)分别固定在瓦斯抽采管(8)的中、后两个部位,长注浆管(5)的前端部伸入前间隔段L3内,短注浆管(4) 的前端部伸入后间隔段L2内;所述的后间隔段L2长度为5.5-6.5m;所述的前间隔段L3的长度为3.5-4.5m;
b.在聚氨酯反应袋(7)反应之前,将卷缠有聚氨酯反应袋(7)的瓦斯抽采管(8)和注浆管一并送入钻孔内,直至后部聚氨酯反应袋(7)距离孔口L1为1.5-2m处,在长注浆管(5)和短注浆管(4)的外露端分别用管路连接不同浆液的浆料罐(6);
c.待聚氨酯反应袋(7)膨胀后,开启浆料罐(6)与短注浆管(4)相连的控制阀,在高压气流内的作用下,通过短注浆管(4)将浆料罐(6)中的膨胀水泥浆液(1)注入后间隔段L2内,直至注满,开启浆料罐(6)与长注浆管(5) 相连的控制阀,在井下压风(3)气流内的作用下,通过长注浆管(5) 将浆料罐(6)中的泥浆(2)注入前间隔段L3 ,直至注满,然后连接瓦斯抽采管网对钻孔(9)进行瓦斯抽采;
d. 经过24小时的瓦斯抽采之后,由于煤体(10)的移动、变形会导致钻孔(9)周边孔裂 隙扩张、发育,在抽采负压作用下,外界空气通过裂隙通道进入孔内,使得瓦斯抽采浓度快速下降,此时用0.3~0.4 MPa的井下压风(3)不断地将浆料罐(6)中的膨胀水泥浆液(1)和泥浆(2)分别压入钻孔(9)内,直至膨胀水泥浆液(1)和泥浆(2)始终充满钻孔(9),此时的密封空间可以随着钻孔(9)形状、煤体(10)裂隙的变化而变化,进而实现动态密封。在瓦斯抽采负压的作用下两种材料渗入钻孔(9)周边的裂隙群内,增加了裂隙内气体的流动阻力,阻隔了外界空气的导入,孔内漏风量减少,从而提高了钻孔(9)内瓦斯抽采浓度,显著改善瓦斯抽采效果,确保瓦斯抽采系统的高效性。
Claims (2)
1.一种本煤层近水平瓦斯抽采钻孔密封方法,其特征在于,包括如下步骤:
a. 瓦斯抽采钻孔(9)成孔之后,在瓦斯抽采管(8)的上侧布置一长注浆管(5),下侧布置一短注浆管(4),用聚氨酯反应袋(7)卷缠在瓦斯抽采管(8)前、中、后三个部位,同时将长注浆管(5) 和短注浆管(4)分别固定在瓦斯抽采管(8)的中、后两个部位,长注浆管(5)的前端部伸入前间隔段L3内,短注浆管(4) 的前端部伸入后间隔段L2内;
b.在聚氨酯反应袋(7)反应之前,将卷缠有聚氨酯反应袋(7)的瓦斯抽采管(8)和注浆管(4-5)一并送入钻孔内,直至后部聚氨酯反应袋(7)距离孔口L1为1.5-2m处,在长注浆管(5)和短注浆管(4)的外露端分别用管路连接不同浆液的浆料罐(6);
c.待聚氨酯反应袋(7)膨胀后,开启浆料罐(6)与短注浆管(4)相连的控制阀,在井下压风(3)气流内的作用下,通过短注浆管(4)将浆料罐(6)中的膨胀水泥浆液(1)注入后间隔段L2内,直至注满,开启浆料罐(6)与长注浆管(5) 相连的控制阀,在井下压风(3)气流内的作用下,通过长注浆管(5) 将浆料罐(6)中的泥浆(2)注入前间隔段L3 ,直至注满,然后连接瓦斯抽采管网对钻孔(9)进行瓦斯抽采;
d. 经过24小时的瓦斯抽采之后,再次开启浆料罐(6),采用0.3~0.4 MPa的井下压风(3)不断地将浆料罐(6)中的膨胀水泥浆液(1)和泥浆(2)分别压入钻孔(9)内,直至膨胀水泥浆液(1)和泥浆(2)始终充满钻孔(9),实现动态密封。
2.根据权利要求1所述的本煤层近水平瓦斯抽采钻孔密封方法,其特征在于:所述的后间隔段L2长度为5.5-6.5m;所述的前间隔段L3的长度为3.5-4.5m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310122581.1A CN103195390B (zh) | 2013-04-10 | 2013-04-10 | 一种本煤层近水平瓦斯抽采钻孔密封方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310122581.1A CN103195390B (zh) | 2013-04-10 | 2013-04-10 | 一种本煤层近水平瓦斯抽采钻孔密封方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195390A CN103195390A (zh) | 2013-07-10 |
CN103195390B true CN103195390B (zh) | 2015-08-05 |
Family
ID=48718189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310122581.1A Expired - Fee Related CN103195390B (zh) | 2013-04-10 | 2013-04-10 | 一种本煤层近水平瓦斯抽采钻孔密封方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195390B (zh) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103993902B (zh) * | 2014-05-22 | 2016-04-27 | 中国矿业大学 | 一种瓦斯抽采钻孔两步注浆封孔方法 |
CN104314607B (zh) * | 2014-08-28 | 2016-06-08 | 太原理工大学 | 一种多阶段提高煤层钻孔瓦斯抽采浓度的方法 |
CN104533336B (zh) * | 2014-12-30 | 2017-01-18 | 华北科技学院 | 一种预注胶体密封松软煤层抽采钻孔的工艺与装置 |
CN104696007B (zh) * | 2015-02-03 | 2016-07-27 | 太原理工大学 | 一种在采煤过程中提高采空区瓦斯抽采浓度和流量的方法 |
CN105401974B (zh) * | 2015-12-23 | 2017-11-03 | 山东科技大学 | 一种瓦斯智能抽采系统及方法 |
CN108104865B (zh) * | 2017-11-28 | 2019-06-11 | 中国矿业大学 | 一种顺层钻孔防漏风瓦斯抽采方法 |
CN108278096B (zh) * | 2018-03-29 | 2024-07-09 | 焦作市美格安矿业科技有限公司 | 一种煤层底板穿层钻孔动态自适应封孔装置及方法 |
CN108468529A (zh) * | 2018-05-23 | 2018-08-31 | 山西潞安环保能源开发股份有限公司常村煤矿 | 一种煤矿瓦斯抽采钻孔压风密封方法及装置 |
CN108757011A (zh) * | 2018-07-13 | 2018-11-06 | 中国矿业大学(北京) | 一种基于正-负压封堵结合的瓦斯钻孔封孔设备及方法 |
CN109458213A (zh) * | 2018-11-29 | 2019-03-12 | 河南焦煤能源有限公司 | 一种高位抽采巷底板自动检漏和堵漏方法 |
CN109681262B (zh) * | 2018-12-10 | 2020-08-07 | 中国矿业大学 | 一种提高破碎煤体中瓦斯钻孔抽采浓度的方法 |
CN110984906A (zh) * | 2019-11-13 | 2020-04-10 | 山西晋煤集团技术研究院有限责任公司 | 长距离测压孔带压注浆封孔法 |
CN111156049B (zh) * | 2020-02-24 | 2021-04-27 | 河南理工大学 | 一种煤矿瓦斯抽采装置 |
CN113153211A (zh) * | 2021-04-08 | 2021-07-23 | 煤炭科学研究总院 | 两堵两注封孔装置和封孔方法 |
CN115467638B (zh) * | 2022-08-15 | 2024-07-26 | 中煤科工集团沈阳研究院有限公司 | 一种煤矿井下瓦斯抽采钻孔快速封孔装置及封孔方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4065927A (en) * | 1975-01-20 | 1978-01-03 | Continental Oil Company | Method for blocking gas flow in a coal seam |
US4687060A (en) * | 1986-06-13 | 1987-08-18 | Methane Drainage Ventures | Production and grout liner for methane drainage in subterranean boreholes and method |
CN102140901A (zh) * | 2011-05-13 | 2011-08-03 | 中国矿业大学 | 一种耐高压钻孔密封方法 |
CN102628345A (zh) * | 2012-04-23 | 2012-08-08 | 中国矿业大学 | 一种高密封性的近水平钻孔密封方法 |
CN102900396A (zh) * | 2012-11-01 | 2013-01-30 | 中国矿业大学 | 煤层瓦斯抽采钻孔封隔一体封孔方法 |
CN102913273A (zh) * | 2012-10-31 | 2013-02-06 | 中国矿业大学 | 一种煤矿自主式动态封孔瓦斯抽采智能系统 |
-
2013
- 2013-04-10 CN CN201310122581.1A patent/CN103195390B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4065927A (en) * | 1975-01-20 | 1978-01-03 | Continental Oil Company | Method for blocking gas flow in a coal seam |
US4687060A (en) * | 1986-06-13 | 1987-08-18 | Methane Drainage Ventures | Production and grout liner for methane drainage in subterranean boreholes and method |
CN102140901A (zh) * | 2011-05-13 | 2011-08-03 | 中国矿业大学 | 一种耐高压钻孔密封方法 |
CN102628345A (zh) * | 2012-04-23 | 2012-08-08 | 中国矿业大学 | 一种高密封性的近水平钻孔密封方法 |
CN102913273A (zh) * | 2012-10-31 | 2013-02-06 | 中国矿业大学 | 一种煤矿自主式动态封孔瓦斯抽采智能系统 |
CN102900396A (zh) * | 2012-11-01 | 2013-01-30 | 中国矿业大学 | 煤层瓦斯抽采钻孔封隔一体封孔方法 |
Non-Patent Citations (3)
Title |
---|
新型耐高压钻孔密封方法试验研究;高亚斌,林柏泉等;《中国煤炭》;20130222;第39卷(第2期);第81-83页 * |
钻孔密封机理及新型煤层瓦斯压力测定技术研究;刘三钧,林柏泉等;《中国煤炭》;20091022;第35卷(第10期);第96-99页 * |
高瓦斯低透气性煤层近水平钻孔高密封性;郑春山,林柏泉等;《煤矿安全》;20121031;第43卷(第10期);第56-60页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103195390A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195390B (zh) | 一种本煤层近水平瓦斯抽采钻孔密封方法 | |
CN102704984B (zh) | 一种钻孔高浓度瓦斯的抽排采方法及其装置 | |
CN103075179B (zh) | 本煤层瓦斯抽采钻孔双管抽采方法 | |
CN206722798U (zh) | 一种组合式煤层注水压裂及瓦斯抽采一体封孔装置 | |
CN105756599A (zh) | 煤矿用两头气堵及中间水封穿层钻孔封孔装置及封孔方法 | |
CN102937011B (zh) | 瓦斯抽采钻孔群区域性裂隙场二次注浆封堵装置及方法 | |
CN104234740B (zh) | 一种低中压空气驱替高压煤层瓦斯系统及其方法 | |
CN205063929U (zh) | 一种煤矿井下封压一体化分段水力压裂装置 | |
CN108278096B (zh) | 一种煤层底板穿层钻孔动态自适应封孔装置及方法 | |
CN108104865B (zh) | 一种顺层钻孔防漏风瓦斯抽采方法 | |
CN103912302B (zh) | 一种穿层钻孔水力破裂瓦斯抽采方法 | |
CN202250166U (zh) | 二次高压注浆封孔器 | |
AU2019201471B2 (en) | High-pressure self-locking packer and setting method thereof | |
CN102704905A (zh) | 分段水力压裂煤层卸压装置及卸压方法 | |
CN102996159A (zh) | 一种瓦斯抽采钻孔多相介质封堵装置及方法 | |
CN103993902B (zh) | 一种瓦斯抽采钻孔两步注浆封孔方法 | |
CN111911225B (zh) | 一种顺煤层钻孔钻进注水一体化装置及方法 | |
CN102200002A (zh) | 上向孔分段高压封孔方法及装置 | |
CN202946188U (zh) | 一种瓦斯抽采钻孔多相介质封堵装置 | |
CN104963670A (zh) | 一种用于井下煤层钻孔的孔内体积膨胀增透的方法 | |
CN109098750B (zh) | 一种井下瓦斯抽采孔兼作煤层注水孔的装置及施工方法 | |
CN103557012A (zh) | 一种大变形巷道围岩注浆紧固承载结构及施工方法 | |
CN103195470B (zh) | 钻孔施工瓦斯涌出收集装置 | |
CN106930746A (zh) | 钻孔丙酮侵袭与水力压裂相结合的交替式煤层增透方法 | |
CN105156067A (zh) | 煤矿井下水力压裂钻孔封孔装置及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20160410 |
|
CF01 | Termination of patent right due to non-payment of annual fee |