CN106911110A - A kind of distribution box support component and the utilization direct pre-embedded construction method of the component - Google Patents
A kind of distribution box support component and the utilization direct pre-embedded construction method of the component Download PDFInfo
- Publication number
- CN106911110A CN106911110A CN201710078200.2A CN201710078200A CN106911110A CN 106911110 A CN106911110 A CN 106911110A CN 201710078200 A CN201710078200 A CN 201710078200A CN 106911110 A CN106911110 A CN 106911110A
- Authority
- CN
- China
- Prior art keywords
- distribution box
- support
- bolt
- component
- backboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/08—Distribution boxes; Connection or junction boxes
- H02G3/12—Distribution boxes; Connection or junction boxes for flush mounting
- H02G3/121—Distribution boxes; Connection or junction boxes for flush mounting in plain walls
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to the realm of building construction, especially disclose a kind of distribution box support component and utilize the direct pre-embedded construction method of the component.The technical solution adopted by the present invention is:A kind of distribution box support component and the utilization direct pre-embedded construction method of the component, including it is arranged on the adjustable bolt support component inside distribution box, support frame and the multiple U-shaped support being arranged on the outside of the distribution box backboard;The adjustable bolt support component includes two vertically disposed bolt supports, and one of bolt support supports the upper lower wall of distribution box, the left and right wall of another bolt support distribution box;Support frame as described above is arranged on backboard;Support bar is fixedly installed between support frame as described above center and two bolt support crosspoints.The present invention have it is pre-buried in place, the characteristics of acceptable quality level is high.
Description
Technical field
The present invention relates to the realm of building construction, especially disclose a kind of distribution box support component and utilize the component direct
Pre-embedded construction method.
Background technology
In building electric installation engineering, generally there is a forceful electric power particularly in colony's residential project, in each resident family
Distribution box and a light current distribution box, the installing engineering amount of electric distribution box are very big, and need to coordinate with structure construction, intersect,
Duration tight task weight, general traditional method is, using the method for reserving hole, to need to carry out during structure construction to make pre- with molding
Stay box, this way easily causes pre-buried hole and situations such as dimensional discrepancy, displacement easily occurs, not only reserved opening quality compared with
Card is difficult to ensure, also needs to carry out reserved opening joint filling repairing after casing installation, it is time-consuming, eventually cause the lengthening of overall duration
And the increase of cost.
The content of the invention
The present invention overcomes the shortcomings of that prior art is present, there is provided it is a kind of once it is pre-buried in place, acceptable quality level distribution high
Case support component and the utilization direct pre-embedded construction method of the component.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of distribution box support component, including set
Put the adjustable bolt support component inside distribution box, support frame and the multiple U-shaped branch being arranged on the outside of the distribution box backboard
Frame;The adjustable bolt support component includes two vertically disposed bolt supports, and one of bolt support support is matched somebody with somebody
The upper lower wall of electronic box, the left and right wall of another bolt support distribution box;Support frame as described above is arranged on backboard;In support frame as described above
Support bar is fixedly installed between the heart and two bolt support crosspoints.
Using a kind of direct pre-embedded construction method of distribution box support component, comprise the following steps:
Step one:Distribution box position is determined according to design attitude, to distribution box and surrounding reinforcing bar colligation, fixed position;
Step 2:Described two bolts are vertically installed in inside distribution box, one of bolt support support distribution box
Upper lower wall, another bolt support supports the left and right wall of distribution box, and adjustment bolt holds out against distribution box, can not be screwed onto during reinforcing
Tightly distribution box body is caused to deform, the too loose effect for not having distribution box that can not also twist, deformation is less than 2mm;
Step 3:Support frame is set on backboard inside distribution box;
Step 4:The support frame center weld support that the two bolt support crosspoints set in step 2 are set with step 3
Bar;
Step 5:Multiple U-shaped supports are welded on the outside of the distribution box backboard;Distribution box is fixed on steel by multiple U-shaped supports
On rib component;
Step 6:The wet cotton yarn bag of filling or wet saw end yarn bag in the distribution box;
Step 7:The distribution box is blocked with front shroud.
Preferably, in the step 2, make in the angle steel of contact jaw Dian ∟ 50 of two bolt supports and distribution box
Backing plate.
The present invention has following beneficial effect compared with prior art:
The present invention can realize distribution box once it is pre-buried in place, reduce the secondary filling-up hole of civil engineering unit bother or leave cavity
Hidden danger, reduces hollowing, the crack at distribution box hole, improves Structural Engineering quality;And it is high to install acceptable quality level.
Brief description of the drawings
Fig. 1 is a kind of distribution box inside support component structural representation;
Fig. 2 is a kind of distribution box back-supported modular construction schematic diagram;
Fig. 3 is a kind of distribution box and the structural representation of front shroud 8.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the invention is described in further detail, is below implemented
Example is not limited to the scope of the present invention for illustrating the present invention.
It is as Figure 1-3 a kind of distribution box support component, including is arranged on the adjustable bolt support group inside distribution box 6
Part, support frame 2 and the multiple U-shaped support 7 being arranged on the outside of the backboard of distribution box 6;Adjustable bolt support component includes two vertically
The bolt support 4 of setting, one of bolt support 4 is vertically arranged, and supports the upper lower wall of distribution box 6, another bolt
The horizontally set of support member 4, supports the left and right wall of distribution box 6;Support frame 2 is arranged on backboard;As preferred embodiment, prop up
Support 2 uses cross angle steel support frame;
Support bar 3 is fixedly installed between the center of support frame 2 and two bolt crosspoints;Support distribution box 6 backboard is offset outside
Stress;
Used as preferred embodiment, by taking the heavy current box of 550*450mm as an example, the angle steel of Cai Yong ∟ 50 makees backing plate, uses Liang Kuai ∟
50 angle steel customize cross supporting frame, using 16 reinforcing bars as support bar, the U-shaped support made using 8 round steel.
Comprised the following steps using a kind of direct pre-embedded construction method of distribution box support component:
Step one:The position of distribution box 6 is determined according to design attitude, to distribution box 6 and surrounding reinforcing bar colligation, fixed position;
During construction, at the scene by design height, levelling, positioning are constructed with civil engineering reinforcement installation and are coordinated, according to the size of distribution box 6
Same box sizes installation site is reserved when wall steel bar is installed, it is ensured that casing installation site is accurate;
Reinforcing bar and casing must not weld together when distribution box 6 is installed, and casing level is controlled with horizon rule, and messenger wire ensures that casing hangs down
Directly, after box location correction, the stiffener colligation on request of casing surrounding fixes the position of distribution box 6;
After fixation, connection wiring pipe adds locknut to distribution box 6 on request, is blocked with plug, and tape-stripping prevents coagulation
Soil paste enters casing;
Step 2:Two bolt supports 4 are vertically installed in inside distribution box 6, the support distribution of one of bolt support 4
The upper lower wall of case 6, another bolt support 4 supports the left and right wall of distribution box 6, and adjustment bolt holds out against distribution box 6, and deformation is less than
2mm;Wherein, bolt support 4 can be using 16 adjustable bolts of customization, as preferred embodiment, in two bolt supports
The angle steel 5 of contact jaw Dian You ∟ 50 of part 4 and distribution box 6.
Step 3:Support frame 2 is set on the inside backboard of distribution box 6;
Step 4:The center weld branch of support frame 2 that two crosspoints of bolt support 4 set in step 2 are set with step 3
Strut 3;
Step 5:Multiple U-shaped supports 7 are welded on the outside of the backboard of distribution box 6;Distribution box 6 is fixed on steel by multiple U-shaped supports 7
On rib component 1;
Step 6:The wet cotton yarn bag of filling or wet saw end yarn bag in distribution box 6;
Step 7:The distribution box 6 is blocked with front shroud 8.
Draw the sawdust yarn bag in distribution box after form removal clearly in time, spool is checked one by one, find the treatment in time of stifled place.Together
When, distribution box 6 must be to be processed order in the earth excavation stage, must be marched into the arena before professional construction development, otherwise this side
Case cannot carry out, and when agent structure forms continuous productive process, the prefabricated of distribution box shell must be carried out in advance, and structure is not caught up with otherwise
Progress, it is impossible to pre-buried installation.
Present invention practical application in Northcentral University's work of renovating shantytowns project, Northcentral University shanty town is located at Taiyuan
In Northcentral University of city campus, engineering is nine residential buildings, and nine houses are the floor of underground two, ground eleventh floor, and building height is
34.35m, residential building gross floors area is 79983.21 square meters, is shear wall structure, and the engineering strong, weak electricity case installs the scale of construction greatly,
Owner requires high.
The engineering amounts to 660 strong, weak electricity casees of pre-buried installation, and installs an acceptance(check).
After the completion of Embedment Construction, checked and accepted through Party A and supervisor, distribution box does not have damaged part, meeting specification will
Ask, meet design requirement.
The support component that the construction method is used can be used in turn, and processing is simple and convenient to operate, and does not produce waste material, green
Environmental protection.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, although with reference to foregoing reality
Apply example to be described in detail the present invention, for a person skilled in the art, it still can be to foregoing each implementation
Technical scheme described in example is modified, or equivalent is carried out to which part technical characteristic, all in essence of the invention
Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.
Claims (3)
1. a kind of distribution box support component, it is characterised in that:Including being arranged on distribution box(6)Internal adjustable bolt support group
Part, support frame(2)Be arranged on the distribution box(6)Multiple U-shaped support on the outside of backboard(7);The adjustable bolt support group
Part includes two vertically disposed bolt supports(4), one of bolt support(4)Support distribution box(6)Upper lower wall,
Another bolt(4)Support distribution box(6)Left and right wall;Support frame as described above(2)It is arranged on backboard;Support frame as described above(2)In
Support bar is fixedly installed between the heart and two bolt support crosspoints(3).
2. using a kind of direct pre-embedded construction method of distribution box support component as claimed in claim 1, it is characterised in that including
Following steps:
Step one:Distribution box is determined according to design attitude(6)Position, to distribution box(6)With reinforcing bar colligation around, fixed position;
Step 2:Described two bolts are vertically installed in distribution box(6)Inside, one of bolt support(4)Support is matched somebody with somebody
Electronic box(6)Upper lower wall, another bolt support(4)Support distribution box(6)Left and right wall, adjustment bolt holds out against distribution box
(6), deformation is less than 2mm;
Step 3:In distribution box(6)Support frame is set on internal backboard(2);
Step 4:In two bolt supports that step 2 is set(4)The support frame that crosspoint is set with step 3(2)Weld at center
Connect support bar(3);
Step 5:In the distribution box(6)The multiple U-shaped supports of backboard outside welding(7);Distribution box(6)By multiple U-shaped supports
(7)It is fixed on reinforcement component(1)On;
Step 6:The distribution box(6)The interior wet cotton yarn bag of filling or wet saw end yarn bag;
Step 7:Use front shroud(8)Block the distribution box(6).
3. a kind of direct pre-embedded construction method of distribution box support component is utilized as claimed in claim 2, it is characterised in that:It is described
In step 2, in two bolt supports(4)With distribution box(6)The angle steel of contact jaw Dian You ∟ 50 make backing plate(5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710078200.2A CN106911110A (en) | 2017-02-14 | 2017-02-14 | A kind of distribution box support component and the utilization direct pre-embedded construction method of the component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710078200.2A CN106911110A (en) | 2017-02-14 | 2017-02-14 | A kind of distribution box support component and the utilization direct pre-embedded construction method of the component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106911110A true CN106911110A (en) | 2017-06-30 |
Family
ID=59208151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710078200.2A Pending CN106911110A (en) | 2017-02-14 | 2017-02-14 | A kind of distribution box support component and the utilization direct pre-embedded construction method of the component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106911110A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107706012A (en) * | 2017-11-01 | 2018-02-16 | 重庆优优新材料有限公司 | One kind can position-sensing switch box |
CN107731585A (en) * | 2017-11-01 | 2018-02-23 | 重庆优优新材料有限公司 | A kind of position-sensing switch box |
CN110474271A (en) * | 2019-08-21 | 2019-11-19 | 云南建投第十一建设有限公司 | The construction method of fixing concrete shear wall distribution box body |
CN111636683A (en) * | 2020-06-01 | 2020-09-08 | 中天华南建设投资集团有限公司 | Complete method for embedding indoor electric box |
CN111779268A (en) * | 2020-06-19 | 2020-10-16 | 中建四局安装工程有限公司 | Construction method for synchronously pre-embedding and molding finished electric box along with main body structure |
CN111997367A (en) * | 2020-09-04 | 2020-11-27 | 刘建 | Construction method for embedding back-plate-free surface frame |
CN112996298A (en) * | 2019-12-02 | 2021-06-18 | 武汉凯飞通信科技有限公司 | Anti-earth potential counterattack box |
CN113027129A (en) * | 2021-03-24 | 2021-06-25 | 甘肃建投建设有限公司 | Embedded integrated distribution box and construction method |
CN114215350A (en) * | 2021-12-02 | 2022-03-22 | 中冶天工集团有限公司 | Internal supporting device for concrete wall buried distribution box and using method of internal supporting device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100675522B1 (en) * | 2006-09-01 | 2007-01-30 | 주식회사 티씨엠씨건축사사무소 | Support structure of terminal box for building |
KR100719232B1 (en) * | 2007-02-07 | 2007-05-18 | (주)종합엔지니어링다인 | Fixing structure of electric terminal box for building |
CN202454909U (en) * | 2011-12-28 | 2012-09-26 | 厦门源昌城建集团有限公司 | Adjustable support device inside pre-embedded distribution box |
CN203475830U (en) * | 2013-09-24 | 2014-03-12 | 中国新兴保信建设总公司 | Distribution box installation combination supporting mold |
CN103806651A (en) * | 2012-05-24 | 2014-05-21 | 成都市第四建筑工程公司 | Bridge embedded part and method for installing bridge through bridge embedded part |
CN104563499A (en) * | 2014-12-28 | 2015-04-29 | 陕西建工第三建设集团有限公司 | Three-direction-adjustable combined rod type inner supporting tool and construction method and application thereof |
CN106049870A (en) * | 2016-08-13 | 2016-10-26 | 甘肃第三建设集团公司 | Construction method for embedding concealed box bodies in shear walls during building construction |
-
2017
- 2017-02-14 CN CN201710078200.2A patent/CN106911110A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100675522B1 (en) * | 2006-09-01 | 2007-01-30 | 주식회사 티씨엠씨건축사사무소 | Support structure of terminal box for building |
KR100719232B1 (en) * | 2007-02-07 | 2007-05-18 | (주)종합엔지니어링다인 | Fixing structure of electric terminal box for building |
CN202454909U (en) * | 2011-12-28 | 2012-09-26 | 厦门源昌城建集团有限公司 | Adjustable support device inside pre-embedded distribution box |
CN103806651A (en) * | 2012-05-24 | 2014-05-21 | 成都市第四建筑工程公司 | Bridge embedded part and method for installing bridge through bridge embedded part |
CN203475830U (en) * | 2013-09-24 | 2014-03-12 | 中国新兴保信建设总公司 | Distribution box installation combination supporting mold |
CN104563499A (en) * | 2014-12-28 | 2015-04-29 | 陕西建工第三建设集团有限公司 | Three-direction-adjustable combined rod type inner supporting tool and construction method and application thereof |
CN106049870A (en) * | 2016-08-13 | 2016-10-26 | 甘肃第三建设集团公司 | Construction method for embedding concealed box bodies in shear walls during building construction |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107706012A (en) * | 2017-11-01 | 2018-02-16 | 重庆优优新材料有限公司 | One kind can position-sensing switch box |
CN107731585A (en) * | 2017-11-01 | 2018-02-23 | 重庆优优新材料有限公司 | A kind of position-sensing switch box |
CN110474271A (en) * | 2019-08-21 | 2019-11-19 | 云南建投第十一建设有限公司 | The construction method of fixing concrete shear wall distribution box body |
CN112996298A (en) * | 2019-12-02 | 2021-06-18 | 武汉凯飞通信科技有限公司 | Anti-earth potential counterattack box |
CN112996298B (en) * | 2019-12-02 | 2022-10-04 | 武汉凯飞通信科技有限公司 | Anti-earth potential counterattack box |
CN111636683A (en) * | 2020-06-01 | 2020-09-08 | 中天华南建设投资集团有限公司 | Complete method for embedding indoor electric box |
CN111779268A (en) * | 2020-06-19 | 2020-10-16 | 中建四局安装工程有限公司 | Construction method for synchronously pre-embedding and molding finished electric box along with main body structure |
CN111779268B (en) * | 2020-06-19 | 2021-09-17 | 中建四局安装工程有限公司 | Construction method for synchronously pre-embedding and molding finished electric box along with main body structure |
CN111997367A (en) * | 2020-09-04 | 2020-11-27 | 刘建 | Construction method for embedding back-plate-free surface frame |
CN113027129A (en) * | 2021-03-24 | 2021-06-25 | 甘肃建投建设有限公司 | Embedded integrated distribution box and construction method |
CN114215350A (en) * | 2021-12-02 | 2022-03-22 | 中冶天工集团有限公司 | Internal supporting device for concrete wall buried distribution box and using method of internal supporting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106911110A (en) | A kind of distribution box support component and the utilization direct pre-embedded construction method of the component | |
CN106049870B (en) | It is a kind of to be used to secretly bury the pre-buried construction method of babinet in construction shear wall | |
CN108798059A (en) | A kind of old masonry seismic reinforcing structure and construction method | |
CN110080419A (en) | Assembled integral shear wall and its construction method | |
CN103628571B (en) | Beam-column joint for reverse construction method and construction method | |
CN207277541U (en) | Prefabricated component and cast-in-place column assembled integral concrete frame structure | |
CN106988303A (en) | A kind of pile foundation and its construction method | |
CN109797777A (en) | Assembled is constructed from sealing underground pipe gallery and construction method | |
CN208881618U (en) | Charging pile prefabricated armored concrete firm banking | |
CN205502616U (en) | Be applied to and face frontier defense guardrail in construction of large tracts of land floor template | |
CN107965139A (en) | The plate face drop readily removable combined type of plate difference of height hangs die body system and construction method | |
CN107558487A (en) | A kind of goaf transmission line foundation bracing means and reinforcement means | |
CN115828381A (en) | Power distribution room foundation design method convenient for correcting inclination | |
CN105178451A (en) | Corrosion-resistant structure of assembled building exterior wall dry hanging node and construction method of corrosion-resistant structure | |
CN215443391U (en) | Transmission line and 5G communication sharing steel pipe pole | |
CN214940212U (en) | Deep foundation pit supporting device | |
CN212507061U (en) | Structure column of early and late construction structure | |
CN114016518A (en) | Underground foundation pit V-shaped column and construction method thereof | |
CN106013097A (en) | In-situ construction shaping formwork for large-diameter ultra-long pile reinforcement cage of abrupt slope of mountainous area and construction method | |
CN207452944U (en) | Buried equipment room | |
CN209637263U (en) | Additional lateral resisting Cable Structure for reinforcing masonry structure | |
CN205152973U (en) | Root stake | |
CN105421671B (en) | A kind of positive kiss modelled after an antique and its installation method | |
CN114622766B (en) | Construction method of lightning protection tower | |
CN216042545U (en) | Hanging basket penetrating and climbing frame structure for construction of high-rise building outer wall finish coat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170630 |